This is a bid schedule template document for federal construction contracting that includes three separate sample price schedules from the National Park Service. The primary bid schedule addresses the Trail Replacement project at Indiana Dunes National Park in Porter, Indiana, specifically the West Beach Succession Trail. Offerors must submit pricing for all base bid line items and option lines to avoid rendering their proposal non-responsive. The base bid encompasses mobilization/demobilization costs, site demolition/removals, installation of new boardwalks and stairs, foundations, and protection ground mats—each broken down by materials, labor, and equipment on a lump-sum basis. Option #1 covers Route 1 Trail Replacement work with the same cost categories. The schedule requires contractors to provide total prices rounded to whole dollars, with separate calculations for subtotals, overhead percentage, profit percentage, bonds percentage, and grand totals for both base bid and optional work.

The document also includes two additional sample price schedules as reference templates: a Design-Bid-Build (DBB) sample for a Visitors Center project at Yellowstone that includes unit-priced line items for water and sewer lines and rock excavation with optional geothermal and photovoltaic work, and a Design-Build (DB) sample for Yosemite Valley featuring lump-sum pricing for design and construction phases with photovoltaic system options. All templates emphasize that in cases of calculation errors, unit prices govern extended prices and corrected totals govern summations. The document provides the standard framework required by the National Park Service Denver Service Center for construction contract pricing submissions.

View the file

Other files for this federal contract opportunity

Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Schedule

BID SCHEDULE

US Department of Interior
National Park Service
Park Location: Indiana Dunes National Park
Project Title: Trail Replacement

NOTICE: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option lines (if applicable). Failure to do so may render the proposal non-responsvive. On lump-sum line items, provide the total price only. Round totals and extended prices to whole dollars.

Contract Line Item Number (CLIN)Contract Line Item (CLI) TitleQuantityUnit of MeasurePrice/UnitTotal Price
1Base Bid1Lump Sum$ - 0$ - 0
2Bid Option 11Lump Sum$ - 0$ - 0
2
3
4
Grand Total (Base Bid + Option #1)$ - 0

Price Schedule Wksht

Indiana Dunes National Park
U.S. Department of Interior1100 N Mneral Sprgs

Porter, IN 46304 National Park Service West Beach Succession Trail

PROJECT: Trail Replacement

PRICE SCHEDULE WORKSHEET

Construction Items Unit Quantity Price/ Unit Subtotal

BASE BID - Mobilization/Demobilization
- Mob/Demob CostsLS1$ - 0$ - 0
BASE BID - SITE DEMOLITION/REMOVALS and all associated work/items
- MaterialsLS1$ - 0$ - 0
- LaborLS1$ - 0$ - 0
- EquipmentLS1$ - 0$ - 0
BASE BID - INSTALLATION OF NEW BOARDWALKS/STAIRS and all associated work/items
- MaterialsLS1$ - 0$ - 0
- LaborLS1$ - 0$ - 0
- EquipmentLS1$ - 0$ - 0
BASE BID - FOUNDATIONS and all associated work/items
- MaterialsLS1$ - 0$ - 0
- LaborLS1$ - 0$ - 0
- EquipmentLS1$ - 0$ - 0
BASE BID - PROTECTION GROUND MATS and all associated work/items
- MaterialsLS1$ - 0$ - 0
- LaborLS1$ - 0$ - 0
- EquipmentLS1$ - 0$ - 0

SUBTOTAL $ - 0

Overhead%$ - 0
Profit%$ - 0
Bonds%$ - 0

Grand Total (BASE BID) $ - 0

OPTION #1 - ROUTE 1 TRAIL REPLACEMENT and all associated work/items
- MaterialsLS1$ - 0$ - 0
- LaborLS1$ - 0$ - 0
- EquipmentLS1$ - 0$ - 0

SUBTOTAL $ - 0

Overhead%$ - 0
Profit%$ - 0
Bonds%$ - 0

Grand Total (OPTION #1) $ - 0

Grand Total (Base Bid + Option #1) $ - 0

Printed: &D &T &Z&F

Design-Bid-Build (DBB) Sample

Contract Price Schedule - Design-Bid-Build (DBB) SAMPLE
National Park Service (NPS) - Denver Service Center (DSC) | 3-13-18
Solicitation Number:N2011080811
PARK - PMIS:YELL 012345
(Project Management Information System)
Developed Area:Old Faithful
Project Title:Johnstonian Visitors Center
Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all
option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced
line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related
item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts
govern. Round totals and extended prices to whole dollars.
Contract Line Item Number (CLIN)Contract Line Item (CLI) TitleQuantityUnit of MeasureUnit PriceTotal Price
1Visitors Center1Lump Sum$0.00
2Water Line400Lineal Feet- 0
3Sanitary Sewer Line200Lineal Feet- 0
4Rock Excavation150Cubic Yards- 0
TOTAL BASE PRICE (Contract Line Item Number 1 through 4) ---------------------------------------------------------------------------------$0.00
5OPTION A, Geothermal Wells1Lump Sum- 0
6OPTION B, Photovoltaic System1Lump Sum- 0
TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 5 and 6) -------------------------------------------------------------------$0.00
TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 6) ----------------------------$0.00
All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items.

Design-Build (DB) Sample

Contract Price Schedule - Design-Build (DB) SAMPLE
National Park Service (NPS) - Denver Service Center (DSC) | 3-13-18
Solicitation Number:N2011080811
PARK - PMIS:YELL 012345
(Project Management Information System)
Developed Area:Yosemite Valley
Project Title:Design and Build a New Structure
Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all
option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced
line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related
item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts
govern. Round totals and extended prices to whole dollars.
Contract Line Item Number (CLIN)Contract Line Item (CLI) TitleQuantityUnit of MeasureUnit PriceTotal Price
1Design1Lump Sum$0.00
2Construction1Lump Sum- 0
TOTAL BASE PRICE (Contract Line Item Number 1 and 2) ---------------------------------------------------------------------------------------$0.00
3OPTION A, Photovoltaic System1Lump Sum- 0
TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 3) ----------------------------------------------------------------------------$0.00
TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 3) ----------------------------$0.00
All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items.

image1.png

File details come from the government source that posted it. Updated .