BMCES Classroom Modular Permit Set Drawings.pdf

PDF 17 MB Posted

Attached to
Provide additional capacity for publications and creative services work needed by OHA and ODHS
Solicitation number
S-44300-00009466
Issued by
Marion County, Oregon

About this file

This document is a permit set of architectural, electrical, plumbing, and technology drawings for the Beatrice Cannady Elementary School Classroom Modular Addition project located in Happy Valley, Oregon, managed by North Clackamas School District in collaboration with BRIC Architecture Inc., KPFF Consulting Engineers, and Interface Engineering. The project involves adding a modular classroom building to the existing school facility, with work including demolition of existing elements in Sector A, installation of new utility connections (electrical, plumbing, technology, and fire alarm systems), and integration of the modular unit into the existing campus infrastructure. The drawings indicate that delegated design components requiring deferred submittals include the modular foundation (Division 03 30 00 - Concrete) and the fire alarm system (Division 28). The architectural plans show first-floor demolition and construction plans for Sector A, floor plans with wall types and interior elevations, and finish plans specifying flooring materials throughout the facility. The bid and permit set was issued on February 9, 2024, with project sheets organized across civil, architectural, electrical, plumbing, and technology disciplines, containing detailed keynotes, specifications, and coordination requirements among all trades.

The electrical scope includes new power distribution to the modular classroom with a dedicated 110-amp, 3-phase panel and circuits for heating units, equipment, and a sewage ejector pump system, with routing through conduit in accessible ceiling spaces. The plumbing work involves underground connections including a 3-inch sanitary discharge line routed to existing infrastructure, 3/4-inch domestic cold water supply with heat tracing in exposed crawl spaces, and vent lines coordinated with the modular building manufacturer. Technology infrastructure includes fiber optic backbone cabling from the main building's MDF to an IDF in the modular unit, Category 5e voice cabling, audio-visual outlets with HDMI connections, surveillance cameras with Category 6A cabling, and paging speakers throughout the space. All work requires extensive coordination among trades to avoid conflicts with existing utilities, the new sewage ejector pump installation, and existing light poles. The project specifications emphasize field verification of existing conditions, proper patching and restoration of finishes to match existing materials, and compliance with the modular building manufacturer's requirements for all integrated systems.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ANGLE

AND

ANCHOR BOLT

ACOUSTICAL CEILING TILE

ADDENDUM

ARCHITECTURAL EXPOSED

STRUCTURAL STEEL

ABOVE FINISH FLOOR

AREA LIGHT STANDARD

ALUMINUM

ANODIZED

BOARD

BUILDING

BLOCKING

BENCH MARK

BOTTOM

BETWEEN

CHANNEL

CATCH BASIN

CLOSED CIRCUIT TV

CORNER GUARD

CAST IN PLACE CONCRETE

CEILING

CLEAR

CONTROL JOINT

CONCRETE MASONRY UNIT

CONTINUOUS

CORRIDOR

CLASSROOM

CONSTRUCTION JOINT

CASEMENT

CERAMIC TILE

CENTER

CENTERLINE

DOUBLE

DETAIL

DRINKING FOUNTAIN

DIAMETER

DIAGONAL

DIMENSION

DISPENSER

DOWN

DAMPROOFING

DOOR

DOWNSPOUT

DRAWING

AB

ACT

ADD

AESS

AFF

ALS

ALUM

ANOD

BD

BLDG

BLKG

BM

BOT

BTWN

C

CB

CCTV

CG

CIP

CLG

CLR

CJ

CMU

CONT

CORR

CR

CSJ

CSMT

CT

CTR

DBL

DTL

DF

DIA

DIAG

DIM

DISP

DN

DP

DR

DS

DWG

(E)

EA

EF

EJ

EL

ELEC

EOS

ENGR

EQ

EQUIP

ES

EW

EXP

EXT

FA

FD

FDN

FE

FEC

FECB

FF

FIN

FL

FO

FOC

FOF

FOM

FOS

FRT

FTG

FURR

GA

GALV

GB

GC

GL

GND

GVP

GWB

HB

HC

HM

HPC

HVAC

HW

INSUL

INT

JAN

JT

JST

EXISTING

EACH

EXHAUST FAN

EXPANSION JOINT

ELEVATION

ELECTRICAL

EDGE OF SLAB

ENGINEER

EQUAL

EQUIPMENT

EACH SIDE

EACH WAY

EXPANSION

EXTERIOR

FIRE ALARM

FLOOR DRAIN

FOUNDATION

FIRE EXTINGUISHER

FIRE EXTINGUISHER CABINET

FIRE EXTINGUISHER CABINET W/

BLANKET

FINISH FLOOR

FINISH

FLOOR

FACE OF

FACE OF CONCRETE

FACE OF FINISH

FACE OF MASONRY

FACE OF STUD

FIRE RETARDANT TREATED

FOOTING

FURRING

GAUGE

GALVANIZED

GRAB BAR

GENERAL CONTRACTOR

GLASS

GROUND

GYPSUM VENEER PLASTER

GYPSUM WALL BOARD

HOSE BIBB

HANDICAP

HOLLOW METAL

HIGH PERFORMANCE COATING

HEATING, VENTILATION AND AIR

CONDITIONING

HOT WATER

INSULATION

INTERIOR

JANITOR

JOINT

JOIST

L

LAV

LB

LKR

LS

LVR

MATL

MB

MAX

MECH

MED

MEZZ

MFR

MIN

MIR

MISC

MTD

MTL

(N)

NA

NIC

NOM

NS

NTS

OA

OC

OD

OD

OFCI

OFOI

OH

OPNG

OPP

OS

PL

PLAS

PLYWD

PSF

PT

PVMT

R

RD

REF

REFR

REQ'D

REV

RM

RO

RCP

LENGTH

LAVATORY

LAG BOLT

LOCKER

LANDSCAPING

LOUVER

MATERIAL

MARKERBOARD

MAXIMUM

MECHANICAL

MEDIUM

MEZZANINE

MANUFACTURER

MINIMUM

MIRROR

MISCELLANEOUS

MOUNTED

METAL

NEW

NOT APPLICABLE

NOT IN CONTRACT

NOMINAL

NELSON STUD

NOT TO SCALE

OVERALL

ON CENTER

OVERFLOW DRAIN

OUTSIDE DIAMETER

OWNER FURNISHED

CONTRACTOR INSTALLED

OWNER FURNISED OWNER

INSTALLED

OVERHEAD

OPENING

OPPOSITE

OUTSIDE

PROPERTY LINE

PLASTER

PLYWOOD

PER SQUARE FOOT

PRESSURE TREATED

PAVEMENT

RADIUS

ROOF DRAIN

REFERENCE

REFRIGERATOR

REQUIRED

REVISE OR REVISION

ROOM

ROUGH OPENING

REFLECTED CEILING PLAN

SAHTS

SAM

SC

SECT

SF

SHTG

SHWR

SHT

SIM

SJ

SM

SQ

SS

STD

STL

STOR

STRUCT

SUSP

T/M T

TC

TEL

T&G

THK

TO

TOD

TOS

TJ

TP

TS

TYP

UNFIN

UNO

VB

VERT

VEST

VFY

W/ W/O

WC

WD

WF

WH

WP

WRB

WT

SELF ADHERED HIGH

TEMPERATURE SHEET

SELF-ADHERED MEMBRANE

SOLID CORE

SECTION

SQUARE FOOT

SHEATHING

SHOWER

SHEET

SIMILAR

SEISMIC JOINT

SHEET METAL

SQUARE

STAINLESS STEEL

STANDARD

STEEL

STORAGE

STRUCTUAL

SUSPENDED

TO MATCH

TEMPERED GLAZING

TOP OF CURB

TELEPHONE

TONGUE AND GROOVE

THICK

TOP OF

TOP OF DECK

TOP OF STRUCTURE

TOOL JOINT

TOILET PAPER

TUBE STEEL

TYPICAL

UNFINISHED

UNLESS NOTED OTHERWISE

VAPOR BARRIER

VERTICAL

VESTIBULE

VERIFY

WITH

WITHOUT

WATER CLOSET

WOOD

WIDE FLANGE

WATER HEATER

WATERPROOFING

WATER-RESISTIVE BARRIER

WEIGHT

CL

A

ROOM NAME & NUMBER

STOREFRONT OR WINDOW TYPE

KEYNOTE REFERENCE

CEILING PLANE HEIGHT - ALL

REFERENCES TO FINISH FLOOR

ELEVATION

INTERIOR FINISH TYPE

HORIZONTAL ELEVATION PLANE

HEIGHT - ALL REFERENCES TO F.F.E.

SPOT ELEVATION - ALL

REFERENCES TO F.F.E.

WALL TYPE WITH FIRE AND STC

RATING WHERE APPLICABLE

DOOR NUMBER - SEE DOOR

SCHEDULE

RELITE NUMBER - SEE

RELITE SCHEDULE

GRID LINE

BUILDING

SECTION

EXTERIOR ELEVATION

INTERIOR ELEVATION

REVISION CLOUD

DETAIL

DETAIL SECTION

Room name

A

0' - 0"

TB-1

0'-0"

B.O.D.

A1

STC

1 HR

A

A

A120B

0'-0"

A101

A101

A101

REV #

A3.01

A5.01

1A

1B

1C

1D

WALL SECTION

A101

T.O.W

SIM SIM

SIM

SIM

A101

NORTH ARROW

TRUE

NORTH

PROJECT

NORTH

DRAWING CONTENTS

architect BRIC Architecture Inc.

1233 NW Northrup Street, Suite 100 Portland, Oregon 97209 t: (503) 595 4900 Julie Condon

P ro je ct owner t:

12400 SE Freeman Way Milwaukie, OR 97222

Shaun Stuhldryer

C :\B

R

IC

P ro je ct s\

B M

C E

S C la ss ro om

M od ul ar

_b re tt.

lu nd m ar kG

9H 2R

.r vt

B E

A T

R

IC

E C

A N

N A

D Y

E L

E M

E N

T A

R Y

S C

H O

O L

M

O D

U L

A R

A D

D

IT

IO

N

.0

9.

BEATRICE CANNADY ELEMENTARY SCHOOL - CLASSROOM MODULAR

North Clackamas School District

18031 Vogel Rd, Happy Valley, OR 97089

B

ID

/P E

R M

IT

S

E T

BID/PERMIT SET

North Clackamas School District

(503) 353-6000

KPFF Consulting Engineers 111 SW 5th Avenue, Suite 2500

Portland, Oregon 97204 t: (503) 227 3251

Eric Melle civil engineer

Interface Engineering 100 SW Main Street, Suite 1600

Portland, Oregon 97204 t: (503) 382 2732 Thomas Phuong electrical engineer

Interface Engineering 100 SW Main Street, Suite 1600

Portland, Oregon 97204 t: (503) 382 2615

Darcy Tucker technology

ARCHITECTURAL ABBREVIATIONS ARCHITECTURAL SYMBOLS VICINITY MAP

CIVIL

C0.10 COVER SHEET

C0.20 OVERALL EXISTING CONDITIONS PLAN

C0.30 EXISTING CONDITIONS & DEMOLITION PLAN

C1.00 SITE AND HORIZONTAL CONTROL PLAN

C2.00 GRADING PLAN

C2.50 WALL PLAN AND PROFILE

C3.00 UTILITY PLAN

C4.00 DETAILS

SITE

ARCHITECTURAL

A1.11 FIRST FLOOR PLAN SECTOR A - DEMO PLAN

A2.11 FLOOR PLAN SECTOR A - FIRST FLOOR

A4.11 FIRST FLOOR PLAN SECTOR A - FINISH PLAN

TECHNOLOGY

T0.01 SYMBOLS LISTS AND GENERAL NOTES - TECHNOLOGY

T2.11 FIRST FLOOR PLAN SECTOR A - TECHNOLOGY

T2.12 FIRST FLOOR PLAN MODULAR CLASSROOM - TECHNOLOGY

T7.01 DETAILS - TECHNOLOGY

PLUMBING

P0.01 SYMBOLS LISTS AND GENERAL NOTES - PLUMBING

P2.11 FIRST FLOOR PLAN SECTOR A - UNDERGROUND PLUMBING

P2.12 FIRST FLOOR PLAN MODULAR CLASSROOM - UNDERGROUND PLUMBING

P2.13 FIRST FLOOR PLAN SECTOR A - PLUMBING

P2.14 FLOOR PLAN MODULAR CLASSROOM - PLUMBING

ELECTRICAL

E0.01 SYMBOLS LISTS AND GENERAL NOTES - ELECTRICAL

E2.11 FIRST FLOOR PLAN SECTOR A - POWER

E2.12 SECOND FLOOR PLAN SECTOR A - POWER

E2.13 FIRST FLOOR MODULAR CLASSROOM - POWER

E5.01 SINGLE LINE DIAGRAMS - ELECTRICAL

Delegated Design components which require Deferred Submittals include, but are not limited to, the following:

Deferred submittal items shall not be installed until the deferred submittal documents have been approved by the building official.

