This document is a permit set of architectural, electrical, plumbing, and technology drawings for the Beatrice Cannady Elementary School Classroom Modular Addition project located in Happy Valley, Oregon, managed by North Clackamas School District in collaboration with BRIC Architecture Inc., KPFF Consulting Engineers, and Interface Engineering. The project involves adding a modular classroom building to the existing school facility, with work including demolition of existing elements in Sector A, installation of new utility connections (electrical, plumbing, technology, and fire alarm systems), and integration of the modular unit into the existing campus infrastructure. The drawings indicate that delegated design components requiring deferred submittals include the modular foundation (Division 03 30 00 - Concrete) and the fire alarm system (Division 28). The architectural plans show first-floor demolition and construction plans for Sector A, floor plans with wall types and interior elevations, and finish plans specifying flooring materials throughout the facility. The bid and permit set was issued on February 9, 2024, with project sheets organized across civil, architectural, electrical, plumbing, and technology disciplines, containing detailed keynotes, specifications, and coordination requirements among all trades.
The electrical scope includes new power distribution to the modular classroom with a dedicated 110-amp, 3-phase panel and circuits for heating units, equipment, and a sewage ejector pump system, with routing through conduit in accessible ceiling spaces. The plumbing work involves underground connections including a 3-inch sanitary discharge line routed to existing infrastructure, 3/4-inch domestic cold water supply with heat tracing in exposed crawl spaces, and vent lines coordinated with the modular building manufacturer. Technology infrastructure includes fiber optic backbone cabling from the main building's MDF to an IDF in the modular unit, Category 5e voice cabling, audio-visual outlets with HDMI connections, surveillance cameras with Category 6A cabling, and paging speakers throughout the space. All work requires extensive coordination among trades to avoid conflicts with existing utilities, the new sewage ejector pump installation, and existing light poles. The project specifications emphasize field verification of existing conditions, proper patching and restoration of finishes to match existing materials, and compliance with the modular building manufacturer's requirements for all integrated systems.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment B Dislosure Exemption Affidavit~2.doc | DOC document | |
| Attachment D Certified Disadvantaged Business Outreach Plan~1.doc | DOC document | |
| Attachment F Price Proposal v1.xlsx | XLSX spreadsheet | |
| Attachment G Reference Form~1.doc | DOC document | |
| Addendum 001_Cannady Modular Project_24-105.pdf | ||
| Attachment A Sample Price Agreement~2.docx | DOCX document | |
| Attachment J OHA Graphic Standards Manual.pdf | ||
| Attachment E Responsiblity Inquiry~1.doc | DOC document | |
| Attachment H ODHS and OHA Writing Style Guide~1.pdf | ||
| Attachment I ODHS Graphic Standards Manual.pdf | ||
| 5711 Intent to award.docx | DOCX document | |
| Questions and Answers~11.pdf | ||
| Attachment C Proposer Information and Certification Sheet~1.doc | DOC document | |
| Attachment K Evaluation tool.docx | DOCX document | |
| Main RFP Document v1.docx | DOCX document | |
| 2nd Round Announcement Final.docx | DOCX document |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ANGLE
AND
ANCHOR BOLT
ACOUSTICAL CEILING TILE
ADDENDUM
ARCHITECTURAL EXPOSED
STRUCTURAL STEEL
ABOVE FINISH FLOOR
AREA LIGHT STANDARD
ALUMINUM
ANODIZED
BOARD
BUILDING
BLOCKING
BENCH MARK
BOTTOM
BETWEEN
CHANNEL
CATCH BASIN
CLOSED CIRCUIT TV
CORNER GUARD
CAST IN PLACE CONCRETE
CEILING
CLEAR
CONTROL JOINT
CONCRETE MASONRY UNIT
CONTINUOUS
CORRIDOR
CLASSROOM
CONSTRUCTION JOINT
CASEMENT
CERAMIC TILE
CENTER
CENTERLINE
DOUBLE
DETAIL
DRINKING FOUNTAIN
DIAMETER
DIAGONAL
DIMENSION
DISPENSER
DOWN
DAMPROOFING
DOOR
DOWNSPOUT
DRAWING
AB
ACT
ADD
AESS
AFF
ALS
ALUM
ANOD
BD
BLDG
BLKG
BM
BOT
BTWN
C
CB
CCTV
CG
CIP
CLG
CLR
CJ
CMU
CONT
CORR
CR
CSJ
CSMT
CT
CTR
DBL
DTL
DF
DIA
DIAG
DIM
DISP
DN
DP
DR
DS
DWG
(E)
EA
EF
EJ
EL
ELEC
EOS
ENGR
EQ
EQUIP
ES
EW
EXP
EXT
FA
FD
FDN
FE
FEC
FECB
FF
FIN
FL
FO
FOC
FOF
FOM
FOS
FRT
FTG
FURR
GA
GALV
GB
GC
GL
GND
GVP
GWB
HB
HC
HM
HPC
HVAC
HW
INSUL
INT
JAN
JT
JST
EXISTING
EACH
EXHAUST FAN
EXPANSION JOINT
ELEVATION
ELECTRICAL
EDGE OF SLAB
ENGINEER
EQUAL
EQUIPMENT
EACH SIDE
EACH WAY
EXPANSION
EXTERIOR
FIRE ALARM
FLOOR DRAIN
FOUNDATION
FIRE EXTINGUISHER
FIRE EXTINGUISHER CABINET
FIRE EXTINGUISHER CABINET W/
BLANKET
FINISH FLOOR
FINISH
FLOOR
FACE OF
FACE OF CONCRETE
FACE OF FINISH
FACE OF MASONRY
FACE OF STUD
FIRE RETARDANT TREATED
FOOTING
FURRING
GAUGE
GALVANIZED
GRAB BAR
GENERAL CONTRACTOR
GLASS
GROUND
GYPSUM VENEER PLASTER
GYPSUM WALL BOARD
HOSE BIBB
HANDICAP
HOLLOW METAL
HIGH PERFORMANCE COATING
HEATING, VENTILATION AND AIR
CONDITIONING
HOT WATER
INSULATION
INTERIOR
JANITOR
JOINT
JOIST
L
LAV
LB
LKR
LS
LVR
MATL
MB
MAX
MECH
MED
MEZZ
MFR
MIN
MIR
MISC
MTD
MTL
(N)
NA
NIC
NOM
NS
NTS
OA
OC
OD
OD
OFCI
OFOI
OH
OPNG
OPP
OS
PL
PLAS
PLYWD
PSF
PT
PVMT
R
RD
REF
REFR
REQ'D
REV
RM
RO
RCP
LENGTH
LAVATORY
LAG BOLT
LOCKER
LANDSCAPING
LOUVER
MATERIAL
MARKERBOARD
MAXIMUM
MECHANICAL
MEDIUM
MEZZANINE
MANUFACTURER
MINIMUM
MIRROR
MISCELLANEOUS
MOUNTED
METAL
NEW
NOT APPLICABLE
NOT IN CONTRACT
NOMINAL
NELSON STUD
NOT TO SCALE
OVERALL
ON CENTER
OVERFLOW DRAIN
OUTSIDE DIAMETER
OWNER FURNISHED
CONTRACTOR INSTALLED
OWNER FURNISED OWNER
INSTALLED
OVERHEAD
OPENING
OPPOSITE
OUTSIDE
PROPERTY LINE
PLASTER
PLYWOOD
PER SQUARE FOOT
PRESSURE TREATED
PAVEMENT
RADIUS
ROOF DRAIN
REFERENCE
REFRIGERATOR
REQUIRED
REVISE OR REVISION
ROOM
ROUGH OPENING
REFLECTED CEILING PLAN
SAHTS
SAM
SC
SECT
SF
SHTG
SHWR
SHT
SIM
SJ
SM
SQ
SS
STD
STL
STOR
STRUCT
SUSP
T/M T
TC
TEL
T&G
THK
TO
TOD
TOS
TJ
TP
TS
TYP
UNFIN
UNO
VB
VERT
VEST
VFY
W/ W/O
WC
WD
WF
WH
WP
WRB
WT
SELF ADHERED HIGH
TEMPERATURE SHEET
SELF-ADHERED MEMBRANE
SOLID CORE
SECTION
SQUARE FOOT
SHEATHING
SHOWER
SHEET
SIMILAR
SEISMIC JOINT
SHEET METAL
SQUARE
STAINLESS STEEL
STANDARD
STEEL
STORAGE
STRUCTUAL
SUSPENDED
TO MATCH
TEMPERED GLAZING
TOP OF CURB
TELEPHONE
TONGUE AND GROOVE
THICK
TOP OF
TOP OF DECK
TOP OF STRUCTURE
TOOL JOINT
TOILET PAPER
TUBE STEEL
TYPICAL
UNFINISHED
UNLESS NOTED OTHERWISE
VAPOR BARRIER
VERTICAL
VESTIBULE
VERIFY
WITH
WITHOUT
WATER CLOSET
WOOD
WIDE FLANGE
WATER HEATER
WATERPROOFING
WATER-RESISTIVE BARRIER
WEIGHT
CL
A
ROOM NAME & NUMBER
STOREFRONT OR WINDOW TYPE
KEYNOTE REFERENCE
CEILING PLANE HEIGHT - ALL
REFERENCES TO FINISH FLOOR
ELEVATION
INTERIOR FINISH TYPE
HORIZONTAL ELEVATION PLANE
HEIGHT - ALL REFERENCES TO F.F.E.
SPOT ELEVATION - ALL
REFERENCES TO F.F.E.
WALL TYPE WITH FIRE AND STC
RATING WHERE APPLICABLE
DOOR NUMBER - SEE DOOR
SCHEDULE
RELITE NUMBER - SEE
RELITE SCHEDULE
GRID LINE
BUILDING
SECTION
EXTERIOR ELEVATION
INTERIOR ELEVATION
REVISION CLOUD
DETAIL
DETAIL SECTION
Room name
A
0' - 0"
TB-1
0'-0"
B.O.D.
A1
STC
1 HR
A
A
A120B
0'-0"
A101
A101
A101
REV #
A3.01
A5.01
1A
1B
1C
1D
WALL SECTION
A101
T.O.W
SIM SIM
SIM
SIM
A101
NORTH ARROW
TRUE
NORTH
PROJECT
NORTH
DRAWING CONTENTS
architect BRIC Architecture Inc.
1233 NW Northrup Street, Suite 100 Portland, Oregon 97209 t: (503) 595 4900 Julie Condon
P ro je ct owner t:
12400 SE Freeman Way Milwaukie, OR 97222
Shaun Stuhldryer
C :\B
R
IC
P ro je ct s\
B M
C E
S C la ss ro om
M od ul ar
_b re tt.
lu nd m ar kG
9H 2R
.r vt
B E
A T
R
IC
E C
A N
N A
D Y
E L
E M
E N
T A
R Y
S C
H O
O L
M
O D
U L
A R
A D
D
IT
IO
N
.0
9.
