Brennaaleen_Cedar_Drainage_Improvements.pdf
PDF 19 MB Posted
- Attached to
- CITY ATTORNEY SERVICES
- Solicitation number
- 2026-02
- Issued by
- Hidalgo County, Texas
About this file
This is a comprehensive design and plan set for the Brennaaleen Cedar Drainage Improvements project in Edinburg, Texas, prepared for the City of Edinburg under Project Number C-317-23. The project consists of drainage infrastructure improvements across Cedar Drive, Cynthia Drive, Sherwood Apartments, and a proposed swale area to provide stormwater relief to the Cedar Heights and Greenbriar Subdivisions. Phase I work includes reclaiming and restoration of paving, installation of new stormwater lines (18" to 36" reinforced concrete pipe with rubber gaskets), inlets, precast concrete manholes, a detention pond with pilot channel, culvert installation, and erosion control measures. The design encompasses approximately 1,289 square yards of asphalt paving restoration, removal of existing 24" and 36" reinforced concrete pipes, installation of multiple drainage structures, and comprehensive utility coordination including water lines, sanitary sewer, gas, and railroad accommodation. The project is divided into multiple phases, with Phase I focusing on the Cedar and Cynthia Drive corridors and Phase II addressing additional infrastructure along Cedar Drive and the detention pond outfall.
The plan set includes detailed construction specifications, traffic control plans, standard details for all drainage structures, horizontal and vertical alignment data, and environmental controls including sediment control fencing, erosion control logs, construction exit stabilization, and stormwater pollution prevention plan (SW3P) requirements. Estimated quantities include 270 cubic yards of excavation, 1,076 linear feet of reinforced concrete pipe installation, 8 precast concrete manholes, 4 Type A inlets with extensions, and comprehensive riprap and concrete work for outfall protection and stabilization. All work adheres to City of Edinburg standards, Texas Department of Transportation (TxDOT) standards, and Texas Commission on Environmental Quality (TCEQ) regulations. The project involves significant coordination with Union Pacific Railroad for pipeline accommodation and jacking bore work, with specific requirements for track monitoring, continuous construction protocols, and railroad right-of-way compliance. Professional engineer Oscar Arturo Garza (TBPE Registration No. F-10573) is responsible for the design, with the plan set dated 1/9/2024 and including subsequent revisions through 11/7/2025.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Revision: 1-9-20241
Revision: 5-13-20242
Change Order #1: 8-8-20241
Revision: 11-7-20253
1 1
INDEX OF SHEETS
(S) - TxDOT STANDARDS
(E) - CITY OF EDINBURG DETAILS
NOTES:
F I
L E
D A
T E
P M
C
SHEET NO.
DS:
DW:
CK:
CK:
SHEET OF SHEETS
S
T
ATE OF TEXA
S
LICENSED
P R
O
F E
SSIONAL ENGI
N
E E
R
122125
OSCAR ARTURO GARZA
DRAINAGE IMPROVEMENTS
BRENNAALEEN CEDAR
EDINBURG
CITY
PROJECT NUMBER
C-317-23 PROJECT PHASE I
PROJECT NAME
p w k c i p w b e n t l e y c o m k c i p w
D o c u m e n t s
P r o j e c t s
B r e n n a a l e e n
C d a r
D a i n a g e
I m p r o v e m e n t s
D e s i g n
P l t
G n e r a l
B r e n n a a l e e n I n d x
O f h t s
1/9/2024
INDEX OF SHEETS
ENVIRONMENTAL ISSUES
58-60 SW3P LAYOUTS
ENVIRONMENTAL ISSUES
61 (E) HAY SOCKS EROSION CONTROL DETAILS
62 (E) TEMPORARY SEDIMENT CONTROL FENCE DETAILS
63 (E) TEMPORARY EROSION CONTROL LOGS-1
64 (E) TEMPORARY EROSION CONTROL LOGS-2.
65 (E) TEMPORARY EROSION CONTROL CONSTRUCTION EXIT
GENERAL
1 TITLE SHEET
2 INDEX OF SHEETS
3 PROJECT LAYOUT
4 EXISTING TYPICAL SECTIONS
5 SUMMARY TABLES OF ESTIMATED QUANTITIES
6-8 GENERAL NOTES
TRAFFIC CONTROL
9 TRAFFIC CONTROL PLAN GENERAL NOTES
10 TRAFFIC CONTROL PLAN SEQUENCE OF CONSTRUCTION
11 TRAFFIC CONTROL PLAN PHASE I
12 TRAFFIC CONTROL PLAN PHASE II
TRAFFIC CONTROL STANDARDS
13-24 (S) BC(1)-21 THRU BC(12)-21
25 (S) TCP (2-2) - 18
ROADWAY DETAILS
26 HORIZONTAL & VERTICAL CONTROL
27 HORIZONTAL ALIGNMENT DATA
28 REMOVAL SHEET
ROADWAY DETAILS STANDARDS
29 (E) MINOR RESIDENTIAL STEET SECTION
30 (E) CURB AND GUTTER DETAILS
31 (E) VALLEY GUTTER DETAILS
DRAINAGE
32 OVERALL DRAINAGE AREA MAP
33 DETENTION POND LAYOUT
34 PROPOSED POND TYPICAL SECTIONS
35 CULVERT LAYOUT
36-38 UTILITIES AND DRAINAGE (CEDAR DRIVE)
39-40 UTILITIES AND DRAINAGE (CYNTHIA DRIVE)
41-42 UTILITIES AND DRAINAGE (SHERWOOD APARTMENTS)
43-44 UTILITIES AND DRAINAGE (PROPOSED SWALE)
45 UTILITIES AND DRAINAGE LATERALS
46 RAILROAD PIPELINE OR CULVERT ACCOMODATION NOTES
DRAINAGE DETAILS STANDARDS
49 (E) TYPE "C-C" INLET DETAILS
50 (E) PRECAST CONCRETE MANHOLE DETAILS
51 (E) CONCRETE PIPE SUPPORT COLLAR DETAILS
52 (E) DOWN DRAIN STRUCTURE DETAILS
53 (E) DITCH CROSS SECTION DETAIL
54 (E) STANDARD PIPE BEDDING DETAIL
55 (E) MANHOLE COVER DETAIL
56 (E) CONCRETE SLOPED-END TREATMENT DETAILS
57 TRASH RACK DETAIL
TBPE Registration No. F-10573 www.kci.com
Phone: 956-271-6688
Mission, TX 78574
2610 North Shary Road
(E) TYPE "A" INLET DETAILS
(E) TYPE "A" INLET WITH EXTENSION DETAILS
25'25'
EXIST 50' R.O.W.
TYPICAL SECTIONS
EXISTING
1 1
2.0% 2.0% E
X I
S
R
W
E X I
S
W
EXIST. 30' ROADWAY (B-B)
EXIST. C&G
EXIST. 8" CRUSHED LIMESTONE
EXIST. 6" LIME-TREATED SUBGRADE
ASPHALT CONCRETE
EXIST. 2" HOT MIX
EXIST. C&G
EXIST. PGL
STA 24+23.00 TO STA 28+19.78 (CYNTHIA DR.)
STA 15+08.12 TO STA 19+53.61 (CEDAR DR.)
EXIST. CYNTHIA DR. [
EXIST. CEDAR DR. [
EXISTING/PROPOSED TYPICAL SECTION
MINOR RESIDENTIAL STANDARD
ASSUMED BASED ON CITY OF EDINBURG
EXISTING PAVEMENT THICKNESS WERE
NOTE:
F I
L E
D A
T E
C
SHEET NO.
DS:
DW:
CK:
SCALE: 1" = 10' SHEET OF SHEETS
ATE OF TEXA
S
LICENSED
P R
O
F E
SSIONAL ENGI
N
E E
R
122125
OSCAR ARTURO GARZA
DRAINAGE IMPROVEMENTS
BRENNAALEEN CEDAR
EDINBURG
CITY
PROJECT NUMBER
C-317-23 PROJECT PHASE I
PROJECT NAME
p w k c i p w b e n t l e y c o m k c i p w
D o c u m e n t s
P r o j e c t s
B r e n n a a l e d a i n a g e
I m p r o v e m e n t s
D e s i g n
P l t n e r a l
B r e n n a a l e e n
T y p c d g n
1/9/2024
TRAVEL LANE
13.5'
TRAVEL LANE
13.5'
TBPE Registration No. F-10573 www.kci.com
Phone: 956-271-6688
Mission, TX 78574
2610 North Shary Road
ESTIMATED QUANTITIES
SUMMARY TABLES OF
F I
L E
D A
T E
A
C
SHEET NO.
DS:
DW:
CK:
ATE OF TEXA
S
LICENSED
P R
O
F E
SSIONAL ENGI
N
E E
R
122125
OSCAR ARTURO GARZA
DRAINAGE IMPROVEMENTS
BRENNAALEEN CEDAR
EDINBURG
CITY
PROJECT NUMBER
C-317-23 PROJECT PHASE I
PROJECT NAME
p w k c i p w b e n t l e y c o m k c i p w
D o c u m e n t s
P r o j e c t s
B r e n n a a l e d a i n a g e
I m p r o v e m e n t s
D e s i g n
P l t n e r a l
B r e n n a a l e e n
S u m m a r y
5/21/2024
SUMMARY OF ROADWAY ITEMS
LOCATION
400-1 432-1 529-1 5071-2
PAVING
ASPH
RESTORE
CUT &
(4 IN)
(CONC)
RIPRAP
& GUTTER
CONC CURB
(INSTALL)
FENCE
WOOD
SY CY LF LF
CULVERT LAYOUT 17
CEDAR DRIVE SHEET 1 OF 3 150
CEDAR DRIVE SHEET 2 OF 3 408
CEDAR DRIVE SHEET 3 OF 3 130 120
CYNTHIA DRIVE SHEET 1 OF 2 243
CYNTHIA DRIVE SHEET 2 OF 2 358
SHERWOOD APARTMENTS SHEET 1 OF 2
SHERWOOD APARTMENTS SHEET 2 OF 2
PROPOSED SWALE SHEET 1 OF 2 8 20
PROPOSED SWALE SHEET 2 OF 2
TOTAL 1,289 25 20 120
REVISION 5-13-242
SUMMARY OF REMOVAL ITEMS
LOCATION
104-1 496-1 496-2 5071-1
GUTTER)
(CURB AND
CONC
REMOVING
(INLET)
REMOV STR
(PIPE)
REMOV STR
(REMOVE)
WOOD FENCE
LF EA LF LF
SHEET 1 OF 1 254 1 132 120
TOTAL 254 1 132 120
SUMMARY OF DRAINAGE ITEMS
LOCATION
400-2 402-1 464-1 464-2 464-3 464-4 464-5 464-6 465-1 465-2 465-3 465-4 465-5 465-6 465-7 467-1 476-1 476-2
BACKFILL
STABILIZED
PROTECTION
EXCAVATION
TRENCH
GASKET
RUBBER
CLASS III
18" R.C.P.