1. Modular Foundation 03 30 00 - Concrete

2. Fire Alarm System, Division 28

SECTOR A

SECTOR B

1 K

3 2

K

K

K 1 2

K 1 2

K

MUSIC

GYM

STOR

[I] [I]

[I]

[I]

[I] [I]

[I]

[I] [I]

BEATRICE

MORROW

CANNADY

SCHOOL

SE

V

O G

EL

R

O

AD

SHEET NOTES

SHEET LEGEND

111 SW Fifth Ave., Suite 2500 Portland, OR 97204 O: 503.227.3251 F: 503.274.4681 www.kpff.com

AB

date phase date project k e y p l a n revisions

/16

/20

7:

:02 P

M C:

\B

RI

C Pr oje cts

\22

7 B

MC

ES

C las sro om M od s_ br ett

.lu nd ma rkG

9H 2R

.rv t

BE

AT

RI

CE

C

AN

NA

DY

E

LE

ME

NT

AR

Y

SC

HO

OL

CL

AS

SR

OO

M

MO

DU

LA

RS

T (5

) 3

-6

No rth

C lac ka ma s S ch oo l D ist ric t

BID/PERMIT SET

02.09.2024 22027

1 V og el Rd

, H ap py V all ey

, O R

SCALE 1 INCH = 40 FEET

ENGINEERINGSURVEYING

FORESTRY

NATURAL RESOURCES

LANDSCAPE ARCHITECTUREPLANNING

OVERALL EXISTING

CONDITIONS PLAN

C0.20

FO

R

IN

FO

RMATIO

N

ONLY

DW

H

1234567910

D

E

C

12 8

B

A

G

C.2

E.8

D.8

F

RECEPTION

HEALTH

133G

RR

133H

CONF

133C

STAFF

LOUNGE

131B

ELEV

E1

RR

131E

RR

131D

FILES

131C

CLASSROOM

CLASSROOM

CLASSROOM

ELD

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

SLC

CLASSROOM

SLC

CLASSROOM

CUST

OFFICE

133D

CLASSROOM

RR

125D

OFFICE

125C

CLASSROOM

AV

STORAGE

100D

MDF

CONF

100A

WORKROOM

100B

MEDIA

CENTER

GIRLS

118A

BOYS

118B

CONF

CLASSROOM

D001

M A

T C

H L

IN

E

S E

C T

O R

A

M A

T C

H L

IN

E

S E

C T

O R

A

M A

T C

H L

IN

E

S E

C T

O R

B

M A

T C

H L

IN

E

S E

C T

O R

B

OFFICE

133E

WORKROOM

ELECT.

WORKROOM/

STORAGE

RR

RR

RR

HALL

HALL

HALL

HALL

HALLWAY

STAIR

S3

STAIR

S1

STAIR

S2

HALL

125B

D002

D004

D004

DEMO PLAN NOTES:

AT DEMOLITION AREA REMOVE ELEMENTS INCLUDING BUT NOT LIMITED TO

WALLS AND FINISHES.

DEMOLITION DRAWINGS ARE DIAGRAMMATIC AND ARE TO ASSIST THE

CONTRACTOR IN ESTABLISHING THE GENERAL SCOPE OF WORK. PROVIDE ALL

DEMOLITION REQUIRED TO COMPLETE THE WORK AS INDICATED ON THE NEW

CONSTRUCTION DRAWINGS AND AS SPECIFIED.

DO NOT DAMAGE OR UNDERMINE FOUNDATIONS SUPPORTING BUILDING

ELEMENTS.

SAW CUT OR OTHERWISE NEATLY REMOVE DEMOLISHED ELEMENTS AT THE

INTERFACE WITH ELEMENTS TO REMAIN.

PROTECT EXISTING ARCHITECTURAL DETAILS AND FINISHES TO REMAIN.

COORDINATE DEMOLITION OF ALL TRADES INCLUDING ELECTRICAL, MECHANICAL,

PLUMBING , TECHNOLOGY AND FIRE PROTECTION DEMOLITION PLANS.

PLAN LEGEND

DEMOLITION

EXISTING TO

REMAIN

AREA OF EXISTING

BUILDING TO BE

DEMOLISHED, UNO

NO WORK

AB

date phase date project k e y p l a n revisions

2/ 6/

:2

2:

P M

C :\B

R

IC

P ro je ct s\

B M

C E

S C la ss ro om

M od ul ar

_b re tt.

lu nd m ar kG

9H 2R

.r vt

A1.11

FIRST FLOOR PLAN

SECTOR A - DEMO PLAN

B E

A T

R

IC

E C

A N

N A

D Y

E

LE

M E

N T

A R

Y S

C H

O O

L

C

LA

S S

R O

O M

M O

D U

LA

R

T

3)

-6

N or th C la ck am as

S ch oo l D is tr ic t

BID/PERMIT SET

02.09.2024 22027

V og el

R d, H ap py V al le y, O

R

SCALE: 1/8" = 1'-0" 1

FIRST FLOOR PLAN - SECTOR A

KEYNOTES

D001 DEMO EXISTING FLOOR FINISH AS NEEDED TO SAWCUT

FLOOR SLAB FOR INSTALLATION OF NEW

UNDERGROUND PLUMBING CONNECTION. SEE PLUMBING

FOR LOCATION AND EXTENTS.

D002 DEMO EXISTING WALLS, CEILING, AND FLOOR FINISHES

AS NEEDED TO ROUTE NEW ULTILITY CONNECTIONS FOR

CLASSROOM MODULAR. REROUTE NEW CONNECTIONS

PER PLUMBING, ELECTRICAL, AND/OR TECHNOLOGY

DRAWINGS & SPECIFICATIONS.

D004 DEMO EXISTING FLOOR SLAB AS NEEDED FOR

INSTALLATION OF NEW UTILITY CONNECTIONS. SEE

PLUMBING, TECHNOLOGY AND/OR ELECTRICAL FOR

LOCATION AND EXTENTS.

PORTLAND, OREGON

E

RE

DANIEL J. HESS

T

A T

T

S

G R E

SI

HC

O

GEROOF

N

E T

C3473

TI

RADE

DW

1234567910

D

E

C

12 8

B

A

G

A2.11

RECEPTION

HEALTH

133G

RR

133H

CONF

133C

STAFF

LOUNGE

131B

ELEV

E1

RR

131E

RR

131D

FILES

131C

CLASSROOM

CLASSROOM

CLASSROOM

ELD

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

SLC

CLASSROOM

SLC

CLASSROOM

CUST

OFFICE

133D

CLASSROOM

RR

125D

OFFICE

125C

CLASSROOM

AV

STORAGE

100D

MDF

CONF

100A

WORKROOM

100B

MEDIA

CENTER

GIRLS

118A

BOYS

118B

CONF

CLASSROOM

A001

M A

T C

H L

IN

E

S E

C T

O R

A

M A

T C

H L

IN

E

S E

C T

O R

B

OFFICE

133E

WORKROOM

ELECT.

WORKROOM/

STORAGE

RR

RR

RR

HALL

HALL

HALL

HALL

HALLWAY

STAIR

S3

STAIR

S1

STAIR

S2

HALL

125B

C.2

E.8

D.8

F

A002

A2aA2a

V

IF

VIF

1'-6"

A003A003

A003A003

NOTED WALL TYPE DEPICTS TYPICAL WALL CONSTRUCTION. SEE ELEVATIONS,

SECTIONS, AND DETAILS FOR ADDITIONAL INFORMATION.

SEE INTERIOR ELEVATIONS FOR LOCATIONS AND EXTENTS OF APPLIED WALL

FINISHES.

WHERE A LENGTH OF WALL IS INTERSECTED BY PERPENDICULAR WALLS, WALL

TYPE TO BE CONTINUOUS BETWEEN TAGS UNLESS OTHERWISE NOTED.

INTERIOR DIMENSIONS ARE TO FACE OF STUD UNLES NOTED OTHERWISE.

SEE INTERIOR ELEVATIONS FOR LOCATION AND EXTENT OF APPLIED WALL FINISHES.

SOUND BATT INSULATION TO EXTEND FULL HEIGHT OF WALL ASSEMBLIES UNLESS

NOTED OTHERWISE.

PROVIDE FIRE BLOCKING IN CONCEALED SPACES OF STUD WALLS AND PARTITIONS

VERTICALLY AT THE CEILING AND FLOOR LEVELS AND HORIZONTALLY AT INTERVALS

NOT EXCEEDING 10 FEET.

ALL GYPSUM BOARD USED IN WALLS IS TYPE X.

CAULK ALONG BOTH SIDES OF THE PERIMETER WITH A NON-HARDENING SILICONE

MASTIC.

ALL OPENINGS AROUND PIPE PENETRATIONS SHALL BE SEALED WITH A NON-

HARDENING SILICONE MASTIC.

WALL TYPE NOTES:

A1

STC

1 HR

WALL CONSTRUCTION TYPE - SEE WALL TYPES

STC RATING

FIRE RATED CONSTRUCTION DESIGNATION (IN HOURS)

FLOOR PLAN NOTES:

DIMENSIONS SHOWN ARE TO FACE OF STUD, FACE OF MASONRY OR CENTERLINE

OF COLUMN OR GRID LINE UNLESS NOTED OTHERWISE.

USE DIMENSIONS SHOWN; IN NO CASE SHALL WORKING DIMENSIONS BE SCALED

FROM DRAWINGS. CROSS CHECK DETAILS AND DIMENSIONS SHOWN ON THE

ARCHITECTURAL DRAWINGS WITH RELATED REQUIREMENTS ON THE

STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING, AND OTHER DRAWINGS AS

APPLICABLE. NOTIFY ARCHITECT OF ANY DISCREPANCIES BEFORE PROCEEDING

WITH THE WORK.

CONDITIONS AND DETAILS MARKED "TYPICAL" SHALL APPLY IN ALL CASES UNLESS

SPECIFICALLY INDICATED OTHERWISE. TYPICAL DETAILS NOT REFERENCED ON

DRAWINGS APPLY UNLESS NOTED OTHERWISE BY SPECIFIC NOTES AND DETAILS.

WHERE NO SPECIFIC DETAIL IS SHOWN, THE CONSTRUCTION SHALL BE IDENTICAL

OR SIMILAR TO THAT INDICATED FOR THE TYPICAL CONSTRUCTION OF THE

PROJECT.