BEATRICE CANNADY ELEMENTARY SCHOOL - CLASSROOM MODULAR
North Clackamas School District
18031 Vogel Rd, Happy Valley, OR 97089
B
ID
/P E
R M
IT
S
E T
BID/PERMIT SET
North Clackamas School District
(503) 353-6000
KPFF Consulting Engineers 111 SW 5th Avenue, Suite 2500
Portland, Oregon 97204 t: (503) 227 3251
Eric Melle civil engineer
Interface Engineering 100 SW Main Street, Suite 1600
Portland, Oregon 97204 t: (503) 382 2732 Thomas Phuong electrical engineer
Interface Engineering 100 SW Main Street, Suite 1600
Portland, Oregon 97204 t: (503) 382 2615
Darcy Tucker technology
ARCHITECTURAL ABBREVIATIONS ARCHITECTURAL SYMBOLS VICINITY MAP
CIVIL
C0.10 COVER SHEET
C0.20 OVERALL EXISTING CONDITIONS PLAN
C0.30 EXISTING CONDITIONS & DEMOLITION PLAN
C1.00 SITE AND HORIZONTAL CONTROL PLAN
C2.00 GRADING PLAN
C2.50 WALL PLAN AND PROFILE
C3.00 UTILITY PLAN
C4.00 DETAILS
SITE
ARCHITECTURAL
A1.11 FIRST FLOOR PLAN SECTOR A - DEMO PLAN
A2.11 FLOOR PLAN SECTOR A - FIRST FLOOR
A4.11 FIRST FLOOR PLAN SECTOR A - FINISH PLAN
TECHNOLOGY
T0.01 SYMBOLS LISTS AND GENERAL NOTES - TECHNOLOGY
T2.11 FIRST FLOOR PLAN SECTOR A - TECHNOLOGY
T2.12 FIRST FLOOR PLAN MODULAR CLASSROOM - TECHNOLOGY
T7.01 DETAILS - TECHNOLOGY
PLUMBING
P0.01 SYMBOLS LISTS AND GENERAL NOTES - PLUMBING
P2.11 FIRST FLOOR PLAN SECTOR A - UNDERGROUND PLUMBING
P2.12 FIRST FLOOR PLAN MODULAR CLASSROOM - UNDERGROUND PLUMBING
P2.13 FIRST FLOOR PLAN SECTOR A - PLUMBING
P2.14 FLOOR PLAN MODULAR CLASSROOM - PLUMBING
ELECTRICAL
E0.01 SYMBOLS LISTS AND GENERAL NOTES - ELECTRICAL
E2.11 FIRST FLOOR PLAN SECTOR A - POWER
E2.12 SECOND FLOOR PLAN SECTOR A - POWER
E2.13 FIRST FLOOR MODULAR CLASSROOM - POWER
E5.01 SINGLE LINE DIAGRAMS - ELECTRICAL
Delegated Design components which require Deferred Submittals include, but are not limited to, the following:
Deferred submittal items shall not be installed until the deferred submittal documents have been approved by the building official.
1. Modular Foundation 03 30 00 - Concrete
2. Fire Alarm System, Division 28
SECTOR A
SECTOR B
1 K
3 2
K
K
K 1 2
K 1 2
K
MUSIC
GYM
STOR
[I] [I]
[I]
[I]
[I] [I]
[I]
[I] [I]
BEATRICE
MORROW
CANNADY
SCHOOL
SE
V
O G
EL
R
O
AD
SHEET NOTES
SHEET LEGEND
111 SW Fifth Ave., Suite 2500 Portland, OR 97204 O: 503.227.3251 F: 503.274.4681 www.kpff.com
AB
date phase date project k e y p l a n revisions
/16
/20
7:
:02 P
M C:
\B
RI
C Pr oje cts
\22
7 B
MC
ES
C las sro om M od s_ br ett
.lu nd ma rkG
9H 2R
.rv t
BE
AT
RI
CE
C
AN
NA
DY
E
LE
ME
NT
AR
Y
SC
HO
OL
CL
AS
SR
OO
M
MO
DU
LA
RS
T (5
) 3
-6
No rth
C lac ka ma s S ch oo l D ist ric t
BID/PERMIT SET
02.09.2024 22027
1 V og el Rd
, H ap py V all ey
, O R
SCALE 1 INCH = 40 FEET
ENGINEERINGSURVEYING
FORESTRY
NATURAL RESOURCES
LANDSCAPE ARCHITECTUREPLANNING
OVERALL EXISTING
CONDITIONS PLAN
C0.20
FO
R
IN
FO
RMATIO
N
ONLY
DW
H
1234567910
D
E
C
12 8
B
A
G
C.2
E.8
D.8
F
RECEPTION
HEALTH
133G
RR
133H
CONF
133C
STAFF
LOUNGE
131B
ELEV
E1
RR
131E
RR
131D
FILES
131C
CLASSROOM
CLASSROOM
CLASSROOM
ELD
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
SLC
CLASSROOM
SLC
CLASSROOM
CUST
OFFICE
133D
CLASSROOM
RR
125D
OFFICE
125C
CLASSROOM
AV
STORAGE
100D
MDF
CONF
100A
WORKROOM
100B
MEDIA
CENTER
GIRLS
118A
BOYS
118B
CONF
CLASSROOM
D001
M A
T C
H L
IN
E
S E
C T
O R
A
M A
T C
H L
IN
E
S E
C T
O R
A
M A
T C
H L
IN
E
S E
C T
O R
B
M A
T C
H L
IN
E
S E
C T
O R
B
OFFICE
133E
WORKROOM
ELECT.
WORKROOM/
STORAGE
RR
RR
RR
HALL
HALL
HALL
HALL
HALLWAY
STAIR
S3
STAIR
S1
STAIR
S2
HALL
125B
D002
D004
D004
DEMO PLAN NOTES:
AT DEMOLITION AREA REMOVE ELEMENTS INCLUDING BUT NOT LIMITED TO
WALLS AND FINISHES.
DEMOLITION DRAWINGS ARE DIAGRAMMATIC AND ARE TO ASSIST THE
CONTRACTOR IN ESTABLISHING THE GENERAL SCOPE OF WORK. PROVIDE ALL
DEMOLITION REQUIRED TO COMPLETE THE WORK AS INDICATED ON THE NEW
CONSTRUCTION DRAWINGS AND AS SPECIFIED.
DO NOT DAMAGE OR UNDERMINE FOUNDATIONS SUPPORTING BUILDING
ELEMENTS.
SAW CUT OR OTHERWISE NEATLY REMOVE DEMOLISHED ELEMENTS AT THE
INTERFACE WITH ELEMENTS TO REMAIN.
PROTECT EXISTING ARCHITECTURAL DETAILS AND FINISHES TO REMAIN.
COORDINATE DEMOLITION OF ALL TRADES INCLUDING ELECTRICAL, MECHANICAL,
PLUMBING , TECHNOLOGY AND FIRE PROTECTION DEMOLITION PLANS.
PLAN LEGEND
DEMOLITION
EXISTING TO
REMAIN
AREA OF EXISTING
BUILDING TO BE
DEMOLISHED, UNO
NO WORK
AB
date phase date project k e y p l a n revisions
2/ 6/
:2
2:
P M
C :\B
R
IC
P ro je ct s\
B M
C E
S C la ss ro om
M od ul ar
_b re tt.
lu nd m ar kG
9H 2R
.r vt
A1.11
FIRST FLOOR PLAN
SECTOR A - DEMO PLAN
B E
A T
R
IC
E C
A N
N A
D Y
E
LE
M E
N T
A R
Y S
C H
O O
L
C
LA
S S
R O
O M
M O
D U
LA
R
T
3)
-6
N or th C la ck am as
S ch oo l D is tr ic t
BID/PERMIT SET
02.09.2024 22027
V og el
R d, H ap py V al le y, O
R
SCALE: 1/8" = 1'-0" 1
FIRST FLOOR PLAN - SECTOR A
KEYNOTES
D001 DEMO EXISTING FLOOR FINISH AS NEEDED TO SAWCUT
FLOOR SLAB FOR INSTALLATION OF NEW
UNDERGROUND PLUMBING CONNECTION. SEE PLUMBING
FOR LOCATION AND EXTENTS.
D002 DEMO EXISTING WALLS, CEILING, AND FLOOR FINISHES
AS NEEDED TO ROUTE NEW ULTILITY CONNECTIONS FOR
CLASSROOM MODULAR. REROUTE NEW CONNECTIONS
PER PLUMBING, ELECTRICAL, AND/OR TECHNOLOGY
DRAWINGS & SPECIFICATIONS.
D004 DEMO EXISTING FLOOR SLAB AS NEEDED FOR
INSTALLATION OF NEW UTILITY CONNECTIONS. SEE
PLUMBING, TECHNOLOGY AND/OR ELECTRICAL FOR
LOCATION AND EXTENTS.
PORTLAND, OREGON
E
RE
DANIEL J. HESS
T
A T
T
S
G R E
SI
HC
O
GEROOF
N
E T
C3473
TI
RADE
DW
1234567910
D
E
C
12 8
B
A
G
A2.11
RECEPTION
HEALTH
133G
RR
133H
CONF
133C
STAFF
LOUNGE
131B
ELEV
E1
RR
131E
RR
131D
FILES
131C
CLASSROOM
CLASSROOM
CLASSROOM
ELD
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
SLC
CLASSROOM
SLC
CLASSROOM
CUST
OFFICE
133D
CLASSROOM
RR
125D
OFFICE
125C
CLASSROOM
AV
STORAGE
100D
MDF
CONF
100A
WORKROOM
100B
MEDIA
CENTER
GIRLS
118A
BOYS
118B
CONF
CLASSROOM
A001
M A
T C
H L
IN
E
S E
C T
O R
A
M A
T C
H L
IN
E
S E
C T
O R
B
OFFICE
133E
WORKROOM
ELECT.
WORKROOM/
STORAGE
RR
RR
RR
HALL
HALL
HALL
HALL
HALLWAY
STAIR
S3
STAIR
S1
STAIR
S2
HALL
125B
C.2
E.8
D.8
F
A002
A2aA2a
V
IF
VIF
1'-6"
A003A003
A003A003
NOTED WALL TYPE DEPICTS TYPICAL WALL CONSTRUCTION. SEE ELEVATIONS,
SECTIONS, AND DETAILS FOR ADDITIONAL INFORMATION.
SEE INTERIOR ELEVATIONS FOR LOCATIONS AND EXTENTS OF APPLIED WALL
FINISHES.
WHERE A LENGTH OF WALL IS INTERSECTED BY PERPENDICULAR WALLS, WALL
TYPE TO BE CONTINUOUS BETWEEN TAGS UNLESS OTHERWISE NOTED.
INTERIOR DIMENSIONS ARE TO FACE OF STUD UNLES NOTED OTHERWISE.
SEE INTERIOR ELEVATIONS FOR LOCATION AND EXTENT OF APPLIED WALL FINISHES.
SOUND BATT INSULATION TO EXTEND FULL HEIGHT OF WALL ASSEMBLIES UNLESS
NOTED OTHERWISE.
PROVIDE FIRE BLOCKING IN CONCEALED SPACES OF STUD WALLS AND PARTITIONS
VERTICALLY AT THE CEILING AND FLOOR LEVELS AND HORIZONTALLY AT INTERVALS
NOT EXCEEDING 10 FEET.
ALL GYPSUM BOARD USED IN WALLS IS TYPE X.
CAULK ALONG BOTH SIDES OF THE PERIMETER WITH A NON-HARDENING SILICONE
MASTIC.
ALL OPENINGS AROUND PIPE PENETRATIONS SHALL BE SEALED WITH A NON-
HARDENING SILICONE MASTIC.
WALL TYPE NOTES:
A1
STC
1 HR
WALL CONSTRUCTION TYPE - SEE WALL TYPES
STC RATING
FIRE RATED CONSTRUCTION DESIGNATION (IN HOURS)
FLOOR PLAN NOTES:
DIMENSIONS SHOWN ARE TO FACE OF STUD, FACE OF MASONRY OR CENTERLINE
OF COLUMN OR GRID LINE UNLESS NOTED OTHERWISE.
USE DIMENSIONS SHOWN; IN NO CASE SHALL WORKING DIMENSIONS BE SCALED
FROM DRAWINGS. CROSS CHECK DETAILS AND DIMENSIONS SHOWN ON THE
ARCHITECTURAL DRAWINGS WITH RELATED REQUIREMENTS ON THE
STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING, AND OTHER DRAWINGS AS
APPLICABLE. NOTIFY ARCHITECT OF ANY DISCREPANCIES BEFORE PROCEEDING
WITH THE WORK.
