This document provides details for a federal construction solicitation seeking replacement of electrical switchgear at a federal building in Albuquerque, New Mexico. The General Services Administration, Public Buildings Service is soliciting bids for a construction contractor to provide all materials, labor, tools, equipment, and daily supervision to replace the main 3000A 277/480V double ended electrical gear located in the basement level of the Dennis Chavez Federal Building. The project scope includes removing existing plaza drains above the switchgear room, adding a new tapered insulation and waterproofing system, and demolishing and replacing the existing switchgear egress door and sink. The estimated value of the project is between $1 million to $5 million. Bids are due by June 24, 2022. A pre-proposal conference will be held on June 6, 2022. This is a 100% service-disabled veteran-owned small business set-aside awarded based on best value. The selected contractor must be properly licensed to perform this type of work in New Mexico.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF30 Amendment 05.pdf | ||
| SF30 Amendment 04.pdf | ||
| SF30 Amendment 03.pdf | ||
| SF30 Amendment 02.pdf | ||
| SF30 Amendment 01.pdf | ||
| Drawing 8.pdf | ||
| Drawing 3.pdf | ||
| GSA527.pdf | ||
| SF1442 47PH0622R0018.pdf | ||
| Drawing 13.pdf | ||
| Drawing 7.pdf | ||
| Drawing 6.pdf | ||
| Drawing 5.pdf | ||
| Drawing 4.pdf | ||
| Drawing 1.pdf | ||
| Waste Diversion Plan.xlsx | XLSX spreadsheet | |
| Vendor Fitness Determination Training Manual.pdf | ||
| Project Manual 101920.pdf | ||
| Drawing 12.pdf | ||
| Past Performance Questionnaire.pdf | ||
| Drawing 11.pdf | ||
| Drawing 10.pdf | ||
| Drawing 9.pdf | ||
| Drawing 2.pdf |
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary Page
| ENTER COMPANY NAME HERE | ||
| PREPARED BY: | DATE: | |
| PROPOSAL SUMMARY |
| Project Number and Name: | 32214 GSA Switchgear |
| Building Number and Name: | NM0030ZZ Chavez Federal Building |
| RFP Number: | 47PH0622R0018 |
DIVISION DESCRIPTION MATERIAL LABOR EQUIPMENT TOTAL
| Division 02 | Existing Conditions | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 03 | Concrete | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 04 | Masonry | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 05 | Metals | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 06 | Wood, Plastics and Composites | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 07 | Thermal and Moisture Protection | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 08 | Openings | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 09 | Finishes | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 10 | Specialties | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 11 | Equipment | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 12 | Furnishings | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 13 | Special Construction | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 14 | Conveying Equipment | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 21 | Fire Suppression | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 22 | Plumbing | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 23 | Heating, Ventilation and Air Conditioning | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 25 | Integrated Automation | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 26 | Electrical | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 27 | Communications | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 28 | Electronic Safety and Security | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 31 | Earthwork | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 32 | Exterior Improvements | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 33 | Utilities | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Subtotal $ - 0 $ - 0 $ - 0 $ - 0
| Division 1 | General Requirements | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 1 | General Conditions | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Subtotal $ - 0 $ - 0 $ - 0 $ - 0
| Subtotal | $ - 0 | ||
| Overhead | 0.00% | $ - 0 | |
| Subtotal | $ - 0 | ||
| Profit | 0.00% | $ - 0 | |
| Subtotal | $ - 0 | ||
| Bonds | 0.00% | $ - 0 | |
| Subtotal | $ - 0 | ||
| Gross Receipts Tax | 0.0000% | $ - 0 |
TOTAL $ - 0
CSI Division (copy as needed)
ENTER COMPANY NAME HERE
| Project Number and Name: | 32214 GSA Switchgear |
| Building Number and Name: | NM0030ZZ Chavez Federal Building |
| RFP Number: | 47PH0622R0018 |
| QTY | UNIT | LABOR | MATERIAL | EQUIPMENT | TOTAL | |||||
| WORK ITEM DESCRIPTION | MANHOURS | RATE | TOTAL | UNIT PRICE | TOTAL | UNIT PRICE | TOTAL | |||
| Enter Relevant Tasks Below | ||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
TOTAL $ - 0 $ - 0 $ - 0 $ - 0
File details come from the government source that posted it. Updated .