About this file
This is Amendment 0001 to Solicitation 140P6426B0002, issued by the Naval Facilities Engineering Systems Command (NAVFAC) through the NPS, MWR - Ohio MABO office located in Sagamore Hills, Ohio. The amendment is effective June 1, 2026, and the solicitation deadline has not been extended.
The amendment serves to post four critical supplemental documents for the referenced project requirement: (1) Questions and Answers (Q&A), (2) Addendum to Specifications dated May 28, 2026, (3) Revised Specifications dated May 28, 2026, and (4) Site Visit Attendee List. Offerors must acknowledge receipt of this amendment prior to the hour and date specified in the original solicitation by completing the required acknowledgment methods outlined in the solicitation instructions, completing and returning SF30, acknowledging receipt on each copy of the offer submitted, or submitting separate correspondence referencing the solicitation and amendment numbers. All other solicitation details remain unchanged. Offerors are instructed to complete the SF1442 as directed and may either sign and return the SF30 after downloading from SAM.gov or acknowledge review of all amendments in Block #19 on the SF1442.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P6426B0002_Amd_0002.pdf | ||
| Questions_and_Answers_0002.pdf | ||
| Addendum_to_Specifications_-_9_Jun_2026_0002.pdf | ||
| Revised_Specifications_-_28_May_2026_0001.pdf | ||
| Addendum_to_Specifications_-_28_May_2026_0001.pdf | ||
| Questions_and_Answers_0001.pdf | ||
| Site_Visit_Attendee_List_0001.pdf | ||
| Attachment_-_Construction_Contract_Admin.pdf | ||
| Sol_140P6426B0002.pdf | ||
| Attachment_-_Limitations_on_Subcontracting_Report.xlsx | XLSX spreadsheet | |
| Wage_Determination_-_Porter_Co.pdf | ||
| Bid_Schedule_-_Trail_Replacement.xlsx | XLSX spreadsheet | |
| Bid_Schedule_-_Trail_Replacement.pdf | ||
| Attachment_-_Drawings-Plans.pdf | ||
| Attachment_-_Notice_to_Contractors.pdf | ||
| Specifications_-_Trail_Replacement.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: is not is required copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7.ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
PAGESOF
Contractor
The hour and date specified for receipt of Offers to sign this document and return
Craig Bryant
See continuation page
NPS, MWR - Ohio MABO 1113 West Aurora Road Sagamore Hills OH 44067-1678
PMO
140P6426B0002
06/01/2026
04/09/2026
1 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
NSN 7540-01-152-8067
140P6426B0002/0001
The purpose of the amendment is to post the technical questions/answers, Addendum to the
Project Specifications, and the Revised
Specifications for this project requirement:
1. Questions and Answers (Q&A)
2. Addendum to Specifications - dated 28 May
3. Revised Specifications - dated 28 May 2026
4. Site Visit Attendee List
Please reference the attached documents for details.
All other solicitation details remain the same.
NOTE: Please complete the SF1442 as instructed.
All amendments must also be read - SF30 can be signed and returned once downloaded from
SAM.gov or acknowledged that it was reviewed in
Block #19 on the SF1442.
| Amendment of solicitation/modification of contract |
| Contract ID code |
| Amendment/modification number |
| Effective date |
| Requisition/purchase requisition number |
| Project number |
| Issued by |
| Code |
| Administered by |
| Code |
| Name and address of contractor |
| Code |
| Facility code |
| Amendment of solicitation number |
| Dated |
| Modification of contract/order number |
| Dated |
| This item only applies to amendments of solicitations |
| Accounting and appropriation data |
| This item applies only to modifications of contracts/orders. |
| This change order is issued pursuant to: |
| The above numbered contract/order is modified to reflect the administrative changes |
| This supplemental agreement is entered into pursuant to authority of: |
| Other |
| Important: |
| Description of amendment/modification |
| Name and title of signer |
| Contractor/offeror |
| Date signed |
| Name and title of contracting officer |
| Signature of Contracting Officer |
| Date signed |
| Previous edition unusable |
| Standard form 30 (rev. 11/2016) |
| Continuation sheet |
| Reference Number |
| Name of Offeror or Contractor |
| OPTIONAL FORM 336 (4-86)) |
Sponsored by GSA FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .