These are design drawings prepared by the Nashville District of the U.S. Army Corps of Engineers for the Department of Energy (DOE) Receiving Warehouse located at 205 Warehouse Road in Oak Ridge, Tennessee. The technical drawings, dated February 2025, detail paving and drainage improvements including typical sections for asphalt trenching, trench drain details, catch basin specifications, and project notes related to concrete and asphalt pavement construction.
The drawings specify technical requirements for multiple project segments (L1-L5) involving drainage improvements, including 6-inch HDPE pipe installation, concrete transition swales, gravel backfill, asphalt milling and overlay, and catch basin modifications. Key technical specifications include using Performance Grade (PG) 64-22 asphalt binder, 4000 PSI concrete, traffic-duty cast iron grates capable of handling HS20 loading, and precise grading and slope requirements ranging from -8.1% to 5.5% to ensure proper water drainage towards designated catch basins.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1916 T2 QA 10.29.25.pdf | ||
| Building 1916 T2 Warehouse Road Paving 2.26.2025 (002).pdf | ||
| Statement of Work - 10.24.25.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Nashville District of Engineers
US Army Corps
XXXXXX-XX-X-XXXX
DOE Receiving Warehouse
Oak Ridge
Oak Ridge, TN
Plans For
Paving and Drainage DOE Warehouse
FEBRUARY 2025
RTA - Certified Final
Submitted:
Elizabeth R. Boeglin, EIT
Project Engineer
Approval Recommended:
Brandon M. Whitley, P.E.
Approval Recommended:
Joshua A. Bomar , P.E.
(2.) The approval signatures appearing in the signature block on this sheet constitute approval of all drawings listed in the sheet index.
of individuals appear on these project documents within the scope of their employment as required by ER 1110-1-8152.
(1.) This project was designed by the Nashville District of the U.S. Army Corps of Engineers. The initials or signatures and registration designations
Note:
Chief, Civil Site and Surveying Section
Chief, Civil and Geotechnics Branch
A N
S I
D
RTA - CERTIFIED FINAL
O
K R
ID
G
E
T E
N N
E S
S E
E
W
A R
E H
O U
S E
R O
A D
D O
E R
E C
E
IV
IN
G
W A
R E
H O
U S
E
S H
V
IL
L E
D
IS
T R
IC
T
F
IL
E N
A M
Y
P
IC
A L
S E
C T
IO
N
S
C-500
E B
O E
G L
IN
B W
H
IT
L
C -5
.d g n
E
B O
E G
L
IN
P
O T
S C
A L
E
T H
A V
E N
U E
S O
U T
H
N A
S H
V
IL
L E
T
N
-3
3'-0" 3'-0"
6'-0"
1'-0"1'-0"
1'-8" 2'-2" 4'-0"2'-2"4'-0"
1'-8" 2'-2" 4'-0"2'-2"4'-0"
1'-8" 2'-2" 4'-0"2'-2"4'-0"
1'-8" 2'-2" 6'-0"2'-2"4'-0"
6'-0"
6'-0"
6'-0"
6'-0"
2 25
1 1
1 1
1 12 2
4 4
1 1
1 1
88 6
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
®of Engineers
US Army Corps
P lo t T im e
P lo t D a te
F il e N a m e
T im e
D a te
F il e
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
SHEET ID
SHEET KEYNOTES
MILL AND FEATHER ASPHALT CUTS 9.
EXISTING ASPHALT 8.
SAWCUT AND REPLACE EXISTING ASPHALT WITH NEW ASPHALT LAYER 7.
GRAVEL BACKFILL AND BEDDING LAYER 6.
TRENCH DRAIN 5.
6" THICK GRAVEL LAYER 4.
6" SDR 11 HDPE PIPE 3.
8" THICK 3000 PSI CONCRETE2.
MILL AND OVERLAY1.
LEGEND
LOCATIONS SHOWN ON CONTRACT DRAWING C-400.
