C_1VIANG VD.pdf

PDF 12 KB Posted

Attached to
Virgin Islands Renewable Energy Systems Federal contract opportunity
Solicitation number
W50S93-20-B-5002-0001
Issued by
Department of the Army Michigan Army National Guard

About this file

This document contains a voltage drop calculation for a photovoltaic system project and the related federal contract opportunity solicitation. The voltage drop calculation specifies wire sizes and lengths for three PV circuits, with circuit one requiring 3/0 aluminum wire over 151 feet, circuit two requiring 1/0 aluminum wire over 220 feet, and circuit three requiring 1/0 aluminum wire over 574 feet. The related solicitation is for renewable energy systems in the U.S. Virgin Islands and seeks design and installation services. Offerors must submit proposals to the Department of the Army Michigan Army National Guard by September 30, 2020. The solicitation was amended to include additional design specifications and points of contact for site visits on St. Croix.

View the file

Other files for this federal contract opportunity

Other files attached to Virgin Islands Renewable Energy Systems, newest first.
File Type Posted
160861.20 - New Wind Turbine - Air National Guard Station - USVI - Geotechnical Report.pdf PDF
G-001-Layout1.pdf PDF
D_FAA FORMS.pdf PDF
C_62.5kW PV.pdf PDF
A1_WS-0001_P10-20.pdf PDF
Structural.pdf PDF
FAA 7460_Response.pdf PDF
C_Glare Report.pdf PDF
W50S93-20-B-5002-0001.pdf PDF
VIANG Renewable Energy_SPECS.pdf PDF
A5_PanelClaw.pdf PDF
A_CUT SHEETS.pdf PDF
C_20kW Wind Turbine.pdf PDF
Electrical.pdf PDF
C_1CUT SHEETS.pdf PDF
A2_sunmodule-plus-mono-5-busbar-datasheet.pdf PDF
A3_IQ6-IQ6-plus_DS_EN-US.pdf PDF
SANGB Base Access List.xlsx XLSX spreadsheet
A4_S-5.pdf PDF
New Wind Turbine USVI - Geotechnical Report.pdf PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VOLTAGE DROP (BUSSMANN METHOD)

PROJECT : VIANG PV System

JOB NO. : 1160634

DONE BY : Clifford

DATE : 9/19/2017

COMMENTS :

VOLTAGE = 208

PHASE = 3

POWER FACTOR (%) = 90

WIRE TYPE ( C / A ) : C

CONDUIT TYPE ( S / NM ) : NM

NAME

AMPS OR VA *

(AMPS) (VA)

WIRE

SIZE

LENGTH

(FEET)

Runs

TABLE

FACTOR

VD %VD

PV-110 39760 3/0 225 1 151 3.75 1.80

3080 10 228 1 1908 3.72 1.79

Total 1 3.59

PV-100 13440 1/0 369 1 220 3.03 1.46

3080 10 293 1 1908 4.78 2.30

Total 1 3.75

PV-107 12320 1/0 574 1 220 4.32 2.08

3080 10 176 1 1908 2.87 1.38

Total 1 3.46

* - YOU CAN ENTER EITHER AMPS OR VA. IF YOU HAVE VALUES FOR BOTH, THE PROGRAM WILL USE THE (AMPS) VALUE.

NOTE: FOR PARALLEL SETS OF CONDUCTORS, YOU MUST DIVIDE THE TOTAL AMPERAGE BY THE NUMBER OF SETS OF

CONDUCTORS TO GET THE (AMPS) VALUE TO USE IN THE TABLE ABOVE.

File details come from the government source that posted it. Updated .