WHERE NO SPECIFIC STANDARDS ARE APPLIED TO A MATERIAL OR METHOD OF

CONSTRUCTION TO BE USED ON THE WORK, ALL SUCH MATERIAL AND METHODS

ARE TO MAINTAIN STANDARDS OF THE INDUSTRY AND, WHERE APPLICABLE,

MANUFACTURER’S INSTRUCTIONS.

LOADING OF CONSTRUCTION MATERIALS SHALL NOT EXCEED THE DESIGN LIVE

LOAD PER SQUARE FOOT.

ESTABLISH AND VERIFY ALL OPENINGS AND INSERTS FOR ARCHITECTURAL,

MECHANICAL, ELECTRICAL, AND PLUMBING WITH APPROPRIATE TRADES,

DRAWINGS, AND SUBCONTRACTORS PRIOR TO CONSTRUCTION.

WHERE A LENGTH OF WALL IS INTERSECTED BY PERPENDICULAR WALLS, WALL

TYPE TO BE CONTINUOUS BETWEEN TAGS UNLESS NOTED OTHERWISE.

PROVIDE DEFLECTION HEAD AT NEW INTERIOR PARITIONS ATTACHED TO

STRUCTURAL FRAMING OR DECK.

P-1

PAINT TO MATCH EXISTING

RUBBER BASE TO

MATCH EXISTING

EXISTING TACK SURFACE

TO REMAIN

ALIGN WALL WITH EXISTING

TACK SURFACE JOINT

P-1

TYP.

PAINT TO MATCH EXISTING

RUBBER BASE TO

MATCH EXISTING

EXISTING TACK SURFACE

TO REMAIN

ALIGN WALL WITH EXISTING

TACK SURFACE JOINT

5/8" GYPSUM BOARD

A2a = 3 5/8" MTL STUD A2b = 6" MTL STUD A2c = 8" MTL STUD A2d = 10" MTL STUD

AT 16" OC

ACOUSTIC BATT

INSULATION

PLAN LEGEND

DEMOLITION

EXISTING TO

REMAIN

AREA OF EXISTING

BUILDING TO BE

DEMOLISHED, UNO

NO WORK

AB

date phase date project k e y p l a n revisions

2/ 6/

:2

1:

P M

C :\B

R

IC

P ro je ct s\

B M

C E

S C la ss ro om

M od ul ar

_b re tt.

lu nd m ar kG

9H 2R

.r vt

A2.11

FLOOR PLAN SECTOR A -

FIRST FLOOR

B E

A T

R

IC

E C

A N

N A

D Y

E

LE

M E

N T

A R

Y S

C H

O O

L

C

LA

S S

R O

O M

M O

D U

LA

R

T

3)

-6

N or th C la ck am as

S ch oo l D is tr ic t

BID/PERMIT SET

02.09.2024 22027

V og el

R d, H ap py V al le y, O

R

SCALE: 1/8" = 1'-0" 1

FIRST FLOOR PLAN - SECTOR A

KEYNOTES

A001 INTERIOR PARTITION CHASE FOR UTILITY CONNECTIONS

TO CLASSROOM MODULAR UP TO 6" ABOVE CEILING

FINISH. ALIGN PARTITION FINISH TO EXISTING TACK

SURFACE JOINT. PATCH AND REPAIR EXISTING

ADJACENT FINISHES INCLUDING BUT NOT LIMITED TO

CEILING GRID, CEILING TILE, RUBBER BASE, TACK

SURFACE, & CARPET TILE AS NEEDED TO MATCH

EXISTING.

A002 PATCH AND REPAIR EXISTING FLOOR ASSEMBLY AND

FINISH AS NEEDED TO MATCH EXISTING FOR NEW

UNDERGROUND PLUMBING CONNECTION. SEE PLUMBING

FOR LOCATION AND EXTENTS.

A003 REINSTALL ALL ACT CEILING TILES REMOVED FOR

INSTALLATION OF NEW OVERHEAD UTILITY

CONNECTIONS. REPLACE ANY DAMAGED ACT CEILING

TILES REMOVED FOR INSTALLATION.

SCALE: 1/4" = 1'-0" 2

INTERIOR ELEVATIONS - CLASSROOM

SCALE: 1/4" = 1'-0" 3

INTERIOR ELEVATIONS - CLASSROOM

SCALE: 3" = 1'-0" 4

WALL TYPE A2

PORTLAND, OREGON

E

RE

DANIEL J. HESS

T

A T

T

S

G R E

SI

HC

O

GEROOF

N

E T

C3473

TI

RADE

RECEPTION

HEALTH

133G

RR

133H

OFFICE

133E

CONF

133C

STAFF

LOUNGE

131B

ELEV

E1

CUST

RR

131E

RR

131D

FILES

131C

CLASSROOM

109 CLASSROOM

CLASSROOM

ELD

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

121SLC

CLASSROOM

SLC

CLASSROOM

WORKROOM

AV

STORAGE

100D

MDF

CONF

CLASSROOM

CLASSROOM

CPT-7

B-1

CLASSROOM

CPT-7

B-1

MEDIA

CENTER

HALLWAY

LNT-1

B-1

OFFICE

133D

GIRLS

118A

BOYS

118B

CONF

100A

WORKROOM

100B

OFFICE

125C

HALL

125B

RR

125D

ELECT.

RR

RR

RR

WORKROOM/

STORAGE

EM-1 SV-1

HALL

HALL

HALL

HALL

1' - 5"

TYP.

TYP.

/4

LNT-6

2'-3"

2'-3"

10'-0"

A002

A002

SEE FINISH LEGEND FOR MATERIAL DESIGNATIONS.

GENERAL NOTES:

LEGEND:

B-1 4" RUBBER BASE

CPT-1

CARPET

TILE

SHEET VINYL

SC-2

SEALED

CONCRETE

POL-1

POLISHED

CONCRETE

EM-1

ENTRY MAT

QT-1

QUARRY

TILE

CERAMIC

TILE

CT-1

WAF-1

WOOD

ATHLETIC

FLOORING

CARPET

TILE

CPT-2

CARPET TILE

(GREEN

ACCENT)

CPT-3A

CARPET TILE

(BLUE

ACCENT)

CPT-3B

CARPET

TILE

CPT-4

CPT-5

CARPET

TILE

CPT-6

CARPET

TILE

CARPET

TILE

CPT-7

SV-1

RBT-2

RBT-1

RUBBER TILE

FLOORING

RUBBER TILE

FLOORING

VINYL

COMPOSTION

TILE

VCT-1

LNT-1

LINOLEUM

TILE

LINOLEUM

TILE

LNT-2

LINOLEUM

TILE

LNT-3

LINOLEUM

TILE

LNT-4

LINOLEUM

TILE

LNT-5

LINOLEUM

TILE

?LNT-6

NO WORK

AB

date phase date project k e y p l a n revisions

2/ 6/

:0

5:

P M

C :\B

R

IC

P ro je ct s\

B M

C E

S C la ss ro om

M od ul ar

_b re tt.

lu nd m ar kG

9H 2R

.r vt

A4.11

FIRST FLOOR PLAN

SECTOR A - FINISH PLAN

B E

A T

R

IC

E C

A N

N A

D Y

E

LE

M E

N T

A R

Y S

C H

O O

L

M O

D U

LA

R

A D

D

IT

IO

N

T

3)

-6

N or th C la ck am as

S ch oo l D is tr ic t

BID/PERMIT SET

02.09.2024 22027

V og el

R d, H ap py V al le y, O

R

SCALE: 1/8" = 1'-0" 1

FINISH FLOOR PLAN SECTOR A - FIRST FLOOR

PORTLAND, OREGON

E

RE

DANIEL J. HESS

T

A T

T

S

G R E

SI

HC

O

GEROOF

N

E T

C3473

TI

RADE

KEYNOTES

A002 PATCH AND REPAIR EXISTING FLOOR ASSEMBLY AND

FINISH AS NEEDED TO MATCH EXISTING FOR NEW

UNDERGROUND PLUMBING CONNECTION. SEE PLUMBING

FOR LOCATION AND EXTENTS.

brett.lundmark Rectangle brett.lundmark Snapshot date phase date project revisions

EXPIRES: 12/31/24

2/ 7/

:0

7:

P M

C :\U se rs

\k ay la a\

D oc um en ts \2

B M

C E

S C la ss ro om

M od s_ E

LE

C

_P

LU

M B

_R

_k ay la _a

.r vt

E0.01

SYMBOL LIST AND

GENERAL NOTES -

ELECTRICAL

B E

A T

R

IC

E C

A N

N A

D Y

E

LE

M E

N T

A R

Y S

C H

O O

L

C

LA

S S

R O

O M

M O

D U

LA

R

T

3)

