Bid Schedule Template.xlsx
XLSX spreadsheet 30 KB Posted
- Solicitation number
- 47PH0622R0018
About this file
This document provides details for a federal construction solicitation seeking replacement of electrical switchgear at a federal building in Albuquerque, New Mexico. The General Services Administration, Public Buildings Service is soliciting bids for a construction contractor to provide all materials, labor, tools, equipment, and daily supervision to replace the main 3000A 277/480V double ended electrical gear located in the basement level of the Dennis Chavez Federal Building. The project scope includes removing existing plaza drains above the switchgear room, adding a new tapered insulation and waterproofing system, and demolishing and replacing the existing switchgear egress door and sink. The estimated value of the project is between $1 million to $5 million. Bids are due by June 24, 2022. A pre-proposal conference will be held on June 6, 2022. This is a 100% service-disabled veteran-owned small business set-aside awarded based on best value. The selected contractor must be properly licensed to perform this type of work in New Mexico.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF30 Amendment 05.pdf | ||
| SF30 Amendment 04.pdf | ||
| SF30 Amendment 03.pdf | ||
| SF30 Amendment 02.pdf | ||
| SF30 Amendment 01.pdf | ||
| Drawing 3.pdf | ||
| Drawing 4.pdf | ||
| Drawing 9.pdf | ||
| GSA527.pdf | ||
| Drawing 6.pdf | ||
| Drawing 5.pdf | ||
| SF1442 47PH0622R0018.pdf | ||
| Drawing 13.pdf | ||
| Vendor Fitness Determination Training Manual.pdf | ||
| Waste Diversion Plan.xlsx | XLSX spreadsheet | |
| Drawing 11.pdf | ||
| Drawing 2.pdf | ||
| Drawing 7.pdf | ||
| Drawing 8.pdf | ||
| Drawing 1.pdf | ||
| Drawing 10.pdf | ||
| Drawing 12.pdf | ||
| Past Performance Questionnaire.pdf | ||
| Project Manual 101920.pdf |
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary Page
| ENTER COMPANY NAME HERE | ||
| PREPARED BY: | DATE: | |
| PROPOSAL SUMMARY |
| Project Number and Name: | 32214 GSA Switchgear |
| Building Number and Name: | NM0030ZZ Chavez Federal Building |
| RFP Number: | 47PH0622R0018 |
DIVISION DESCRIPTION MATERIAL LABOR EQUIPMENT TOTAL
| Division 02 | Existing Conditions | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 03 | Concrete | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 04 | Masonry | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 05 | Metals | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 06 | Wood, Plastics and Composites | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 07 | Thermal and Moisture Protection | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 08 | Openings | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 09 | Finishes | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 10 | Specialties | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 11 | Equipment | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 12 | Furnishings | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 13 | Special Construction | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 14 | Conveying Equipment | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 21 | Fire Suppression | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 22 | Plumbing | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 23 | Heating, Ventilation and Air Conditioning | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 25 | Integrated Automation | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 26 | Electrical | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 27 | Communications | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 28 | Electronic Safety and Security | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 31 | Earthwork | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 32 | Exterior Improvements | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 33 | Utilities | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Subtotal $ - 0 $ - 0 $ - 0 $ - 0
| Division 1 | General Requirements | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 1 | General Conditions | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Subtotal $ - 0 $ - 0 $ - 0 $ - 0
| Subtotal | $ - 0 | ||
| Overhead | 0.00% | $ - 0 | |
| Subtotal | $ - 0 | ||
| Profit | 0.00% | $ - 0 | |
| Subtotal | $ - 0 | ||
| Bonds | 0.00% | $ - 0 | |
| Subtotal | $ - 0 | ||
| Gross Receipts Tax | 0.0000% | $ - 0 |
TOTAL $ - 0
CSI Division (copy as needed)
ENTER COMPANY NAME HERE
| Project Number and Name: | 32214 GSA Switchgear |
| Building Number and Name: | NM0030ZZ Chavez Federal Building |
| RFP Number: | 47PH0622R0018 |
| QTY | UNIT | LABOR | MATERIAL | EQUIPMENT | TOTAL | |||||
| WORK ITEM DESCRIPTION | MANHOURS | RATE | TOTAL | UNIT PRICE | TOTAL | UNIT PRICE | TOTAL | |||
| Enter Relevant Tasks Below | ||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
TOTAL $ - 0 $ - 0 $ - 0 $ - 0
File details come from the government source that posted it. Updated .