GASKET
RUBBER
CLASS III
24" R.C.P.
GASKET
RUBBER
CLASS III
30" R.C.P.
GASKET
RUBBER
CLASS III
36" R.C.P.
CLASS V
36" R.C.P.
RACK
TRASH
OUTFALL
(48")
MANHOLE
(60")
MANHOLE
(72")
MANHOLE
INLET
TYPE A
1~EXTENSION
INLET W/
TYPE A
2~EXTENSION
INLET W/
TYPE A
INLET
C-C
TYPE
(P)
(RCP) (3:1)
(18 IN)
SET (TY II)
(CL V)
(RCP)
IN)
PIPE (24
OR TUN
JACK BOR
(CL V)
(RCP)
IN)
PIPE (36
OR TUN
JACK BOR
CY LF LF LF LF LF LF EA EA EA EA EA EA EA EA EA LF LF
CULVERT LAYOUT 55 1 50
CEDAR DRIVE SHEET 1 OF 3 327 99 2 4
CEDAR DRIVE SHEET 2 OF 3 26 330 102 2 1 1
CEDAR DRIVE SHEET 3 OF 3 135 208 1 1 1
CYNTHIA DRIVE SHEET 1 OF 2 306 1 2
CYNTHIA DRIVE SHEET 2 OF 2 326 88 2 4
SHERWOOD APARTMENTS SHEET 1 OF 2 345 1
SHERWOOD APARTMENTS SHEET 2 OF 2 226 90 1 3 80
PROPOSED SWALE SHEET 1 OF 2
PROPOSED SWALE SHEET 2 OF 2 30 1
270 1,076
TOTAL 270 1,076 1,015 917 237 434 90 1 8 1 4 1 11 1 1 1 50 80
SUMMARY OF EROSION CONTROL ITEMS
LOCATION
162-1 164-1 164-2 168-1 506-1 506-2 506-3 506-4 506-5 506-6
ROLL SODDING
(WARM)
(TEMP)
MLCH SEED
STRAW/HAY
(WARM OR COLD)
SEED (TEMP)
STRAW/HAY MLCH
WATERING
VEGETATIVE
(TY 1)
(INSTALL)
EXITS
CONSTRUCTION
(TY 1)
(REMOVE)
EXITS
CONSTRUCTION
(INSTALL)
CONT FENCE
TEMP SEDMT
(REMOVE)
CONT FENCE
TEMP SEDMT
(INSTL) (12")
CONT LOGS
BIODEG EROSN
(REMOVE) (12")
CONT LOGS
BIODEG EROSN
SY SY SY MG SY SY LF LF LF LF
SHEET 1 OF 3 78 78
SHEET 2 OF 3 99 10,098 10,098 184 1,708 1,708 215 215
SHEET 3 OF 3 95 95
TOTAL 99 10,098 10,098 184 78 78 1,708 1,708 310 310
TBPE Registration No. F-10573 www.kci.com
Phone: 956-271-6688
Mission, TX 78574
2610 North Shary Road
Revision: 1-9-20241
1 3
GENERAL NOTES
GENERAL NOTES: GENERAL NOTES (CONTINUE):
CONSTRUCTION.
15. CONTRACTOR TO INSURE SAME DAY ACCESS TO ALL RESIDENCE AND BUSINESS ADJACENT TO
14. FILL TO BE COMPACTED AS PER CITY OF EDINBURG REQUIREMENTS.
MANNER AT CONTRACTOR'S EXPENSE.
DISPOSAL OF ALL EXCESS CONCRETE, CURBS, RUBBLE, ETC. TO BE DONE IN A LEGAL
D. ALL EXPOSED CONCRETE WORK TO BE CHAMFERED. DEMOLITION, REMOVAL, AND
C. ALL REINFORCING STEEL TO BE ASTM A-615, GRADE 60, UNLESS OTHERWISE SHOWN.
STRENGTH TO BE DETERMINED BY CYLINDER BREAK TEST.
B. ALL CONCRETE TO BE 3500-PSI MINIMUM AT 28 DAYS, UNLESS OTHERWISE SHOWN.
A. ALL CONCRETE WORK TO BE FORMED, UNLESS OTHERWISE APPROVED.
13. CONCRETE NOTES:
MANUFACTURED PLUG.
12. ALL PROPOSED PIPE STUB-OUTS ARE TO BE PLUGGED. PLUG SANITARY SEWERS WITH
UNDERGROUND UTILITIES CONSTRUCTION.)
EXCESS TRENCH MATERIAL (NO ADDITIONAL PAYMENT-INCLUDE IN COST OF
UTILITY TRENCH EXCAVATION TO BE CLEARED AND GRUBBED PRIOR TO PLACEMENT OF
TIMES DURING CONSTRUCTION OF PROPOSED FACILITIES. NATURAL GROUND ADJACENT TO
11. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING ADEQUATE DRAINAGE AT ALL
COURSE OF CONSTRUCTION WITHOUT PRIOR APPROVAL FROM CITY OF EDINBURG AGENCY.
10. EQUIPMENT AND MATERIALS SHALL NOT BE STORED ON PUBLIC RIGHT OF WAY DURING THE
MEASURED FOR PAYMENT.
DAMAGED. THIS WILL BE CONSIDERED SUBSIDIARY TO THE VARIOUS ITEMS AND SHALL NOT BE
BE HELD LIABLE IF ANY OF THE CONTRACTOR'S EQUIPMENT OR MATERIAL IS STOLEN OR
9. THE CONTRACTOR SHALL STORE THE MATERIALS AT THE SITE AT HIS OWN RISK. CITY SHALL NOT
INSPECTION TO DOCUMENT EXISTING CONDITIONS (NOTES & PHOTOS).
8. PRIOR TO CONSTRUCTION, CONTRACTOR, OWNER AND ENGINEER TO PERFORM ON-SITE FIELD
HIS EXPENSE.
WORK. REQUIRED PERMITS THAT CAN ONLY BE ISSUED TO CONTRACTOR WILL BE OBTAINED AT
THAT ALL CONSTRUCTION PERMITS HAVE BEEN OBTAINED PRIOR TO COMMENCEMENT OF
OPERATIONS PRIOR TO COMMENCEMENT OF WORK. CONTRACTOR SHALL ASSURE HIMSELF
PERSONS IN CHARGE OF PRIVATE AND PUBLIC UTILITIES OR RAILROADS AFFECTED BY HIS
7. CONTRACTOR SHALL GIVE NOTICE TO ALL AUTHORIZED INSPECTORS, SUPERINTENDENTS, OR
EXPENSE PRIOR TO COMMENCEMENT OF WORK.
6. CONTRACTOR TO OBTAIN ALL CONSTRUCTION PERMITS NOT SUPPLIED BY OWNER AT HIS
NOTED.
5. MAINTAIN A MINIMUM OF 6 INCHES CLEARANCE BETWEEN ALL UTILITIES, UNLESS OTHERWISE
SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE ENGINEER.
CONSTRUCTION OF PROPOSED IMPROVEMENTS. ANY CONFLICTS FOUND BY SUCH EXPLORATION
FIELD EXPLORATION THE LOCATION AND DEPTH OF ALL UTILITY LINES PRIOR TO
CONTACT ALL UTILITY LOCATORS AS NOTED ON COVER SHEET AND SHALL VERIFY BY HIS OWN
SAID LINES HAVE ACTUALLY BEEN CONSTRUCTED AS SHOWN. THE CONTRACTOR SHALL
AVAILABLE PLANS, UTILITY MAPS, AND VISUAL INSPECTIONS. THERE IS NO GUARANTEE THAT
4. THE LOCATION AND DEPTH OF EXISTING UTILITIES SHOWN HEREON, ARE BASED UPON
CONSTRUCTION OPERATION WILL BE REPAIRED BY THE CONTRACTOR AT HIS OWN EXPENSE.
OF CONSTRUCTION. ANY DAMAGE TO EXISTING FACILITIES INCURRED AS A RESULT OF THIS
BROUGHT TO THE ATTENTION OF THE CITY ENGINEER IN WRITING PRIOR TO COMMENCEMENT
CONSTRUCTION OF PROPOSED FACILITIES (NO SEPARATE PAY). ANY DISCREPANCIES SHALL BE
3. CONTRACTOR TO VERIFY LOCATION AND ELEVATION OF EXISTING FACILITIES PRIOR TO
48 HOURS PRIOR TO EXCAVATION NEAR THE UTILITIES.
2. CONTRACTOR TO NOTIFY ALL UTILITY COMPANIES WITHIN THE CONSTRUCTION AREA
956-388-8211, 48 HOURS PRIOR TO START OF ANY CONSTRUCTION WITHIN PROJECT SITE.
1. CONTRACTOR SHALL CONTACT THE CITY OF EDINBURG ENGINEERING DEPARTMENT AT
CONTRACTOR AT NO SEPARATE PAY.
