About this file

This is a Quality Assurance Surveillance Plan (QASP) for grounds maintenance services at a VA National Cemetery, specifically focused on evaluating contractor performance against the Performance Work Statement (PWS). The plan outlines 13 key performance requirements including daily inspection of burial sections, weed control, pest management, maintenance of planting beds, fire break maintenance, irrigation management, trash removal, site furnishing maintenance, and headstone installation.

The QASP establishes a zero-deviation standard for all performance requirements, with surveillance conducted through periodic inspections by the Contracting Officer's Representative (COR) and tracking of visitor complaints. Key requirements include maintaining 100% weed-free gravesites, daily pest inspection and control, maintaining a 5-foot fire break along the cemetery's east edge and 10-foot breaks elsewhere, proper irrigation management to prevent standing water, daily trash removal, and installation of headstones within 7 days of delivery with a 90-day alignment guarantee. The plan details the complaint resolution process, requiring the contractor's Quality Control Inspector to address issues within 2-3 hours of notification.

View the file

Other files

File Type Posted
36C78625R50297 00002 Answers.pdf PDF
SolicitationAmendment0002.pdf PDF
BNC GMC SITE VISIT SIGNING LOG Dec 3-24.pdf PDF
QSE 36C78624R50297.pdf PDF
SolicitationAmendment0001.pdf PDF
Contract Guaranteed Minimum and Maximum Value.docx DOCX document
929 Bakersfield NC PriceSched FY25 11032024.xlsx XLSX spreadsheet
P07 DBA CA20240020 11152024.pdf PDF
P07 SCA WD 2015-5603 Rev25 07222024.pdf PDF
Solicitation.pdf PDF
INSTRUCTIONS TO OFFERORS_EVALUATIONS.docx DOCX document
DIGNITY CLAUSE.docx DOCX document
929 BAKERSFIED NC_EXISTING PLANTS_09072023.xls XLS spreadsheet
PERFORMANCE WORK STATEMENT.docx DOCX document
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE SURVEILLANCE PLAN

FOR

GROUNDS MAINTENANCE SERVICES

INTRODUCTION

This Quality Assurance Surveillance Plan (QASP) has been developed to evaluate contractor actions while implementing this PWS. It is designed to provide an effective surveillance method of monitoring contractor performance for each listed objective in the PWS in the maintenance contract.

The QASP provides a systematic method to evaluate the services the contractor is required to furnish.

This QASP is based on the premise the Government desires to maintain a quality standard in operating, maintaining, and repairing facilities and that a service contract to provide the service is the best means of achieving that objective.

The contractor, and not the Government, is responsible for management and quality control actions to meet the terms of the contract. The role of the Government is quality assurance to ensure contract standards are achieved.

In this contract the quality control program is the driver for product quality. The contractor is required to develop a comprehensive program of inspections and monitoring actions. The first major step to ensuring a “self-correcting” contract is to ensure that the quality control program approved at the beginning of the contract provides the measures needed to lead the contractor to success.

Once the quality control program is approved, careful application of the process and standards presented in the remainder of this document will ensure a robust quality assurance program.

Performance Objective
SOW Para
Performance Standard
AQL
Surveillance Method

Prior to close of business each day including necessary weekends and holidays, the Contractor shall inspect all burial sections to ensure the areas are raked and groomed; the gravesites are smooth, level, free of footprints and tire impressions; blend with adjacent grade levels; are weed and pest free; and cleared of leaves, debris, and trash.