-6

N or th C la ck am as

S ch oo l D is tr ic t

BID/PERMIT SET

02.09.2024 22027

V og el

R d, H ap py V al le y, O

R

E0.01 SYMBOL LIST AND GENERAL NOTES - ELECTRICAL

E2.11 FLOOR PLAN SECTOR A - FIRST FLOOR - POWER

E2.12 FLOOR PLAN SECTOR A - SECOND FLOOR - POWER

E2.13 FLOOR PLAN MODULAR CLASSROOM - POWER

E5.01 SINGLE LINE DIAGRAMS - ELECTRICAL

GENERAL ELECTRICAL NOTES

SHEET INDEX

Abbreviations

AFC ABOVE FINISHED CEILING

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

ARF ABOVE RAISED FLOOR

ANSI AMERICAN NATIONAL STANDARDS INSTITUTE

AWG AMERICAN WIRE GAUGE

A AMPERES, AMBER

AV AUDIO VISUAL

AHJ AUTHORITY HAVING JURISDICTION

AIC AVAILABLE INTERRUPTING CAPACITY

BAS BUILDING AUTOMATION SYSTEM

CA CABLE

CAT CATEGORY

CLG CEILING

CB CIRCUIT BREAKER

C CONDUIT, CLOSE, CONTROL

CFCI CONTRACTOR FURNISHED CONTRACTOR INSTALLED

CFOI CONTRACTOR FURNISHED OWNER INSTALLED

COORD COORDINATE

CU COPPER

dB DECIBEL

(X) DEMOLISH

DTL DETAIL

DIA DIAMETER

DIM DIMENSION

DIV DIVISION

DN DOWN

DWG DRAWING

EA EACH

EMT ELECTRICAL METALLIC TUBING

ENT ELECTRICAL NON-METALLIC TUBING

ESD ELECTROSTATIC DISCHARGE

EL ELEVATION

E EMERGENCY

EF EXHAUST FAN

(E) EXISTING

FMS FACILITY MANAGEMENT SYSTEMS

FF FINISH FLOOR

FA FIRE ALARM

FACP FIRE ALARM CONTROL PANEL

FMC FLEXIBLE METAL CONDUIT

FT FOOT, FEET

FBO FURNISHED BY OTHERS

G, GND GROUND

GFCI GROUND FAULT CIRCUIT INTERRUPTER

GFI GROUND FAULT INTERRUPTER

GFP GROUND FAULT PROTECTION

GE GROUNDING EQUALIZER

HH HANDHOLE

HT HEIGHT

HC HORIZONTAL CROSS CONNECT

ID IDENTIFICATION

IN INCH, INCHES

IEEE INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS

IMC INTERMEDIATE METAL CONDUIT

IG ISOLATED GROUND

KV KILOVOLT

KVA KILOVOLT AMPERES

KW KILOWATT

LED LIGHT EMITTING DIODE

LNC LIQUID TIGHT FLEXIBLE NONMETALLIC CONDUIT

LFMC LIQUIDTIGHT FLEXIBLE METAL CONDUIT

LV LOW VOLTAGE

MOCP MAXIMUM OVERCURRENT PROTECTION

MHz MEGAHERTZ mA MILLIAMPERES

MIN MINIMUM

MCA MINIMUM CIRCUIT AMPS

MISC MISCELLANEOUS

M MOTOR

MCC MOTOR CONTROL CENTER

MT, MTD MOUNT, MOUNTED

MDU MULTI-DWELLING UNIT

NEC NATIONAL ELECTRIC CODE

NESC NATIONAL ELECTRIC SAFETY CODE

NEMA NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION

N NEUTRAL

(N) NEW

NC NORMALLY CLOSED

NO NORMALLY OPEN

N/A NOT APPLICABLE

N.I.C. NOT IN CONTRACT

NTS NOT TO SCALE

OC ON CENTER

OSP OUTSIDE PLANT

OFCI OWNER FURNISHED, CONTRACTOR INSTALLED

OFOI OWNER FURNISHED, OWNER INSTALLED

PNL PANEL

PH PHASE

PVC POLY-VINYL-CHLORIDE

PWR POWER

QTY QUANTITY

REF REFERENCE

(R) RELOCATE

RFI REQUEST FOR INFORMATION

REQD REQUIRED

RMC RIGID METAL CONDUIT

RM ROOM

SHT SHEET

SIM SIMILAR

SPKR SPEAKER

STD STANDARD

SPD SURGE PROTECTION DEVICE

SWBD SWITCHBOARD

TBB TELECOMMUNICATIONS BONDING BACKBONE

TGB TELECOMMUNICATIONS GROUNDING BUS BAR

TTB TELEPHONE TERMINAL BOARD

TBD TO BE DETERMINED

XFMR TRANSFORMER

TVSS TRANSIENT VOLTAGE SURGE SUPPRESSOR

TP TRANSITION POINT

TYP TYPICAL

UG UNDERGROUND

UL UNDERWRITERS LABORATORIES

UPS UNINTERRUPTIBLE POWER SUPPLY

UON UNLESS OTHERWISE NOTED

VFD VARIABLE FREQUENCY DRIVE

VRFY VERIFY

V VOLTS, VOLTAGE

WP WEATHERPROOF

WG WIRE GUARD

W WIRE, WHITE

W/ WITH

W/O WITHOUT

WAO WORK AREA OUTLET

Raceways

EXISTING CONDUIT CONCEALED IN WALL OR CEILING SPACE

EXISTING CONDUIT ROUTED BELOW FLOOR / GRADE

OVERHEAD PRIMARY SERVICE

OVERHEAD TELEPHONE SERVICE

UNDERGROUND CABLE TELEVISION SERVICE

UNDERGROUND PRIMARY SERVICE

UNDERGROUND SECONDARY SERVICE

UNDERGROUND TELEPHONE SERVICE

CONDUIT CONCEALED IN WALL OR CEILING SPACE

CONDUIT ROUTED BELOW FLOOR / GRADE

CONDUIT ELLED DOWN

CONDUIT ELLED UP

CONDUIT/WIRING CONTINUATION

CONDUIT/WIRING STUBBED OUT WITH END CAP OR INSULATED

PLASTIC BUSHING

FLEXIBLE CONDUIT

Miscellaneous

BRANCH CIRCUIT WIRING. ARROW INDICATES HOME RUN TO

PANEL WITH CIRCUITS AS NOTED. WIRE SIZE IS #12 AWG MINIMUM

UNLESS NOTED OTHERWISE. SHORT TICK MARKS INDICATE PHASE

CONDUCTORS. LONG TICK MARKS INDICATE NEUTRAL

CONDUCTORS. A SINGLE CURVED TICK MARK INDICATES

INSULATED GREEN GROUND CONDUCTOR. SECOND CURVED TICK

MARK INDICATES "ISOLATED GROUND" (GREEN INSULATION WITH

YELLOW STRIPE) CONDUCTOR.

BRANCH PANEL

CIRCUIT BREAKER

DRY TYPE TRANSFORMER

FLUSH MOUNT EQUIPMENT ENCLOSURE AS NOTED

FLUSH WALL MOUNTED BRANCH PANEL

GROUND BAR

GROUNDING POINT

MAIN DISTRIBUTION PANEL / SUB DISTRIBUTION PANEL

POWER UTILITY POLE

SUBGRADE VAULT CATV

SUBGRADE VAULT POWER

SUBGRADE VAULT TELEPHONE

SURFACE MOUNT EQUIPMENT ENCLOSURE AS NOTED

TELEPHONE UTILITY POLE

UTILITY TRANSFORMER PAD/VAULT

Connections / Equipment

COMBINATION ADJUSTABLE FREQUENCY DRIVE WITH SAFETY

DISCONNECT SWITCH. FURNISHED BY DIVISION 23 AND INSTALLED

BY DIVISION 26.

COMBINATION MOTOR STARTER/FUSED DISCONNECT SWITCH

CONTACTOR COIL

HEAVY DUTY FUSED DISCONNECT SWITCH

MOTOR CONNECTION

NON-FUSED DISCONNECT SWITCH

RELAY

REMOTE DRIVER FOR LED LUMINAIRES

TRANSFORMER

FIRE SMOKE DAMPER

SMOKE DAMPER

CEILING MOUNTED JUNCTION BOX

FLOOR MOUNTED JUNCTION BOX

WALL-MOUNTED JUNCTION BOX

MAGNETIC DOOR HOLDER

Fire Alarm

FIRE ALARM CONTROL PANEL

NOTIFICATION APPLIANCE CIRCUIT PANEL

FIRE ALARM ANNUNCIATOR PANEL

General

DETAIL NUMBER AND SHEET LOCATION

EQUIPMENT IDENTIFICATION

FOOD SERVICE EQUIPMENT / CALCULATION TAG

KEYED NOTE

POINT OF CONNECTION

SECTION NUMBER AND SHEET LOCATION

DEMOLISH

EXISTING WORK

NEW WORK

ELECTRICAL SYMBOL LIST

NOTE: This is a standard symbol list and not all items listed may be used.

A. CONSULT ALL DRAWINGS AND SPECIFICATIONS IN THE PROJECT AND BECOME

FAMILIAR WITH ALL EQUIPMENT TO BE INSTALLED. COORDINATE ALL ASPECTS

OF THE CONSTRUCTION WITH THE OTHER TRADES ON THE JOB TO ENSURE

THAT ALL WORK AND MATERIAL REQUIRED PROVIDE A COMPLETE AND

OPERATIONAL FACILITY ARE INCLUDED IN BID.

B. PROVIDE 120V CIRCUITS FOR NEW FIRE ALARM PANELS / POWER SUPPLIES AS

REQUIRED. COORDINATE WITH DIVISION 28 DESIGN BUILD CONTRACTOR.

PROJECT

CONTACT

www.interfaceengineering.com

KRISTINE LEAVENS

2023-1267

100 SW Main Street, Suite 1600 Portland, OR 97204

TEL 503.382.2266

EXPIRES: 12/31/24

F

12456791011 8

H

D

E

C

K

B

A

G

C.2

D.8

J F

STAIR

S1

CONF

133C

RR

133H

OFFICE

133D

HALL

125B

CONF

100A

CONF

ELEV

E1

CUST

RR

131E

HEALTH

133G

HALL / MAIL

133F

RECEPTION

RR

RR

CLASSROOM

OFFICE

125C

BOYS

118B

COMMONS

FILES

131C

RR

131D

RR

STAIR

S3

HALL

131F GIRLS

118A

HALL

HALL

RR

125D

WORKROOM

100B

COMMONS

WORKROOM/ STORAGE

HALL

SLC CLASSROOM

CLASSROOM

CLASSROOM

SLC CLASSROOM

MDF

AV STORAGE

100D

ELECT.

CLASSROOM

MEDIA CENTER

HALL

CLASSROOM

HALLWAY

STAFF LOUNGE

131B

OFFICE

133E

CLASSROOM

WORKROOM

CLASSROOM

CLASSROOM

CLASSROOM

ELD CLASSROOM

STAIR

S2

(E) POLE

LUMINAIRE

E2.13

(1) 1-1/4" C.

2" C. FOR

FIRE ALARM

AB

date phase date project k e y p l a n revisions

EXPIRES: 12/31/24

2/ 7/

:0

7:

P M

C :\U se rs

\k ay la a\

D oc um en ts \2

B M

C E

S C la ss ro om

M od s_ E

LE

C

_P

LU

M B

_R

_k ay la _a

.r vt

E2.11

FLOOR PLAN SECTOR A -

FIRST FLOOR - POWER

B E

A T

R

IC

E C

A N

N A

D Y

E

LE

M E

N T

A R

Y S

C H

O O

L

C

LA

S S

R O

O M

M O

D U

LA

R

T

3)

-6

N or th C la ck am as

S ch oo l D is tr ic t

BID/PERMIT SET

02.09.2024 22027

V og el

R d, H ap py V al le y, O

R

PROJECT

CONTACT

www.interfaceengineering.com

KRISTINE LEAVENS

2023-1267

100 SW Main Street, Suite 1600 Portland, OR 97204

TEL 503.382.2266

0' 4' 8' 16'

1/8" = 1'-0"

1 FIRST FLOOR PLAN - SECTOR A - POWER N

O R T H

SHEET KEYNOTES

1. ROUTE NEW CONDUIT IN ACCESSIBLE CEILING SPACE.

2. ESTIMATE LOCATION OF EXISTING POLE LUMINAIRE

WITH CONCRETE PEDESTAL ANCHOR BASE. FIELD

COORDINATE NEW CONDUIT ROUTING WITH EXISTING

POLE LOCATION AND NEW SEWAGE EJECTOR PUMP.

D

E

C

K

B

A

G

C.2

D.8

J F

STAIR

S1

STAIR

S2

HALL

HALL

RR

ELECT.

OFF

WORKROOM

218 BOYS

218B

GIRLS

202B

RR

CUST

BOYS

202A

GIRLS

218A

COMMONS

COMMONS

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

HALLWAY

128 HALL

CONF

HALL

ELEV

E1

FLEX/ WORKROOM

CLASSROOM

CLASSROOM

RESOURCE/SL CLASSROOM

(E) PANEL '4M3'

E5.01

AB

date phase date project k e y p l a n revisions

EXPIRES: 12/31/24

2/ 7/

:0

7:

P M

C :\U se rs

\k ay la a\

D oc um en ts \2

B M

C E

S C la ss ro om

M od s_ E

LE

C

_P

LU

M B

_R

_k ay la _a

.r vt

E2.12

FLOOR PLAN SECTOR A -

SECOND FLOOR - POWER

B E

A T

R

IC

E C

A N

N A

D Y

E

LE

M E

N T

A R

Y S

C H

O O

L

C

LA

S S

R O

O M

M O

D U

LA

R

T

3)

-6

N or th C la ck am as

S ch oo l D is tr ic t

BID/PERMIT SET

02.09.2024 22027

V og el

R d, H ap py V al le y, O

R

0' 4' 8' 16'

1/8" = 1'-0"

1 FLOOR PLAN SECTOR A - SECOND FLOOR - POWER

PROJECT

CONTACT

www.interfaceengineering.com

KRISTINE LEAVENS

2023-1267

100 SW Main Street, Suite 1600 Portland, OR 97204

TEL 503.382.2266

N O R T

T

F

M

A

PANEL 'MODULE' 1 3

TRANSFORMER 'X2M3'

E5.01

(1) 1-1/4" C.

(1) 2" C.

(1) 2" C.