THE CONCRETE TRANSITION SWALE APPLIES TO SECTIONS M1 AND M2 1.
GENERAL NOTES
DRAWING C-400.
TRANSITION SWALES ARE TO BE CONSTRUCTED ARE GIVEN ON CONTRACT
INFORMATION FOR ALIGNMENTS M1 AND M2 WHERE THE CONCRETE
POSITIVE DRAINAGE TOWARDS THE RESPECTIVE CATCH BASINS.
SLOPE EACH SIDE OF THE CONCRETE TRANSITION SWALE TO PROMOTE 3
6" HDPE PIPE.
CONCRETE SWALE WHILE ALSO MAINTAINING THE REQUIRED SLOPE OF THE
REACH THE BOTTOM OF THE 6" LAYER OF GRAVEL UNDERNEATH THE
COMPACTED TO 6" LIFTS. PLACE ENOUGH GRAVEL ON TOP OF THE PIPE TO
OF THE NEW 6" HDPE DRAIN PIPE. PLACE THE GRAVEL IN 8" LIFTS
PLACE 6" OF 3/4" MAX NOMINAL SIZE GRAVEL BELOW AND ON EITHER SIDE 2
BE CONSTRUCTED.
FROM THE EXISTING ASPHALT SURFACE TO THE NEW CONCRETE SWALE TO
WITHIN THE LIMITS PLACING WEDGING TO PROVIDE A SMOOTH TRANSITION
VIEW ON C-400 AND THE TYPICAL SECTIONS ON THIS DRAWING. REPAVE
MILL THE TOP 2" OF EXISTING ASPHALT WITHIN THE LIMITS SHOWN IN PLAN 1
CONSTRUCTION NOTES
L1
TYPICAL SECTION FOR SEGMENT L1
3/4"=1'-0"SCALE:
H1
TYPICAL SECTION FOR SEGMENTS L2 & L4
3/4"=1'-0"SCALE:
E1
TYPICAL SECTION FOR SEGMENT L3
3/4"=1'-0"SCALE:
A2
TYPICAL SECTION FOR SEGMENT L5
3/4"=1'-0"SCALE:
K12
ASPHALT TRENCHING
3/4"=1'-0"SCALE:
F11
CONCRETE TRANSITION SWALE
3/4"=1'-0"SCALE:
VARIES -0.55% to 1.7%VARIES -5.9% to 3.8%
VARIES 2.6% to 4.8%
VARIES 1.3% to 3.9%
VARIES -8.1% to 2.6%
VARIES 2.4% to 5.5%
VARIES 2.3% to 4.2%
VARIES -7.9% to 4.1%
VARIESVARIES
S I
K R
ID
G
E
T E
N N
E S
S E
E
W
A R
E H
O U
S E
R O
A D
D O
E R
E C
E
IV
IN
G
W A
R E
H O
U
S H
V
IL
L E
D
IS
T R
E N
A M
R
E N
C H
D R
A
IN
D E
T A
IL
S
C-501
E B
O E
G L
IN
B W
H
IT
L
.d g n
E
B O
E G
O T
S C
A L
E
T H
A V
E N
U E
S O
U T
H
N A
S H
V
IL
L E
T
N
-3
TRENCH DRAIN ISOMETRIC VIEW
SCALE: N.T.S.
A2
8'
19.57"
0.27"
9.71"
1.
5"
10"
8" N
O T
E
S E
E G
E N
E R
3" MIN.
1" MIN.
MIN. ALL SIDES
POUR 6.02"
MONLITHIC
K2
TRENCH DRAIN END VIEW
K9
DRAIN GRATE PLAN VIEW
D9
GRATE END VIEW
6 5
K13
TRENCH DRAIN PIPE CONNECTION
F13
FINISHED TRENCH DRAIN END
A13
TRENCH DRAIN INSTALLATION EXAMPLE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
®of Engineers
US Army Corps
P lo t T im e
P lo t D a te
F il e N a m e
T im e
D a te
F il e
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
SHEET ID
SHEET KEYNOTES
LOCKING DEVICE 15.