32. CONSTRUCTION STAKING (ALIGNMENT AND GRADE) TO BE PROVIDED BY THE
PAY.
COST OF SECURING POLES WILL BE PAID FOR BY THE CONTRACTOR. NO SEPARATE
FOR SECURING POLES, IF NECESSARY, WHILE CONSTRUCTION PASSES BY POLES.
31. CONTRACTOR TO MAKE ARRANGEMENTS WITH THE APPROPRIATE UTILITY COMPANY
THE CONTRACTOR AT THE CONTRACTOR'S EXPENSE, NO SEPARATE PAY.
30. ANY DAMAGES TO FENCES, WALKS OR PRIVATE PROPERTY SHALL BE REPAIRED BY
CAUTION.
MAY BE BURIED BELOW GROUND WITH CONDUITS. THE CONTRACTOR SHOULD EXERCISE
CONTAIN HIGH VOLTAGE OR LOW VOLTAGE ELECTRICAL WIRING. SOME ELECTRICAL WIRING
29. THE CONSTRUCTION AREAS MAY CONTAIN UNDERGROUND ELECTRICAL LINES, CONDUITS MAY
BOTH CRIMINAL AND CIVIL LIABILITY.
RESPONSIBLE FOR SAFETY OF CONSTRUCTION WORKERS UNDER THIS LAW. THIS LAW CARRIES
WITHIN SIX (6) FEET OF LIVE OVERHEAD HIGH VOLTAGE LINES. CONTRACTORS ARE LEGALLY
HEALTH & SAFETY CODE, FORBIDS ALL ACTIVITIES IN WHICH PERSONS OR OBJECTS MY COME
CONTRACTOR TO NOTE THEIR LOCATION PRIOR TO CONSTRUCTION. TEXAS LAW, SECTION 752,
28. OVERHEAD LINES MAY EXIST ON THE PROPERTY. CLEARLY VISIBLE LINES ARE NOT MARKED, AND
EXPENSE.
27. ANY SOIL BORINGS THE CONTRACTOR REQUIRES ARE TO BE DONE BY THE CONTRACTOR AT HIS
26. ALL WORK SHALL BE PERFORMED DURING DAYLIGHT HOURS.
25. NO EXCAVATION SHALL REMAIN OPEN OVERNIGHT.
OF EXCAVATION.
24. CONTRACTOR TO EXPOSE ANY EXISTING FACILITY THAT MAY BE IN CONFLICT PRIOR TO START
EXCAVATION.
APPROXIMATE. CONTRACTOR TO LOCATE LINES AND/OR OBSTRUCTIONS AHEAD OF
TELEPHONE, ELECTRICAL, ETC.) ARE DETERMINED FROM AVAILABLE RECORDS AND ARE
23. LOCATION OF EXISTING UNDERGROUND UTILITIES AND SERVICE LINES (WATER, SEWER, GAS, DIRECTLY BUT CONSIDERED SUBSIDIARY TO THE VARIOUS BID ITEMS.
REMOVED TO THE TIME THE PROPOSED FENCE IS PLACED. THIS WORK WILL NOT BE PAID FOR
22. THE CONTRACTOR SHALL PROVIDE A TEMPORARY FENCE FROM THE TIME AN EXISTING FENCE IS
PROVIDE/MAINTAIN ALTERNATIVE ALL WEATHER ROUTES.
21. CONTRACTOR SHALL AT ALL TIMES MAINTAIN ACCESS TO EXISTING DRIVEWAYS OR
PROJECT.
VEHICULAR TRAFFIC FROM CONSTRUCTION RELATED ACTIVITIES DURING THE COURSE OF THIS
20. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THE SAFETY OF THE PEDESTRIANS AND ALL
CITY ENGINEER & OTHER APPROPRIATE PERSONS.
TRAFFIC CONTROL PLAN SHALL BE SUBMITTED PRIOR TO CONSTRUCTION FOR REVIEW BY THE
MOST RECENT EDITION AS REVISED) DURING CONSTRUCTION (NO SEPARATE PAY). A WRITTEN
PART VI OF THE "TEXAS MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES" (TEXAS MUTCD,
CONTRACTOR SHALL PROVIDE AND INSTALL TRAFFIC CONTROL DEVICES IN ACCORDANCE WITH
19. WHERE CONTRACTOR'S WORK AND/OR EQUIPMENT CAUSE AN OBSTRUCTION TO TRAFFIC,
STRICT ACCORDANCE WITH THE LATEST OSHA STANDARDS.
18. CONTRACTOR IS HEREBY INFORMED THAT ALL TRENCHING AND SHORING WILL BE DONE IN
CONSTRUCTION WILL BE THE UTILITY CONTRACTOR'S RESPONSIBILITY. NO SEPARATE PAY.
17. RETESTING OF ALL UTILITIES AND ACCEPTANCE BY OWNER SUBSEQUENT TO THE PAVEMENT
SEPARATE PAY.
STREETS MUST BE CLEANED WITHIN 2 HOURS OF WHEN THE TRACKING OCCURS. NO
EXISTING STREETS BY HIS WORK MEN'S SUPPLIERS, OR SUBCONTRACTOR'S VEHICLES.
16. CONTRACTOR IS RESPONSIBLE FOR CLEANING MUD AND/OR DIRT TRACKED ONTO
F I
L E
D A
T E
C
SHEET NO.
DS:
DW:
CK:
ATE OF TEXA
S
LICENSED
P R
O
F E
SSIONAL ENGI
N
E E
R
122125
OSCAR ARTURO GARZA
DRAINAGE IMPROVEMENTS
BRENNAALEEN CEDAR
EDINBURG
CITY
PROJECT NUMBER
C-317-23 PROJECT PHASE I
PROJECT NAME
p w k c i p w b e n t l e y c o m k c i p w
D o c u m e n t s
P r o j e c t s
B r e n n a a l e d a i n a g e
I m p r o v e m e n t s
D e s i g n
P l t n e r a l
B r e n n a a l e e n
G e n e r a l
N o t e s
1/9/2024
TBPE Registration No. F-10573 www.kci.com
Phone: 956-271-6688
2 3
WASTEWATER COLLECTION LINE CONSTRUCTION NOTES:
WATER LINE CONSTRUCTION NOTES:
5. CONTRACTOR SHALL MAINTAIN A MIN. OF 4 FT COVER ON ALL WATER LINES.
REQUIRED.
EDINBURG REQUIREMENTS PRIOR TO TIE-INS. CITY OF EDINBURG APPROVAL OF TESTING IS
4. WATER LINE MAINS TO BE HYDROSTATICALLY & BACTERIOLOGICALLY TESTED PER CITY OF
LOCATIONS PRIOR TO CONSTRUCTION OF MAIN.
3. CONTRACTOR TO FIELD LOCATE EXISTING METERS & PROPOSED SERVICE CONNECTION
TESTING.
2. DOUBLE CHECK VALVE WILL BE REQUIRED WHEN FILLING NEW WATERLINE FOR PRESSURE
NOTED.
1. ALL WATER LINES TO BE BLUE COLORED C-900 DR 18 CLASS 235 PVC UNLESS OTHERWISE
GENERAL NOTES (CONTINUE):
REQUIRED DESIGN CHARACTERISTICS.
DESIGN, HORIZONTAL RIBS AND/OR VERTICAL STIFFENERS MAY BE UTILIZED TO ACHIEVE
MINIMUM WALL THICKNESS SHALL BE 0.5 INCH. IF REQUIRED BY THE MANUFACTURERS
VEHICLE) AND THE APPLICABLE SOIL AND HYDROSTATIC PRESSURE LOADING CONDITIONS.
SHOWING THAT THE MANHOLES ARE DESIGNED FOR TRAFFIC LOADING (H20 DESIGN
MANUFACTURER SHALL PROVIDE CERTIFICATION AND DESIGN CALCULATIONS TO THE CITY
11. ALL MANHOLES INSTALLED ON THIS PROJECT SHALL BE FIBERGLASS. THE MANHOLE
CITY LOGO.
10. WASTEWATER MANHOLES SHALL INCLUDE A RAIN GUARD AND SHALL INCLUDE THE LATEST
9. NO WATER JETTING ALLOWED, MECHANICAL COMPACTION REQUIRED.
PAYMENT.
CONSIDERED SUBSIDIARY TO THE MANHOLE ITEMS AND SHALL NOT BE MEASURED FOR
8. EXCAVATION, BACKFILL, TOP SLAB, RING AND COVERS, ETC. FOR MANHOLES ARE
CHAPTER 317 (c), (5) (h) OF THE STATE WASTEWATER CODE, NO WATER TEST ALLOWED.
7. CONTRACTOR TO PROVIDE LEAKAGE TEST FOR MANHOLE IN ACCORDANCE WITH TCEQ
CHAPTER 317 SUBCHAPTER C. NO SEPARATE PAY.
6. ALL TESTING OF WASTEWATER COLLECTION LINES ARE TO COMPLY WITH TCEQ REGULATIONS
CONSTRUCTED IN ACCORDANCE WITH TCEQ REGULATIONS CHAPTER 290 AND 317.
5. ALL PARALLEL AND CROSSING OF WASTEWATER COLLECTION LINES AND WATER LINES
(4) (b), 30 DAYS AFTER INSTALLATION, NO WATER TEST ALLOWED.
4. CONTRACTOR TO PROVIDE DEFLECTION TEST IN ACCORDANCE WITH TCEQ CHAPTER 317.2(a), USED FOR SANITARY SEWERS.
MATERIAL UNLESS OTHERWISE NOTED. NEITHER BLUE PVC NOR DUCTILE IRON PIPE SHALL BE
3. ALL PROPOSED WASTEWATER COLLECTION LINES WILL BE GREEN COLORED SDR 26 PIPE
OTHERWISE ON PLANS. FINISHED GRADE TO SLOPE AWAY FROM TOP OF RIM.