2" C. FOR FIRE ALARM

SE-1

'SE-1 CONTROL PANEL'4

(E) POLE

LUMINAIRE

E2.11

AB

date phase date project k e y p l a n revisions

EXPIRES: 12/31/24

2/ 7/

:0

7:

P M

C :\U se rs

\k ay la a\

D oc um en ts \2

B M

C E

S C la ss ro om

M od s_ E

LE

C

_P

LU

M B

_R

_k ay la _a

.r vt

E2.13

FLOOR PLAN MODULAR

CLASSROOM - POWER

B E

A T

R

IC

E C

A N

N A

D Y

E

LE

M E

N T

A R

Y S

C H

O O

L

C

LA

S S

R O

O M

M O

D U

LA

R

T

3)

-6

N or th C la ck am as

S ch oo l D is tr ic t

BID/PERMIT SET

02.09.2024 22027

V og el

R d, H ap py V al le y, O

R

0' 2' 4' 8'

1/4" = 1'-0"

1 FLOOR PLAN MODULAR CLASSROOM - POWER

PROJECT

CONTACT

www.interfaceengineering.com

KRISTINE LEAVENS

2023-1267

100 SW Main Street, Suite 1600 Portland, OR 97204

TEL 503.382.2266

N O R T H

SHEET KEYNOTES

1. MODULE PANEL SHOWN FOR COORDINATION ONLY.

PANEL PROVIDED BY MODULE MANUFACTURER.

COORDINATE WITH VENDOR FOR LOCATION.

2. ROUTE NEW CONDUIT IN ACCESSIBLE CEILING SPACE,

BENEATH STRUCTURE, OR IN WALLS.

3. PROVIDE 30mA GFEP 20A/1P CIRCUIT BREAKER IN

MODULE PANEL TO SERVE EXTERIOR COLD WATER

LINE HEAT TRACE. PROVIDE CONNECTION TO HEAT

TRACE PER MANUFACTURER REQUIREMENTS AND

COORDINATE WITH DIVISION 22.

4. SEWAGE EJECTOR, 208V, 14A. PROVIDE 20A / 2P

CIRCUIT BREAKER IN MODULE PANEL. CIRCUIT FROM

CIRCUIT BREAKER WITH #12 CU, COORDINATE WITH

DIVISION 22 IF NEUTRAL IS NEEDED FOR CONTROL

PANEL.

5. ESTIMATE LOCATION OF EXISTING POLE LUMINAIRE

WITH CONCRETE PEDESTAL ANCHOR BASE. FIELD

COORDINATE NEW CONDUIT ROUTING WITH EXISTING

POLE LOCATION AND NEW SEWAGE EJECTOR PUMP.

2023-1267

Ckt. C.B. C.B. Ckt.

No. Description / Location A/Pole Note Ph. Note A/Pole Description / Location No.

1 (E) HRU-101 4,432 H 25/3 A 25/3 4,432 H (E) HRU-201 2

3 --- 4,432 H - B - 4,432 H --- 4

5 --- 4,432 H - C - 4,432 H --- 6

7 (E) HRU-102 4,432 H 25/3 A 25/3 4,432 H (E) HRU-202 8

9 --- 4,432 H - B - 4,432 H --- 10

11 --- 4,432 H - C - 4,432 H --- 12

13 (E) HRU-103 4,432 H 25/3 A 25/3 4,432 H (E) HRU-203 14

15 --- 4,432 H - B - 4,432 H --- 16

17 --- 4,432 H - C - 4,432 H --- 18

19 (E) HRU-104 4,432 H 25/3 A 25/3 4,432 H (E) HRU-204 20

21 --- 4,432 H - B - 4,432 H --- 22

23 --- 4,432 H - C - 4,432 H --- 24

25 (E) HRU-105 4,432 H 25/3 A 25/3 4,432 H (E) HRU-205 26

27 --- 4,432 H - B - 4,432 H --- 28

29 --- 4,432 H - C - 4,432 H --- 30

31 (E) HRU-106 4,432 H 25/3 A 25/3 4,432 H (E) HRU-206 32

33 --- 4,432 H - B - 4,432 H --- 34

35 --- 4,432 H - C - 4,432 H --- 36

37 (E) AC-1 9,972 H 50/3 A 20/1 (E) SPARE BREAKER 38

39 --- 9,972 H - B 20/1 (E) SPARE BREAKER 40

41 --- 9,972 H - C 20/1 (E) SPARE BREAKER 42

43 (N) MODULAR BUILDING 18,400 G 110/3 1 A (E) BUSSED SPACE 44

45 --- 18,400 G - B (E) BUSSED SPACE 46

47 --- 18,400 G - C (E) BUSSED SPACE 48

49 (E) BUSSED SPACE A (E) BUSSED SPACE 50

51 (E) BUSSED SPACE B (E) BUSSED SPACE 52

53 (E) BUSSED SPACE C (E) BUSSED SPACE 54

55 (E) BUSSED SPACE A (E) BUSSED SPACE 56

Total Connected Load: Ph. A 81,556 VA 294 Amps Panel Connected Load: 244.7 KVA 294.3 Amps

Total Connected Load: Ph. B 81,556 VA 294 Amps Sub-Fed Connected Load: 0.0 KVA 0.0 Amps

Total Connected Load: Ph. C 81,556 VA 294 Amps Total Demand Load: 244.7 KVA 294.3 Amps

Notes: Accessories:

1. NEW BREAKER TO MATCH EXISTING MANUFACTURER AND AIC RATING.

(E) Panel '4M3' 277/480V, 3 Ph., 4 W.; 400A Bus with 400A Main Circuit Breaker Surface Mounted Panelboard with an Available Fault Current of 13110A RMS

Load Load

(VA)|Type (VA)|Type

20FT., 3/4" DIAMETER

MINIMUM REBAR IN

CONCRETE FOOTING/

FOUNDATION

NEUT. BUSFULL LENGTH

SUB-DISTRIBUTION SWITCHBOARD '2SDS'

208Y/120 VOLT, 3 PHASE, 4 WIRE

AVAILABLE FAULT CURRENT: 11,488A

MAIN DISTRIBUTION SWITCHBOARD '4MDS'

480Y/277 VOLT, 3 PHASE, 4 WIRE

AVAILABLE FAULT CURRENT: 22,553A

EXISTING CALCULATED DEMAND LOAD

FROM AS-BUILTS: 800.5 AMPS

#3/0

SPARE

3P3P

200A SPACE

ELEVATOR

800 AMP BUS 1200 AMP BUS

#3/0 BARE COPPER

BUILDING

STEEL

COLD

WATER

PIPE

10'-0"

GROUND

RODS AT

20'-0"C/C

GROUND BUS

#3/0

BARE

COPPER TO

TELEPHONE

TERMINAL

BOARD

SPD

PANEL

'2A'

PANEL

'2B'

PANEL

'2C'

PANEL

'2D'

PANEL

'2E'

PANEL

'2F'

PANEL

'2G'

300kVA 480~

120/208V

'X2SDS'

30HP

100420045003703

10004X

4004 1254 1254 1254 1504 1504 2004

1200A

3P70A

3P 200A

3P

100A

3P

400A

3P

450A

3P

150A

3P

100A

3P400A

3P

125A

3P

125A

3P

125A

3P

125A

3P

125A

3P

200A

3P

200A

3P GFP

#4 COPPER

#6 COPPER

250kcmil

SHEET KEYNOTES

200A

3P

100A

3P

100A

3P

200A

3P

SPARE

3P

SPACE800A

3P

1. INSTALL FEEDER FROM TRANSFORMER SECONDARY TO MAIN FUSED

DISCONNECT, NOT TO EXCEED 25 FEET PER NEC 240.21(C)(6).

2. PROVIDE 4-INCH HIGH CONCRETE HOUSEKEEPING PAD UNDER

TRANSFORMER.

3. CONNECT GROUNDING ELECTRODE CONDUCTORS FROM

TRANSFORMER GROUNDING LUG TO AVAILABLE GROUNDING

ELECTRODES PER NEC 250.30 AND 250.104.

4. PANEL PROVIDED BY MODULE MANUFACTURER. GROUNDING AT

BUILDING SERVICE PANEL AS INDICATED ON MODULAR BUILDING

VENDOR DRAWINGS.

SPACE

3P

SPARE

METER BASE PER

POWER

COMPANY

REQUIREMENTS

TERMINAL

CABINET

CABINET

TRANSF.

CURRENTM

INTEGRAL SURGE PROTECTIVE DEVICE

1200C

G200 AMP

480/277V, 200 kW

GENERATOR

100 AMP

STANDBY AUTOMATIC

TRANSFER SWITCH

'ATS-SB'

200A, 480/277V, 4-POLE

AVAILABLE FAULT

CURRENT: 16127A

NEMA 3R ENCLOSURE

E7.03

PANEL

'2K1'

PANEL

'2SB'

20044004X

PANEL

'4EM'

SPD

EMERGENCY AUTOMATIC

TRANSFER SWITCH

'ATS-EM'

100A, 480/277V, 4-POLE

AVAILABLE FAULT

CURRENT: 17654A

NEMA 3R ENCLOSURE

LCP

GENERATOR DOCKING

STATION

480/277V, 4-POLE, 100A

NEMA 3R ENCLOSURE

WITH LOCKABLE CABINET

PANEL

'2K2'

#2

112.5kVA 480~

120/208V

'X2SB'

PANEL

'4L1'

PANEL

'4L2'

PANEL

'4M1'

20044004

PANEL

'4L3'

PANEL

'4M3'

E7.03

CONCRETE

PAD/VAULT PER

POWER COMPANY

REQUIREMENTS

1-4"C

WITH PULL WIRE

SEE SITE PLAN

100AS / 70A DUAL

ELEMENT FUSES,

BUSSMANN POWER

MODULE SWITCH

100C

100C FUTURE 100kW

SOLAR INVERTER

PANEL

'MODULE'

12532004X

#2

75kVA 480~

120/208V

'X2M3'

110A/3P

F

200AS

200AF

NEMA 3R

COLD

WATER

PIPE

NEW SCOPE, ALL ONE-LINE

ELEMENTS SHOWN

OUTSIDE THIS ZONE IS

EXISTING TO REMAIN.

AVAILABLE

FAULT

CURRENT:

5,301A date phase date project revisions

EXPIRES: 12/31/24

2/ 7/

:0

7:

P M

C :\U se rs

\k ay la a\

D oc um en ts \2

B M

C E

S C la ss ro om

M od s_ E

LE

C

_P

LU

M B

_R

_k ay la _a

.r vt

E5.01

SINGLE LINE DIAGRAMS -

ELECTRICAL

B E

A T

R

IC

E C

A N

N A

D Y

E

LE

M E

N T

A R

Y S

C H

O O

L

C

LA

S S

R O

O M

M O

D U

LA

R

T

3)

-6

N or th C la ck am as

S ch oo l D is tr ic t

BID/PERMIT SET

02.09.2024 22027

V og el

R d, H ap py V al le y, O

R

A,C,S,X A=Aluminum C=Conduit only S=Service secondary X=Seperately derived system

FEEDER SCHEDULE

603 3 #4 CU, 1 #10 CU GND., IN 1" C.

703 3 #4 CU, 1 #8 CU GND., IN 1" C.

1004 4 #2 CU, 1 #8 CU GND., IN 1 1/4" C.

1253 3 #1 CU, 1 #6 CU GND., IN 1 1/4" C.

1504 4 #1/0 CU, 1 #6 CU GND., IN 2" C.

2003 3 #3/0 CU, 1 #6 CU GND., IN 2" C.

2004 4 #3/0 CU, 1 #6 CU GND., IN 2" C.