CONDITIONS AND DETAILS MARKED "TYPICAL" SHALL APPLY IN ALL CASES UNLESS
SPECIFICALLY INDICATED OTHERWISE. TYPICAL DETAILS NOT REFERENCED ON
DRAWINGS APPLY UNLESS NOTED OTHERWISE BY SPECIFIC NOTES AND DETAILS.
WHERE NO SPECIFIC DETAIL IS SHOWN, THE CONSTRUCTION SHALL BE IDENTICAL
OR SIMILAR TO THAT INDICATED FOR THE TYPICAL CONSTRUCTION OF THE
PROJECT.
WHERE NO SPECIFIC STANDARDS ARE APPLIED TO A MATERIAL OR METHOD OF
CONSTRUCTION TO BE USED ON THE WORK, ALL SUCH MATERIAL AND METHODS
ARE TO MAINTAIN STANDARDS OF THE INDUSTRY AND, WHERE APPLICABLE,
MANUFACTURER’S INSTRUCTIONS.
LOADING OF CONSTRUCTION MATERIALS SHALL NOT EXCEED THE DESIGN LIVE
LOAD PER SQUARE FOOT.
ESTABLISH AND VERIFY ALL OPENINGS AND INSERTS FOR ARCHITECTURAL,
MECHANICAL, ELECTRICAL, AND PLUMBING WITH APPROPRIATE TRADES,
DRAWINGS, AND SUBCONTRACTORS PRIOR TO CONSTRUCTION.
WHERE A LENGTH OF WALL IS INTERSECTED BY PERPENDICULAR WALLS, WALL
TYPE TO BE CONTINUOUS BETWEEN TAGS UNLESS NOTED OTHERWISE.
PROVIDE DEFLECTION HEAD AT NEW INTERIOR PARITIONS ATTACHED TO
STRUCTURAL FRAMING OR DECK.
P-1
PAINT TO MATCH EXISTING
RUBBER BASE TO
MATCH EXISTING
EXISTING TACK SURFACE
TO REMAIN
ALIGN WALL WITH EXISTING
TACK SURFACE JOINT
P-1
TYP.
PAINT TO MATCH EXISTING
RUBBER BASE TO
MATCH EXISTING
EXISTING TACK SURFACE
TO REMAIN
ALIGN WALL WITH EXISTING
TACK SURFACE JOINT
5/8" GYPSUM BOARD
A2a = 3 5/8" MTL STUD A2b = 6" MTL STUD A2c = 8" MTL STUD A2d = 10" MTL STUD
AT 16" OC
ACOUSTIC BATT
INSULATION
PLAN LEGEND
DEMOLITION
EXISTING TO
REMAIN
AREA OF EXISTING
BUILDING TO BE
DEMOLISHED, UNO
NO WORK
AB
date phase date project k e y p l a n revisions
2/ 6/
:2
1:
P M
C :\B
R
IC
P ro je ct s\
B M
C E
S C la ss ro om
M od ul ar
_b re tt.
lu nd m ar kG
9H 2R
.r vt
A2.11
FLOOR PLAN SECTOR A -
FIRST FLOOR
B E
A T
R
IC
E C
A N
N A
D Y
E
LE
M E
N T
A R
Y S
C H
O O
L
C
LA
S S
R O
O M
M O
D U
LA
R
T
3)
-6
N or th C la ck am as
S ch oo l D is tr ic t
BID/PERMIT SET
02.09.2024 22027
V og el
R d, H ap py V al le y, O
R
SCALE: 1/8" = 1'-0" 1
FIRST FLOOR PLAN - SECTOR A
KEYNOTES
A001 INTERIOR PARTITION CHASE FOR UTILITY CONNECTIONS
TO CLASSROOM MODULAR UP TO 6" ABOVE CEILING
FINISH. ALIGN PARTITION FINISH TO EXISTING TACK
SURFACE JOINT. PATCH AND REPAIR EXISTING
ADJACENT FINISHES INCLUDING BUT NOT LIMITED TO
CEILING GRID, CEILING TILE, RUBBER BASE, TACK
SURFACE, & CARPET TILE AS NEEDED TO MATCH
EXISTING.
A002 PATCH AND REPAIR EXISTING FLOOR ASSEMBLY AND
FINISH AS NEEDED TO MATCH EXISTING FOR NEW
UNDERGROUND PLUMBING CONNECTION. SEE PLUMBING
FOR LOCATION AND EXTENTS.
A003 REINSTALL ALL ACT CEILING TILES REMOVED FOR
INSTALLATION OF NEW OVERHEAD UTILITY
CONNECTIONS. REPLACE ANY DAMAGED ACT CEILING
TILES REMOVED FOR INSTALLATION.
SCALE: 1/4" = 1'-0" 2
INTERIOR ELEVATIONS - CLASSROOM
SCALE: 1/4" = 1'-0" 3
INTERIOR ELEVATIONS - CLASSROOM
SCALE: 3" = 1'-0" 4
WALL TYPE A2
PORTLAND, OREGON
E
RE
DANIEL J. HESS
T
A T
T
S
G R E
SI
HC
O
GEROOF
N
E T
C3473
TI
RADE
RECEPTION
HEALTH
133G
RR
133H
OFFICE
133E
CONF
133C
STAFF
LOUNGE
131B
ELEV
E1
CUST
RR
131E
RR
131D
FILES
131C
CLASSROOM
109 CLASSROOM
CLASSROOM
ELD
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
121SLC
CLASSROOM
SLC
CLASSROOM
WORKROOM
AV
STORAGE
100D
MDF
CONF
CLASSROOM
CLASSROOM
CPT-7
B-1
CLASSROOM
CPT-7
B-1
MEDIA
CENTER
HALLWAY
LNT-1
B-1
OFFICE
133D
GIRLS
118A
BOYS
118B
CONF
100A
WORKROOM
100B
OFFICE
125C
HALL
125B
RR
125D
ELECT.
RR
RR
RR
WORKROOM/
STORAGE
EM-1 SV-1
HALL
HALL
HALL
HALL
1' - 5"
TYP.
TYP.
/4
LNT-6
2'-3"
2'-3"
10'-0"
A002
A002
SEE FINISH LEGEND FOR MATERIAL DESIGNATIONS.
GENERAL NOTES:
LEGEND:
B-1 4" RUBBER BASE
CPT-1
CARPET
TILE
SHEET VINYL
SC-2
SEALED
CONCRETE
POL-1
POLISHED
CONCRETE
EM-1
ENTRY MAT
QT-1
QUARRY
TILE
CERAMIC
TILE
CT-1
WAF-1
WOOD
ATHLETIC
FLOORING
CARPET
TILE
CPT-2
CARPET TILE
(GREEN
ACCENT)
CPT-3A
CARPET TILE
(BLUE
ACCENT)
CPT-3B
CARPET
TILE
CPT-4
CPT-5
CARPET
TILE
CPT-6
CARPET
TILE
CARPET
TILE
CPT-7
SV-1
RBT-2
RBT-1
RUBBER TILE
FLOORING
RUBBER TILE
FLOORING
VINYL
COMPOSTION
TILE
VCT-1
LNT-1
LINOLEUM
TILE
LINOLEUM
TILE
LNT-2
LINOLEUM
TILE
LNT-3
LINOLEUM
TILE
LNT-4
LINOLEUM
TILE
LNT-5
LINOLEUM
TILE
?LNT-6
NO WORK
AB
date phase date project k e y p l a n revisions
2/ 6/
:0
5:
P M
C :\B
R
IC
P ro je ct s\
B M
C E
S C la ss ro om
M od ul ar
_b re tt.
lu nd m ar kG
9H 2R
.r vt
A4.11
FIRST FLOOR PLAN
SECTOR A - FINISH PLAN
B E
A T
R
IC
E C
A N
N A
D Y
E
LE
M E
N T
A R
Y S
C H
O O
L
M O
D U
LA
R
A D
D
IT
IO
N
T
3)
-6
N or th C la ck am as
S ch oo l D is tr ic t
BID/PERMIT SET
02.09.2024 22027
V og el
R d, H ap py V al le y, O
R
SCALE: 1/8" = 1'-0" 1
FINISH FLOOR PLAN SECTOR A - FIRST FLOOR
PORTLAND, OREGON
E
RE
DANIEL J. HESS
T
A T
T
S
G R E
SI
HC
O
GEROOF
N
E T
C3473
TI
RADE
KEYNOTES
A002 PATCH AND REPAIR EXISTING FLOOR ASSEMBLY AND
FINISH AS NEEDED TO MATCH EXISTING FOR NEW
UNDERGROUND PLUMBING CONNECTION. SEE PLUMBING
FOR LOCATION AND EXTENTS.
