BPM003283_Evaluation_Consensus_Score_Nara_Sin.pdf

PDF 152 KB Posted

Attached to
Master Agreement AZ|CTR055131
Contract number
CTR055131
Issued by
Arizona

About this file

This document is an evaluation scoresheet for BPM003283, a Wildlife Waters Construction and Redevelopment/Wildlife Habitat Construction contract for the State of Arizona. The evaluation involves multiple contractors including Action Direct (dba Redpoint Contracting), Clay Bundy Construction Inc, Copperstate Earthworks, DBA Construction, Hylan-West, IOI Construction Corp, MD Merrett, and Ranch to Ranch. Three evaluators scored these contractors across three primary evaluation criteria: Experience and Reliability, Firm's Demonstrated Experience, and Method of Approach.

The contract appears to be a general contractor solicitation for wildlife water and habitat construction projects. The scoring matrix shows maximum points of 40 for each of the first two categories and 10 for Method of Approach, totaling 90 possible points. Copperstate Earthworks and Smith Shurtliff and Smith are highlighted as potentially preferred contractors, with Copperstate Earthworks receiving consensus scores of 36, 33.333, and 9.6667 across the three evaluation categories, resulting in a total consensus score of 79.00. The document is dated 03/30/21 and was signed by an engineer from the SSDV - AZSGD branch/entity, indicating this is likely a state-level procurement for wildlife habitat infrastructure development.

View the file

Other files

File Type Posted
BPM003283_Evaluation_Consensus_Score.xls XLS spreadsheet
BPM003283_from__Spencer_Construction_LLC-_due_4-19-21.pdf PDF
CTR055131_Spencer_Construction__Amendment_Renewal_Yr_3_DB_Signed.pdf PDF
Certificate_6-1-22_to_6-1-23.pdf PDF
Certificate__1_.pdf PDF
DNS20210223_30_legal_ad_affidavit.pdf PDF
Legal_Add_Proof_WOODARD-35-459212-1.pdf PDF
STAZMail_-TO_Evaluation_Committee___BPM003283___3-9-21.pdf PDF
STAZMail_-_Spencer_Construction__BPM003283_Price_Negotiations_INVITE.pdf PDF
STAZMail_-to__Spencer_Construction___Price_Negotiations_due_4-15-21.pdf PDF
STAZ_Mail_-_FROM_Spencer_Construction__BPM003283_Price_Negotiations_due_4-15-21.pdf PDF
STAZ_Mail_-_JOC_2-9-21.pdf PDF
STAZ_Mail_-_Request_for_Best_and_Final_Offer-BPM003283__RESPONSE-_Spencer_Construction.pdf PDF
STAZ__Mail_-_attached_picture_2-9-21.pdf PDF
Sam___AZ_Copr_Yr_2_renewal_Spencer_Construction_LLC_CTR055131.pdf PDF
Sign_in_sheet_RFP_Eval_Meeting.pdf PDF
Spencer_Construction_O_A_signed_BPM003283.pdf PDF
State_of_Arizona_Mail_-_Legal_ad_proof_BPM003283.pdf PDF
Stipulations_for_the_Redevelopment_of_Wildlife_Water_Catchments.pdf PDF
AZGF_Wildlife_Waters_Construction_and_Redevelopment_Score_and_Narrative_Ed_Jahrke.pdf PDF
BAFO-Spencer.pdf PDF
Evaluation_Committee_Member_Statement_Nara_Sin.pdf PDF
Guidelines_for_Evaluation_for_Committee_Members.pdf PDF
PDS_Ed.pdf PDF
PDS_Kmetz.pdf PDF
STAZMail_-_Award_approval_Coppertree_and_Spencer_BPM003283_4-26-21.pdf PDF
STAZ_Mail_-_Legal_Ad_Request_BMP003283_2-17-21.pdf PDF
STAZ_Mail_-_Re__Phone_Call_with_E_Jahrke.pdf PDF
STAZ_Mail_-_Term_Contract_-water_catchment_-Eval_Committee_requirements_1-27-21.pdf PDF
STAZ_Mail_-_Wildlife_Waters_RFP_2-4-21_Conversations_with_E_Jahrke.pdf PDF
STAZ__Mail_-_Wildlife_Waters_RFP_Ed_s_Edits_2-3-21.pdf PDF
20_21_LIAC_AUTC_WCMC_XLIC_w-_AI_-_Insurance_Spencer_Const.pdf PDF
AZGF_Wildlife_Waters_Construction_and_Redevelopment_Score_and_Narrative_Jeff_Green.pdf PDF
CTR055131_YR5_Contract_Renewal_AZGFD_Signed.pdf PDF
Due_Diligence_Check_List_RFP_5-10-21.pdf PDF
STAZMail_-_Spencer__BPM003283._Price_Negotiations.pdf PDF
WILDLIFE_WATERS_CONSTRUCTION_AND_REDEVELOPMENT_Eds_Edits_02-03-2021.pdf PDF
WOODARD-53-459212-1_legal_ad.pdf PDF
Award_Determination_Spencer_signed.pdf PDF
BABA_Amendment_Contract__CTR055131_Spencer_executed.pdf PDF
CAD_Drawing_for_Wildlife_Water_Catchment_ATTACHMENT_TO_2-9-21.pdf PDF
COI2023.06.01_GL_AL_UMBRELLA_WC_EQ_FLOATER.pdf PDF
COI_6-1-2023_Spencer_Construction_LLC.pdf PDF
COI_Spencer_Construction.pdf PDF
CTR055131_Contract_Renewal_YR3_Vendor_Signed__1_.pdf PDF
CTR055131_Spencer_Construction__Amendment_Renewal_Yr_3_fully_Executed.pdf PDF
Certificate.pdf PDF
Conflict_of_Interset_form_Jeff_Green.pdf PDF
Legal_Ad_Request_BPM003283.pdf PDF
STAZ_Mail_-_Conversations_Re__draft_2-17-21.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BPM003283 Wildlife Waters Construction and Redevelopment/Wildlife Habitat Construction General Contractor

