About this file

This is a site layout and architectural drawing for the Kenai Lake Work Center Pole Barn project located within the Chugach National Forest, Seward Ranger District, administered by the United States Department of Agriculture Forest Service Region Ten. The drawing, dated September 17, 2021, depicts a phased construction approach for a heated storage building and associated infrastructure on a site measuring approximately 127.0 feet by 39.3 feet with a 16.0-foot concrete apron.

The project includes a pole barn structure with a finish floor elevation of 458.00 feet, chainlink security fencing measuring 437.00 feet by 247.00 feet (designated as Option Item 1 contingent on separate project funding), a 12-foot chain link rolling gate 4 feet wide, and gravel surfacing within the storage yard. Key work requirements include drainage swale construction on the north, south, and east sides of the structure, removal of a perforated pipe from the foundation scope, electrical service coordination with Seward Electric (with the contractor responsible for work downstream from electrical meters only), internet service installation to a Liftmaster SL595 gate unit via previously installed 3-inch conduit, and new water and sewer infrastructure construction to serve the heated storage building. The drawing specifies that site grading for the storage yard does not occur under this contract, that heated storage and future buildings are constructed separately under a phased approach dependent on project-specific funding, and that security fence installation is dependent on separate project phasing per Specification Section 011000.

View the file

Other files for this federal contract opportunity

Other files attached to Kenai Lake Work Center Storage and Security, newest first.
File Type Posted
C-4 Seward Electric Estimate.pdf PDF
C-2 Attachment 8 Geotechnical Memo.pdf PDF
C-3 QA 1240BJ26Q0003.docx DOCX document
C-3 QA 1240BJ26Q0003.docx DOCX document
C-1 RFQ 1240BJ26Q0003 - Kenai Lake Work Center Storage and Security.pdf PDF
C-2 Attachment 3-1 Updated Phasing Plan.pdf PDF
C-2 Attachment 7 Bid Bond SF24.pdf PDF
C-2 Attachment 1 SOW.pdf PDF
C-2 Attachment 5 Wage Determination Construction.pdf PDF
C-2 Attachment 2 Specifications.pdf PDF
C-2 Attachment 3 Pole Barn Plans.pdf PDF
C-2 Attachment 4 Map.jpg JPG image
C-2 Attachment 6 Quote.docx DOCX document
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UG

P

UG

P

UG

P

U G

P

UGP

UGP

UGP

UGP

UGP

UGP

UGP

UG

P

UG

P

U G

P U G

P

UGP

UGP

UGP

UGP

UGP

UGP

UGP UGP

UGP

UGP

U G P

U G

T

U G T

U G T

U G T

UGT

UGT

U G T

U G T

U G T

U G T

U G T

U G T

U G T

UG

T

UG

T

U G T

U G T

U G T

U G T

UGT

UGT

UGT

W W

W

W

W

W

W

W

W

W

WWWW

W

W

W W

W W

W W

W W

O H P

O H P

O H P

O H P

O H P

O H P

O H P

O H P

O H P

O H P

O H P

O H P

O H P

O H P

O H P

O H P

O H P

O H P

O H P

O H P

O H P

W

W

W

W

OHT

OHT

OHT

OHT

OHT

OHT OHT

OHT

U G

P

U G P

UGP

U G

T U G

T U G

T U G

T U G

T U G

T

TJ

U G T

U G T

U G T

U G T

U G T

UG

T

U G T

U G T

U G T

ES ES

ES

ES ES ES ES ES ES ES

EJ

FT

FT

FT

FT

FT

FT

O H T

O H T

O H T

O H T

O H T

O H T

O H T

O H T

O H T

O H T

O H T

O H T

O H T

O H T

O H T

O H T

O H T

O H T

O H T

O H T

O H T

O H T

O H T

E

W

EW

EW

S

X

12FT CHAIN LINK

ROLLING GATE

4' WIDE 6" CONCRETE

APRON

9/1 5/2

1 1 6:

T

YL

ER

.F

RA

NC

IS

F :\6

0.0

K

EN

AI

L

AK

E W

OR

K

CE

NT

ER

A

E

D

ES

IG

N\

DW

G\

4.0 P

OL

E

BA

RN

\69

.02 1_

PO

LE

B

AR

N_

SH

EE

TS

.D W

G;

DRAWING

TITLE

PROJECT NAME

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OF

SHEET

United States Department of Agriculture Forest Service

(R-10)