GRATE 14.
CROSS TIE13.
CONNECTION SCREWS 12.
SET SCREW 11.
STANDARD RAIL 10.
ANCHOR STUD9.
END RAIL 8.
DEFORM GROOVE 7.
1.75" X 1.75" X 0.19" BLACK POLYMER COATED STEEL ANGLE WITH ANCHOR 6.
4000 PSI CONCRETE SLAB 5.
RAIL CLAMP 4.
TRENCH DRAIN FORMER 3.
NO-FLOAT #4 REBAR U-LEG2.
ANCHOR SLAB (4000 PSI CONCRETE)1.
LEGEND
DEPTH VARIES, SEE ELEVATION CALLOUTS ON CONTRACT DRAWING C-4007.
REQUIREMENTS.
TRENCH DRAIN GRATES STRENGTH MUST EXCEED AASHTO H-20 LOADING 6.
TRENCH DRAIN GRATES MUST BE HEAVY DUTY DUCTILE IRON. 5.
DRAIN SECTIONS AND TIEING INTO THE EXISTING CATCH BASINS.
TRENCH DRAIN PRODUCT WITH 6 INCH PIPES CONNECTING THE TRENCH
BETWEEN MANUFACTURERS. THE DESIGN IS BASED ON A 8 INCH WIDE
DIMENSIONS SHOWN FOR THE TRENCH DRAIN PRODUCT MAY VARY 4.
PRIOR TO CONSTRUCTION.
SUBMIT PROPOSED PRODUCT AND PLACEMENT METHOD FOR APPROVAL 3.
LOCATIONS.
REFER TO CONTRACT DRAWING C-400 FOR TRENCH DRAIN SECTION 2.
WITHSTANDING AN AASHTO H-20 LOADING.
THE TRENCH DRAIN PRODUCT CHOSEN MUST BE CAPABLE OF 1.
GENERAL NOTES
AND THE FORMER IS REMOVED ANY EXTRA PIPE CAN BE TRIMMED
CONNECTING IT TO THE TRENCH DRAIN. ONCE THE CONCRETE IS READY
INTO THE TRENCH DRAIN SECTION IS PROPERLY SUPPORTED BEFORE
TRANSITION. THE CONTRACTOR WILL NEED TO MAKE SURE THE PIPE TYING
APPROXIMATELY 1 INCH TO HELP SECURE THE PIPE AND MAKE A SEAMLESS
FORM, TRACING THE PIPE AND THEN NOTCHING THE FORMER
TRENCH DRAIN SECTIONS BY BUTTING THE PIPE UP TO THE END OF THE
THE CONTRACTOR SHOULD CONNECT THE 6" HDPE DRAIN PIPE TO THE 1
CONSTRUCTION NOTES
S I
K R
ID
G
E
T E
N N
E S
S E
E
W
A R
E H
O U
S E
R O
A D
D O
E R
E C
E
IV
IN
G
W A
R E
H O
U
S H
V
IL
L E
D
IS
T R
E N
A M
T C
H B
A S
IN
D
E T
A
IL
S
C-502
E B
O E
G L
IN
B W
H
IT
L
.d g n
E
B O
E G
O T
S C
A L
E
T H
A V
E N
U E
S O
U T
H
N A
S H
V
IL
L E
T
N
-3
H1
DIAMETER (O.D.)
OUTSIDE
6" OR 12"
ISOMETRIC VIEW OF CATCH BASIN
H2
B3
PARTIAL SECTION VIEW
B9
SIDE VIEW OF CATCH BASIN
5 5
J9
SCALE: N.T.S.
