Building 1916 T2 Warehouse Road Paving 2.26.2025 (002).pdf
PDF 2 MB Posted
- Solicitation number
- D9HFSCYSX833
- Issued by
-
Department of Energy
About this file
This document is a construction proposal for the U.S. Department of Energy's Building 1916, T2 located at 250 Warehouse Road in Oak Ridge, TN. The project involves stormwater drainage repair and parking lot asphalt re-sealing, with specific tasks including removing concrete to allow asphalt placement, reworking down spouts, and addressing various site improvements. Key project requirements include using no VOC paints and adhesives, protecting existing structures during construction, performing a visual inspection before cutting or drilling, and submitting shop drawings and product data for DOE approval. The site plan details include relocating compact parking spaces, identifying handicap access ramps, marking three parking bumper wheel stops, and addressing a damaged awning column. The project is scheduled for 2/26/2025, with the task order number still to be determined, and will be drawn by JDM.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1916 T2 QA 10.29.25.pdf | ||
| 1916-T2 ACOE Design Drawings Full Set 2.28.2025 SMALL.pdf | ||
| Statement of Work - 10.24.25.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Data
Data
Da ta
Window.
Window.
Disconnect
Battery Charger
GOV VISITOR VISITOR
Remove concrete to allow for asphalt placement.
STORM
DRAIN
Rework Down SpoutRework Down Spout
COMPACT COMPACT
GRAVEL/BROKEN PAVEMENT GRASS
GRASS
GRASS
GRASS
CONCRETE
U. S. DEPARTMENT OF ENERGY
Building 1916, T2
230 Warehouse Road
OAK RIDGE, TN 37830
DRAWING LEGEND
PAGE #1 COVER PAGE AND NOTES
PAGE #2 ASPHALT SEALING AND STRIPPING PLAN.
GENERAL NOTES
THE CONTRACTOR SHALL PERFORM ALL WORK IN ACCORDANCE WITH PREVAILING INDUSTRY
AND MOST CURRENT CODE STANDARDS AND MANUFACTURER'S GUIDELINES UNLESS THE
AGENCY'S REQUIRES THE CONTRACTOR TO ADHERE TO A HIGHER STANDARD. THE
CONTRACTOR SHALL NOTIFY THE CO AND THE COR OF ANY CONFLICTS BETWEEN THE
AGENCY'S REQUIREMENT AND INDUSTRY AND CODE STANDARDS OR THE MANUFACTURERS'
GUIDELINES AT LEAST 3 DAYS BEFORE INSTALLATION.
1. ENSURE WALLS, FLOORS, DOORS, TRIM, EQUIPMENT, ETCETERA, REMAIN COVERED AND
PROTECTED FROM DUST, DEBRIS AND CONSTRUCTION ACTIVITIES. KEEP THE JOB SITES
CLEAN AT ALL TIMES TO MAINTAIN A SAFE WORKING ENVIRONMENT.
2. PRIOR TO ANY CUTTING, DRILLING, SAWING, PERFORM A VISUAL INSPECTION TO ENSURE
NO ELECTRICAL, PLUMBING, HVAC, SPRINKLER LINES, ETCETERA ARE PRESENT.
3. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING MEASUREMENTS AND QUANTITIES.
4. CONTRACTOR SHALL REVIEW SHOP DRAWINGS FOR ACCURACY AND ENSURE
COMPLIANCE WITH THE CONTRACT DOCUMENTS PRIOR TO PRESENTING TO THE DOE FOR
APPROVAL.
5. SHOP DRAWINGS/SUBMITTALS FOR ALL PRODUCTS MUST BE PROVIDED AND APPROVED
BY THE DOE PRIOR TO ANY MATERIALS BEING ORDERED.
6. FOR PROJECTS REQUIRING ASBESTOS ABATEMENT, CONTRACTOR SHALL SUBMIT A COPY
OF THE NOTIFICATION OF DEMOLITION, FORM RDA 1298, AS ISSUED BY THE STATE OF
TENNESSEE, DEPARTMENT OF ENVIRONMENT AND CONSERVATION DIVISION OF AIR
POLLUTION CONTROL, AND A COPY OF THE WASTE DISPOSAL MANIFEST, AS SOON AS
THEY BECOME AVAILABLE.