REGION TEN

KENAI LAKE

WORK CENTER

POLE BARN

CHUGACH NATIONAL

FOREST

SEWARD

RANGER DISTRICT

September 17, 2021

TJF

TJF

BJE

6960.021

SITE LAYOUT

C2.0

N

SCALE IN FEET

0 25 50

STORAGE

YARD

EXISTING PUMP HOUSE

FOR WATER DISTRIBUTION SYSTEM

NEW WATER AND SEWER

INFRASTRUCTURE TO BE

CONSTRUCTED BEFORE

HEATED STORAGE

BUILDING

HEATED

STORAGE

(NOT IN

CONTRACT)

POLE BARN

FF=458.00

FUTURE

POLE BARN

(APPROXIMATE

LOCATION)

(NOT IN

CONTRACT)

FUTURE

HEATED

STORAGE

(APPROXIMATE

LOCATION)

(NOT IN

CONTRACT)

DRAINAGE SWALE

TO BE CONSTRUCTED

AS PART OF

SEPARATE CONTRACT

(TYP.)

NORTH DORM

NEW ELECTRICAL LAYOUT

TO BE PROVIDED BY

SEWARD ELECTRIC

GRAVEL

SURFACING

A

C2.2

C

S2.1

127.0'

39.3'

16.0'

6960.021_POLE BARN_SHEETS.dwg

C

C2.2

D

C2.2

AUTOMATIC ROLLING

SECURITY GATE

NOTES:

1. HEATED STORAGE AND FUTURE BUILDINGS TO BE

CONSTRUCTED SEPARATELY; PHASED APPROACHED FOR

CONSTRUCTION TIMELINE CONTINGENT ON PROJECT

SPECIFIC FUNDING. SEE SHEET C1.2 FOR PHASING

PLAN.

2. SECURITY FENCE INSTALLATION (OPTION ITEM 1)

DEPENDANT ON SEPARATE PROJECT PHASING. SEE

SPECIFICATION SECTION 011000.

3. SITE GRADING FOR THE STORAGE YARD DOES NOT

TAKE PLACE UNDER THIS CONTRACT; SEE SHEET C2.1

FOR STORAGE YARD GRADING AND DRAINAGE PLAN.

4. ALL ELECTRICAL RELOCATION WORK UPSTREAM FROM

ELECTRICAL METERS IS TO BE PERFORMED BY SEWARD

ELECTRIC. SEE SHEET E1.1 FOR ELECTRICAL SITE PLAN

FOR PROPOSED ELECTRICAL SERVICE ALIGNMENT. ALL

NEW ELECTRICAL SERVICE WORK IS TO BE

COORDINATED WITH SEWARD ELECTRIC.

CHAINLINK

SECURITY FENCE

CHAINLINK

SECURITY FENCE

437.00'

247.00'

B

C2.2

B

C2.2

GATE CONTROL KEYPAD

ON GOOSENECK POST

MOUNT

SECURITY FENCE NOTES:

1. SECURITY FENCE INSTALLATION (OPTION ITEM 1)

DEPENDANT ON SPECIFIC PROJECT FUNDING; SEE

SPECIFICATION SECTION 011000.

2. SECURITY FENCE TO NOT BE INSTALLED ALONG THE

BACKSIDE OF THE BUILDINGS (BACKSIDE OF

BUILDINGS TO BE FLUSH WITH FENCE); IF SECURITY

FENCE IS AWARDED IN THE POLE BARN PROJECT, THE

SECURITY FENCE SHALL BE REMOVED ALONG THE

BACKSIDE OF THE HEATED STORAGE BUILDING.

3. INTERNET SERVICE TO THE LIFTMASTER SL595 UNIT

TO BE INSTALLED IN PREVIOUSLY INSTALLED 3"

CONDUIT FROM THE KLO BUILDING; CONDUIT TO BE

INSTALLED IN PRIOR PHASE OF WORK.

erynboone Polygonal Line erynboone Callout Red box shows approximate location of pole barn if electrical transformer is not moved. This location shall be assumed for the base estimate.

erynboone Line erynboone Line erynboone Line erynboone Line erynboone Line erynboone Line erynboone Callout Contractor is to create drainage swales on the north, south, and east sides of the structure. Perf pipe at the foundation to be removed from the scope.

File details come from the government source that posted it. Updated .