PRS # 1. (PWS Section 5.2.2.2.7)
Safety hazards (holes, hazardous trees and branches, sprinkler heads, etc.) identified and corrective action initiated within the same workday. All Visually Prominent Areas are raked and groomed and returning the gravesites to their original state within the same workday and areas have a neat appearance, free of debris and fixed pollutants, and properly finished with the correct infill.
Zero Deviation from Standard.
Periodic Inspection by the COR.
Remove weeds by chemical or mechanical means such that the gravesites are 100 percent weed free.
PRS # 2(PWS Section 5.2.2.3.1)
Gravesites are maintained100 percent weed free
Zero Deviation from Standard.
Periodic Inspection by the COR and Visitor Complaint
Repair damage to burial sections cause by vertebrate and invertebrate pests
PRS # 3 (PWS Section 5.2.2.4.1

Repair damage to burial sections caused by vertebrate and invertebrate pests in accordance with requirements as stated in NCA Handbook 3410 – Integrated Pest Management Procedures for VA National Cemeteries.

Zero Deviation from Standard.
Periodic Inspection by the COR and Visitor Complaint

Planting beds shall be kept attractive and free of weeds. Weeds and their root system will be removed.

PRS # 4 (PWS Section 5.3.1.2.1)

Planting beds are maintained 100 percent weed free. Weeds and their root system will be removed.
Zero Deviation from Standard.
Periodic Inspection by the COR and Visitor Complaint

Areas with mineral mulch such as rock-lined swales, rock borders, and other areas mulched with decorative rock shall be kept free of weeds. Weeds and their root system shall be removed. Mineral mulch includes decomposed granite, pea gravel, pebbles, cobblestones, rip-rap, boulders, etc.

PRS # 5 (PWS Section 5.3.1.2.2)
Areas with mineral mulch such as rock-lined swales, rock borders, and other areas mulched with decorative rock shall be kept free of weeds.
Zero Deviation from Standard.
Periodic Inspection by the COR.

All planting beds, tree wells and gravesites areas shall be free of weeds, diseases, and pests. In addition, areas around all buildings, walkways and roadways shall be free of weeds. All pests shall be controlled and/or removed in accordance with appropriate local, county, state and federal regulations, and in accordance with NCA Handbook 3410 – Integrated Pest Management Procedures for VA National Cemeteries.

PRS # 6 (PWS Section 5.3.1.3.1)
All planting beds, tree wells and gravesites areas shall be free of weeds, diseases, and pests.
Zero Deviation from Standard.
Periodic Inspection by the COR.
Contractor shall inspect for pest damage daily. If any additional signs of pest damage are found the Contractor shall set baits and/or traps the day of discovery.
PRS # 7 (PWS Section 5.3.1.4.1)
Pests that are included, but not limited to: voles, mice, rats, ground squirrels, rabbits, wild pigs, birds and snakes shall be controlled by trapping, elimination of their food source, pesticides, or other effective methods.
Pests should be control first, at the visually prominent areas: Interment areas (burial sections and columbarium). Committal service shelters. Areas adjacent to all cemetery roadways (entry, loop, cortege, committal shelter).

Second, at Medium Visual Impact Areas: Areas adjoining the memorial path. Areas adjacent to the maintenance building and yard.

Last, Low Visual Impact Areas: Non-use areas. Soil spoils areas. Areas viewed at considerable distance Periodic Inspection by the COR.