brett.lundmark Rectangle brett.lundmark Snapshot date phase date project revisions
EXPIRES: 12/31/24
2/ 7/
:0
7:
P M
C :\U se rs
\k ay la a\
D oc um en ts \2
B M
C E
S C la ss ro om
M od s_ E
LE
C
_P
LU
M B
_R
_k ay la _a
.r vt
E0.01
SYMBOL LIST AND
GENERAL NOTES -
ELECTRICAL
B E
A T
R
IC
E C
A N
N A
D Y
E
LE
M E
N T
A R
Y S
C H
O O
L
C
LA
S S
R O
O M
M O
D U
LA
R
T
3)
-6
N or th C la ck am as
S ch oo l D is tr ic t
BID/PERMIT SET
02.09.2024 22027
V og el
R d, H ap py V al le y, O
R
E0.01 SYMBOL LIST AND GENERAL NOTES - ELECTRICAL
E2.11 FLOOR PLAN SECTOR A - FIRST FLOOR - POWER
E2.12 FLOOR PLAN SECTOR A - SECOND FLOOR - POWER
E2.13 FLOOR PLAN MODULAR CLASSROOM - POWER
E5.01 SINGLE LINE DIAGRAMS - ELECTRICAL
GENERAL ELECTRICAL NOTES
SHEET INDEX
Abbreviations
AFC ABOVE FINISHED CEILING
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
ARF ABOVE RAISED FLOOR
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
AWG AMERICAN WIRE GAUGE
A AMPERES, AMBER
AV AUDIO VISUAL
AHJ AUTHORITY HAVING JURISDICTION
AIC AVAILABLE INTERRUPTING CAPACITY
BAS BUILDING AUTOMATION SYSTEM
CA CABLE
CAT CATEGORY
CLG CEILING
CB CIRCUIT BREAKER
C CONDUIT, CLOSE, CONTROL
CFCI CONTRACTOR FURNISHED CONTRACTOR INSTALLED
CFOI CONTRACTOR FURNISHED OWNER INSTALLED
COORD COORDINATE
CU COPPER
dB DECIBEL
(X) DEMOLISH
DTL DETAIL
DIA DIAMETER
DIM DIMENSION
DIV DIVISION
DN DOWN
DWG DRAWING
EA EACH
EMT ELECTRICAL METALLIC TUBING
ENT ELECTRICAL NON-METALLIC TUBING
ESD ELECTROSTATIC DISCHARGE
EL ELEVATION
E EMERGENCY
EF EXHAUST FAN
(E) EXISTING
FMS FACILITY MANAGEMENT SYSTEMS
FF FINISH FLOOR
FA FIRE ALARM
FACP FIRE ALARM CONTROL PANEL
FMC FLEXIBLE METAL CONDUIT
FT FOOT, FEET
FBO FURNISHED BY OTHERS
G, GND GROUND
GFCI GROUND FAULT CIRCUIT INTERRUPTER
GFI GROUND FAULT INTERRUPTER
GFP GROUND FAULT PROTECTION
GE GROUNDING EQUALIZER
HH HANDHOLE
HT HEIGHT
HC HORIZONTAL CROSS CONNECT
ID IDENTIFICATION
IN INCH, INCHES
IEEE INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS
IMC INTERMEDIATE METAL CONDUIT
IG ISOLATED GROUND
KV KILOVOLT
KVA KILOVOLT AMPERES
KW KILOWATT
LED LIGHT EMITTING DIODE
LNC LIQUID TIGHT FLEXIBLE NONMETALLIC CONDUIT
LFMC LIQUIDTIGHT FLEXIBLE METAL CONDUIT
LV LOW VOLTAGE
MOCP MAXIMUM OVERCURRENT PROTECTION
MHz MEGAHERTZ mA MILLIAMPERES
MIN MINIMUM
MCA MINIMUM CIRCUIT AMPS
MISC MISCELLANEOUS
M MOTOR
MCC MOTOR CONTROL CENTER
MT, MTD MOUNT, MOUNTED
MDU MULTI-DWELLING UNIT
NEC NATIONAL ELECTRIC CODE
NESC NATIONAL ELECTRIC SAFETY CODE
NEMA NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION
N NEUTRAL
(N) NEW
NC NORMALLY CLOSED
NO NORMALLY OPEN
N/A NOT APPLICABLE
N.I.C. NOT IN CONTRACT
NTS NOT TO SCALE
OC ON CENTER
OSP OUTSIDE PLANT
OFCI OWNER FURNISHED, CONTRACTOR INSTALLED
OFOI OWNER FURNISHED, OWNER INSTALLED
PNL PANEL
PH PHASE
PVC POLY-VINYL-CHLORIDE
PWR POWER
QTY QUANTITY
REF REFERENCE
(R) RELOCATE
RFI REQUEST FOR INFORMATION
REQD REQUIRED
RMC RIGID METAL CONDUIT
RM ROOM
SHT SHEET
SIM SIMILAR
SPKR SPEAKER
STD STANDARD
SPD SURGE PROTECTION DEVICE
SWBD SWITCHBOARD
TBB TELECOMMUNICATIONS BONDING BACKBONE
TGB TELECOMMUNICATIONS GROUNDING BUS BAR
TTB TELEPHONE TERMINAL BOARD
TBD TO BE DETERMINED
XFMR TRANSFORMER
TVSS TRANSIENT VOLTAGE SURGE SUPPRESSOR
TP TRANSITION POINT
TYP TYPICAL
UG UNDERGROUND
UL UNDERWRITERS LABORATORIES
UPS UNINTERRUPTIBLE POWER SUPPLY
UON UNLESS OTHERWISE NOTED
VFD VARIABLE FREQUENCY DRIVE
VRFY VERIFY
V VOLTS, VOLTAGE
WP WEATHERPROOF
WG WIRE GUARD
W WIRE, WHITE
W/ WITH
W/O WITHOUT
WAO WORK AREA OUTLET
Raceways
EXISTING CONDUIT CONCEALED IN WALL OR CEILING SPACE
EXISTING CONDUIT ROUTED BELOW FLOOR / GRADE
OVERHEAD PRIMARY SERVICE
OVERHEAD TELEPHONE SERVICE
UNDERGROUND CABLE TELEVISION SERVICE
UNDERGROUND PRIMARY SERVICE
UNDERGROUND SECONDARY SERVICE
UNDERGROUND TELEPHONE SERVICE
CONDUIT CONCEALED IN WALL OR CEILING SPACE
CONDUIT ROUTED BELOW FLOOR / GRADE
CONDUIT ELLED DOWN
CONDUIT ELLED UP
CONDUIT/WIRING CONTINUATION
CONDUIT/WIRING STUBBED OUT WITH END CAP OR INSULATED
PLASTIC BUSHING
FLEXIBLE CONDUIT
Miscellaneous
BRANCH CIRCUIT WIRING. ARROW INDICATES HOME RUN TO
PANEL WITH CIRCUITS AS NOTED. WIRE SIZE IS #12 AWG MINIMUM
UNLESS NOTED OTHERWISE. SHORT TICK MARKS INDICATE PHASE
CONDUCTORS. LONG TICK MARKS INDICATE NEUTRAL
CONDUCTORS. A SINGLE CURVED TICK MARK INDICATES
INSULATED GREEN GROUND CONDUCTOR. SECOND CURVED TICK
MARK INDICATES "ISOLATED GROUND" (GREEN INSULATION WITH
YELLOW STRIPE) CONDUCTOR.
BRANCH PANEL
CIRCUIT BREAKER
DRY TYPE TRANSFORMER
FLUSH MOUNT EQUIPMENT ENCLOSURE AS NOTED
FLUSH WALL MOUNTED BRANCH PANEL
GROUND BAR
GROUNDING POINT
MAIN DISTRIBUTION PANEL / SUB DISTRIBUTION PANEL
POWER UTILITY POLE
SUBGRADE VAULT CATV
SUBGRADE VAULT POWER
SUBGRADE VAULT TELEPHONE
SURFACE MOUNT EQUIPMENT ENCLOSURE AS NOTED
TELEPHONE UTILITY POLE
UTILITY TRANSFORMER PAD/VAULT
Connections / Equipment
COMBINATION ADJUSTABLE FREQUENCY DRIVE WITH SAFETY
DISCONNECT SWITCH. FURNISHED BY DIVISION 23 AND INSTALLED
BY DIVISION 26.
COMBINATION MOTOR STARTER/FUSED DISCONNECT SWITCH
CONTACTOR COIL
HEAVY DUTY FUSED DISCONNECT SWITCH
MOTOR CONNECTION
NON-FUSED DISCONNECT SWITCH
RELAY
REMOTE DRIVER FOR LED LUMINAIRES
TRANSFORMER
FIRE SMOKE DAMPER
SMOKE DAMPER
CEILING MOUNTED JUNCTION BOX
FLOOR MOUNTED JUNCTION BOX
WALL-MOUNTED JUNCTION BOX
MAGNETIC DOOR HOLDER
Fire Alarm
FIRE ALARM CONTROL PANEL
NOTIFICATION APPLIANCE CIRCUIT PANEL
FIRE ALARM ANNUNCIATOR PANEL
General
DETAIL NUMBER AND SHEET LOCATION
EQUIPMENT IDENTIFICATION
FOOD SERVICE EQUIPMENT / CALCULATION TAG
KEYED NOTE
POINT OF CONNECTION
SECTION NUMBER AND SHEET LOCATION
DEMOLISH
EXISTING WORK
NEW WORK
ELECTRICAL SYMBOL LIST
NOTE: This is a standard symbol list and not all items listed may be used.
A. CONSULT ALL DRAWINGS AND SPECIFICATIONS IN THE PROJECT AND BECOME
FAMILIAR WITH ALL EQUIPMENT TO BE INSTALLED. COORDINATE ALL ASPECTS
OF THE CONSTRUCTION WITH THE OTHER TRADES ON THE JOB TO ENSURE
THAT ALL WORK AND MATERIAL REQUIRED PROVIDE A COMPLETE AND
OPERATIONAL FACILITY ARE INCLUDED IN BID.
B. PROVIDE 120V CIRCUITS FOR NEW FIRE ALARM PANELS / POWER SUPPLIES AS
REQUIRED. COORDINATE WITH DIVISION 28 DESIGN BUILD CONTRACTOR.
PROJECT
CONTACT
www.interfaceengineering.com
KRISTINE LEAVENS
2023-1267
100 SW Main Street, Suite 1600 Portland, OR 97204
TEL 503.382.2266
EXPIRES: 12/31/24
F
12456791011 8
H
D
E
C
K
B
A
G
C.2
D.8
J F
STAIR
S1
CONF
133C
RR
133H
OFFICE
133D
HALL
125B
CONF
100A
CONF
ELEV
E1
CUST
RR
131E
HEALTH
133G
HALL / MAIL
133F
RECEPTION
RR
RR
CLASSROOM
OFFICE
125C
BOYS
118B
COMMONS
FILES
131C
RR
131D
RR
STAIR
S3
HALL
131F GIRLS
118A
HALL
HALL
RR
125D
WORKROOM
100B
COMMONS
WORKROOM/ STORAGE
HALL
SLC CLASSROOM
CLASSROOM
CLASSROOM
SLC CLASSROOM
MDF
AV STORAGE
100D
ELECT.
CLASSROOM
MEDIA CENTER
HALL
CLASSROOM
HALLWAY
STAFF LOUNGE
131B
OFFICE
133E
CLASSROOM
WORKROOM
CLASSROOM
CLASSROOM
CLASSROOM
ELD CLASSROOM
STAIR
S2
(E) POLE
LUMINAIRE
E2.13
(1) 1-1/4" C.
2" C. FOR
FIRE ALARM
AB
date phase date project k e y p l a n revisions
EXPIRES: 12/31/24
2/ 7/
:0
7:
P M
C :\U se rs
\k ay la a\
D oc um en ts \2
B M
C E
S C la ss ro om
M od s_ E
LE
C
_P
LU
M B
_R
_k ay la _a
.r vt
E2.11
FLOOR PLAN SECTOR A -
FIRST FLOOR - POWER
B E
A T
R
IC
E C
A N
N A
D Y
E
LE
M E
N T
A R
Y S
C H
O O
L
C
LA
S S
R O
O M
M O
D U
LA
R
T
3)
-6
N or th C la ck am as
S ch oo l D is tr ic t
BID/PERMIT SET
02.09.2024 22027
V og el
R d, H ap py V al le y, O
R
PROJECT
CONTACT
www.interfaceengineering.com
KRISTINE LEAVENS
2023-1267
100 SW Main Street, Suite 1600 Portland, OR 97204
TEL 503.382.2266
0' 4' 8' 16'
1/8" = 1'-0"
1 FIRST FLOOR PLAN - SECTOR A - POWER N
O R T H
SHEET KEYNOTES
1. ROUTE NEW CONDUIT IN ACCESSIBLE CEILING SPACE.
2. ESTIMATE LOCATION OF EXISTING POLE LUMINAIRE
WITH CONCRETE PEDESTAL ANCHOR BASE. FIELD
COORDINATE NEW CONDUIT ROUTING WITH EXISTING
POLE LOCATION AND NEW SEWAGE EJECTOR PUMP.
D
E
C
K
B
A
G
C.2
D.8
J F
STAIR
S1
STAIR
S2
HALL
HALL
RR
ELECT.
OFF
WORKROOM
218 BOYS
218B
GIRLS
202B
RR
CUST
BOYS
202A
GIRLS
218A
COMMONS
COMMONS
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
HALLWAY
128 HALL
CONF
HALL
ELEV
E1
FLEX/ WORKROOM
CLASSROOM
CLASSROOM
RESOURCE/SL CLASSROOM
(E) PANEL '4M3'
E5.01
AB
date phase date project k e y p l a n revisions
EXPIRES: 12/31/24
2/ 7/
:0
7:
P M
C :\U se rs
\k ay la a\
D oc um en ts \2
B M
C E
S C la ss ro om
M od s_ E
LE
C
_P
LU
M B
_R
_k ay la _a
.r vt
E2.12
FLOOR PLAN SECTOR A -
SECOND FLOOR - POWER
B E
A T
R
IC
E C
A N
N A
D Y
E
LE
M E
N T
A R
Y S
C H
O O
L
C
LA
S S
R O
O M
M O
D U
LA
R
T
3)
-6
N or th C la ck am as
S ch oo l D is tr ic t
BID/PERMIT SET
02.09.2024 22027
V og el
R d, H ap py V al le y, O
R
0' 4' 8' 16'
1/8" = 1'-0"
1 FLOOR PLAN SECTOR A - SECOND FLOOR - POWER
PROJECT
CONTACT
www.interfaceengineering.com
KRISTINE LEAVENS
2023-1267
100 SW Main Street, Suite 1600 Portland, OR 97204
TEL 503.382.2266
N O R T
T
F
M
A
PANEL 'MODULE' 1 3
TRANSFORMER 'X2M3'
E5.01
(1) 1-1/4" C.
