This is a phasing plan drawing for the Kenai Lake Work Center Heated Storage Building project located at the Chugach National Forest, Seward Ranger District, under the United States Department of Agriculture Forest Service Region Ten (R-10). The document, dated September 17, 2021, is an architectural site plan with project number 6960.021, drawn by T. Francis and checked by B. Elkins.

The phasing plan outlines six construction phases scheduled across multiple years: Phase A encompasses utilities and decommissioning of mess hall and cabins (A-1, completed 2024) and utility installation (A-2, completed 2024); Phase B involves office building expansion including realignment and construction of service road and parking (B-1), construction of new office building with interior renovation and parking modifications (B-2), construction of southern parking area (B-3), relocation of staff from modular office building to new expansion (B-4), and construction of remaining parking area (B-5); Phase C addresses the proposed heated storage building with site grading (C-1), building construction (C-2), and perimeter fence installation (C-3); Phase D encompasses a proposed pole barn with slab and structure construction (D-1) and optional perimeter fence (D-2); Phase E includes future construction of a second pole barn (E-1); and Phase F provides for future construction of a second heated storage building (F-1). The site plan indicates existing facilities including ranger station spur, carpenter's shop, equipment storage, warehouse, flex-housing units, and dormitories, with a proposed gate location marked on the property boundary. The document notes that phases may be reordered as needed by Forest Service requirements.

View the file

Other files for this federal contract opportunity

Other files attached to Kenai Lake Work Center Storage and Security, newest first.
File Type Posted
C-4 Seward Electric Estimate.pdf PDF
C-2 Attachment 3-2 Updated Location and Drainage.pdf PDF
C-2 Attachment 8 Geotechnical Memo.pdf PDF
C-3 QA 1240BJ26Q0003.docx DOCX document
C-3 QA 1240BJ26Q0003.docx DOCX document
C-1 RFQ 1240BJ26Q0003 - Kenai Lake Work Center Storage and Security.pdf PDF
C-2 Attachment 7 Bid Bond SF24.pdf PDF
C-2 Attachment 1 SOW.pdf PDF
C-2 Attachment 5 Wage Determination Construction.pdf PDF
C-2 Attachment 2 Specifications.pdf PDF
C-2 Attachment 3 Pole Barn Plans.pdf PDF
C-2 Attachment 4 Map.jpg JPG image
C-2 Attachment 6 Quote.docx DOCX document
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

9/1 5/2

1 1 4:

L

EX

I F

:\6

0.0

K

EN

AI

L

AK

E

W

OR

K

CE

NT

ER

A

E D

ES

IG

N\

DW

G\

PH

AS

IN

G

PL

AN

\69

.02

1_

PH

AS

IN

G

PL

AN

.D

W G;

PHASING PLAN

C1.2

DRAWING

TITLE

PROJECT NAME

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OF

SHEET

United States Department of Agriculture Forest Service

(R-10)

REGION TEN

KENAI LAKE

WORK CENTER

HEATED STORAGE

BUILDING

CHUGACH NATIONAL

FOREST

SEWARD

RANGER DISTRICT

SEPTEMBER 17, 2021

T. FRANCIS

T. FRANCIS

B. ELKINS

6960.021

RANGER STATION SPUR

SM

O

KE

Y

LA

NE

PICKAROON LOOP

CARPENTER’S SHOP

EQUIPMENT

STORAGE

KENAI

LAKE

OFFICE

33419

Pickaroon

Loop Seward, AK 99664

KLWC

OFFICE

EXPANSION

NO

RT

H

DO

RM

SOUTH

DORM

LEO

W

AREHOUSE

RESIDENCE

FLEX-HOUSING UNIT

RAIL LINE

PROPOSED

GATE LOCATION

C-3 / D-2

B-1

B-1

B-1

A-1

A-1

A-1

C-1

C-2

D-1

E-1

F-1

B-2 A-2

A-2

A-2

A-2

B-3

B-4

B-5

PHASING NOTES*

REALIGNMENT & CONSTRUCTION OF SERVICE ROAD

AND PUBLIC PARKING LOT/CUL-DE-SAC

CONSTRUCTION OF NEW BUILDING & REMODEL OF

EXISTING OFFICE INTERIOR (EMPLOYEE PARKING

SHIFTED TO GRAVEL YARD OR OTHER LOCATION)

CONSTRUCTION OF SOUTHERN PARKING AREA

RELOCATE STAFF FROM MODULAR OFFICE

BUILDING TO NEW KLWC OFFICE EXPANSION

AND DECOMMISSION MODULAR BUILDING

AND SEPTIC SYSTEM

CONSTRUCTION OF REMAINING PARKING AREA

DECOMMISSION MESS HALL,

29423 SMOKEY LANE, AND CABINS

(COMPLETED 2024)

UTILITY INSTALLATION (COMPLETED 2024)

GRADING OF SITE TO ACCOMMODATE BUILDING

PADS OF PROPOSED AND FUTURE BUILDINGS WITH

DRAINAGE SWALE THROUGH THE MIDDLE

CONSTRUCTION OF HEATED STORAGE BUILDING

OPTION 1 - PERIMETER FENCE

(C-3 OPTION 1 IS THE SAME OPTION ITEM SCOPE NOTED BELOW

IN D-2 - SEE SPECIFICATION SECTION 01 10 00 “SUMMARY OF

WORK” FOR ADDITIONAL INFORMATION)

CONSTRUCTION OF SLAB AND POLE BARN

OPTION 1 - PERIMETER FENCE

(D-2 OPTION 1 IS THE SAME OPTION ITEM SCOPE NOTED ABOVE IN

C-3 - SEE SPECIFICATION SECTION 01 10 00 “SUMMARY OF WORK”

FOR ADDITIONAL INFORMATION)

CONSTRUCT SECOND POLE BARN

CONSTRUCT SECOND HEATED STORAGE BUILDING

*PHASES MAY BE REORDERED AS NEEDED BY FOREST SERVICE

PHASE B: OFFICE BUILDING EXPANSION

PHASE A : UTILITIES

PHASE C: HEATED STORAGE (PROPOSED)

PHASE D: POLE BARN (PROPOSED)

PHASE E: POLE BARN (FUTURE)

PHASE F: HEATED STORAGE BUILDING (FUTURE)

B-1

A-1

C-1

C-2

C-3

D-1

E-1

F-1

D-2

B-2

A-2

B-3

B-4

B-5

File details come from the government source that posted it. Updated .