7. CONTRACTOR IS RESPONSIBLE FOR THE REPAIR/PAINT OF ANY WALL(S) AFFECTED BY
THIS PROJECT.
8. ANY WALL REQUIRING TOUCH-UP SHALL BE PAINTED IN ITS ENTIRETY, FLOOR TO CEILING, CORNER TO CORNER.
9. USE ONLY NO VOC (VOLATILE ORGANIC COMPOUND) PAINTS AND ADHESIVES.
10. CONTRACTOR SHALL SUBMIT ALL PRODUCT DATA, OWNER'S/OPERATOR'S MANUALS,
WARRANTY INFORMATION, ETCETERA, TO THE DOE MAINTENANCE DEPARTMENT.
CONTRACTOR SHALL REGISTER PRODUCT WARRANTIES.
11. CONTRACTOR SHALL SUBMIT AS-BUILT DRAWINGS AS PART OF PROJECT CLOSEOUT AND
SHALL NOT BE EXCLUDED.
GENERAL DRAWING COLOR
LEGEND
AREA FOR ASPHALT
RESEALING
LAWN AREAS
CONTROLLED UNCLASSIFIED INFORMATION (CUI)
May be exempt from public release under the Freedom of Information Act (5 U.S.C.)exemption number and category_____________________________
Department of Energy review required before public release.
Name/Organization_________________Date________ Guidance (If applicable)_________
ASBESTOS-CONTAINING MATERIALS (ACM) MAY BE PRESENT AND CAN BE FOUND ABOVE DROP/HARD CEILINGS, PIPE CHASES, INSIDE WALLS, UNDER CARPET, MECHANICAL ROOMS, ETC. MATERIALS COULD INCLUDE BUT ARE NOT LIMITED TO: CEILING TILES, FLOOR TILES (9X9 AND 12X12), PIPE AND FITTING INSULATION, SPRAY ON TEXTURED CEILING. SURVEY REPORTS, BOTH IN QUICK REFERENCE AND FULL FILES, ARE AVAILABLE FOR REVIEW IN THE JOE L. EVINS FEDERAL BUILDING. IF YOU SUSPECT A MATERIAL MAY CONTAIN ASBESTOS, CONTACT FACILITIES MANAGEMENT AT 865-576-0586 BEFORE
DISTURBING IT.
PROJECT TITLE:
SHEET TITLE: PLAN DATE:
TASK ORDER #:
DRAWN BY:
JDM
ISSUED FOR CONSTRUCTION PROPOSAL
PAGE #1
COVER PAGE 2/26/2025
BUILDING 1916, T2, STORMWATER DRAINAGE REPAIR AND
PARKING LOT ASPHALT RE-SEALING PROJECT.
TBD
NOTE: THESE TWO PAGES SHOW THE AREAS AFFECTED BY THE
ASPHALT RESEALING PHASE OF THE BUILDING 1916, T2, STORMWATER
DRAINAGE REPAIR AND PARKING ASPHALT LOT RE-SEALING PROJECT .
THE GENERAL NOTES APPLY TO ALL PHASES OF THE PROJECT.
BRISBANE ROAD
WAREHOUSE ROAD
2/26/2025 8:20:33 AM, ARCH D (24.00 x 36.00 Inches)
COMPACT COMPACT
Data
Data
Da ta
Window.
Window.
Disconnect
Battery Charger
GOV VISITOR VISITOR
Remove concrete to allow for asphalt placement.
STORM
DRAIN
Rework Down SpoutRework Down Spout
COMPACT COMPACT
GRAVEL/BROKEN PAVEMENT GRASS
GRASS
GRASS
GRASS
CONCRETE
CONTROLLED UNCLASSIFIED INFORMATION (CUI)
May be exempt from public release under the Freedom of Information Act (5 U.S.C.)exemption number and category_____________________________
Department of Energy review required before public release.
