This document is a Final Filed Sub-Bid Results sheet issued by the Massachusetts Department of Transportation for Proposal No. 616454-134457, concerning electrical work sub-bids for the cooling tower replacement project at Haymarket Center in Boston. The sub-bids for electrical work were opened on Monday, July 27, 2026, with seven electrical contractors submitting proposals. The project involves full replacement of two corroded galvanized steel cooling towers with new stainless steel units, installation of new air handling and exhaust fan equipment, replacement of roof drains, and installation of new electrical disconnects and GFCI receptacles at 136 Blackstone Street, Boston. The general bid deadline is August 5, 2026, with substantial completion required within 300 calendar days of Notice to Proceed and final acceptance within 45 days thereafter.

The office estimate for electrical work was $50,350.00, with sub-bid responses ranging from $32,000.00 to $75,947.00. The lowest bidder is General Air Conditioning & Heating, Inc. at $32,000.00, followed by Dagle Electrical Construction Corp at $34,343.00 and CDS Contracting Services LLC at $43,998.00. Two bids carry usage restrictions: General Air Conditioning & Heating, Inc. may only be used by itself, and Annese Electrical Services Inc. may only be used by Enterprise Equipment Co, Inc. The remaining five bidders—Aldon Electric Inc., Brothers Electrica Corp., Dagle Electrical Construction Corp., and Integrated Electrical Systems Inc.—have no restrictions on their use by the general contractor.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Massachusetts Department of Transportation Property Services Proposal No. 616454-134457

FINAL FILED SUB-BID RESULTS

July 30, 2026

Boston - Cooling Tower Replacements at Haymarket Center

Proposal No. 616454-134457

SUB BIDS OPENED Monday July 27, 2026

OFFICE ESTIMATE: $50,350.00

FINAL FILED SUB-BID RESULTS -- ELECTRICAL WORK

Aldon Electric Inc. 38 Greenwood Avenue, Weymouth MA 02189 $75,947.00

Annese Electrical Services Inc 280 Libbey Industrial Parkway, Weymouth MA 02189 $44,400.00

Brothers Electrica Corp 18 Graf Rd, Unit #31, Newburyport, MA 01950 $58,000.00

CDS Contracting Services LLC. 275 Centre Street, STE 1Holbrook, MA 02343 $43,998.00

Dagle Electrical Construction Corp 68 Industrial Way, Wilmington MA 01887 $34,343.00

General Air Conditioning & Heating, Inc. 7 Gaston Street, Dorchester, MA 02121 $32,000.00

Integrated Electrical Systems Inc. 6 Hancock St., Braintree, MA 02186 $47,600.00

SUB-BID RESTRICTIONS

Aldon Electric Inc. No restrictions

Annese Electrical Services Inc May Only be used by Enterprise Equipment Co, Inc.

Brothers Electrica Corp No restrictions

CDS Contracting Services LLC. No restrictions

Dagle Electrical Construction Corp No restrictions

General Air Conditioning & Heating, Inc May Only be used by General Air Conditioning & Heating, Inc

Integrated Electrical Systems Inc. No restrictions