2004X 4 #3/0 CU, 1 #4 CU GND., IN 2" C.

2254 4 #4/0 CU, 1 #4 CU GND., IN 2 1/2" C.

2504 4 - 250 kcmil CU, 1 #4 CU GND., IN 2 1/2" C.

3503 3 - 500 kcmil CU, 1 #2 CU GND., IN 3" C.

6004 2 SETS OF (4 - 350 kcmil CU, 1 #1 CU GND., IN 3" C.)

8004 3 SETS OF (4 - 300 kcmil CU, 1 #1/0 CU GND., IN 3" C.)

PROJECT

CONTACT

www.interfaceengineering.com

KRISTINE LEAVENS

2023-1267

100 SW Main Street, Suite 1600 Portland, OR 97204

TEL 503.382.2266

NO SCALE

1 ONE-LINE POWER DISTRIBUTION DIAGRAM

SE-1 DUPLEX SEWAGE EJECTOR OUTSIDE / MODULAR

BUILDING

WEIL 2515 76 8 208 1 14 (2) .75 3 INCH DISCHARGE, BASIN: GB-48 x 078-401: 6 FT DEEP. 564

GALLONS, WITH GASKETED LID: PRCP-01-48, MOTOR BRACKET -

DUPLEX: 2613K7032, WITH GUIDES AND LEVEL CONTROL FLOATS:

8234, BALL CHECK VALVE: 2616-3, WEIL JUCTION BOX NEMA-6P FOR

EXTERIOR USE: WEIL: DUPLEX ISR ALTERNATING PUMP CONTROL

PANEL: 8251

NOTE:

PUMP SCHEDULE

SYMBOL EQUIPMENT TYPE LOCATION / SERVING

BASIS OF DESIGN

FLOW

RATE (GPM)

HEAD (FT

H2O)

ELECTRICAL

COMMENTSMFR MODEL VOLTS PH AMPS HP

COORDINATE WITH DIV 26 FOR POWER CONNECTIONS.

date phase date project revisions

EXPIRES: 12/31/24

2/ 7/

:2

3:

P M

C :\U se rs

\k ay la a\

D oc um en ts \2

B M

C E

S C la ss ro om

M od s_ E

LE

C

_P

LU

M B

_R

_k ay la _a

.r vt

P0.01

SYMBOL LIST AND

GENERAL NOTES -

PLUMBING

B E

A T

R

IC

E C

A N

N A

D Y

E

LE

M E

N T

A R

Y S

C H

O O

L

C

LA

S S

R O

O M

M O

D U

LA

R

T

3)

-6

N or th C la ck am as

S ch oo l D is tr ic t

BID/PERMIT SET

02.09.2024 22027

V og el

R d, H ap py V al le y, O

R

P0.01 SYMBOL LIST AND GENERAL NOTES - PLUMBING

P2.11 FLOOR PLAN SECTOR A - UNDERGROUND - PLUMBING

P2.12 FLOOR PLAN MODULAR CLASSROOM - UNDERGROUND - PLUMBING

P2.13 FLOOR PLAN SECTOR A - FIRST FLOOR - PLUMBING

P2.14 FLOOR PLAN MODULAR CLASSROOM - PLUMBING

GENERAL PLUMBING NOTES

SHEET INDEX

PLUMBING SYMBOL LIST

NOTE: This is a standard symbol list and not all items listed may be used.

PRESSURE GAUGE WITH COCK

PUMP

TEE DOWN ON PIPE

TEE UP ON PIPE

UNION

VENT THROUGH ROOF

WALL CLEANOUT

Piping Systems

COLD WATER PIPING

PUMPED DISCHARGE

SANITARY VENT PIPING

SANITARY WASTE OR SOIL PIPING ABOVE GRADE OR FINISHED

FLOOR

SANITARY WASTE OR SOIL PIPING BELOW GRADE OR FINISHED

FLOOR

Valves

SHUTOFF VALVE, GENERAL

General

DETAIL NUMBER AND SHEET LOCATION

KEYED NOTE

SECTION NUMBER AND SHEET LOCATION

EXISTING WORK

NEW WORK

PIPE OR CONDUIT BELOW GRADE

CONTINUATION

EXTENT OF DEMOLITION

PIPE BELOW GRADE

POINT OF CONNECTION

PLUMBING EQUIPMENT IDENTIFICATION

Piping Fittings

ACCESS PANEL

BLIND FLANGE

CAP

CLEANOUT TO GRADE

ECCENTRIC REDUCER

EXPANSION JOINT

FLEXIBLE CONNECTION

FLOOR CLEANOUT

FLOW DIRECTION

FLOW SWITCH

PIPE DROP

PIPE RISE

Abbreviations

AFF ABOVE FINISHED FLOOR

& AND

A AQUASTAT, ARCHITECT, ANCHOR, AMPHERE

@ AT

BFF BELOW FINISHED FLOOR

BLDG BUILDING

COTG CLEAN OUT TO GRADE

CO CLEANOUT

CW COLD WATER

CONT. CONTINUATION

CFH CUBIC FEET PER HOUR

CFS CUBIC FEET PER SECOND

(X) DEMOLISH

DN DOWN

DFU DRAINAGE FIXTURE UNIT

DWV DRAINAGE, WASTE AND VENT

ELECT ELECTRICAL

ESV ELECTRONIC SOLENOID VALVE

(E) EXISTING

EJ EXPANSION JOINT

FT FEET

FPS FEET PER SECOND

FFE FINISHED FLOOR ELEVATION

FC FLEXIBLE CONNECTOR

FL FLOOR

FCO FLOOR CLEANOUT

' FOOT, FEET

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

HD HEAD, HUB DRAIN

HP HEAT PUMP, HORSE POWER, HOUSEKEEPING PAD

HZ HERTZ

IN, " INCHES

INV INVERT ELEVATION

KW KILOWATT

MAX MAXIMUM

HG MERCURY

MIN MINIMUM

MH MOUNTING HEIGHT, MANHOLE

(N) NEW

NOP NORMALLY OPEN

N NORTH

N/A NOT APPLICABLE

NIC NOT IN CONTRACT

NTS NOT TO SCALE

# NUMBER

NO. NUMBER

PLBG PLUMBING

P PLUMBING, PUMP

POC POINT OF CONNECTION

PSI POUNDS PER SQUARE INCH

PD PRESSURE DROP, PLUMBING DEMOLITION, PUMPED DISCHARGE

QTY QUANTITY

RPM REVOLUTIONS PER MINUTE

SAN SANITARY

SJ SEISMIC JOINT

SE SEWAGE EJECTOR

SHT SHEET

SOV SHUT OFF VALVE

SP SUMP PUMP, STATIC PRESSURE

TP TRAP PRIMER, TOTAL PRESSURE

TYP TYPICAL

V VACUUM, VENT, VOLT

VS VENT STACK

VTR VENT THRU ROOF

W WASTE

WS WASTE STACK

WSFU WATER SUPPLY FIXTURE UNIT

W/ WITH

A. COORDINATE ALL WASTE, VENT & DOMESTIC COLD WATER WITH MODULAR BUILDING.

B. CONTRACTOR SHALL VERIFY AND COORDINATE ALL EXISTING WASTE, WATER PIPING TO REMAIN

IN SERVICE.

C. COORDINATE CUTTING, PATCHING, ETC WITH GENERAL CONTRACTOR AND EXISTING FIELD

CONDITIONS PRIOR START SCOPE OF WORK.

D. CONTRACTOR TO VERIFY EXISTING INVERT ELEVATION OF EXISTING 6" SANITARY.

E. PROVIDE CLEANOUTS FOR SANITARY WASTE SYSTEMS WHERE SHOWN AND AS OTHERWISE

REQUIRED PER CODE.

F. COORDINATE LOCATION OF PLUMBING FIXTURE WASTE AND WATER MANIFOLDS UNDER

MODULAR BUILDING FROM PLUMBING FIXTURES TO PIPING INSTALLED BY SITE CONTRACTOR.

G. PROVIDE HEAT TRACING IN CRAWL SPACE WHERE COLD WATER IS EXPOSED TO FREEZING

CONDITIONS. 3W/FT.

PROJECT

CONTACT

www.interfaceengineering.com

TODD KOLIBABA

2023-1267

100 SW Main Street, Suite 1600 Portland, OR 97204

E

C

K

G

C.2

D.8

J F

3/4" CW UP

POC 3" PD

TO EXISTING 6" SAN

SAW-CUT AND PATCH

3" PD & 3/4" CW

FOR CONT.

SEE CIVIL DWG'S

SAW-CUT AND PATCH

(E) 6" SAN(E) 6" SAN

P D

AB

date phase date project k e y p l a n revisions

EXPIRES: 12/31/24

2/ 7/

:2

3:

P M

C :\U se rs

\k ay la a\

D oc um en ts \2

B M

C E

S C la ss ro om

M od s_ E

LE

C

_P

LU

M B

_R

_k ay la _a

.r vt

P2.11

FLOOR PLAN SECTOR A -

UNDERGROUND -

PLUMBING

B E

A T

R

IC

E C

A N

N A

D Y

E

LE

M E

N T

A R

Y S

C H

O O

L

C

LA

S S

R O

O M

M O

D U

LA

R

T

3)

-6

N or th C la ck am as

S ch oo l D is tr ic t

BID/PERMIT SET

02.09.2024 22027

V og el

R d, H ap py V al le y, O

R

0' 4' 8' 16'

1/8" = 1'-0"

1 FLOOR PLAN SECTOR A - UNDERGROUND - PLUMBING

PROJECT

CONTACT

www.interfaceengineering.com

TODD KOLIBABA

2023-1267

100 SW Main Street, Suite 1600 Portland, OR 97204

TEL 503.382.2266

N O R

M

POC 3" PD

FOR CONT.

I.E. = -3'-0"

SEE CIVIL'S DWG'S

SE-1

3" @ 2%

2" V UP

2" V

COTG

ROUTED IN CRAWL SPACE

COORDINATE WITH MODULAR

BUILDING

2" VENT BELOW

GRADE

2" V DN

BELOW GRADE

4 4

COTG

I.E.= -3'-0'

POC 3/4" DOMESTIC

COLD WATER

FOR CONT.

SEE CIVIL'S DWG'S

6 6

6 6

AB

date phase date project k e y p l a n revisions

EXPIRES: 12/31/24

2/ 7/

:2

3:

P M

C :\U se rs

\k ay la a\

D oc um en ts \2

B M

C E

S C la ss ro om

M od s_ E

LE

C

_P

LU

M B

_R

_k ay la _a

.r vt

P2.12

FLOOR PLAN MODULAR

CLASSROOM -

UNDERGROUND -

PLUMBING

B E

A T

R

IC

E C

A N

N A

D Y

E

LE

M E

N T

A R

Y S

C H

O O

L

C

LA

S S

R O

O M

M O

D U

LA

R

T

3)

-6

N or th C la ck am as

S ch oo l D is tr ic t

BID/PERMIT SET

02.09.2024 22027

V og el

R d, H ap py V al le y, O

R

PROJECT

CONTACT

www.interfaceengineering.com

TODD KOLIBABA

2023-1267

100 SW Main Street, Suite 1600 Portland, OR 97204

TEL 503.382.2266

N O R T H

SHEET KEYNOTES

1. COORDINATE 3" SANITARY ROUTING BELOW GRADE WITH

MODULAR BUILDING DRAWINGS AND PROVIDE A COMPLETE SANITARY

SYSTEM.

2. COORDINATE 3/4" COLD WATER BELOW GRADE IN THE CRAWL

SPACE WITH MODULAR BUILDING DRAWINGS AND PROVIDE A

COMPLETE DOMESTIC WATER SYSTEM, PROVIDE HEAT TRACING

3W/FT ON EXPOSED PIPING.