2. TOPS OF MANHOLES TO BE SET AT ELEVATION OF NATURAL GROUND. UNLESS SHOWN
1. PIPE BEDDING REQUIREMENTS ARE OUTLINED IN DETAIL SHEET.
50. CONTRACTOR SHALL FOLLOW THE CITY OF EDINBURG LATEST ENGINEERING STANDARDS.
ORIGINAL CONDITION AT NO ADDITIONAL EXPENSE.
THE CONSTRUCTION MUST BE PROTECTED FROM DAMAGE, CLEANED AND RESTORED TO THE
THE WORK PROGRESS. ALL AREAS ADJACENT TO THE CONSTRUCTION AREA OR AFFECTED BY
PERSONS AND PROPERTY, AND FOR PROVIDING SAFE WORKING CONDITIONS THROUGHOUT
CONTRACTOR. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING PROTECTION OF
49. ALL SAFETY EXPOSURES OR VIOLATIONS SHALL BE RECTIFIED IMMEDIATELY BY THE
SESSION.
BILLS 622 AND 665 ENACTED BY THE TEXAS LEGISLATURE IN THE 7TH LEGISLATURE REGULAR
SAFETY SYSTEMS, INCLUDING THE PLANS AND SPECIFICATIONS REQUIRED BY THE HOUSE
PLANS. THE CONSTRUCTION CONTRACTOR SHALL PREPARE OR OBTAIN THE APPROPRIATE
ANY SUCH SAFETY SYSTEMS THAT MAY NOW OR HEREAFTER BE INCORPORATED IN THESE
OF CITY OF EDINBURG LICENSED PROFESSIONAL ENGINEER(S) HEREON DOES NOT EXTEND TO
EMPLOYEES, AGENTS OR REPRESENTATIVES IN THE PERFORMANCE OF THE WORK. THE SEAL
OR SYSTEMS PERTAINING TO THE SAFEY OF THE CONSTRUCTION CONTRACTOR OR ITS
48. THESE PLANS, PREPARED BY THE CITY OF EDINBURG DO NOT EXTEND TO OR INCLUDE DESIGN
4205.
OBSERVATIONS; NAVD 88 HORIZ: STATE PLANE COORDINATES (NAD83) ZONE SOUTH TEXAS -
47. SURVEY PERFORMED BY KCI TECHNOLOGIES, INC.. ELEVATIONS BASED UPON STATIC GPS
LIMITED TO BACKFILL, TOP SOIL, HYDRO MULCH, ETC.
CONTRACTOR SHALL RETURN THE SITE TO ORIGINAL CONDITIONS INCLUDING BUT NOT
TO INSURE NO AREAS OF PONDING ARE PRESENT. UPON COMPLETION OF CONSTRUCTION,
CONTOURS UNLESS DIFFERENT FINISHED ELEVATIONS ARE SHOWN ON PLANS. CONTRACTOR
46. UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL RETURN THE SITE TO ORIGINAL
EDINBURG ENGINEERING DEPARTMENT.
45. ALL CONSTRUCTION MATERIALS TESTING WILL BE COORDINATED THROUGH CITY OF
ON WORK SCHEDULES, TESTING, GENERAL INSPECTION, AND EXISTING LINES.
44. CONTRACTOR TO COORDINATE WITH THE CITY OF EDINBURG ENGINEERING DEPARTMENT
REQUIREMENTS OF GOVERNING ENTITIES.
PUBLIC GOVERNMENTAL AND PRIVATE ENTITIES. CONTRACTOR SHALL COMPLY WITH ALL
43. WORK PERFORMED UNDER THIS CONTRACT IS GOVERNED BY REQUIREMENTS OF SEVERAL
REPRESENTATIVE, AND THE OWNER'S REPRESENTATIVE.
OF PLANS ON SITE FOR INSPECTION BY THE CITY ENGINEER, THE CITY ENGINEER'S
42. THE CONTRACTOR SHALL BE RESPONSIBLE TO MAINTAIN AN UPDATED REDLINED "AS-BUILT" SET
MEASURED FOR PAYMENT.
WARNING SIGNS, ETC. ARE CONSIDERED SUBSIDIARY TO THE WORK AND SHALL NOT BE
41. TEMPORARY FENCING AND TEMPORARY GATES, BARRICADES, WARNING LIGHTS,
PAYMENT.
SUBSIDIARY TO THE PIPE AND TRENCH ITEMS AND SHALL NOT BE MEASURED FOR
BY-PASS PUMPING FLOW DIVERSIONS AND TEMPORARY PIPE PLUGS ARE CONSIDERED
40. COLLECTION AND DISPOSAL OF WASTEWATER, REMOVING EXISTING PIPE AND FITTINGS,
SEPARATE PAY.
39. RETESTING OF ANY TESTING FAILURES WILL BE THE CONTRACTOR'S RESPONSIBILITY. NO
SEPARATE PAY.
38. CONTINUOUS METALLIC MARKER TAPE SHALL BE USED FOR ALL NON-METALLIC PIPE. NO
LAND SURVEYOR TO ORIGINAL PROPERTY CORNER AT NO SEPARATE PAY.
37. IRON RODS DISTURBED DURING CONSTRUCTION TO BE REPLACED BY REGISTERED PUBLIC
36. PAVED SURFACES SHALL BE PROTECTED FROM DAMAGE FROM TRACKED EQUIPMENT.
PROPOSED WORK.
35. CONTRACTOR SHALL PROTECT EXISTING UNDERGROUND FACILITIES DURING INSTALLATION OF
34. ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPLICABLE LOCAL REQUIREMENTS.
WILL BE HIS RESPONSIBILITY TO DISPOSE OF OFF-SITE.
33. EXCAVATED MATERIAL SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND
F I
L E
D A
T E
C
SHEET NO.
DS:
DW:
CK:
ATE OF TEXA
S
LICENSED
P R
O
F E
SSIONAL ENGI
N
E E
R
122125
OSCAR ARTURO GARZA
DRAINAGE IMPROVEMENTS
BRENNAALEEN CEDAR
EDINBURG
CITY
PROJECT NUMBER
C-317-23 PROJECT PHASE I
PROJECT NAME
p w k c i p w b e n t l e y c o m k c i p w
D o c u m e n t s
P r o j e c t s
B r e n n a a l e d a i n a g e
I m p r o v e m e n t s
D e s i g n
P l t n e r a l
B r e n n a a l e e n
G e n e r a l
N o t e s
1/9/2024
TBPE Registration No. F-10573 www.kci.com
Phone: 956-271-6688
Mission, TX 78574
2610 North Shary Road
Revision: 1/9/20241
3 3
PAVING CONSTRUCTION NOTES:
ON JUNE 1, 2004, SHALL GOVERN ON THIS PROJECT.
8. SPECIFICATIONS ADOPTED BY THE TEXAS DEPARTMENT OF TRANSPORTATION
TEMPERATURE OF 225 DEGREE FAHRENHEIT.
TEMPERATURE SHALL BE REJECTED. HOT MIX SHALL BE LAID AT A MINIMUM
DURING MATERIAL HAULING. MATERIAL DELIVERED TO SITE AT IMPROPER
7. HMAC TRANSPORT TRUCKS TO BE EQUIPPED WITH CANVAS COVERS TO BE UTILIZED
SURFACES FROM ASPHALT SPLATTER DURING PRIMING AND SEALING OPERATIONS.
6. CARE SHALL BE TAKEN TO PROTECT CURB AND GUTTER AND OTHER CONCRETE
CONCRETE AND SHALL MEET THE REQUIRED TX DOT ITEM 340.
5. TYPES AND RATES FOR SURFACE TREATMENTS SHALL BE: HOT MIX ASPHALTIC
4. PRIME COAT SHALL BE MC-30 APPLIED AT A RATE OF 0.15 GAL/SY.
3. FLEXIBLE BASE ARE TO COMPLY WITH LATEST CITY OF EDINBURG REQUIREMENTS.
VERTICAL AND MADE WITH A SAW.
2. WHERE EXISTING ASPHALT AND CONCRETE ARE TO BE CUT, THESE CUTS SHALL BE
DRAINAGE.
1. CONTRACTOR TO FILL BEHIND CURBS AND WALKS AND SHAPE TO ENSURE PROPER
EROSION CONTROL:
EXIT POINTS PRIOR TO EXISTING ONTO ANY PAVED ROADWAY.
13. THE CONTRACTOR SHALL CONSTRUCT A STABILIZED CONSTRUCTION EXIT AT ALL TRAFFIC
AREAS WATERED UNTIL FULLY ESTABLISHED AND ACCEPTED BY THE OWNER.
EMBANKMENTS. THE CONTRACTOR SHALL MAINTAIN FINAL GRADING AND KEEP SEEDED
IMMEDIATELY UPON COMPLETION OF FINAL GRADING. THIS INCLUDES ALL DITCHES AND
12. ALL NON-PAVED AREAS SHALL BE MULCHED AND SEEDED WITH EROSION PROTECTION
THE CONTRACTOR AT NO ADDITIONAL EXPENSE TO THE OWNER.
OF THE STORM WATER POLLUTION PREVENTION PLAN (SW3P). THE WORK SHALL BE DONE BY
DETAILS. ALL WORK SHALL CONFORM TO THE GOVERNMENTAL REQUIREMENTS AND BECOME PART
11. BORROW AREAS, IF EXCAVATED, SHALL BE PROTECTED AND STABILIZED UTILIZING THE PLAN
SHOWN ON THE PLANS.
10. AREAS OF CONSTRUCTION ELSEWHERE ON THE JOB SITE SHALL CONFORM TO THE DETAILS
ADDITIONAL COST TO THE OWNER.