(1) 2" C.
(1) 2" C.
2" C. FOR FIRE ALARM
SE-1
'SE-1 CONTROL PANEL'4
(E) POLE
LUMINAIRE
E2.11
AB
date phase date project k e y p l a n revisions
EXPIRES: 12/31/24
2/ 7/
:0
7:
P M
C :\U se rs
\k ay la a\
D oc um en ts \2
B M
C E
S C la ss ro om
M od s_ E
LE
C
_P
LU
M B
_R
_k ay la _a
.r vt
E2.13
FLOOR PLAN MODULAR
CLASSROOM - POWER
B E
A T
R
IC
E C
A N
N A
D Y
E
LE
M E
N T
A R
Y S
C H
O O
L
C
LA
S S
R O
O M
M O
D U
LA
R
T
3)
-6
N or th C la ck am as
S ch oo l D is tr ic t
BID/PERMIT SET
02.09.2024 22027
V og el
R d, H ap py V al le y, O
R
0' 2' 4' 8'
1/4" = 1'-0"
1 FLOOR PLAN MODULAR CLASSROOM - POWER
PROJECT
CONTACT
www.interfaceengineering.com
KRISTINE LEAVENS
2023-1267
100 SW Main Street, Suite 1600 Portland, OR 97204
TEL 503.382.2266
N O R T H
SHEET KEYNOTES
1. MODULE PANEL SHOWN FOR COORDINATION ONLY.
PANEL PROVIDED BY MODULE MANUFACTURER.
COORDINATE WITH VENDOR FOR LOCATION.
2. ROUTE NEW CONDUIT IN ACCESSIBLE CEILING SPACE,
BENEATH STRUCTURE, OR IN WALLS.
3. PROVIDE 30mA GFEP 20A/1P CIRCUIT BREAKER IN
MODULE PANEL TO SERVE EXTERIOR COLD WATER
LINE HEAT TRACE. PROVIDE CONNECTION TO HEAT
TRACE PER MANUFACTURER REQUIREMENTS AND
COORDINATE WITH DIVISION 22.
4. SEWAGE EJECTOR, 208V, 14A. PROVIDE 20A / 2P
CIRCUIT BREAKER IN MODULE PANEL. CIRCUIT FROM
CIRCUIT BREAKER WITH #12 CU, COORDINATE WITH
DIVISION 22 IF NEUTRAL IS NEEDED FOR CONTROL
PANEL.
5. ESTIMATE LOCATION OF EXISTING POLE LUMINAIRE
WITH CONCRETE PEDESTAL ANCHOR BASE. FIELD
COORDINATE NEW CONDUIT ROUTING WITH EXISTING
POLE LOCATION AND NEW SEWAGE EJECTOR PUMP.
2023-1267
Ckt. C.B. C.B. Ckt.
No. Description / Location A/Pole Note Ph. Note A/Pole Description / Location No.
1 (E) HRU-101 4,432 H 25/3 A 25/3 4,432 H (E) HRU-201 2
3 --- 4,432 H - B - 4,432 H --- 4
5 --- 4,432 H - C - 4,432 H --- 6
7 (E) HRU-102 4,432 H 25/3 A 25/3 4,432 H (E) HRU-202 8
9 --- 4,432 H - B - 4,432 H --- 10
11 --- 4,432 H - C - 4,432 H --- 12
13 (E) HRU-103 4,432 H 25/3 A 25/3 4,432 H (E) HRU-203 14
15 --- 4,432 H - B - 4,432 H --- 16
17 --- 4,432 H - C - 4,432 H --- 18
19 (E) HRU-104 4,432 H 25/3 A 25/3 4,432 H (E) HRU-204 20
21 --- 4,432 H - B - 4,432 H --- 22
23 --- 4,432 H - C - 4,432 H --- 24
25 (E) HRU-105 4,432 H 25/3 A 25/3 4,432 H (E) HRU-205 26
27 --- 4,432 H - B - 4,432 H --- 28
29 --- 4,432 H - C - 4,432 H --- 30
31 (E) HRU-106 4,432 H 25/3 A 25/3 4,432 H (E) HRU-206 32
33 --- 4,432 H - B - 4,432 H --- 34
35 --- 4,432 H - C - 4,432 H --- 36
37 (E) AC-1 9,972 H 50/3 A 20/1 (E) SPARE BREAKER 38
39 --- 9,972 H - B 20/1 (E) SPARE BREAKER 40
41 --- 9,972 H - C 20/1 (E) SPARE BREAKER 42
43 (N) MODULAR BUILDING 18,400 G 110/3 1 A (E) BUSSED SPACE 44
45 --- 18,400 G - B (E) BUSSED SPACE 46
47 --- 18,400 G - C (E) BUSSED SPACE 48
49 (E) BUSSED SPACE A (E) BUSSED SPACE 50
51 (E) BUSSED SPACE B (E) BUSSED SPACE 52
53 (E) BUSSED SPACE C (E) BUSSED SPACE 54
55 (E) BUSSED SPACE A (E) BUSSED SPACE 56
Total Connected Load: Ph. A 81,556 VA 294 Amps Panel Connected Load: 244.7 KVA 294.3 Amps
Total Connected Load: Ph. B 81,556 VA 294 Amps Sub-Fed Connected Load: 0.0 KVA 0.0 Amps
Total Connected Load: Ph. C 81,556 VA 294 Amps Total Demand Load: 244.7 KVA 294.3 Amps
Notes: Accessories:
1. NEW BREAKER TO MATCH EXISTING MANUFACTURER AND AIC RATING.
(E) Panel '4M3' 277/480V, 3 Ph., 4 W.; 400A Bus with 400A Main Circuit Breaker Surface Mounted Panelboard with an Available Fault Current of 13110A RMS
Load Load
(VA)|Type (VA)|Type
20FT., 3/4" DIAMETER
MINIMUM REBAR IN
CONCRETE FOOTING/
FOUNDATION
NEUT. BUSFULL LENGTH
SUB-DISTRIBUTION SWITCHBOARD '2SDS'
208Y/120 VOLT, 3 PHASE, 4 WIRE
AVAILABLE FAULT CURRENT: 11,488A
MAIN DISTRIBUTION SWITCHBOARD '4MDS'
480Y/277 VOLT, 3 PHASE, 4 WIRE
AVAILABLE FAULT CURRENT: 22,553A
EXISTING CALCULATED DEMAND LOAD
FROM AS-BUILTS: 800.5 AMPS
#3/0
SPARE
3P3P
200A SPACE
ELEVATOR
800 AMP BUS 1200 AMP BUS
#3/0 BARE COPPER
BUILDING
STEEL
COLD
WATER
PIPE
10'-0"
GROUND
RODS AT
20'-0"C/C
GROUND BUS
#3/0
BARE
COPPER TO
TELEPHONE
TERMINAL
BOARD
SPD
PANEL
'2A'
PANEL
'2B'
PANEL
'2C'
PANEL
'2D'
PANEL
'2E'
PANEL
'2F'
PANEL
'2G'
300kVA 480~
120/208V
'X2SDS'
30HP
100420045003703
10004X
4004 1254 1254 1254 1504 1504 2004
1200A
3P70A
3P 200A
3P
100A
3P
400A
3P
450A
3P
150A
3P
100A
3P400A
3P
125A
3P
125A
3P
125A
3P
125A
3P
125A
3P
200A
3P
200A
3P GFP
#4 COPPER
#6 COPPER
250kcmil
SHEET KEYNOTES
200A
3P
100A
3P
100A
3P
200A
3P
SPARE
3P
SPACE800A
3P
1. INSTALL FEEDER FROM TRANSFORMER SECONDARY TO MAIN FUSED
DISCONNECT, NOT TO EXCEED 25 FEET PER NEC 240.21(C)(6).
2. PROVIDE 4-INCH HIGH CONCRETE HOUSEKEEPING PAD UNDER
TRANSFORMER.
3. CONNECT GROUNDING ELECTRODE CONDUCTORS FROM
TRANSFORMER GROUNDING LUG TO AVAILABLE GROUNDING
ELECTRODES PER NEC 250.30 AND 250.104.
4. PANEL PROVIDED BY MODULE MANUFACTURER. GROUNDING AT
BUILDING SERVICE PANEL AS INDICATED ON MODULAR BUILDING
VENDOR DRAWINGS.
SPACE
3P
SPARE
METER BASE PER
POWER
COMPANY
REQUIREMENTS
TERMINAL
CABINET
CABINET
TRANSF.
CURRENTM
INTEGRAL SURGE PROTECTIVE DEVICE
1200C
G200 AMP
480/277V, 200 kW
GENERATOR
100 AMP
STANDBY AUTOMATIC
TRANSFER SWITCH
'ATS-SB'
200A, 480/277V, 4-POLE
AVAILABLE FAULT
CURRENT: 16127A
NEMA 3R ENCLOSURE
E7.03
PANEL
'2K1'
PANEL
'2SB'
20044004X
PANEL
'4EM'
SPD
EMERGENCY AUTOMATIC
TRANSFER SWITCH
'ATS-EM'
100A, 480/277V, 4-POLE
AVAILABLE FAULT
CURRENT: 17654A
NEMA 3R ENCLOSURE
LCP
GENERATOR DOCKING
STATION
480/277V, 4-POLE, 100A
NEMA 3R ENCLOSURE
WITH LOCKABLE CABINET
PANEL
'2K2'
#2
112.5kVA 480~
120/208V
'X2SB'
PANEL
'4L1'
PANEL
'4L2'
PANEL
'4M1'
20044004
PANEL
'4L3'
PANEL
'4M3'
E7.03
CONCRETE
PAD/VAULT PER
POWER COMPANY
REQUIREMENTS
1-4"C
WITH PULL WIRE
SEE SITE PLAN
100AS / 70A DUAL
ELEMENT FUSES,
BUSSMANN POWER
MODULE SWITCH
100C
100C FUTURE 100kW
SOLAR INVERTER
PANEL
'MODULE'
12532004X
#2
75kVA 480~
120/208V
'X2M3'
110A/3P
F
200AS
200AF
NEMA 3R
COLD
WATER
PIPE
NEW SCOPE, ALL ONE-LINE
ELEMENTS SHOWN
OUTSIDE THIS ZONE IS
EXISTING TO REMAIN.
AVAILABLE
FAULT
CURRENT:
5,301A date phase date project revisions
EXPIRES: 12/31/24
2/ 7/
:0
7:
P M
C :\U se rs
\k ay la a\
D oc um en ts \2
B M
C E
S C la ss ro om
M od s_ E
LE
C
_P
LU
M B
_R
_k ay la _a
.r vt
E5.01
SINGLE LINE DIAGRAMS -
ELECTRICAL
B E
A T
R
IC
E C
A N
N A
D Y
E
LE
M E
N T
A R
Y S
C H
O O
L
C
LA
S S
R O
O M
M O
D U
LA
R
T
3)
-6
N or th C la ck am as
S ch oo l D is tr ic t
BID/PERMIT SET
02.09.2024 22027
V og el
R d, H ap py V al le y, O
R
A,C,S,X A=Aluminum C=Conduit only S=Service secondary X=Seperately derived system
FEEDER SCHEDULE
603 3 #4 CU, 1 #10 CU GND., IN 1" C.
703 3 #4 CU, 1 #8 CU GND., IN 1" C.
1004 4 #2 CU, 1 #8 CU GND., IN 1 1/4" C.
1253 3 #1 CU, 1 #6 CU GND., IN 1 1/4" C.
1504 4 #1/0 CU, 1 #6 CU GND., IN 2" C.