3. COORDINATE 2" VENT IN CRAWL SPACE WITH MODULAR BUILDING,

ROUTE UP THROUGH ROOF.

4. COORDINATE MODULAR BUILDING PLUMBING SCHEMATICS DRAWING

FOR WATER PIPING AND ROUTING, SANITARY PIPING FROM FIXTURE TO

THE SITE. CONTRACTOR TO PROVIDE A COMPLETE SYSTEM.

5. COORDINATE LOCATION OF SE-1 WITH OTHER TRADES, SEE CIVIL

DRAWINGS FOR EXACT LOCATION.

6. COORDINATE WITH CIVIL DWG'S FOR DOWNSPOUT LOCATIONS

(TYPICAL).

0' 2' 4' 8'

1/4" = 1'-0"

1 FLOOR PLAN MODULAR CLASSROOM - UNDERGROUND - PLUMBING

D

E

C

K

B

A

G

C.2

D.8

J F

STAIR

S1

CONF

133C

OFFICE

133D

HALL

125B

CONF

100A

CONF

ELEV

E1

CUST

RR

131E

HEALTH

133G

HALL / MAIL

133F

RECEPTION

RR

RR

CLASSROOM

OFFICE

125C

BOYS

118B

COMMONS

FILES

131C

RR

131D

RR

STAIR

S3

HALL

131F GIRLS

118A

HALL

HALL

RR

125D

WORKROOM

100B

COMMONS

WORKROOM/ STORAGE

HALL

SLC CLASSROOM

CLASSROOM

CLASSROOM

SLC CLASSROOM

MDF

ELECT.

CLASSROOM

MEDIA CENTER

HALL

CLASSROOM

HALLWAY

STAFF LOUNGE

131B

OFFICE

133E

CLASSROOM

WORKROOM

CLASSROOM

CLASSROOM

CLASSROOM

ELD CLASSROOM

STAIR

S2

POC 3/4" CW TO

EXISTING 2" CW

3/4" CW DN BELOW SLAB,

SAW CUT AND PATCH AS REQUIRED,

SEE ARCHITECTS DWG'S FOR NEW

FURRED OUT CHASE. COORDINATE

ROUTING WITH DIV 26

SAW-CUT AND PATCH

3/4" CW

(E)

(E)

AB

date phase date project k e y p l a n revisions

EXPIRES: 12/31/24

2/ 7/

:2

4:

P M

C :\U se rs

\k ay la a\

D oc um en ts \2

B M

C E

S C la ss ro om

M od s_ E

LE

C

_P

LU

M B

_R

_k ay la _a

.r vt

P2.13

FLOOR PLAN SECTOR A -

FIRST FLOOR - PLUMBING

B E

A T

R

IC

E C

A N

N A

D Y

E

LE

M E

N T

A R

Y S

C H

O O

L

C

LA

S S

R O

O M

M O

D U

LA

R

T

3)

-6

N or th C la ck am as

S ch oo l D is tr ic t

BID/PERMIT SET

02.09.2024 22027

V og el

R d, H ap py V al le y, O

R

PROJECT

CONTACT

www.interfaceengineering.com

TODD KOLIBABA

2023-1267

100 SW Main Street, Suite 1600 Portland, OR 97204

TEL 503.382.2266

0' 4' 8' 16'

1/8" = 1'-0"

1 FLOOR PLAN SECTOR A - FIRST FLOOR - PLUMBING N

O R

M

A

SE-1 CONTROL

PANEL

2" V UP

TO 2" VTR,

2" V DN

SE-1

DOWNSPOUT BY OTHERS,

COORDINATE WITH ARCHITECTS

DRAWINGS, (TYPICAL)

2 2

2 2

AB

date phase date project k e y p l a n revisions

EXPIRES: 12/31/24

2/ 7/

:2

4:

P M

C :\U se rs

\k ay la a\

D oc um en ts \2

B M

C E

S C la ss ro om

M od s_ E

LE

C

_P

LU

M B

_R

_k ay la _a

.r vt

P2.14

FLOOR PLAN MODULAR

CLASSROOM - PLUMBING

B E

A T

R

IC

E C

A N

N A

D Y

E

LE

M E

N T

A R

Y S

C H

O O

L

C

LA

S S

R O

O M

M O

D U

LA

R

T

3)

-6

N or th C la ck am as

S ch oo l D is tr ic t

BID/PERMIT SET

02.09.2024 22027

V og el

R d, H ap py V al le y, O

R

PROJECT

CONTACT

www.interfaceengineering.com

TODD KOLIBABA

2023-1267

100 SW Main Street, Suite 1600 Portland, OR 97204

TEL 503.382.2266

N O R T H

0' 2' 4' 8'

1/4" = 1'-0"

1 FLOOR PLAN - MODULAR CLASSROOM - PLUMBING

SHEET KEYNOTES

1. COORDINATE LOCATION OF SE-1 AND CONTROL PANEL WITH SITE

UTILITIES AND MODULAR BUILDING.

2. PLUMBING FIXTURES BY OTHERS SEE MODULAR BUILDING DRAWINGS.

date phase date project revisions

EXPIRES: 12/31/24

2/ 7/

:0

6:

P M

C :\U se rs

\k ay la a\

D oc um en ts \2

B M

C E

S C la ss ro om

M od s_ E

LE

C

_P

LU

M B

_R

_k ay la _a

.r vt

T0.01

SYMBOL LIST AND

GENERAL NOTES -

TECHNOLOGY

B E

A T

R

IC

E C

A N

N A

D Y

E

LE

M E

N T

A R

Y S

C H

O O

L

C

LA

S S

R O

O M

M O

D U

LA

R

T

3)

-6

N or th C la ck am as

S ch oo l D is tr ic t

BID/PERMIT SET

02.09.2024 22027

V og el

R d, H ap py V al le y, O

R

TECHNOLOGY SYMBOL LIST

NOTE: This is a standard symbol list and not all items listed may be used.

Abbreviations

AFF ABOVE FINISHED FLOOR

ALS ASSISTED LISTENING SYSTEM

AV AUDIO VISUAL

CATV CABLE ANTENNA TELEVISION

CAT CATEGORY CABLE

CCTV CLOSED CIRCUIT TELEVISION

COAX COAXIAL

COM COMMUNICATION

CFCI CONTRACTOR FURNISHED CONTRACTOR INSTALLED

CFOI CONTRACTOR FURNISHED OWNER INSTALLED

(X) DEMOLISH

EF ENTRANCE FACILITY

ER EQUIPMENT ROOM

(E) EXISTING

LC FIBER OPTIC CONNECTOR

SC FIBER OPTIC CONNECTOR

FDU FIBER OPTIC DISTRIBUTION UNIT

FT FOOT, FEET

(F) FUTURE

GND GROUND

HH HANDHOLE

IN INCH, INCHES

ICT INFORMATION AND COMMUNICATIONS TECHNOLOGY

IT INFORMATION TECHNOLOGY

ISP INSIDE PLANT

LAN LOCAL AREA NETWORK

LV LOW VOLTAGE

MTR MAIN TELECOMMUNICATIONS ROOM

MH MAINTENANCE HOLE

MATV MASTER ANTENNA TELEVISION

(N) NEW

NTS NOT TO SCALE

OSP OUTSIDE PLANT

OFCI OWNER FURNISHED, CONTRACTOR INSTALLED

OFOI OWNER FURNISHED, OWNER INSTALLED

PTZ PAN, TILT, ZOOM

PBB PRIMARY BONDING BUSBAR

QTY QUANTITY

RU RACK UNIT

SATV SATELLITE ANTENNA TELEVISION

SBB SECONDARY BONDING BUSBAR

SBC SECONDARY BONDING CONDUCTOR

TBB TELECOMMUNICATIONS BONDING BACKBONE

TBC TELECOMMUNICATIONS BONDING CONDUCTOR

TEBC TELECOMMUNICATIONS EQUIPMENT BONDING CONDUCTOR

TR TELECOMMUNICATIONS ROOM

TYP TYPICAL

UPS UNINTERRUPTABLE POWER SUPPLY

UON UNLESS OTHERWISE NOTED

WP WEATHERPROOF

WAN WIDE AREA NETWORK

WAP WIRELESS ACCESS POINT

WIFI WIRELESS FIDELITY

Audio/Video

AUDIO-VISUAL OUTLET. PROVIDE (2) HDMI CONNECTORS AND

(2) HDMI CABLES WITH CONNECTION TO AV OUTLET IN WALL

BOX WITH SINGLE-GANG ADAPTER RING AND 1.25" CONDUIT

WITH PROTECTIVE BUSHING TO NEAREST ACCESSIBLE

CEILING SPACE.

DISPLAY(PLAN VIEW), INDICATED BY SIZE IN INCHES ON

DRAWINGS, DETAILS AND SPECIFICATIONS

FLUSH MOUNTED PAGING SPEAKER IN CEILING WITH 1"

CONDUIT TO NEAREST ACCESSIBLE CEILING SPACE AND

CABLING PER SPECIFICATION

Electronic Security

VIDEO SURVEILLANCE CAMERA WITH ONE, CATEGORY 6A

CABLE. PROVIDE 5S BOX WITH SINGLE GANG ADAPTER RING

AND 1.25" CONDUIT WITH PROTECTIVE BUSHING, STUBBED TO

NEAREST ACCESSIBLE CEILING SPACE. SEE NOTES ON

DRAWINGS FOR CAMERA TYPE.

Equipment

ENCLOSED CABINET

SECONDARY BONDING BUSBAR (SBB) 4" X 12" X.25"

Reference Symbols

DETAIL NUMBER AND SHEET LOCATION

KEYED NOTES

SECTION NUMBER AND SHEET LOCATION

Telecommunications

CEILING MOUNTED TELECOM OUTLET MOUNTED ON CEILING

WITH TWO CATEGORY 6A CABLES. PROVIDE 5S BOX WITH

SINGLE GANG ADAPTER RING AND 1-1/4" CONDUIT WITH

PROTECTIVE BUSHING STUBBED TO NEAREST ACCESSIBLE

CEILING SPACE

LOCATION OF SURFACE MOUNTED RADIO CLOCK. PROVIDE

PRIMEX.

TELECOM OUTLET WITH TWO CATEGORY 6A CABLES. PROVIDE

5S BOX WITH SINGLE GANG ADAPTER RING AND 1-1/4"

CONDUIT WITH PROTECTIVE BUSHING STUBBED TO NEAREST

ACCESSIBLE CEILING SPACE. MOUNTED AT +18", UON.

T0.01 SYMBOL LIST AND GENERAL NOTES - TECHNOLOGY

T2.11 FLOOR PLAN SECTOR A - FIRST FLOOR - TECHNOLOGY

T2.12 FLOOR PLAN MODULAR CLASSROOM - TECHNOLOGY

T7.01 DETAILS - TECHNOLOGY

GENERAL SHEET NOTES

SHEET INDEX

A. COMMUNICATIONS RACEWAYS, TRAYS AND OUTLETS ARE SHOWN

DIAGRAMMATICALLY. LOCATIONS ARE APPROXIMATE UNLESS

SPECIFICALLY DIMENSIONED. FIELD COORDINATE ALL WORK WITH

OTHER TRADES.

B. CONSTRUCTION DETAILS SHOW TYPICAL INSTALLATION UNLESS

OTHERWISE NOTED AND APPLY TO ALL COMMUNICATIONS WORK

INCLUDED IN THE SUMMARY OF WORK FOR THIS PACKAGE EVEN

THOUGH NOT SPECIFICALLY REFERENCED ON THE PLAN

DRAWINGS.