EVALUATOR'S SCORES M

A

XI

M

U M

PO

IN

TS

A ct io n

D ire ct db a

R ed po in t C on tr ac tin g C la y

B un dy

C on st ru ct io n In c

C op pe rs ta te

Ea rt hw or ks

D B

A

C on st ru ct io n

H yl an -W es t

IO

I

C on st ru ct io n C or p

M D

M er re tt

R an ch to

R an ch

SD

B

In c

Sm ith

S hu rt lif f an d Sm ith

Sp en ce r

C on st ru ct io n

W in ds or

U nd er gr ou nd

Evaluator #1 25 33 35 35 25 25 30 20 33 35 33 30

#2 30 35 38 35 30 30 40 35 30 40 35 30 #3 35 30 35 35 5 33 36 35 33 35 36 28

CONSENSUS SCORE 30 32.667 36 35 20 29.333 35.333 30 32 36.667 34.667 29.333

Evaluator #1 20 35 35 33 20 30 30 35 35 35 33 29

#2 30 30 35 35 20 30 40 30 30 40 30 25 #3 34 10 30 34 5 28 36 35 35 35 33 10

CONSENSUS SCORE 28 25 33.333 34 15 29.333 35.333 33.333 33.333 36.667 32 21.333

10 0 0 0 Evaluator #1 7 8 10 8 7 7 8 8 8 8 7 7

#2 8 6 10 10 5 8 10 8 8 10 6 8 #3 8 7 9 8 6 8 7 8 8 8 8 7

CONSENSUS SCORE 7.66667 7 9.6667 8.6667 6 7.6667 8.3333 8 8 8.6667 7 7.3333

Totals

Evaluator #1 52 76 80 76 52 62 68 63 76 78 73 66 #2 68 71 83 80 55 68 90 73 68 90 71 63 #3 77 47 74 77 16 69 79 78 76 78 77 45

CONSENSUS TOTAL 65.67 64.67 79.00 77.67 41.00 66.33 79.00 71.33 73.33 82.00 73.67 58.00 8 10 2 4 12 8 2 7 6 1 5 11

SIGNATURE TITLE BRANCH/ENTITY DATE

Engineer SSDV - AZGFD 03/30/21

SMITH SHURTLIFF AND SMITH, COPPERSTATE EARTHWORKS, MD MERRETT, DBA CONSTRUCTION, and SPENCER CONSTRUCTION

I HEREBY ATTEST THAT THE POINTS AWARDED TO EACH OFFEROR LISTED ABOVE WERE SCORED IN ACCORDANCE WITH THE ESTABLISHED EVALUATION CRITERIA AND REPRESENT MY BEST JUDGEMENT OF THE OFFEROR'S PROPOSAL. AS INDICATED BY THE HIGHEST TOTAL SCORE, MY SELECTION OF THE PROPOSALS WHICH OFFERS THE MOST ADVANTAGEOUS SERVICE TO THE STATE OF ARIZONA ARE:

Ranking

Experience and Reliability

Firm's Demonstrated Experience

Method of Approach

Nara Stamp

File details come from the government source that posted it. Updated .