CONCRETE APRON
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
®of Engineers
US Army Corps
P lo t T im e
P lo t D a te
F il e N a m e
T im e
D a te
F il e
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
SHEET ID
SHEET KEYNOTES
8" THICK, 6FT BY 6FT CONCRETE CATCH BASIN COLLAR 14.
EXISTING 12 INCH RCP OUTLET PIPE 13.
CATCH BASIN 12.
EXISTING ASPHALT SURFACE 11.
6 INCH HDPE INLET PIPE 10.
TROWEL FINISHED 9.
6 INCH HDPE PIPE 8.
INSIDE WALL
INSERT 12 INCH CONCRETE PIPE INTO BASIN SO THAT PIPE IS FLUSH WITH 7.
ANCHOR PIPE INTO CATCH BASIN USING NON-SHRINK GROUT6.
MATCH ELEVATION OF CURRENT TOP OF CATCH BASIN 5.
PRECAST CONCRETE BASIN SECTION4.
GRATES
RISER TO MEET REQUIRED CULVERT ELEVATIONS AND FOR SUPPORTING 3.
CAST-IN STEEL FRAME 2.
TRAFFIC DUTY CAST IRON GRATE1.
LEGEND
GREY CAST IRON CONFORMING TO ASTM A48-76 CLASS 35.
C.I. CASTINGS CAST IRON FRAMES AND GRATES ARE MANUFACTURED OF 7.
REBAR CONFORMING TO ASTM A615.
CATCH BASIN REINFORCEMENT SHALL BE GRADE 60 REINFORCED STEEL 6.
DEPTH.
AT FLOOR AND FIRST STAGE OF WALL WITH SECTIONAL RISER TO REQUIRED
STRENGTH OF 4000 PSI AT 28 DAYS. UNIT IS OF MONOLITHIC CONSTRUCTION
CATCH BASIN CONCRETE SHALL BE CLASS I/II CONCRETE WITH DESIGN 5.
CONSTRUCTION.
SUBMIT PROPOSED CATCH BASIN PRODUCT FOR APPROVAL PRIOR TO 4.
CATCH BASIN WALLS WILL BE NO LESS THAN 6 INCHES THICK.3.
PIPE AND A 6 INCH HDPE PIPE.
CATCH BASIN TO BE SIZED TO SUPPORT A 12 INCH REINFORCED CONCRETE 2.
PROPOSED GRATE FOR APPROVAL.
EXCEED 50 POUNDS. DUAL GRATES ARE PERMITTED, SUBMIT THE
DIMENSIONS MAY VARY. IT IS PREFERRED THAT INDIVIDUAL GRATES DO NOT
CAST IRON GRATE DESIGNED TO HANDLE AN HS20 LOADING, THE 1.
GENERAL NOTES
W2W2
2 FT2 FT
T1
H2
T1
WATER
SURFACE
S I
K R
ID
G
E
T E
N N
E S
S E
E
W
A R
E H
O U
S E
R O
A D
D O
E R
E C
E
IV
IN
G
W A
R E
H O
U
S H
V
IL
L E
D
IS
T R
E N
A M
R
O J E
C T
N O
T E
S C
O N
T
IN
U E
D
G-101
E B
O E
G L
IN
B W
H
IT
L
G -1
.d g n
E
B O
E G
O T
S C
A L
E
T H
A V
E N
U E
S O
U T
H
N A
S H
V
IL
L E
T
N
-3
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
®of Engineers
US Army Corps
P lo t T im e
P lo t D a te
F il e N a m e
T im e
D a te
F il e
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
SHEET ID
IS DEFINED AS THE LAST SOURCE OF ANY MODIFICATION TO THE BINDER.
OF THESE CERTIFICATIONS TO THE CONTRACTING OFFICER. THE SUPPLIER
THE TIME OF DELIVERY OF EACH LOAD TO THE MIX PLANT. SUBMIT COPIES
INDICATING GRADE CERTIFICATION SHALL BE PROVIDED BY THE SUPPLIER AT
PERFORMANCE GRADE (PG) 64-22 GRADING "E" SHOULDER. TEST DATA
ASPHALT CEMENT BINDER SHALL CONFORM TO AASHTO M 320 10.