C. INSTALL PULL STRINGS IN ALL CONDUITS AT THE TIME OF CONDUIT

AND CABLE INSTALLATION.

PROJECT

CONTACT

www.interfaceengineering.com

KEVIN RITTENBACH

2023-1267

100 SW Main Street, Suite 1600 Portland, OR 97204

DES

C

DD

DD

L

D C

AR

AR

AR

AR

AR

AR

L C

ARAR

ARAR

AR

AR

REX

DD L

REX

LL

C

C

MD

MD

SC

SC

MD

MD

MD

ES

ES

MD

REX

C

DL

12456791011 8

H

D

E

C

K

B

A

G

C.2

D.8

J F

STAIR

S1

CONF

133C

RR

133H

OFFICE

133D

HALL

125B

CONF

100A

CONF

ELEV

E1

CUST

RR

131E

HEALTH

133G

HALL / MAIL

133F

RECEPTION

RR

RR

CLASSROOM

OFFICE

125C

BOYS

118B

COMMONS

FILES

131C

RR

131D

RR

STAIR

S3

HALL

131F GIRLS

118A

HALL

HALL

RR

125D

WORKROOM

100B

COMMONS

WORKROOM/ STORAGE

HALL

SLC CLASSROOM

CLASSROOM

CLASSROOM

SLC CLASSROOM

MDF

AV STORAGE

100D

ELECT.

CLASSROOM

MEDIA CENTER

HALL

CLASSROOM

HALLWAY

STAFF LOUNGE

131B

OFFICE

133E

CLASSROOM

WORKROOM

CLASSROOM

CLASSROOM

CLASSROOM

ELD CLASSROOM

STAIR

S2

AVOID NEW SEWER

EJECTOR PUMP AND

EXISTING LIGHT POLE.

AB

date phase date project k e y p l a n revisions

EXPIRES: 12/31/24

2/ 7/

:0

6:

P M

C :\U se rs

\k ay la a\

D oc um en ts \2

B M

C E

S C la ss ro om

M od s_ E

LE

C

_P

LU

M B

_R

_k ay la _a

.r vt

T2.11

FLOOR PLAN SECTOR A -

FIRST FLOOR -

TECHNOLOGY

B E

A T

R

IC

E C

A N

N A

D Y

E

LE

M E

N T

A R

Y S

C H

O O

L

C

LA

S S

R O

O M

M O

D U

LA

R

T

3)

-6

N or th C la ck am as

S ch oo l D is tr ic t

BID/PERMIT SET

02.09.2024 22027

V og el

R d, H ap py V al le y, O

R

PROJECT

CONTACT

www.interfaceengineering.com

KEVIN RITTENBACH

2023-1267

100 SW Main Street, Suite 1600 Portland, OR 97204

TEL 503.382.2266

0' 4' 8' 16'

1/8" = 1'-0"

1 1ST FLOOR LEVEL TELECOM PLAN - SECTOR A N

O R T H

SHEET KEYNOTES

1. PROVIDE (1) 3" C. TO IDF LOCATION IN

MODULAR BUILDING 1. SEE T2.12 FOR

CONTINUATION.

2. PROVIDE (1) 3" C. ABOVE CEILING. TIE INTO

EXISTING CABLE TRAY PATHWAYS ABOVE

CEILING.

3. PROVIDE 110 BLOCK FOR INTERCONNECT

WITH 25-PAIR CAT5e CABLE.

4. FIELD VERIFY EXISTING PATHWAYS FROM

CABLE TRAY TO MDF CAN SUPPORT NEW

CABLING TO MODULARS.

AVOID NEW SEWAGE

EJECTOR PUMP AND

EXISTING LIGHT POLE.

SC

SC

679 8

OFCI WALL MOUNTED EQUIPMENT CABINET

PROVIDE 70" DIAGONAL FLAT PANEL DISPLAY -

SHARP LE701, MOUNT DISPLAY AT HEIGHT OF 45"

FROM FINISHED FLOOR TO BOTTOM OF SCREEN

+77"

+77"

+18"

PROVIDE 70" DIAGONAL FLAT PANEL DISPLAY -

SHARP LE701, MOUNT DISPLAY AT HEIGHT OF 45"

FROM FINISHED FLOOR TO BOTTOM OF SCREEN

+77"

+18" +77"

AV

AV

AV

AV

PROVIDE PULLBOX

PROVIDE FIRE-RATED PLYWOOD MOUNTING BACKBOARD

PROVIDE SECONDARY BONDING BUSBAR

PROVIDE 66 BLOCK IN REAR OF CABINET FOR PAGING INTERCONNECT

PROVIDE CORNER MOUNT, 4 LENS HANWHA WISENET P SERIES PNM-9084QZ1

PROVIDE CORNER MOUNT, 4 LENS

HANWHA WISENET P SERIES PNM-9084QZ1

+18"

+18"

T7.01

T7.01

AB

date phase date project k e y p l a n revisions

EXPIRES: 12/31/24

2/ 7/

:0

6:

P M

C :\U se rs

\k ay la a\

D oc um en ts \2

B M

C E

S C la ss ro om

M od s_ E

LE

C

_P

LU

M B

_R

_k ay la _a

.r vt

T2.12

FLOOR PLAN MODULAR

CLASSROOM -

TECHNOLOGY

B E

A T

R

IC

E C

A N

N A

D Y

E

LE

M E

N T

A R

Y S

C H

O O

L

C

LA

S S

R O

O M

M O

D U

LA

R

T

3)

-6

N or th C la ck am as

S ch oo l D is tr ic t

BID/PERMIT SET

02.09.2024 22027

V og el

R d, H ap py V al le y, O

R

PROJECT

CONTACT

www.interfaceengineering.com

KEVIN RITTENBACH

2023-1267

100 SW Main Street, Suite 1600 Portland, OR 97204

TEL 503.382.2266

0' 2' 4' 8'

1/4" = 1'-0"

1 FLOOR PLAN - MODULAR CLASSROOM - TECHNOLOGY N

O R T H

SHEET KEYNOTES

1. PROVIDE (1) 3" C. TO IDF LOCATION. PROVIDE THE

FOLLOWING FROM THE MDF IN THE MAIN

BUILDING TO IDF LOCATION IN MODULE 1:

• ONE (1) CORNING 12-STRAND ARMORED

PLENUM-RATED SINGLE MODE OS2 LSZH

FIBER OPTIC CABLE.

• ONE (1) 25-PAIR CATEGORY 5e CABLE FOR

VOICE INTERCONNECT USING NCSD

SUPPLIED CAT5E 1U PATCH PANEL

MOUNTED IN CABINET AND LABELED WITH

DESTINATION.

• TWO (2) 18 GAUGE/2 CONDUCTOR

STRANDED, SHIELDED CABLES FOR THE

TWO PAGING SPEAKERS.

WALL/ COLUMN

CEILING CROSS "T" BAR

ACOUSTICAL TILE, TYP

T-BAR TILE BRIDGE

SINGLE GANG BOX

CAT6A TO CABINET

10-15' SERVICE LOOP

CEILING

SOFFIT MOUNT CAMERA

CEILING

FASCIA MOUNT CAMERA BASIC FLAT WALL MOUNT CAMERA SURFACE WALL MOUNT PATHWAY

CORNER MOUNT CAMERA

MODULAR BUILDING 1

MDF

PROVIDE 12-STRAND SINGLEMODE

OS2 LSZH FIBER OPTIC CABLE

PROVIDE 25-PAIR CAT5E COPPER

CABLE FOR VOICE

PROVIDE (2) 18 GAUGE, 2 CONDUCTOR,

STRANDED, SHIELDED CABLES, ONE

FOR EACH PAGING SPEAKER

70" DIAGONAL DISPLAY,

PROVIDE SHARP LE701

A

F F

1"C TO

ACCESSIBLE

CEILING SPACE

1-1/4"C

VIDEO INPUT; PROVIDE (2) HDMI CONNECTORS, CABLING TO OUTLET BEHIND DISPLAY

VIDEO OUTPUT; PROVIDE (2) HDMI

CONNECTORS, (2) HDMI CABLES AV

OUTLET BELOW

DATA; CABLING TO CABINET

POWER

A

F F 4

A

F F 7

A

F F date phase date project revisions

EXPIRES: 12/31/24

2/ 7/

:0

7:

P M

C :\U se rs

\k ay la a\

D oc um en ts \2

B M

C E

S C la ss ro om

M od s_ E

LE

C

_P

LU

M B

_R

_k ay la _a

.r vt

T7.01

DETAILS - TECHNOLOGY

B E

A T

R

IC

E C

A N

N A

D Y

E

LE

M E

N T

A R

Y S

C H

O O

L

C

LA

S S

R O

O M

M O

D U

LA

R

T

3)

-6

N or th C la ck am as

S ch oo l D is tr ic t

BID/PERMIT SET

02.09.2024 22027

V og el

R d, H ap py V al le y, O

R

PROJECT

CONTACT

www.interfaceengineering.com

KEVIN RITTENBACH

2023-1267

100 SW Main Street, Suite 1600 Portland, OR 97204

TEL 503.382.2266

NO SCALE

1 WIRELESS ACCESS POINT OUTLET DETAIL

NO SCALE

2 CAMERA MOUNTING DETAILS

NO SCALE

3 BACKBONE RISER DIAGRAM

NO SCALE

4 AV INFRASTRUCTURE RISER - WALL DISPLAY

COVER SHEET
Cannady ES - CIVIL
C0.10 COVER SHEET
C0.20 OVERALL EXISTING CONDITIONS PLAN
C0.30 EXISTING CONDITIONS & DEMOLITION PLAN
C1.00 SITE AND HORIZONTAL CONTROL PLAN
C2.00 GRADING PLAN
C2.50 WALL PLAN AND PROFILE
C2.51 WALL SECTIONS
C3.00 UTILITY PLAN
C4.00 DETAILS
C4.01 DETAILS
Cannady ES - ARCHITECTURAL
A1.11 - FIRST FLOOR PLAN SECTOR A - DEMO PLAN
A2.11 - FLOOR PLAN SECTOR A - FIRST FLOOR
A4.11 - FIRST FLOOR PLAN SECTOR A - FINISH PLAN
Cannady ES - Bid-Permit Set - ELECTRICAL
E0.01 - SYMBOL LIST AND GENERAL NOTES - ELECTRICAL
E2.11 - FLOOR PLAN SECTOR A - FIRST FLOOR - POWER
E2.12 - FLOOR PLAN SECTOR A - SECOND FLOOR - POWER
E2.13 - FLOOR PLAN MODULAR CLASSROOM - POWER
E5.01 - SINGLE LINE DIAGRAMS - ELECTRICAL
Cannady ES - Bid-Permit Set - PLUMBING
P0.01 - SYMBOL LIST AND GENERAL NOTES - PLUMBING
P2.11 - FLOOR PLAN SECTOR A - UNDERGROUND - PLUMBING
P2.12 - FLOOR PLAN MODULAR CLASSROOM - UNDERGROUND - PLUMBING
P2.13 - FLOOR PLAN SECTOR A - FIRST FLOOR - PLUMBING
P2.14 - FLOOR PLAN MODULAR CLASSROOM - PLUMBING
Cannady ES - Bid-Permit Set - TECHNOLOGY
T0.01 - SYMBOL LIST AND GENERAL NOTES - TECHNOLOGY
T2.11 - FLOOR PLAN SECTOR A - FIRST FLOOR - TECHNOLOGY
T2.12 - FLOOR PLAN MODULAR CLASSROOM - TECHNOLOGY
T7.01 - DETAILS - TECHNOLOGY