Contractor shall maintain a five (5’) foot fire break along both sides of the fence line surrounding the developed area of the cemetery along the east edge of the cemetery (along CA-223), and a ten (10) foot fire break along the interior of the fence line of the remaining developed area of the cemetery.
PRS # 8 (PWS Section 5.3.1.5.1)
Fire break shall be properly maintained down to bare soil and free of all plant debris at all times. Maintain vegetation height at no more than 6 inches throughout the year. Mowing frequency varies throughout the year corresponding with active plant growth.
Zero Deviation from Standard.
Periodic Inspection by the COR.
Contractor shall correctly program and manage the irrigation controllers to ensure that all cemetery plant material receives the correct amount of water for plant health and vigor without overwatering. Any plant material lost by over- watering or under-watering as determined by the COR shall be replaced by the Contractor at no cost to the Government
PRS # 9 (PWS Section 5.4.2.1.1)
Contractor shall ensure that there is no standing water in the interment areas, and walkways and manage the irrigation controllers to ensure that all cemetery plant material receives the correct amount of water for plant health and vigor without overwatering.
Zero Deviation from Standard.
Periodic Inspection by the COR.
Maintain all the cemetery grounds and burial sections free of trash and debris.
PRS # 10 (PWS Section 5.6.2.2.1).
Remove trash and debris each work day from the cemetery grounds. Trash & debris shall also be removed from all areas in conjunction with each crushed aggregate grooming cycle. Trash & debris removal shall also include clearing of all roads/walks with a power leaf blower as necessary to clean the street / walkways of clippings, small debris and leaves.
Zero Deviation from Standard.
100% Inspection
Clean roads, curbs, gutters, sidewalks, stairs, paths, assembly area, and parking lots. Parking lots are accessible and well maintained.
PRS # 11 (PWS Section 5.7.1.2.1)
Roads, walkways, shelters, and burial sections are free of grounds maintenance debris by the end of the workday.
Zero Deviation from Standard.
100% Inspection
Maintain site furnishings including seat walls, benches, memorial benches, trash receptacles, decorative planters, flower vase receptacles, flower vases, flower watering stations, fire hydrants, etc.
PRS # 12 (PWS Section 5.9.1.2.12.1)
Daily clean and maintain site furnishings including seat walls, benches, memorial benches, trash receptacles, decorative planters, flower vase receptacles, flower vases, flower watering stations, fire hydrants, etc.
Zero Deviation from Standard.
100% Inspection
Contractor is responsible for setting new or replacement headstones on gravesites
PRS # 13 (PWS Section 5.11.2.1)

Headstones shall be installed within seven (7) days of delivery to the Cemetery as weather and soil conditions permit. Headstones shall be cleaned after setting. Cost for cleaning to be included in work for headstone setting. Headstones that are set by the Contractor shall maintain the proper height and alignment for a period of 90 days after being initially set. Any settlement or misalignment of headstones during this 90-day time will be corrected by the Contractor at no additional cost to the Government.

Zero Deviation from Standard.
100% Inspection

SURVEILLANCE: The Government Contracting Officers Representative (COR) person will receive complaints from base personnel and pass them to the contractor's quality control inspector (QCI) for correction.

STANDARD: Customer complaints shall not exceed the thresholds cited above for each performance standard. The COR shall notify the Contracting Officer for appropriate action in accordance with FAR 52.212.4, Contract Terms and Conditions-Commercial Items (May 1997) or the appropriate Inspection of Services clause, if any of the above service areas exceed the customer complaint thresholds.

PROCEDURES: Any base employee that observes unacceptable services, either incomplete or not performed, for any of the above performance objectives should immediately contact the COR and the COR will complete appropriate documentation to record the complaint. The COR will consider the customer complaint valid upon receipt from the customer. The COR should inform the customer of the approximate time the unacceptable performance will be corrected and advise the customer to contact the COR if not corrected. The COR will consider customer complaints as resolved unless notified otherwise by the customer. The COR shall verbally notify the Contractor’s Quality Control Inspector (QCI) to pick up the written customer complaint. The QCI will be given two hours after verbal notification to correct the unacceptable performance. If the QCI disagrees with the complaint after investigation of the site and challenges the validity of the complaint, the QCI will notify the COR. The COR will conduct an investigation to determine the validity of the complaint. If the COR determines the complaint as invalid, he will document the written complaint of the findings and notify the customer. The COR will retain the annotated copy of the written complaint for his/her files. If after investigation the COR determines the complaint as valid, the COR will inform the QCI and the QCI will be given an additional hour to correct the customer complaint. A customer complaint will not be recorded if proper and timely correction of the unacceptable condition(s) is accomplished. The QCI shall return the written customer complaint document, properly completed with actions taken, to the COR, who will file the complaint for monitoring future recurring performance. Recurring customer complaints are not permitted for any of the above service items. If a repeat customer complaint is received indicating the same deficiency during the service period (month, quarter, etc.), the COR should contact the Contracting Officer for appropriate action.