THE REQUIREMENTS OF LAW AND THIS PLAN. MODIFICATIONS SHALL NOT BE BASIS FOR
MEANS, METHODS AND SEQUENCE. MODIFICATIONS SHALL NOT COMPROMISE THE INTENT OF
9. THE CONTRACTOR SHALL AMEND OR MODIFY THIS PLAN AS REQUIRED BY CONSTRUCTION
d. DESIGNATING AND CONTROLLING EQUIPMENT WASH DOWN.
c. CONVENIENTLY LOCATED WASTE RECEPTACLES; AND
b. REGULAR COLLECTION OF WASTE;
a. DESIGNATING AREAS FOR EQUIPMENT MAINTENANCE AND REPAIR;
POLLUTANTS TO STORM WATER. APPROPRIATE PRACTICES CAN INCLUDE:
PRACTICES TO PREVENT THE DISCHARGE OF OILS, GREASE, PAINTS, GASOLINE, AND OTHER
8. THE CONTRACTOR SHALL ADOPT APPROPRIATE CONSTRUCTION SITE MANAGEMENT
IDENTIFIED IN THE POLLUTION PREVENTION PLAN.
UNDERSTANDING OF THE NDPES GENERAL PERMIT BEFORE CONDUCTING ANY ACTIVITY
7. ALL CONTRACTORS AND SUBCONTRACTORS IDENTIFIED IN THE PLAN MUST CERTIFY AS TO AN
MADE PART OF THE PLAN.
OF THE STORM WATER POLLUTION PREVENTION PLAN (SW3P) SHALL BE RETAINED AND
6. AN INSPECTION REPORT THAT SUMMARIZES INSPECTION ACTIVITIES AND IMPLEMENTATION
DAYS FOLLOWING THE INSPECTION.
INADEQUACIES REVEALED BY THE INSPECTION MUST BE IMPLEMENTED WITHIN 7 CALENDAR
AND WITHIN 24 HOURS AFTER ANY STORM EVEN GREATER THAN 0.5 INCHES. REPAIRS AND
5. STABILIZATION MEASURES ARE TO BE INSPECTED AT A MINIMUM OF ONCE EVERY 14 DAYS
EXPENSE TO THE OWNER.
MATERIALS AND WORK SHALL BE ACCOMPLISHED BY THE CONTRACTOR AT NO ADDITIONAL
PLAN PROVES INEFFECTIVE. MODIFICATIONS INCLUDING DESIGN AND ALL ADDITIONAL
CONSTRUCTION, OPERATION, OR MAINTENANCE OF THE PLAN, OR WHEN THE EXISTING
4. THE CONTRACTOR MUST AMEND PLANS WHENEVER THERE IS A CHANGE IN DESIGN,
AVAILABLE, UPON REQUEST, TO TCEQ.
3. THE CONTRACTOR SHALL MAKE THE STORM WATER POLLUTION PREVENTION PLAN (SW3P)
c. REMOVAL OF SEDIMENT FROM STORM WATER BEFORE IT LEAVES THE SITE.
AND
b. LIMITS THE EXPOSURE OF DISTURBED AREAS TO THE SHORTEST DURATION POSSIBLE;
a. DIVERSION OF UPSLOPE WATER AROUND DISTURBED AREAS OF THE SITE;
2. THE STORM WATER POLLUTION PREVENTION PLAN (SW3P) SHOULD ADDRESS THREE GOALS:
FOR REGION 6 FOR STORM WATER DISCHARGES FROM CONSTRUCTION SITES.
COMMISSION ON ENVIRONMENTAL QUALITY (TCEQ) (NO SEPARATE PAY) TPDES GENERAL PERMIT
PREVENTION PLAN (SW3P) SHALL MEET THE REQUIREMENTS SET FORTH IN THE TEXAS
BE SOLELY RESPONSIBLE FOR ITS IMPLEMENTATION. THE STORM WATER POLLUTION
CONTRACTOR SHALL PREPARE THE STORM WATER POLLUTION PREVENTION PLAN (SW3P) AND
NOTICE OF INTENT PER THE REQUIREMENTS IN THE NPDES GENERAL PERMIT. THE
COMPLIANCE WITH FEDERAL REGULATIONS. CONTRACTOR SHALL PREPARE AND SUBMIT A
PREVENTION PLAN (SW3P) FOR THIS PROJECT TO ESTABLISH A MINIMUM BASIS OF
SPECIFICATIONS TO BE USED AS THE GENERAL GUIDELINES OF THE STORM WATER POLLUTION
1. IT IS THE INTENT OF THIS SUGGESTED EROSION CONTROL PLAN AND WITHIN THE
F I
L E
D A
T E
C
SHEET NO.
DS:
DW:
CK:
ATE OF TEXA
S
LICENSED
P R
O
F E
SSIONAL ENGI
N
E E
R
122125
OSCAR ARTURO GARZA
DRAINAGE IMPROVEMENTS
BRENNAALEEN CEDAR
EDINBURG
CITY
PROJECT NUMBER
C-317-23 PROJECT PHASE I
PROJECT NAME
p w k c i p w b e n t l e y c o m k c i p w
D o c u m e n t s
P r o j e c t s
B r e n n a a l e d a i n a g e
I m p r o v e m e n t s
D e s i g n
P l t n e r a l
B r e n n a a l e e n
G e n e r a l
N o t e s
1/9/2024
TBPE Registration No. F-10573 www.kci.com
Phone: 956-271-6688
TRAFFIC THROUGH THE PROJECT AREAS.
CONSTRUCTION PROJECTS, TO INSURE THE UNINTERRUPTED FLOW OF
VARIOUS SEQUENCE OF CONSTRUCTION WITH ANY ADJACENT
THE CONTRACTOR SHALL COORDINATE THE TRAFFIC CONTROL PLAN AND
TRAFFIC CONTROL.
PROPOSED NUMBER OF LANES AS SPECIFIED AT EVERY PHASE OF THE
AT THE END OF EACH WORKING DAY, THE ROADWAY WILL BE OPEN TO THE
ALL PAVING OPERATIONS SHALL PROCEED IN THE DIRECTION OF TRAFFIC.
SPECIFICATIONS.
ROADWAY AND OTHER RELATED ITEMS, AS NOTED ON THE PLANS AND
CONTRACTOR OF THE RESPONSIBILITY OF CONSTRUCTING THE COMPLETE
EACH PHASE OF CONSTRUCTION. ALSO, THIS DOES NOT RELIEVE THE
ADDRESS EVERY ASPECT OF CONSTRUCTION THAT IS REQUIRED DURING
INSTALLATION AND OTHER RELATED ITEMS. IT DOES NOT ATTEMPT TO
DURING CONSTRUCTION OF THE PROJECT ROADWAY AS WELL AS UTILITY
CONSTRUCTION, SERVE AS A GUIDE FOR THE SAFE HANDLING OF TRAFFIC
THE TRAFFIC CONTROL PLAN AND VARIOUS PHASES AND SEQUENCES OF
CONSTRUCTION PHASES.
ANY POSSBILE CHANGE IN TCP THAT MAY BE IN CONFLICT WITH ANY
THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING WITH THE ENGINEER FOR
PHASES ARE NOTED AS SUCH ON THE PLANS.
SHALL BE REMOVED. ANY DEVICES THAT ARE UTILIZED IN CONSECUTIVE
PHASES THAT CONFLICT WITH THE TRAFFIC CONTROL FOR THE CURRENT PHASE
PLANS ON A PER PHASES. THEREFORE, ANY DEVICE UTILIZED IN A PREVIOUS
CONTRACTOR SHALL UTILIZE TRAFFIC CONTROL DEVICES AS SHOWN ON THE
FOR THE DURATION OF THE DETOUR AND/OR CONSTRUCTION.
OF TRAFFIC DURING CONSTRUCTION SHALL BE TEMPORARILY COVERED
ANY PERMANENT SIGNING IN CONFLICT WITH THE DETOUR OR DIRECTION
MAINTENANCE DUE TO ACTS OF VANDALISM OR ACCIDENTS.
IN A CLEAN AND FUNCTIONAL CONDITION AT ALL TIMES, INCLUDING
DEVICES, WARNING LIGHTS AND TRAFFIC HANDLING DEVICES ARE MAINTAINED
THE CONTRACTOR SHALL ENSURE THAT BARRICADES, SIGNS, CHANNELIZING
CONDITIONS AS REQUIRED AND AS DIRECTED BY THE ENGINEER.
HANDLING DEVICES MAY BE ADJUSTED OR SHIFTED TO FIT FIELD
THE BARRICADES, SIGNS, CHANNELIZING DEVICES AND OTHER TRAFFIC
AND TRAFFIC HANDLING."
SHALL BE CONSIDERED SUBSIDIRARY TO "BARRICADES, SIGNS,
CONSTRUCTION. ANY SUCH ADDITIONAL SIGNS AND BARRICADES, ETC.
REQUIRED TO MAINTAIN TRAFFIC AND MOTORIST SAFETY DURING
ADDITIONAL SIGNS, BARRICADES AND CHANNELIZING DEVICES AS
TO TRAFFIC. THE ENGINEER MAY DIRECT THE CONTRACTOR TO FURNISH
APPROVED BY THE ENGINEER PRIOR TO CLOSING/OPENING ANY SECTION
THE CONTRACTOR AND SHALL BE INSTALLED BY THE CONTRACTOR AND
ADEQUATE SIGNS AND BARRICADES SHALL BE THE RESPONSIBILITY OF
OTHER PHASES OF CONSTRUCTION.
WILL NOT CONFLICT OR REQUIRE CHANGES OR ADDITIONAL WORK DURING
ALL WORK IS ACCOMPLISHED FOR EACH PHASE OF CONSTRUCTION AND
BETWEEN THE VARIOUS TRADES AND SUB-CONTRACTORS, TO ASSURE THAT
THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK
BC (2) - 21 - STANDARD SHEET.
T.M.U.T.C.D. ALL CROSS STREET SIGNING SHALL BE SET UP AS PER
"WZ (STPM)-03, BC (10)-21, BC (11)-21, BC (12)-21", AND THE
CONTRACTOR, AND SHALL BE IN ACCORDANCE WITH THE STANDARD SHEETS,
ALL WORK ZONE PAVEMENT MARKINGS SHALL BE THE RESPOSIBILITY OF THE
PROFESSIONAL ENGINEER.