2003 3 #3/0 CU, 1 #6 CU GND., IN 2" C.
2004 4 #3/0 CU, 1 #6 CU GND., IN 2" C.
2004X 4 #3/0 CU, 1 #4 CU GND., IN 2" C.
2254 4 #4/0 CU, 1 #4 CU GND., IN 2 1/2" C.
2504 4 - 250 kcmil CU, 1 #4 CU GND., IN 2 1/2" C.
3503 3 - 500 kcmil CU, 1 #2 CU GND., IN 3" C.
6004 2 SETS OF (4 - 350 kcmil CU, 1 #1 CU GND., IN 3" C.)
8004 3 SETS OF (4 - 300 kcmil CU, 1 #1/0 CU GND., IN 3" C.)
PROJECT
CONTACT
www.interfaceengineering.com
KRISTINE LEAVENS
2023-1267
100 SW Main Street, Suite 1600 Portland, OR 97204
TEL 503.382.2266
NO SCALE
1 ONE-LINE POWER DISTRIBUTION DIAGRAM
SE-1 DUPLEX SEWAGE EJECTOR OUTSIDE / MODULAR
BUILDING
WEIL 2515 76 8 208 1 14 (2) .75 3 INCH DISCHARGE, BASIN: GB-48 x 078-401: 6 FT DEEP. 564
GALLONS, WITH GASKETED LID: PRCP-01-48, MOTOR BRACKET -
DUPLEX: 2613K7032, WITH GUIDES AND LEVEL CONTROL FLOATS:
8234, BALL CHECK VALVE: 2616-3, WEIL JUCTION BOX NEMA-6P FOR
EXTERIOR USE: WEIL: DUPLEX ISR ALTERNATING PUMP CONTROL
PANEL: 8251
NOTE:
PUMP SCHEDULE
SYMBOL EQUIPMENT TYPE LOCATION / SERVING
BASIS OF DESIGN
FLOW
RATE (GPM)
HEAD (FT
H2O)
ELECTRICAL
COMMENTSMFR MODEL VOLTS PH AMPS HP
COORDINATE WITH DIV 26 FOR POWER CONNECTIONS.
date phase date project revisions
EXPIRES: 12/31/24
2/ 7/
:2
3:
P M
C :\U se rs
\k ay la a\
D oc um en ts \2
B M
C E
S C la ss ro om
M od s_ E
LE
C
_P
LU
M B
_R
_k ay la _a
.r vt
P0.01
SYMBOL LIST AND
GENERAL NOTES -
PLUMBING
B E
A T
R
IC
E C
A N
N A
D Y
E
LE
M E
N T
A R
Y S
C H
O O
L
C
LA
S S
R O
O M
M O
D U
LA
R
T
3)
-6
N or th C la ck am as
S ch oo l D is tr ic t
BID/PERMIT SET
02.09.2024 22027
V og el
R d, H ap py V al le y, O
R
P0.01 SYMBOL LIST AND GENERAL NOTES - PLUMBING
P2.11 FLOOR PLAN SECTOR A - UNDERGROUND - PLUMBING
P2.12 FLOOR PLAN MODULAR CLASSROOM - UNDERGROUND - PLUMBING
P2.13 FLOOR PLAN SECTOR A - FIRST FLOOR - PLUMBING
P2.14 FLOOR PLAN MODULAR CLASSROOM - PLUMBING
GENERAL PLUMBING NOTES
SHEET INDEX
PLUMBING SYMBOL LIST
NOTE: This is a standard symbol list and not all items listed may be used.
PRESSURE GAUGE WITH COCK
PUMP
TEE DOWN ON PIPE
TEE UP ON PIPE
UNION
VENT THROUGH ROOF
WALL CLEANOUT
Piping Systems
COLD WATER PIPING
PUMPED DISCHARGE
SANITARY VENT PIPING
SANITARY WASTE OR SOIL PIPING ABOVE GRADE OR FINISHED
FLOOR
SANITARY WASTE OR SOIL PIPING BELOW GRADE OR FINISHED
FLOOR
Valves
SHUTOFF VALVE, GENERAL
General
DETAIL NUMBER AND SHEET LOCATION
KEYED NOTE
SECTION NUMBER AND SHEET LOCATION
EXISTING WORK
NEW WORK
PIPE OR CONDUIT BELOW GRADE
CONTINUATION
EXTENT OF DEMOLITION
PIPE BELOW GRADE
POINT OF CONNECTION
PLUMBING EQUIPMENT IDENTIFICATION
Piping Fittings
ACCESS PANEL
BLIND FLANGE
CAP
CLEANOUT TO GRADE
ECCENTRIC REDUCER
EXPANSION JOINT
FLEXIBLE CONNECTION
FLOOR CLEANOUT
FLOW DIRECTION
FLOW SWITCH
PIPE DROP
PIPE RISE
Abbreviations
AFF ABOVE FINISHED FLOOR
& AND
A AQUASTAT, ARCHITECT, ANCHOR, AMPHERE
@ AT
BFF BELOW FINISHED FLOOR
BLDG BUILDING
COTG CLEAN OUT TO GRADE
CO CLEANOUT
CW COLD WATER
CONT. CONTINUATION
CFH CUBIC FEET PER HOUR
CFS CUBIC FEET PER SECOND
(X) DEMOLISH
DN DOWN
DFU DRAINAGE FIXTURE UNIT
DWV DRAINAGE, WASTE AND VENT
ELECT ELECTRICAL
ESV ELECTRONIC SOLENOID VALVE
(E) EXISTING
EJ EXPANSION JOINT
FT FEET
FPS FEET PER SECOND
FFE FINISHED FLOOR ELEVATION
FC FLEXIBLE CONNECTOR
FL FLOOR
FCO FLOOR CLEANOUT
' FOOT, FEET
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
HD HEAD, HUB DRAIN
HP HEAT PUMP, HORSE POWER, HOUSEKEEPING PAD
HZ HERTZ
IN, " INCHES
INV INVERT ELEVATION
KW KILOWATT
MAX MAXIMUM
HG MERCURY
MIN MINIMUM
MH MOUNTING HEIGHT, MANHOLE
(N) NEW
NOP NORMALLY OPEN
N NORTH
N/A NOT APPLICABLE
NIC NOT IN CONTRACT
NTS NOT TO SCALE
# NUMBER
NO. NUMBER
PLBG PLUMBING
P PLUMBING, PUMP
POC POINT OF CONNECTION
PSI POUNDS PER SQUARE INCH
PD PRESSURE DROP, PLUMBING DEMOLITION, PUMPED DISCHARGE
QTY QUANTITY
RPM REVOLUTIONS PER MINUTE
SAN SANITARY
SJ SEISMIC JOINT
SE SEWAGE EJECTOR
SHT SHEET
SOV SHUT OFF VALVE
SP SUMP PUMP, STATIC PRESSURE
TP TRAP PRIMER, TOTAL PRESSURE
TYP TYPICAL
V VACUUM, VENT, VOLT
VS VENT STACK
VTR VENT THRU ROOF
W WASTE
WS WASTE STACK
WSFU WATER SUPPLY FIXTURE UNIT
W/ WITH
A. COORDINATE ALL WASTE, VENT & DOMESTIC COLD WATER WITH MODULAR BUILDING.
B. CONTRACTOR SHALL VERIFY AND COORDINATE ALL EXISTING WASTE, WATER PIPING TO REMAIN
IN SERVICE.
C. COORDINATE CUTTING, PATCHING, ETC WITH GENERAL CONTRACTOR AND EXISTING FIELD
CONDITIONS PRIOR START SCOPE OF WORK.
D. CONTRACTOR TO VERIFY EXISTING INVERT ELEVATION OF EXISTING 6" SANITARY.
E. PROVIDE CLEANOUTS FOR SANITARY WASTE SYSTEMS WHERE SHOWN AND AS OTHERWISE
REQUIRED PER CODE.
F. COORDINATE LOCATION OF PLUMBING FIXTURE WASTE AND WATER MANIFOLDS UNDER
MODULAR BUILDING FROM PLUMBING FIXTURES TO PIPING INSTALLED BY SITE CONTRACTOR.
G. PROVIDE HEAT TRACING IN CRAWL SPACE WHERE COLD WATER IS EXPOSED TO FREEZING
CONDITIONS. 3W/FT.
PROJECT
CONTACT
www.interfaceengineering.com
TODD KOLIBABA
2023-1267
100 SW Main Street, Suite 1600 Portland, OR 97204
E
C
K
G
C.2
D.8
J F
3/4" CW UP
POC 3" PD
TO EXISTING 6" SAN
SAW-CUT AND PATCH
3" PD & 3/4" CW
FOR CONT.
SEE CIVIL DWG'S
SAW-CUT AND PATCH
(E) 6" SAN(E) 6" SAN
P D
AB
date phase date project k e y p l a n revisions
EXPIRES: 12/31/24
2/ 7/
:2
3:
P M
C :\U se rs
\k ay la a\
D oc um en ts \2
B M
C E
S C la ss ro om
M od s_ E
LE
C
_P
LU
M B
_R
_k ay la _a
.r vt
P2.11
FLOOR PLAN SECTOR A -
UNDERGROUND -
PLUMBING
B E
A T
R
IC
E C
A N
N A
D Y
E
LE
M E
N T
A R
Y S
C H
O O
L
C
LA
S S
R O
O M
M O
D U
LA
R
T
3)
-6
N or th C la ck am as
S ch oo l D is tr ic t
BID/PERMIT SET
02.09.2024 22027
V og el
R d, H ap py V al le y, O
R
0' 4' 8' 16'
1/8" = 1'-0"
1 FLOOR PLAN SECTOR A - UNDERGROUND - PLUMBING
PROJECT
CONTACT
www.interfaceengineering.com
TODD KOLIBABA
2023-1267
100 SW Main Street, Suite 1600 Portland, OR 97204
TEL 503.382.2266
N O R
M
POC 3" PD
FOR CONT.
I.E. = -3'-0"
SEE CIVIL'S DWG'S
SE-1
3" @ 2%
2" V UP
2" V
COTG
ROUTED IN CRAWL SPACE
COORDINATE WITH MODULAR
BUILDING
2" VENT BELOW
GRADE
2" V DN
BELOW GRADE
4 4
COTG
I.E.= -3'-0'
POC 3/4" DOMESTIC
COLD WATER
FOR CONT.
SEE CIVIL'S DWG'S
6 6
6 6
AB
date phase date project k e y p l a n revisions
EXPIRES: 12/31/24
2/ 7/
:2
3:
P M
C :\U se rs
\k ay la a\
D oc um en ts \2
B M
C E
S C la ss ro om
M od s_ E
LE
C
_P
LU
M B
_R
_k ay la _a
.r vt
P2.12
FLOOR PLAN MODULAR
CLASSROOM -
UNDERGROUND -
PLUMBING
B E
A T
R
IC
E C
A N
N A
D Y
E
LE
M E
N T
A R
Y S
C H
O O
L
C
LA
S S
R O
O M
M O
D U
LA
R
T
3)
-6
N or th C la ck am as
S ch oo l D is tr ic t
BID/PERMIT SET
02.09.2024 22027
V og el
R d, H ap py V al le y, O
R
PROJECT
CONTACT
www.interfaceengineering.com
TODD KOLIBABA
2023-1267
100 SW Main Street, Suite 1600 Portland, OR 97204
TEL 503.382.2266
N O R T H
SHEET KEYNOTES
1. COORDINATE 3" SANITARY ROUTING BELOW GRADE WITH
MODULAR BUILDING DRAWINGS AND PROVIDE A COMPLETE SANITARY
SYSTEM.