Name/Organization_________________Date________ Guidance (If applicable)_________
ASBESTOS-CONTAINING MATERIALS (ACM) MAY BE PRESENT AND CAN BE FOUND ABOVE DROP/HARD CEILINGS, PIPE CHASES, INSIDE WALLS, UNDER CARPET, MECHANICAL ROOMS, ETC. MATERIALS COULD INCLUDE BUT ARE NOT LIMITED TO: CEILING TILES, FLOOR TILES (9X9 AND 12X12), PIPE AND FITTING INSULATION, SPRAY ON TEXTURED CEILING. SURVEY REPORTS, BOTH IN QUICK REFERENCE AND FULL FILES, ARE AVAILABLE FOR REVIEW IN THE JOE L. EVINS FEDERAL BUILDING. IF YOU SUSPECT A MATERIAL MAY CONTAIN ASBESTOS, CONTACT FACILITIES MANAGEMENT AT 865-576-0586 BEFORE
DISTURBING IT.
PROJECT TITLE:
SHEET TITLE: PLAN DATE:
TASK ORDER #:
DRAWN BY:
JDM
ISSUED FOR CONSTRUCTION PROPOSAL
PAGE #2
Building 1916, T2, Warehouse Road Parking Lots Reseal Asphalt and Re-stripe Parking Areas.
SCOPE OF WORK:
1. KILL AND REMOVE ANY VEGETATION GROWING THROUGH CRACKS IN
THE ASPHALT, AREA SHADE IN ORANGE.
2. SWEEP/CLEAN ALL SURFACES TO BE RESEALED, AREA SHADED IN
ORANGE.
3. SEAL CRACKS IN THE EXISTING ASPHALT AREAS THAT ARE 1/8" WIDE OR
WIDER.
4. PATCH THE EDGES OF THE ASPHALT RAMP LEADING INTO BAY-1.
5. APPLY ASPHALT SEALER, TWO LAYERS, AT ALL OTHER AREAS,
INCLUDING THE ASPHALT RAMP.
6. RE-STRIPE PARKING SPACES, WHITE.
7. RE-STRIPE "NO-PARKING" HATCHED AREAS, YELLOW.
8. PAINT HANDICAP SYMBOLS, AREAS NOTED PER DRAWING.
9. ADD COMPACT LETTERING ON THE TWO SPACES NEAR BAY-3'S
HANDICAP ACCESS RAMP.
10. REPLACE THE AWNING'S DAMAGED COLUMN (1EA) AT BAY 3'S HANDICAP
RAMP.
11. ADD PARKING BUMPER WHEEL STOPS AT THE 3 SPACES AT BAY 3'S
HANDICAP RAMP.
LOCATION OF DAMAGED
AWNING COLUMN
(S.O.W. NOTE #10)
LOCATION OF THE 3 PARKING
BUMPER WHEEL STOPS.
(S.O.W. NOTE #11)
BAY 3 HANDI-CAP ACCESS RAMP
(ENLARGED)
SITE PLAN 2/26/2025
BUILDING 1916, T2, STORMWATER DRAINAGE REPAIR AND
PARKING LOT ASPHALT RE-SEALING PROJECT.
TBD
GENERAL DRAWING COLOR
LEGEND
AREA FOR ASPHALT
RESEALING
LAWN AREAS
LOCATION OF COMPACT
PARKING SPACES.
(S.O.W. NOTE #9)
LOCATION OF HANDICAP
PARKING SPACES.
(S.O.W. NOTE #8)
LOCATION OF THE ASPHALT RAMP
(S.O.W. NOTE #4)
2/26/2025 11:30:01 AM, ARCH D (24.00 x 36.00 Inches)
| Building 1916, T2 Warehouse Road Paving, Page #1, 2.26.2025 |
| Sheets and Views |
| Building 1916, T2 Warehouse Road Paving 2.19.2025-ARCH D COVER |
| Building 1916, T2 Warehouse Road Paving, Page #2, 2.26.2025 |
| Sheets and Views |
| Building 1916, T2 Warehouse Road Paving 2.19.2025-ARCH D SITE PLAN |
File details come from the government source that posted it. Updated .