OR MILLING FOR CORRECTING HIGH AREAS WILL NOT BE PERMITTED.
REQUIREMENTS. SKIN PATCHING FOR CORRECTING LOW AREAS OR PLANING
DIAMOND GRINDING MAY BE USED TO REMOVE HIGH SPOTS TO MEET GRADE 9.
ELEVATION WILL NOT BE PERMITTED.
ELEVATIONS AND TYPICAL SECTIONS SHOWN. DEVIATION FROM THE PLAN
THE FINAL WEARING SURFACE OF PAVEMENT SHALL CONFORM TO THE 8.
WORK SHALL BE DONE AT THE CONTRACTOR'S EXPENSE.
IMMEDIATELY COMPACTED TO CONFORM TO THE SURROUNDING AREA. THIS
REMOVED FULL DEPTH, REPLACED WITH FRESH HOT MIXTURE AND
CONTAINS CHECK-CRACKING, OR IS IN ANY WAY DEFECTIVE SHALL BE
ANY MIXTURE THAT BECOMES LOOSE AND BROKEN, MIXED WITH DIRT, 7.
HAND TAMPERS.
TO THE ROLLER, THE MIXTURE SHALL BE THOUROUGHLY COMPACTED WITH
OTHER CAUSE, SHALL BE CORRECTED AT ONCE. IN AREAS NOT ACCESSIBLE
A RESULT OF REVERSING THE DIRECTION OF THE ROLLER, OR FROM ANY
THE DISCRETION OF THE CONTRACTOR. ANY DISPLACEMENT OCCURRING AS
OF ROLLING OPERATIONS AND THE TYPE OF ROLLERS USED SHALL BE AT
WITHOUT CAUSING DISPLACEMENT, CRACKING OR SHOVING. THE SEQUENCE
COMPACTED BY ROLLING. COMPACT THE SURFACE AS SOON AS POSSIBLE
AFTER PLACING, THE MIXTURE SHALL BE THOUROUGHLY AND UNIFORMLY 6.
SPECIFICATION SECTION 407.09 FOR WEATHER LIMITATIONS.
DENSITY AND SURFACE SMOOTHNESS. REFER TO TDOT STANDARD
PLACE AND COMPACT THE MIX AT A TEMPERATURE SUITABLE FOR OBTAINING 5.
STANDARD SPECIFICATION SECTION 403.05..
OF 0.08 TO 0.12 GALLONS PER SQUARE YARD IN ACCORDANCE WITH TDOT
UNDERLYING COURSE OF DUST AND DEBRIS. APPLY A TACK COAT AT A RATE
IMMEDIATELY BEFORE PLACING THE HOT MIX ASPHALT, CLEAN THE 4.
WRITTEN AND LAB PERFORMANCE TESTING.
BY THE TENNESSEE DEPARTMENT OF TRANSPORTATION, INCLUDING THE
COMPLETED THE MARSHALL METHOD OF MIX DESIGN SCHOOL CONDUCTED
LABORATORY DESIGN. TO BE CERTIFIED, THE TECHNICIAN SHALL HAVE
CERTIFIED LABORATORY TECHNICIAN SHALL PREPARE AND SIGN THE
JOB MIX FORMULA (JMF) AND LABRATORY DESIGN IN ELECTRONIC FORM. A
PRODUCTION OF THE ASPHALT PAVING MIXTURE, SUBMIT THE PROPOSED
AT LEAST 14 WORKING DAYS BEFORE THE SCHEDULED START OF 3.
MINERAL FILLER SHALL BE NON-PLASTIC.
PROVIDE MINERAL FILLER CONFORMING TO AASHTO M17, EXCEPT THAT THE 2.