2. COORDINATE 3/4" COLD WATER BELOW GRADE IN THE CRAWL
SPACE WITH MODULAR BUILDING DRAWINGS AND PROVIDE A
COMPLETE DOMESTIC WATER SYSTEM, PROVIDE HEAT TRACING
3W/FT ON EXPOSED PIPING.
3. COORDINATE 2" VENT IN CRAWL SPACE WITH MODULAR BUILDING,
ROUTE UP THROUGH ROOF.
4. COORDINATE MODULAR BUILDING PLUMBING SCHEMATICS DRAWING
FOR WATER PIPING AND ROUTING, SANITARY PIPING FROM FIXTURE TO
THE SITE. CONTRACTOR TO PROVIDE A COMPLETE SYSTEM.
5. COORDINATE LOCATION OF SE-1 WITH OTHER TRADES, SEE CIVIL
DRAWINGS FOR EXACT LOCATION.
6. COORDINATE WITH CIVIL DWG'S FOR DOWNSPOUT LOCATIONS
(TYPICAL).
0' 2' 4' 8'
1/4" = 1'-0"
1 FLOOR PLAN MODULAR CLASSROOM - UNDERGROUND - PLUMBING
D
E
C
K
B
A
G
C.2
D.8
J F
STAIR
S1
CONF
133C
OFFICE
133D
HALL
125B
CONF
100A
CONF
ELEV
E1
CUST
RR
131E
HEALTH
133G
HALL / MAIL
133F
RECEPTION
RR
RR
CLASSROOM
OFFICE
125C
BOYS
118B
COMMONS
FILES
131C
RR
131D
RR
STAIR
S3
HALL
131F GIRLS
118A
HALL
HALL
RR
125D
WORKROOM
100B
COMMONS
WORKROOM/ STORAGE
HALL
SLC CLASSROOM
CLASSROOM
CLASSROOM
SLC CLASSROOM
MDF
ELECT.
CLASSROOM
MEDIA CENTER
HALL
CLASSROOM
HALLWAY
STAFF LOUNGE
131B
OFFICE
133E
CLASSROOM
WORKROOM
CLASSROOM
CLASSROOM
CLASSROOM
ELD CLASSROOM
STAIR
S2
POC 3/4" CW TO
EXISTING 2" CW
3/4" CW DN BELOW SLAB,
SAW CUT AND PATCH AS REQUIRED,
SEE ARCHITECTS DWG'S FOR NEW
FURRED OUT CHASE. COORDINATE
ROUTING WITH DIV 26
SAW-CUT AND PATCH
3/4" CW
(E)
(E)
AB
date phase date project k e y p l a n revisions
EXPIRES: 12/31/24
2/ 7/
:2
4:
P M
C :\U se rs
\k ay la a\
D oc um en ts \2
B M
C E
S C la ss ro om
M od s_ E
LE
C
_P
LU
M B
_R
_k ay la _a
.r vt
P2.13
FLOOR PLAN SECTOR A -
FIRST FLOOR - PLUMBING
B E
A T
R
IC
E C
A N
N A
D Y
E
LE
M E
N T
A R
Y S
C H
O O
L
C
LA
S S
R O
O M
M O
D U
LA
R
T
3)
-6
N or th C la ck am as
S ch oo l D is tr ic t
BID/PERMIT SET
02.09.2024 22027
V og el
R d, H ap py V al le y, O
R
PROJECT
CONTACT
www.interfaceengineering.com
TODD KOLIBABA
2023-1267
100 SW Main Street, Suite 1600 Portland, OR 97204
TEL 503.382.2266
0' 4' 8' 16'
1/8" = 1'-0"
1 FLOOR PLAN SECTOR A - FIRST FLOOR - PLUMBING N
O R
M
A
SE-1 CONTROL
PANEL
2" V UP
TO 2" VTR,
2" V DN
SE-1
DOWNSPOUT BY OTHERS,
COORDINATE WITH ARCHITECTS
DRAWINGS, (TYPICAL)
2 2
2 2
AB
date phase date project k e y p l a n revisions
EXPIRES: 12/31/24
2/ 7/
:2
4:
P M
C :\U se rs
\k ay la a\
D oc um en ts \2
B M
C E
S C la ss ro om
M od s_ E
LE
C
_P
LU
M B
_R
_k ay la _a
.r vt
P2.14
FLOOR PLAN MODULAR
CLASSROOM - PLUMBING
B E
A T
R
IC
E C
A N
N A
D Y
E
LE
M E
N T
A R
Y S
C H
O O
L
C
LA
S S
R O
O M
M O
D U
LA
R
T
3)
-6
N or th C la ck am as
S ch oo l D is tr ic t
BID/PERMIT SET
02.09.2024 22027
V og el
R d, H ap py V al le y, O
R
PROJECT
CONTACT
www.interfaceengineering.com
TODD KOLIBABA
2023-1267
100 SW Main Street, Suite 1600 Portland, OR 97204
TEL 503.382.2266
N O R T H
0' 2' 4' 8'
1/4" = 1'-0"
1 FLOOR PLAN - MODULAR CLASSROOM - PLUMBING
SHEET KEYNOTES
1. COORDINATE LOCATION OF SE-1 AND CONTROL PANEL WITH SITE
UTILITIES AND MODULAR BUILDING.
2. PLUMBING FIXTURES BY OTHERS SEE MODULAR BUILDING DRAWINGS.
date phase date project revisions
EXPIRES: 12/31/24
2/ 7/
:0
6:
P M
C :\U se rs
\k ay la a\
D oc um en ts \2
B M
C E
S C la ss ro om
M od s_ E
LE
C
_P
LU
M B
_R
_k ay la _a
.r vt
T0.01
SYMBOL LIST AND
GENERAL NOTES -
TECHNOLOGY
B E
A T
R
IC
E C
A N
N A
D Y
E
LE
M E
N T
A R
Y S
C H
O O
L
C
LA
S S
R O
O M
M O
D U
LA
R
T
3)
-6
N or th C la ck am as
S ch oo l D is tr ic t
BID/PERMIT SET
02.09.2024 22027
V og el
R d, H ap py V al le y, O
R
TECHNOLOGY SYMBOL LIST
NOTE: This is a standard symbol list and not all items listed may be used.
Abbreviations
AFF ABOVE FINISHED FLOOR
ALS ASSISTED LISTENING SYSTEM
AV AUDIO VISUAL
CATV CABLE ANTENNA TELEVISION
CAT CATEGORY CABLE
CCTV CLOSED CIRCUIT TELEVISION
COAX COAXIAL
COM COMMUNICATION
CFCI CONTRACTOR FURNISHED CONTRACTOR INSTALLED
CFOI CONTRACTOR FURNISHED OWNER INSTALLED
(X) DEMOLISH
EF ENTRANCE FACILITY
ER EQUIPMENT ROOM
(E) EXISTING
LC FIBER OPTIC CONNECTOR
SC FIBER OPTIC CONNECTOR
FDU FIBER OPTIC DISTRIBUTION UNIT
FT FOOT, FEET
(F) FUTURE
GND GROUND
HH HANDHOLE
IN INCH, INCHES
ICT INFORMATION AND COMMUNICATIONS TECHNOLOGY
IT INFORMATION TECHNOLOGY
ISP INSIDE PLANT
LAN LOCAL AREA NETWORK
LV LOW VOLTAGE
MTR MAIN TELECOMMUNICATIONS ROOM
MH MAINTENANCE HOLE
MATV MASTER ANTENNA TELEVISION
(N) NEW
NTS NOT TO SCALE
OSP OUTSIDE PLANT
OFCI OWNER FURNISHED, CONTRACTOR INSTALLED
OFOI OWNER FURNISHED, OWNER INSTALLED
PTZ PAN, TILT, ZOOM
PBB PRIMARY BONDING BUSBAR
QTY QUANTITY
RU RACK UNIT
SATV SATELLITE ANTENNA TELEVISION
SBB SECONDARY BONDING BUSBAR
SBC SECONDARY BONDING CONDUCTOR
TBB TELECOMMUNICATIONS BONDING BACKBONE
TBC TELECOMMUNICATIONS BONDING CONDUCTOR
TEBC TELECOMMUNICATIONS EQUIPMENT BONDING CONDUCTOR
TR TELECOMMUNICATIONS ROOM
TYP TYPICAL
UPS UNINTERRUPTABLE POWER SUPPLY
UON UNLESS OTHERWISE NOTED
WP WEATHERPROOF
WAN WIDE AREA NETWORK
WAP WIRELESS ACCESS POINT
WIFI WIRELESS FIDELITY
Audio/Video
AUDIO-VISUAL OUTLET. PROVIDE (2) HDMI CONNECTORS AND
(2) HDMI CABLES WITH CONNECTION TO AV OUTLET IN WALL
BOX WITH SINGLE-GANG ADAPTER RING AND 1.25" CONDUIT
WITH PROTECTIVE BUSHING TO NEAREST ACCESSIBLE
CEILING SPACE.
DISPLAY(PLAN VIEW), INDICATED BY SIZE IN INCHES ON
DRAWINGS, DETAILS AND SPECIFICATIONS
FLUSH MOUNTED PAGING SPEAKER IN CEILING WITH 1"
CONDUIT TO NEAREST ACCESSIBLE CEILING SPACE AND
CABLING PER SPECIFICATION
Electronic Security
VIDEO SURVEILLANCE CAMERA WITH ONE, CATEGORY 6A
CABLE. PROVIDE 5S BOX WITH SINGLE GANG ADAPTER RING
AND 1.25" CONDUIT WITH PROTECTIVE BUSHING, STUBBED TO
NEAREST ACCESSIBLE CEILING SPACE. SEE NOTES ON
DRAWINGS FOR CAMERA TYPE.
Equipment
ENCLOSED CABINET
SECONDARY BONDING BUSBAR (SBB) 4" X 12" X.25"
Reference Symbols
DETAIL NUMBER AND SHEET LOCATION
KEYED NOTES
SECTION NUMBER AND SHEET LOCATION
Telecommunications
CEILING MOUNTED TELECOM OUTLET MOUNTED ON CEILING
WITH TWO CATEGORY 6A CABLES. PROVIDE 5S BOX WITH
SINGLE GANG ADAPTER RING AND 1-1/4" CONDUIT WITH
PROTECTIVE BUSHING STUBBED TO NEAREST ACCESSIBLE
CEILING SPACE
LOCATION OF SURFACE MOUNTED RADIO CLOCK. PROVIDE
PRIMEX.
TELECOM OUTLET WITH TWO CATEGORY 6A CABLES. PROVIDE
5S BOX WITH SINGLE GANG ADAPTER RING AND 1-1/4"
CONDUIT WITH PROTECTIVE BUSHING STUBBED TO NEAREST
ACCESSIBLE CEILING SPACE. MOUNTED AT +18", UON.
T0.01 SYMBOL LIST AND GENERAL NOTES - TECHNOLOGY
T2.11 FLOOR PLAN SECTOR A - FIRST FLOOR - TECHNOLOGY
T2.12 FLOOR PLAN MODULAR CLASSROOM - TECHNOLOGY
T7.01 DETAILS - TECHNOLOGY
GENERAL SHEET NOTES
SHEET INDEX
A. COMMUNICATIONS RACEWAYS, TRAYS AND OUTLETS ARE SHOWN
DIAGRAMMATICALLY. LOCATIONS ARE APPROXIMATE UNLESS
SPECIFICALLY DIMENSIONED. FIELD COORDINATE ALL WORK WITH
OTHER TRADES.
B. CONSTRUCTION DETAILS SHOW TYPICAL INSTALLATION UNLESS
OTHERWISE NOTED AND APPLY TO ALL COMMUNICATIONS WORK
INCLUDED IN THE SUMMARY OF WORK FOR THIS PACKAGE EVEN
THOUGH NOT SPECIFICALLY REFERENCED ON THE PLAN
DRAWINGS.