ENGINEER FOR APPROVAL. ALTERNATE PLAN MUST BE SEALED BY A
CONTRACTOR MAY SUBMIT AN ALTERNATE TRAFFIC CONTROL PLAN TO THE
12' LANE ALONG ROADWAY AS INDICATED IN TCP LAYOUTS.
WILL BE REQUIRED TO MAINTAIN, AT ALL TIMES, A MINIMUM OF ONE
TIMES,UNLESS OTHERWISE DIRECTED BY THE ENGINEER. THE CONTRACTOR
AND/OR PRIVATE DRIVES SHALL BE KEPT OPEN TO THE TRAFFIC AT ALL
THE PORTION OF THIS PROJECT WHICH COINCIDES WITH EXISTING ROADS
REGARD, WITH HIS WORK FORCES, SUBCONTRACTOR, AND THE ENGINEER.
RESPONSIBLE TRAFFIC CONTROL PERSON TO PROVIDE COORDINATION IN THIS
THE CONTRACTOR WILL BE REQUIRED TO ASSIGN A KNOWLEDGEABLE AND
BARRICADES AND CONSTRUCTION STANDARDS. OR AS DIRECTED BY THE ENGINEER.
THIS WILL BE DONE IN ACCORDANCE WITH THE TRAFFIC CONTROL PLANS,
PAVEMENT MARKINGS,CHANNELIZING DEVICES,AND CONSTRUCTION WARNING SIGNS.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING ALL THE CONFLICTING
LANE TRANSITIONS, AND LANE OR SHOULDER CLOSURES.
PHASES OF CONSTRUCTION. THE VARIOUS PHASES WILL BE REQUIRING
THE TRAFFIC CONTROL PLAN HAS BEEN DIVIDED INTO THREE (3) MAJOR
THE NOTIFICATION MUST BE MADE FIVE DAYS PRIOR TO THE CHANGE.
SAFETY. OFFICIAL WHEN MAJOR TRAFFIC CHANGES ARE TO BE MADE,
DEPARTMENT, POLICE DEPARTMENT, TEXAS DEPARTMENT OF PUBLIC
THE CONTRACTOR SHALL NOTIFY THE PROPER CITY, EMS, FIRE
WITH THE TRAFFIC CONTROL PLAN, BARRICADE & CONSTRUCTION STANDARDS.
CONTRACTOR AND SHALL BE INSTALLED AND MAINTAINED IN ACCORDANCE
ALL SIGNING & BARRICADES SHALL BE THE RESPONSIBILITY OF THE
BY THE TCP BARRICADE AND CONSTRUCTION STANDARDS.
HANDLING. OTHER SIGNS MAY BE USED IN ADDITION TO THOSE REQUIRED
SIGNS WILL BE CONSIDERED SUBSIDIRARY TO "BARRICADES, SIGNS, & TRAFFIC
AND SIGNS TO REPLACE THOSE DAMAGED. THE REPLACEMENT OF DAMAGED
THE CONTRACTOR SHALL HAVE AT ALL TIMES ENOUGH BARRICADES
TRAFFIC CONTROL PLAN
TCP GENERAL NOTES: TCP GENERAL NOTES: (CONTINUED) TCP GENERAL NOTES: (CONTINUED)
RELOCATED SIGNS.
INSTALLED TO ALLOW FOR IMMEDIATE REPLACEMENT OF PROPOSED
SHALL NOT BE REMOVED UNTIL TEMPORARY SIGN SUPPORTS HAVE BEEN
THE VARIOUS CONSTRUCTION PHASES. ALL EXISTING REGULATORY SIGNS
STOP SIGNS AT INTERSECTING STREETS SHALL BE ADJUSTED DURING
F I
L E
D A
T E
C
SHEET NO.
DS:
DW:
CK:
ATE OF TEXA
S
LICENSED
P R
O
F E
SSIONAL ENGI
N
E E
R
122125
OSCAR ARTURO GARZA
DRAINAGE IMPROVEMENTS
BRENNAALEEN CEDAR
EDINBURG
CITY
PROJECT NUMBER
C-317-23 PROJECT PHASE I
PROJECT NAME
p w k c i p w b e n t l e y c o m k c i p w
D o c u m e n t s
P r o j e c t s
B r e n n a a l e d a i n a g e
I m p r o v e m e n t s
D e s i g n
P l t
P
B r e n n a a l e e n
T n e r a l
N o t e s
1/9/2024
TBPE Registration No. F-10573 www.kci.com
Phone: 956-271-6688
T
20+00 25+00
P C
P T
P O T
POT 30+00.00
PI 34+18.13
I
POT
+9 2.
P O
T
10+00 15+00
P C
P T
PI
+79 .39
P O
T
P O
T
P O
T
10+00 11+00 12+00
TRAFFIC DIRECTION
SIGN
CHANNELIZING DEVICE
TYPE 3 BARRICADE
F I
L E
D A
T E
C
SHEET NO.
DS:
DW:
CK:
SCALE: 1" = 100' SHEET OF SHEETS
ATE OF TEXA
S
LICENSED
P R
O
F E
SSIONAL ENGI
N
E E
R
122125
OSCAR ARTURO GARZA
DRAINAGE IMPROVEMENTS
BRENNAALEEN CEDAR
EDINBURG
CITY
PROJECT NUMBER
C-317-23 PROJECT PHASE I
PROJECT NAME
p w k c i p w b e n t l e y c o m k c i p w
D o c u m e n t s
P r o j e c t s
B r e n n a a l e d a i n a g e
I m p r o v e m e n t s
D e s i g n
P l t
P
B r e n n a a l e e n
T C
P
P H
1/9/2024
SHED
OVERHANG
WOOD FENCE
WOOD FENCE
SD
SD
EX. 15" PLA STM SWR
EX. 24" RCP STM SWR
EX. 36" RCP STM SWR
POND
DETENTION
PROPOSED
1 1
PHASE I
TRAFFIC CONTROL PLAN
TCP PHASE I
TCP PHASE II
LEGEND
END
WORK ZONE
G20-2bt
END
WORK ZONE
G20-2bt
G20-1bTR
ROAD WORK
NEXT 1 MILES
G20-1bTR
45' 45' 45' 50'
MIN.
A B C D
48" X 48"
CW20-1D
See note 1)
(Flags-
48" X 48"
(See note 2)
CW3-4
CW20-4
48" X 48"
24" X 18"
CW20-7
48" X 48"
CW16-2P
A B
C D
48" X 24"
G20-2
E
E
ROAD WORK
NEXT 1 MILES
E X I
T C
H
CYNTHIA DRIVE
F
E D
Y
N Z
A L
E Z
S O
U T
H E R
N
P
A C I F I C
R
A I L R
O A
D
CEDAR DRIVE
TBPE Registration No. F-10573 www.kci.com
Phone: 956-271-6688
Mission, TX 78574
DN: CK: DW: CK:FILE:
JOB
COUNTY
SECT
DIST
REVISIONS
TxDOT TxDOT TxDOT TxDOT
HIGHWAY
SHEET NO.
C TxDOT o f t h i s s t a n d a r d t o o t h e r f o r m a t s o r f o r i n c o r r e c t r e s u l t s o r d a m a g e s r e s u l t i n g f r o m i t s u s e k i n d i s m d e b
D O
T f o r a n y p u r p o w a t s o e v e
D O
T a s s u m e s n o r e s p o n s i b i l i t y f o r t h e c o n v e r s i o e u s e o f t h i s s t a n d a r d i s g o v e r n e d b y t h e
T e x g i n e e r i g a c t i c t
N r r a n t y o f a n y
D I
S C
L A I
M E
R
CONTNovember 2002
F I
L E
D A
T E
SHEET 1 OF 12
AND REQUIREMENTS
GENERAL NOTES
BARRICADE AND CONSTRUCTION
4-03
9-07
5-10
7-13
BC(1)-21
8-14 bc-21.dgn
Standard Division Safety Traffic
BARRICADE AND CONSTRUCTION (BC) STANDARD SHEETS GENERAL NOTES:
http://www.txdot.gov
THE DOCUMENTS BELOW CAN BE FOUND ON-LINE AT
COMPLIANT WORK ZONE TRAFFIC CONTROL DEVICES LIST (CWZTCD)
TEXAS MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (TMUTCD)
STANDARD HIGHWAY SIGN DESIGNS FOR TEXAS (SHSD)
TRAFFIC ENGINEERING STANDARD SHEETS
MATERIAL PRODUCER LIST (MPL)
ROADWAY DESIGN MANUAL - SEE "MANUALS (ONLINE MANUALS)"
DEPARTMENTAL MATERIAL SPECIFICATIONS (DMS)
or as approved by the Engineer.
right-of-way line as possible, or located behind a barrier or guardrail, must be parked away from travel lanes. They should be as close to the
13. Inactive equipment and work vehicles, including workers' private vehicles devices.
12. The Engineer has the final decision on the location of all traffic control progress or a definite need exists.
11. Traffic control devices should be in place only while work is actually in limits. For mobile operations, CSJ limit signs are not required.
CONTRACTOR and END ROAD WORK signs shall be erected at or near the CSJ erected in advance of the CSJ limits. The BEGIN ROAD WORK NEXT X MILES, LATER and the WORK ZONE TRAFFIC FINES DOUBLE sign with plaque shall be on BC(2). The OBEY WARNING SIGNS STATE LAW sign, STAY ALERT TALK OR TEXT
Control Devices, CSJ limit signs are required. CSJ limit signs are shown than mobile operations as defined by the Texas Manual on Uniform Traffic
10. Where highway construction or maintenance work is being undertaken, other appropriate traffic control devices to be used.