ACCORDANCE WITH ASTM C136/C136M AND ASTM C117.
GRADATION SPECIFIED IN THE TABLE BELOW, WHEN TESTED IN
SPECIFICATION 903.24. AGGREGATE GRADATION SHALL CONFORM TO THE
PHYSICAL AND CHEMICAL REQUIREMENTS SPECIFIED IN TDOT
FROM GRAVEL, SLAG, OR FROM CRUSHED STONE AGGREGATE MEETING THE
FINE AGGREGATE CONSISTING OF NATURAL SAND OR SAND MANUFACTURED
SPECIFICATION TABLE 903.11-2. PER TDOT STANDARD SPECIFICATIONS USE
SURFACE MIX AGGREGATE GRADATION TAKEN FROM TDOT STANDARD 1.
ASPHALT PAVEMENT NOTES
CONCRETE.
EXPANSION AND CONTRACTION JOINTS FOR APPROVAL PRIOR TO PLACING
SUBMIT CONSTRUCTION DRAWING SHOWING THE LOCATION OF ALL 12.
RUBBER CONFORMING TO ASTM D1752 TYPE I.
PROVIDE EXPANSION JOINT FILLER STRIPS, PREMOLDED OF SPONGE 11.
INDICATED.
MAXIMUM, AND AT POINTS OF CHANGE IN WIDTH UNLESS OTHERWISE
PROVIDE EXPANSION JOINTS 1/2 INCH THICK AND SPACED EVERY 100 FT 10.
CONCRETE. SATISFACTORILY COMPACT EARTH FOUNDATIONS.
DEBRIS, AND FOREIGN MATTER FROM THE BASE LAYER BEFORE PLACING
REMOVE SNOW, ICE, STANDING OR FLOWING WATER, LOOSE PARTICLES, 9.
FINISHED.
CONCRETE DEPTH WITH A JOINTING TOOL AFTER THE SURFACE HAS BEEN
SECTIONS. CUT CONTRACTION JOINTS AT A MINIMUM OF 1/3 OF THE
PROVIDE CONTRACTION JOINTS EVERY 10 FEET IN THE CONCRETE SWALE 8.
WOOD, STEEL, OR OTHER APPROVED MATERIAL.
ACCORDANCE WITH ACI 301 SECTION 2 AND 5 AND ACI 347. FABRICATE OF
DESIGN AND ENGINEER THE FORMWORK AS WELL AS ITS CONSTRUCTION IN 7.
ACID, SALT OR ALKALI.
MIXING AND CURING WATER MUST BE FREE OF INJURIOUS AMOUNTS OF OIL, 6.
REQUIREMENTS OF ASTM C494/C494M, TYPE A, B, OR D.
WATER-REDUCING OR RETARDING ADMIXTURES MEETING THE
IF WATER-REDUCING OR RETARDING ADMIXTURES ARE REQUIRED: PROVIDE 5.
TYPE C OR E.
ACCELERATORS MUST MEET THE REQUIREMENTS OF ASTM C494/C494M,
CHLORIDE MEETING THE REQUIREMENTS OF ASTM D98. OTHER
IF ACCELERATING ADMIXTURES ARE REQUIRED: PROVIDE CALCIUM 4.
ADMIXTURE THAT MEETS THE REQUIREMENTS OF ASTM C260/C260M.
IF AIR-ENTRAINING ADMIXTURES ARE REQUIRED: PROVIDE AIR-ENTRAINING 3.
REQUIREMENTS OF ASTM C33/C33M.
FOR FINE AND COARSE AGGREGATES MEET THE QUALITY AND GRADING 2.
WATER-CEMENTITIOUS MATERIAL RATIO IS 0.45.
