Bid_Schedule_-_Trail_Replacement.pdf

PDF 214 KB Posted

Attached to
Trail Replacement Federal contract opportunity
Solicitation number
140P6426B0002
Issued by
Department of the Interior National Park Service Midwest Region

About this file

This is a Bid Schedule and Price Schedule Worksheet for a construction contract with the U.S. Department of Interior, National Park Service, for trail replacement work at Indiana Dunes National Park located in Porter, Indiana.

The project encompasses trail replacement work on the West Beach Succession Trail and includes five primary construction work categories under the Base Bid: Mobilization/Demobilization, Site Demolition/Removals, Installation of New Boardwalks/Stairs, Foundations, and Protection Ground Mats. Each category requires offerors to provide detailed pricing broken down by Materials, Labor, and Equipment line items. The contract structure includes a Base Bid (CLIN 1) and one Bid Option (CLIN 2 - Route 1 Trail Replacement), with both items priced on a lump-sum basis. Offerors must provide pricing for all line items including subtotals, overhead percentages, profit percentages, and bond costs for both the Base Bid and Option #1 to be considered responsive. All prices must be rounded to whole dollars. The Grand Total combines the Base Bid and Option #1 pricing into a single contract value. This pricing template provides the framework for offerors to submit comprehensive cost proposals covering materials, labor, equipment, overhead, profit margins, and bonding requirements for the complete trail replacement project.

View the file

Other files for this federal contract opportunity

Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract Line Item Number

(CLIN)

Contract Line Item (CLI) Title Quantity Unit of Measure Price/Unit Total Price

1 Base Bid 1 Lump Sum $ - $ -

2 Bid Option 1 1 Lump Sum $ - $ -

NOTICE: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option lines (if applicable). Failure to do so may render the proposal non-responsvive. On lump-sum line items, provide the total price only. Round totals and extended prices to whole dollars.

Grand Total (Base Bid + Option #1)

BID SCHEDULE

US Department of Interior National Park Service Park Location: Indiana Dunes National Park Project Title: Trail Replacement

Unit Quantity Price/ Unit Subtotal

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

SUBTOTAL

Bonds Profit

OPTION #1 - ROUTE 1 TRAIL REPLACEMENT and all associated work/items

- Equipment

Grand Total (BASE BID)

Overhead

- Materials

- Labor

Overhead

SUBTOTAL

Profit Bonds

Grand Total (OPTION #1)

- Materials

- Labor

- Equipment

- Materials

- Labor

- Equipment

- Materials

- Labor

BASE BID - SITE DEMOLITION/REMOVALS and all associated work/items

- Equipment

BASE BID - PROTECTION GROUND MATS and all associated work/items

BASE BID - Mobilization/Demobilization

- Mob/Demob Costs

BASE BID - FOUNDATIONS and all associated work/items

- Materials

- Equipment

- Labor

Grand Total (Base Bid + Option #1)

1100 N Mneral Sprgs Porter, IN 46304

Construction Items

National Park Service U.S. Department of Interior

Indiana Dunes National Park

West Beach Succession Trail

PRICE SCHEDULE WORKSHEET

BASE BID - INSTALLATION OF NEW BOARDWALKS/STAIRS and all associated work/items

PROJECT: Trail Replacement

Bid Schedule
Price Schedule Wksht