BC sheets are examples. As necessary, the Engineer will determine the most
9. The temporary traffic control devices shown in the illustrations of the provide a detail to the Contractor before the sign is manufactured.
not shown in this manual shall be shown in the plans or the Engineer shall
"Standard Highway Sign Designs for Texas," latest edition. Sign details
8. All signs shall be constructed in accordance with the details found in the justify the signing.
divided highways where median width will permit and traffic volumes
7. The Engineer may require duplicate warning signs on the median side of revised to show appropriate work zone distance.
directed by the Engineer. The BEGIN ROAD WORK NEXT X MILES sign shall be necessary warning signs as shown on these sheets, the TCP sheets or as adjacent project is completed first, the Contractor shall erect the redundant and the work areas appear continuous to the motorists. If the
FINES DOUBLE, and other advance warning signs if the signing would be
6. When projects abut, the Engineer(s) may omit the END ROAD WORK, TRAFFIC
Design Manual" or engineering judgment.
"A Policy on Geometric Design of Highways and Streets," the TxDOT "Roadway
Association of State Highway and Transportation Officials (AASHTO), applicable design criteria contained in manuals such as the American
5. Geometric design of lane shifts and detours should, when possible, meet the the approximate location of any device without the approval of the Engineer.
control devices as shown in the plans. The Contractor may not move or change
4. The Contractor is responsible for installing and maintaining the traffic sign and seal Contractor proposed changes.
by a licensed professional engineer for approval. The Engineer may develop,
3. The Contractor may propose changes to the TCP that are signed and sealed responsibility of the Engineer.
2. The development and design of the Traffic Control Plan (TCP)is the shown in the "Texas Manual on Uniform Traffic Control Devices" (TMUTCD).
The information contained in these sheets meet or exceed the requirements devices, construction pavement markings, and typical work zone signs.
to show typical examples for placement of temporary traffic control
1. The Barricade and Construction Standard Sheets (BC sheets) are intended
5-21
COMPLIANT WORKZONE TRAFFIC CONTROL DEVICES
Assessing safety Hardware (MASH).
2. Work zone traffic control devices shall be compliant with the Manual for and their sources.
Traffic Control Devices List" (CWZTCD) describes pre-qualified products
1. Only pre-qualified products shall be used. The "Compliant Work Zone when flagging is used at night.
2. Except in emergency situations, flagger stations shall be illuminated considered for high traffic volume work areas or night time work.
performance for Class 2 or 3 risk exposure. Class 3 garments should be
Apparel," or equivalent revisions, and labeled as ANSI 107-2004 standard the requirements of ISEA "American National Standard for High-Visibility within the right-of-way shall wear high-visibility safety apparel meeting
1. Workers on foot who are exposed to traffic or to construction equipment
WORKER SAFETY NOTES:
COUNTY
SECT
DIST
REVISIONS
TxDOT TxDOT TxDOT
HIGHWAY
SHEET NO.
C TxDOT o f t h i s s t a n d a r d t o o t h e r f o r m a t s o r f o r i n c o r r e c t r e s u l t s o r d a m a g e s r e s u l t i n g f r o m i t s u s e k i n d d e
D O
T f o r a n y p u r p o a t s o e v e
D O
T a s s u m e s n o r e s p o n s i b i l i t y f o r t h e c o n v e r s i e u s e o f t h i s s t a n d a r d i s g o v e r n e d b y t h e
T e x g i n e e r i a c t i t r r a n t y o f a n y
D I
S C
L A I
M E
R
CONT
bc-21.dgn
November 2002
F I
L E
D A
T E
SHEET 2 OF 12
R11-2
ROAD
CLOSED
XX
ROAD
WORK
AHEAD
END
ROAD WORK
END
ROAD WORK
CW20-1D
CW1-6
NAME
ADDRESS
CITY
STATE
CONTRACTOR
ROAD WORK
NEXT X MILES
BEGIN
ROAD
WORK
AHEAD
ROAD
WORK
AHEAD
P R
O J
E C
T
1 Block - City
1 Block - City
ROAD WORK
END
ROAD WORK
NEXT X MILES
P R
O J
E C
T
CROSSROAD X
X
X
X
ROAD
WORK
AHEAD
END
ROAD WORK
END
ROAD WORK
CW20-1D
NAME
ADDRESS
CITY
STATE
CONTRACTOR
ROAD WORK
BEGIN
T-INTERSECTION
ROAD
WORK
AHEAD
CW20-1D
CW20-1D
CW20-1D
3X
3X
XX
ROAD WORK
NEXT X MILES
ROAD WORK
NEXT X MILES
NEXT X MILES
INTERSECTED
ROADWAY 1000'-1500' - Hwy
1000'-1500' - Hwy
CSJ Limit
CSJ Limit
XXXXX
XXXXX
1,5,6
X
X
TYPICAL LOCATION OF CROSSROAD SIGNS
X
X
G20-5T
G20-5T
CW1-4R
SAMPLE LAYOUT OF SIGNING FOR WORK BEGINNING AT THE CSJ LIMITS
SAMPLE LAYOUT OF SIGNING FOR WORK BEGINNING DOWNSTREAM OF THE CSJ LIMITS
CW1-4L
CW20-1E
WORK
ROAD G20-5T
/ MILE
NEXT X MILES
TYPICAL CONSTRUCTION WARNING SIGN SIZE AND SPACING
MPH
Posted
Speed
Sign
Spacing
(Apprx.)
65 700
70 800
"X"
Feet
75 900 2
80 1000 2
SPACING
SIZE
9-07
Devices Channelizing
Devices Channelizing min.
80'
AREA
WORK
Limit
CSJ
1 and 4) see Note
(Optional
G20-2
G20-1aT
G20-1aT
NEXT X MILES
G20-2
CW13-1P
SPACE
WORK
CW13-1P
MPH
MPH
G20-2
SPACE
WORK
Channelizing Devices
LEGEND
Sign
Type 3 Barricade spacing requirements.
TMUTCD for sign
Spacing chart or the
Warning Sign Size and
See Typical Construction
G20-1bTR
G20-6T
G20-2
G20-2
G20-6T channelizing devices
Type 3 Barricade or devices channelizing
Barricade or
Type 3
G20-6T
GENERAL NOTES
or Series
Number
Sign
Freeway
Expressway/
Road
Conventional
CW20
CW21
CW22 48" x 48" 48" x 48"
CW23
CW25
CW1, CW2,
CW7, CW8, 36" x 36" 48" x 48"
CW9, CW11,
CW14
CW3, CW4,
CW5, CW6, 48" x 48" 48" x 48"
CW8-3,
CW10, CW12
CSJ LIMITS AT T-INTERSECTION
TxDOT
7-13 channelizing devices.
within the project limits. See the applicable TCP sheets for exact location and spacing of signs and
"ROAD WORK AHEAD"(CW20-1D)signs are placed in advance of these work areas to remind drivers they are still
When extended distances occur between minimal work spaces, the Engineer/Inspector should ensure additional
PROJECT LIMIT
BARRICADE AND CONSTRUCTION
WARNING
SIGNS
STATE LAW
OBEY
R20-3T
WARNING
SIGNS
STATE LAW
OBEY
WORK
ZONE
TRAFFIC
FINES
DOUBLE
WHEN
WORKERS
ARE PRESENT
BEGIN
R20-5T
R20-5aTP
SPEED
LIMIT
XX
X location with sign coordinate line should
NO-PASSING
Beginning of SPEED
LIMIT
XX
R2-1
R2-1
BC(2)-21
8-14
R2-1
SPEED
LIMIT
XX
X
G20-10T
XX
CW1-4L
MPHCW13-1P
NAME
ADDRESS
CITY
STATE
CONTRACTOR
ROAD WORK
NEXT X MILES
BEGIN DO
NOT
PASS
appropriate) (as R4-1 work area and/or distance between each additional sign.
Minimum distance from work area to first Advance Warning sign nearest the
(TMUTCD) typical application diagrams or TCP Standard Sheets.
see Part 6 of the "Texas Manual on Uniform Traffic Control Devices"
For typical sign spacings on divided highways, expressways and freeways, G20-10T
SPEED
LIMIT
R2-1
XX
X X
X
G20-2bT
END
WORK ZONE
(See note 2 below)
May be mounted on back of "ROAD WORK AHEAD"(CW20-1D) sign with approval of Engineer.
Safety Traffic
NOTES
G20-2bT
END
WORK ZONE
WORK
ZONE
TRAFFIC
FINES
DOUBLE
WHEN
WORKERS
ARE PRESENT
R20-5T
R20-5aTP
BEGIN
G20-9TP
WORK
ZONE
TRAFFIC
FINES
DOUBLE
WHEN
WORKERS
ARE PRESENT
R20-5T
R20-5aTP
BEGIN
G20-9TP
WORK
ZONE
TRAFFIC
FINES
DOUBLE
WHEN
WORKERS
ARE PRESENT
R20-5T
R20-5aTP
BEGIN
G20-9TP
G20-2bT
END
WORK ZONE
ROAD WORK
NEXT X MILES
G20-1bTL
G20-2bT
END
WORK ZONE
X
ROAD
WORK
AHEAD
CW20-1D
the end of the work zone.
Contractor will install a regulatory speed limit sign at
Control Plan.
and other signs or devices as called for on the Traffic
Area for placement of "ROAD WORK AHEAD" (CW20-1D)sign maintenance work, with the exception of mobile operations.
CSJ limit signing is required for highway construction and if workers are present.
lying outside the CSJ Limits where traffic fines may double motorist of entering or leaving a part of the work zone signs are required outside the CSJ Limits. They inform the shall be used as shown on the sample layout when advance
The "BEGIN WORK ZONE"(G20-9TP) and "END WORK ZONE" (G20-2bT)
No decimals shall be used.
to the nearest whole mile with the approval of the Engineer.
This distance shall replace the "X" and shall be rounded
WORK NEXT X MILES"(G20-5T)sign for each specific project.
to be placed on the G20-1 series signs and "BEGIN ROAD
The Contractor shall determine the appropriate distance
1 and 4) see Note
(Optional
(G20-1bTR)" signs shall be replaced by the detour signing called for in the plans.