8.0 PERCENT WITH A SLUMP BETWEEN 2 AND 5 INCHES. THE MAXIMUM
ACCORDANCE WITH ACI 304R. THE AIR CONTENT MUST BE BETWEEN 5.0 AND
OF 3000 PSI. THE MAXIMUM NOMINAL SIZE COARSE AGGREGATE IS 1 INCH, IN
FOR THE PROJECT SHALL HAVE A COMPRESSIVE STRENGTH (f ' c) AT 28 DAYS
UNLESS OTHERWISE STATED ON THE CONTRACT DRAWINGS, CONCRETE 1.
CONCRETE NOTES
BASINS.
VARIANCE SO LONG AS POSITIVE DRAINAGE IS MAINTAINED TO THE CATCH
BASIN IS ACHIEVED. ELEVATIONS CAPTURED WILL BE ALLOWED 1 INCH OF
EVERY 50 FT INTERVAL TO ENSURE THE 0.5% SLOPE TOWARDS EACH CATCH
THE CONTRACTOR WILL SURVEY THE FINAL SUBGRADE TAKING SHOTS AT 6.
BACKFILL MATERIAL.
MATERIAL AS DIRECTED BY THE GOVERNMENT AND REPLACE WITH FILL AND
SUITABLE COMPACTION EQUIPMENT. UNDERCUT RUTTING OR PUMPING OF
BUT NOT BE LIMITED TO, RAKING SMOOTH OR CONSOLIDATING WITH
DEEPER THAN 1/2 INCH SHOULD BE REPAIRED. REPAIR SHOULD INCLUDE,
CORRECTIVE ACTION SHOULD BE TAKEN. ANY DEPRESSION IN THE SURFACE
DURING THE PREPARATION OF THE SUBGRADE, SUBBASE, OR BASE ROLLING,
ACCEPTABLE SUBGRADE. IF RUTTING OR PUMPING IS EVIDENT AT ANY TIME
WATER WHICH WOULD PROMOTE DEGRADATION OF AN OTHERWISE
PROOF ROLL THE SUBGRADE WHEN THE SUBGRADE IS FREE OF SURFACE 5.
FEDERAL REQUIREMENTS.
FOR DISPOSING OF THE MATERIAL IN ACCORDANCE WITH ANY STATE AND
PROPERTY OF THE CONTRACTOR. THE CONTRACTOR WILL BE RESPONSIBLE
EXCESS MATERIAL RESULTING FROM EXCAVATION WILL BECOME THE 4.
AREAS.
MATERIALS, AS DIRECTED BY THE CONTRACTING OFFICER, IN EXCAVATED
REMOVE AND REPLACE UNSATISFACTORY MATERIAL WITH SATISFACTORY 3.
IN ACCORDANCE WITH ASTM D698.
PERCENT LABORATORY MAXIMUM DENSITY FOR COHESIONLESS MATERIALS.
PERCENT LABORATORY MAXIMUM DENSITY FOR COHESIZE MATERIALS OR 95
THE CONTRACTOR SHALL COMPACT THE SOIL LAYER TO AT LEAST 90 2.
EARTHWORK MUST BE COMPLETED IN THE DRY. 1.
EARTHWORK NOTES
PLACE THE AGGREGATE IN 8 INCH LAYERS COMPACTED TO 6 INCH LAYERS. 2.
DRAIN PIPE.
PLACEMENT BELOW THE CONCRETE AND AROUND THE 6 INCH HDPE STORM
PROVIDE AGGREGATES WITH A MAXIMUM NOMINAL SIZE OF 3/4" FOR 1.
AGGREGATE NOTES
| Binder1 |
| CVR-RTA-FEB 2025 |
| C-100 - RTA - FEB 2025 |
| C-400 - RTA - FEB 2025 |
| C-500 - RTA - FEB 2025 |
| C-501 - RTA - FEB 2025 |
| C-502 - RTA - FEB 2025 |
| G-100 - RTA - FEB 2025 |
| G-101 - RTA - FEB 2025 |
V-100 - RTA - FEB 2025
File details come from the government source that posted it. Updated .