C. INSTALL PULL STRINGS IN ALL CONDUITS AT THE TIME OF CONDUIT
AND CABLE INSTALLATION.
PROJECT
CONTACT
www.interfaceengineering.com
KEVIN RITTENBACH
2023-1267
100 SW Main Street, Suite 1600 Portland, OR 97204
DES
C
DD
DD
L
D C
AR
AR
AR
AR
AR
AR
L C
ARAR
ARAR
AR
AR
REX
DD L
REX
LL
C
C
MD
MD
SC
SC
MD
MD
MD
ES
ES
MD
REX
C
DL
12456791011 8
H
D
E
C
K
B
A
G
C.2
D.8
J F
STAIR
S1
CONF
133C
RR
133H
OFFICE
133D
HALL
125B
CONF
100A
CONF
ELEV
E1
CUST
RR
131E
HEALTH
133G
HALL / MAIL
133F
RECEPTION
RR
RR
CLASSROOM
OFFICE
125C
BOYS
118B
COMMONS
FILES
131C
RR
131D
RR
STAIR
S3
HALL
131F GIRLS
118A
HALL
HALL
RR
125D
WORKROOM
100B
COMMONS
WORKROOM/ STORAGE
HALL
SLC CLASSROOM
CLASSROOM
CLASSROOM
SLC CLASSROOM
MDF
AV STORAGE
100D
ELECT.
CLASSROOM
MEDIA CENTER
HALL
CLASSROOM
HALLWAY
STAFF LOUNGE
131B
OFFICE
133E
CLASSROOM
WORKROOM
CLASSROOM
CLASSROOM
CLASSROOM
ELD CLASSROOM
STAIR
S2
AVOID NEW SEWER
EJECTOR PUMP AND
EXISTING LIGHT POLE.
AB
date phase date project k e y p l a n revisions
EXPIRES: 12/31/24
2/ 7/
:0
6:
P M
C :\U se rs
\k ay la a\
D oc um en ts \2
B M
C E
S C la ss ro om
M od s_ E
LE
C
_P
LU
M B
_R
_k ay la _a
.r vt
T2.11
FLOOR PLAN SECTOR A -
FIRST FLOOR -
TECHNOLOGY
B E
A T
R
IC
E C
A N
N A
D Y
E
LE
M E
N T
A R
Y S
C H
O O
L
C
LA
S S
R O
O M
M O
D U
LA
R
T
3)
-6
N or th C la ck am as
S ch oo l D is tr ic t
BID/PERMIT SET
02.09.2024 22027
V og el
R d, H ap py V al le y, O
R
PROJECT
CONTACT
www.interfaceengineering.com
KEVIN RITTENBACH
2023-1267
100 SW Main Street, Suite 1600 Portland, OR 97204
TEL 503.382.2266
0' 4' 8' 16'
1/8" = 1'-0"
1 1ST FLOOR LEVEL TELECOM PLAN - SECTOR A N
O R T H
SHEET KEYNOTES
1. PROVIDE (1) 3" C. TO IDF LOCATION IN
MODULAR BUILDING 1. SEE T2.12 FOR
CONTINUATION.
2. PROVIDE (1) 3" C. ABOVE CEILING. TIE INTO
EXISTING CABLE TRAY PATHWAYS ABOVE
CEILING.
3. PROVIDE 110 BLOCK FOR INTERCONNECT
WITH 25-PAIR CAT5e CABLE.
4. FIELD VERIFY EXISTING PATHWAYS FROM
CABLE TRAY TO MDF CAN SUPPORT NEW
CABLING TO MODULARS.
AVOID NEW SEWAGE
EJECTOR PUMP AND
EXISTING LIGHT POLE.
SC
SC
679 8
OFCI WALL MOUNTED EQUIPMENT CABINET
PROVIDE 70" DIAGONAL FLAT PANEL DISPLAY -
SHARP LE701, MOUNT DISPLAY AT HEIGHT OF 45"
FROM FINISHED FLOOR TO BOTTOM OF SCREEN
+77"
+77"
+18"
PROVIDE 70" DIAGONAL FLAT PANEL DISPLAY -
SHARP LE701, MOUNT DISPLAY AT HEIGHT OF 45"
FROM FINISHED FLOOR TO BOTTOM OF SCREEN
+77"
+18" +77"
AV
AV
AV
AV
PROVIDE PULLBOX
PROVIDE FIRE-RATED PLYWOOD MOUNTING BACKBOARD
PROVIDE SECONDARY BONDING BUSBAR
PROVIDE 66 BLOCK IN REAR OF CABINET FOR PAGING INTERCONNECT
PROVIDE CORNER MOUNT, 4 LENS HANWHA WISENET P SERIES PNM-9084QZ1
PROVIDE CORNER MOUNT, 4 LENS
HANWHA WISENET P SERIES PNM-9084QZ1
+18"
+18"
T7.01
T7.01
AB
date phase date project k e y p l a n revisions
EXPIRES: 12/31/24
2/ 7/
:0
6:
P M
C :\U se rs
\k ay la a\
D oc um en ts \2
B M
C E
S C la ss ro om
M od s_ E
LE
C
_P
LU
M B
_R
_k ay la _a
.r vt
T2.12
FLOOR PLAN MODULAR
CLASSROOM -
TECHNOLOGY
B E
A T
R
IC
E C
A N
N A
D Y
E
LE
M E
N T
A R
Y S
C H
O O
L
C
LA
S S
R O
O M
M O
D U
LA
R
T
3)
-6
N or th C la ck am as
S ch oo l D is tr ic t
BID/PERMIT SET
02.09.2024 22027
V og el
R d, H ap py V al le y, O
R
PROJECT
CONTACT
www.interfaceengineering.com
KEVIN RITTENBACH
2023-1267
100 SW Main Street, Suite 1600 Portland, OR 97204
TEL 503.382.2266
0' 2' 4' 8'
1/4" = 1'-0"
1 FLOOR PLAN - MODULAR CLASSROOM - TECHNOLOGY N
O R T H
SHEET KEYNOTES
1. PROVIDE (1) 3" C. TO IDF LOCATION. PROVIDE THE
FOLLOWING FROM THE MDF IN THE MAIN
BUILDING TO IDF LOCATION IN MODULE 1:
• ONE (1) CORNING 12-STRAND ARMORED
PLENUM-RATED SINGLE MODE OS2 LSZH
FIBER OPTIC CABLE.
• ONE (1) 25-PAIR CATEGORY 5e CABLE FOR
VOICE INTERCONNECT USING NCSD
SUPPLIED CAT5E 1U PATCH PANEL
MOUNTED IN CABINET AND LABELED WITH
DESTINATION.
• TWO (2) 18 GAUGE/2 CONDUCTOR
STRANDED, SHIELDED CABLES FOR THE
TWO PAGING SPEAKERS.
WALL/ COLUMN
CEILING CROSS "T" BAR
ACOUSTICAL TILE, TYP
T-BAR TILE BRIDGE
SINGLE GANG BOX
CAT6A TO CABINET
10-15' SERVICE LOOP
CEILING
SOFFIT MOUNT CAMERA
CEILING
FASCIA MOUNT CAMERA BASIC FLAT WALL MOUNT CAMERA SURFACE WALL MOUNT PATHWAY
CORNER MOUNT CAMERA
MODULAR BUILDING 1
MDF
PROVIDE 12-STRAND SINGLEMODE
OS2 LSZH FIBER OPTIC CABLE
PROVIDE 25-PAIR CAT5E COPPER
CABLE FOR VOICE
PROVIDE (2) 18 GAUGE, 2 CONDUCTOR,
STRANDED, SHIELDED CABLES, ONE
FOR EACH PAGING SPEAKER
70" DIAGONAL DISPLAY,
PROVIDE SHARP LE701
A
F F
1"C TO
ACCESSIBLE
CEILING SPACE
1-1/4"C
VIDEO INPUT; PROVIDE (2) HDMI CONNECTORS, CABLING TO OUTLET BEHIND DISPLAY
VIDEO OUTPUT; PROVIDE (2) HDMI
CONNECTORS, (2) HDMI CABLES AV
OUTLET BELOW
DATA; CABLING TO CABINET
POWER
A
F F 4
A
F F 7
A
F F date phase date project revisions
EXPIRES: 12/31/24
2/ 7/
:0
7:
P M
C :\U se rs
\k ay la a\
D oc um en ts \2
B M
C E
S C la ss ro om
M od s_ E
LE
C
_P
LU
M B
_R
_k ay la _a
.r vt
T7.01
DETAILS - TECHNOLOGY
B E
A T
R
IC
E C
A N
N A
D Y
E
LE
M E
N T
A R
Y S
C H
O O
L
C
LA
S S
R O
O M
M O
D U
LA
R
T
3)
-6
N or th C la ck am as
S ch oo l D is tr ic t
BID/PERMIT SET
02.09.2024 22027
V og el
R d, H ap py V al le y, O
R
PROJECT
CONTACT
www.interfaceengineering.com
KEVIN RITTENBACH
2023-1267
100 SW Main Street, Suite 1600 Portland, OR 97204
TEL 503.382.2266
NO SCALE
1 WIRELESS ACCESS POINT OUTLET DETAIL
NO SCALE
2 CAMERA MOUNTING DETAILS
NO SCALE
3 BACKBONE RISER DIAGRAM
NO SCALE
4 AV INFRASTRUCTURE RISER - WALL DISPLAY
| COVER SHEET |
| Cannady ES - CIVIL |
| C0.10 COVER SHEET |
| C0.20 OVERALL EXISTING CONDITIONS PLAN |
| C0.30 EXISTING CONDITIONS & DEMOLITION PLAN |
| C1.00 SITE AND HORIZONTAL CONTROL PLAN |
| C2.00 GRADING PLAN |
| C2.50 WALL PLAN AND PROFILE |
| C2.51 WALL SECTIONS |
| C3.00 UTILITY PLAN |
| C4.00 DETAILS |
| C4.01 DETAILS |
| Cannady ES - ARCHITECTURAL |
| A1.11 - FIRST FLOOR PLAN SECTOR A - DEMO PLAN |
| A2.11 - FLOOR PLAN SECTOR A - FIRST FLOOR |
| A4.11 - FIRST FLOOR PLAN SECTOR A - FINISH PLAN |
| Cannady ES - Bid-Permit Set - ELECTRICAL |
| E0.01 - SYMBOL LIST AND GENERAL NOTES - ELECTRICAL |
| E2.11 - FLOOR PLAN SECTOR A - FIRST FLOOR - POWER |
| E2.12 - FLOOR PLAN SECTOR A - SECOND FLOOR - POWER |
| E2.13 - FLOOR PLAN MODULAR CLASSROOM - POWER |
| E5.01 - SINGLE LINE DIAGRAMS - ELECTRICAL |
| Cannady ES - Bid-Permit Set - PLUMBING |
| P0.01 - SYMBOL LIST AND GENERAL NOTES - PLUMBING |
| P2.11 - FLOOR PLAN SECTOR A - UNDERGROUND - PLUMBING |
| P2.12 - FLOOR PLAN MODULAR CLASSROOM - UNDERGROUND - PLUMBING |
| P2.13 - FLOOR PLAN SECTOR A - FIRST FLOOR - PLUMBING |
| P2.14 - FLOOR PLAN MODULAR CLASSROOM - PLUMBING |
| Cannady ES - Bid-Permit Set - TECHNOLOGY |
| T0.01 - SYMBOL LIST AND GENERAL NOTES - TECHNOLOGY |
| T2.11 - FLOOR PLAN SECTOR A - FIRST FLOOR - TECHNOLOGY |
| T2.12 - FLOOR PLAN MODULAR CLASSROOM - TECHNOLOGY |
| T7.01 - DETAILS - TECHNOLOGY |