The "ROAD WORK NEXT X MILES" left arrow(G20-1bTL) and "ROAD WORK NEXT X MILES" right arrow
NAME"(G20-6T) sign behind the Type 3 Barricades for the road closure (see BC(10) also).
2. If construction closes the road at a T-intersection, the Contractor shall place the "CONTRACTOR being performed at or near an intersection.
such as a flagger and accompanying signs, or other signs, that should be used when work is
1. The Engineer will determine the types and location of any additional traffic control devices, sizes.
Sign Designs for Texas" manual for complete list of available sign design
6. See sign size listing in "TMUTCD", Sign Appendix or the "Standard Highway
5. Only diamond shaped warning sign sizes are indicated.
Note 2 under "Typical Location of Crossroad Signs".
crossroads at the discretion of the Engineer as per TMUTCD Part 5. See
4. 36" x 36" "ROAD WORK AHEAD" (CW20-1D)signs may be used on low volume or more advance warning.
3. Distance between signs should be increased as required to have 1/2 mile advance warning.
2. Distance between signs should be increased as required to have 1500 feet
1. Special or larger size signs may be used as necessary.
the plans or as determined by the Engineer/Inspector, shall be in place.
6. When work occurs in the intersection area, appropriate traffic control devices, as shown elsewhere in
5. Additional traffic control devices may be shown elsewhere in the plans for higher volume crossroads.
will determine whether a roadway is considered high volume.
motorists of the length of construction in either direction from the intersection. The Engineer
4. The "ROAD WORK NEXT X MILES"(G20-1aT)sign shall be required at high volume crossroads to advise
Zone Standard Sheets.
location and spacing of any sign not shown on the BC sheets, Traffic Control Plan sheets or the Work be considered part of the minimum requirements. The Engineer/Inspector will determine the proper
AHEAD, LOOSE GRAVEL, or other appropriate signs. When additional signs are required, these signs will
3. Based on existing field conditions, the Engineer/Inspector may require additional signs such as FLAGGER information shall be shown in the plans.
crossroads. The Engineer will determine whether a road is low volume as per TMUTCD Part 5. This
Texas" manual for sign details. The Engineer may omit the advance warning signs on low volume
"Typical Construction Warning Sign Size and Spacing"). See the "Standard Highway Sign Designs for with the reduced size 36" x 18" "END ROAD WORK"(G20-2) sign on low volume crossroads (see Note 4 under
2. The Engineer may use the reduced size 36" x 36" ROAD WORK AHEAD (CW20-1D) sign mounted back to back
(G20-2) "END ROAD WORK" sign, unless noted otherwise in plans.
1. The typical minimum signing on a crossroad approach should be a "ROAD WORK AHEAD" (CW20-1D)sign and a
WORK AREAS IN MULTIPLE LOCATIONS WITHIN CSJ LIMITS
G20-9TP
5-21
R20-3T
COUNTY
SECT
DIST
REVISIONS
TxDOT TxDOT TxDOT
HIGHWAY
SHEET NO.
C TxDOT o f t h i s s t a n d a r d t o o t h e r f o r m a t s o r f o r i n c o r r e c t r e s u l t s o r d a m a g e s r e s u l t i n g f r o m i t s u s e k i n d d e
D O
T f o r a n y p u r p o a t s o e v e
D O
T a s s u m e s n o r e s p o n s i b i l i t y f o r t h e c o n v e r s i e u s e o f t h i s s t a n d a r d i s g o v e r n e d b y t h e
T e x g i n e e r i a c t i t r r a n t y o f a n y
D I
S C
L A I
M E
R
CONT
bc-21.dgn
November 2002
F I
L E
D A
T E
SHEET 3 OF 12
TxDOT
9-07
7-13
WORK ZONE SPEED LIMIT
BARRICADE AND CONSTRUCTION
BC(3)-21
Safety Traffic
SPEED
LIMIT
SPEED
LIMIT
TYPICAL APPLICATION OF WORK ZONE SPEED LIMIT SIGNS
WORK
ZONE
SPEED
LIMIT
WORK
ZONE
WORK
ZONE
SPEED
LIMIT
(750' - 1500') (750' - 1500')
R2-1
R2-1
R2-1 R2-1
Reduced speeds should only be posted in the vicinity of work activity and not throughout the entire project.
LIMIT
SPEED
CW3-5
See General Note 4 and approved by the Texas Transportation Commission, or by City Ordinance when within Incorporated City Limits.
Work zone speed limits shall be regulatory, established in accordance with the "Procedures for Establishing Speed Zones," or covered during periods when they are not needed.
Regulatory work zone speed signs (R2-1) shall be removed signing.
additional advance
See BC(2) for one direction only.
Signing shown for
LIMITS
CSJ
Note 4
See General
LIMIT
SPEED
CW3-5
G20-5aP
G20-5aP
SPEED
LIMIT
GENERAL NOTES
GUIDANCE FOR USE:
mounting height.
3. Speed zone signs are illustrated for one direction of travel and are normally posted for each direction of travel.
40 mph and greater 0.2 to 2 miles
35 mph and less 0.2 to 1 mile
5. Regulatory speed limit signs shall have black legend and border on a white reflective
B. Flagger stationed next to sign.
A. Law enforcement.
C. Portable changeable message sign (PCMS).
This type of work zone speed limit should be included on the design of the traffic control plans when restricted geometrics with a lower design speed are present in the work zone and modification of the geometrics to a higher design speed is not feasible.
Work activity may also be defined as a change in the roadway that requires a reduced speed for motorists to safely negotiate the work area, including:
a) rough road or damaged pavement surface
b) substantial alteration of roadway geometrics (diversions)
c) construction detours
d) grade
e) width
As long as any of these conditions exist, the work zone speed limit signs
SHORT TERM WORK ZONE SPEED LIMITS
the traffic control plans when workers or equipment are not behind concrete
f) other conditions readily apparent to the driver projects where speed control is of major importance.
E. Speed monitor trailers or signs.
D. Low-power (drone) radar transmitter.
(See Removing or Covering on BC(4)).
Long/Intermediate Term Work Zone Speed Limit signs, when approved as described above, should be posted and visible to the motorist when work activity is present.
motorists only when work activity is present. When work activity is not present, signs shall be removed or covered.
Short Term Work Zone Speed Limit signs should be posted and visible to the background (See "Reflective Sheeting" on BC(4)).
4. Frequency of work zone speed limit signs should be:
8. Techniques that may help reduce traffic speeds include but are not limited to:
2. Regulatory work zone speed limit signs shall be placed on supports at a 7 foot minimum should remain in place.
1. Regulatory work zone speed limits should be used only for sections of construction
LONG/INTERMEDIATE TERM WORK ZONE SPEED LIMITS
zone reduction see TxDOT form #1204 in the TxDOT e-form system.
conditions and factors impacting allowable regulatory construction speed
10.For more specific guidance concerning the type of work, work zone
Work Zone Speed Limits should only be posted as approved for each project.
9. Speeds shown on details above are for illustration only.
This type of work zone speed limit may be included on the design of barrier, when work activity is within 10 feet of the traveled way or actually in the traveled way.
otherwise noted under "REMOVING OR COVERING" on BC(4).
7. Turning signs from view, laying signs over or down will not be allowed, unless as directly, but shall be considered subsidiary to Item 502.
"WORK ZONE"(G20-5aP) plaque and the "SPEED LIMIT"(R2-1)signs shall not be paid for
6. Fabrication, erection and maintenance of the"ADVANCE SPEED LIMIT"(CW3-5)sign, Note 4
See General
R2-1
WORK
ZONE
SPEED
LIMIT
R2-1 signing.
additional advance
See BC(2) for one direction only.
Signing shown for
G20-5aP G20-5aP
SPEED
LIMIT
70 R2-1
LIMITS
CSJ
5-21 t h i s s t a n d a r d t o o t h e r f o r m a t s o r f o r i n c o r r e c t r e s u l t s o r d a m a g e s r e s u l t i n g f r o m i t s u s e k i n d d e
D O
T f o r a n y p u r p o a t s o e v e
D O
T a s s u m e s n o r e s p o n s i b i l i t y f o r t h e c o n v e r s i e u s e o f t h i s s t a n d a r d i s g o v e r n e d b y t h e
T e x g i n e e r i a c t i t r r a n t y o f a n y
D I
S C
L A I
M E
R
F I
L E
D A
T E
DN: CK: DW: CK:FILE:
JOB
COUNTY
SECT
DIST
REVISIONS
TxDOT TxDOT TxDOT TxDOT
HIGHWAY
SHEET NO.
C TxDOT CONT bc-21.dgn
November 2002
SHEET 4 OF 12
9-07
7-13
TEMPORARY SIGN NOTES
BARRICADE AND CONSTRUCTION
XX
T r a v e l l a n e e d
12' min.
FRONT ELEVATION
SIDE ELEVATION
T r a v e l l a n e e d
OR
TYPICAL MINIMUM CLEARANCES FOR LONG TERM AND INTERMEDIATE TERM SIGNS
CONTRACTOR REQUIREMENTS FOR MAINTAINING PERMANENT SIGNS
WITHIN THE PROJECT LIMITS
0'-6'
3. When existing permanent signs are moved and relocated due to construction
Standards. This work should be paid for under the appropriate pay item for or his/her construction equipment shall be replaced as soon as possible by the to Item 502.
ATTACHMENT FOR SIGN SUPPORTS
Wood
STOP/SLOW PADDLES
24"
24"
6.0' min.
Fiber Reinforced Plastic
Wood, metal or
SIZE OF SIGNS
SIGN SUBSTRATES
SIGN LETTERS
min.
6'
9.0' max.
7.0' min.
9.0' max.
7.0' min.
shoulder
Paved shoulder
Paved above sign protrude shall not
Support above sign protrude shall…
This is the start of the file's text. The full file is on GovTribe.