SF30 Amendment 01.pdf
PDF 179 KB Posted
- Attached to
- 32214 Chavez Switchgear Replacement Albuquerque, NM Federal contract opportunity
- Solicitation number
- 47PH0622R0018
About this file
This document contains an amendment to a solicitation for electrical switchgear replacement services at a federal building in Albuquerque, New Mexico. The General Services Administration, Public Buildings Service is seeking a service-disabled veteran owned small business to replace the main 3000A 277/480V double ended electrical gear located in the basement of the Dennis Chavez Federal Building for between $1 million to $5 million. The selected firm must have an NAICS code of 238210 for general construction with a size standard of $16.5 million. The project is anticipated to take 210 calendar days from notice to proceed and will require work within an occupied federal courthouse while minimizing disruptions. The pre-proposal conference was held on June 6, 2022 and proposals are due by July 7, 2022. The amendment provides responses to contractor questions and extends the proposal due date.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF30 Amendment 05.pdf | ||
| SF30 Amendment 04.pdf | ||
| SF30 Amendment 03.pdf | ||
| SF30 Amendment 02.pdf | ||
| SF1442 47PH0622R0018.pdf | ||
| Drawing 13.pdf | ||
| Drawing 7.pdf | ||
| Drawing 6.pdf | ||
| Drawing 5.pdf | ||
| Drawing 4.pdf | ||
| Drawing 1.pdf | ||
| Waste Diversion Plan.xlsx | XLSX spreadsheet | |
| Bid Schedule Template.xlsx | XLSX spreadsheet | |
| Vendor Fitness Determination Training Manual.pdf | ||
| Project Manual 101920.pdf | ||
| Drawing 12.pdf | ||
| Past Performance Questionnaire.pdf | ||
| Drawing 8.pdf | ||
| Drawing 3.pdf | ||
| GSA527.pdf | ||
| Drawing 11.pdf | ||
| Drawing 10.pdf | ||
| Drawing 9.pdf | ||
| Drawing 2.pdf |
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
R10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
AM #01
7PQC-DA
Brenna Lanphear
This amendment is being issues to answer some of the RFIs submitted for the Chavez Switchgear project in Albuquerque, NM.
There are remaining technical questions which will be answered in another amendment. The proposal due date is extended from 6/24/2022 at 4:00PM CST to 7/7/2022 at 4:00PM CST.
All other terms and conditions remain unchanged.
ACQUISITION MANAGEMENT DIVISION
ACQUISITION NON-PROSPECTUS
1100 Commerce Street, Suite 720 DALLAS, TX 75242-0198 United States
Same as block #6
EQ7PACS-22-0049
47PH0622R0018
3221406/16/2022
05/23/2022
PAGE OF PAGES
1 3
1.) Technical Proposal – Past Experience: May respondents submit Project Detail/Description
Profiles with Final CPAR reports in lieu of Past Performance Questionnaires?
Answer: Yes, we will accept Final CPARs in lieu of the Past Performance Questionnaire (PPQ);
however, the CPAR must meet the same project criteria as the PPQ in terms of scope, magnitude, recency, etc.
2.) Technical Proposal – Past Experience: May respondents submit previously received Past
Performance Questionnaires if the government personnel involved in the project have since retired? Also, the statement made in the INSTRUCTIONS paragraph suggests that previously completed PPQs may be used for future GSA/PBS solicitations. Please confirm that previously received PPQs may be used for this solicitation.
Answer: Yes, the offeror may submit previously received PPQs; however, the Government must be able to verify the PPQ was completed by the client listed on the PPQ. Whether the PPQ is submitted by the client or the offeror, the Government must verify the completion of the PPQ by the client.
3.) Technical Proposal – Past Experience and Past Performance: May respondents include projects that are currently more than 90% complete and/or projects that will be substantially complete within 30 days of the proposal due date providing that they meet all other “Recent” and
“Relevant” criteria?
Answer: No, the project must be 100% complete at the time the solicitation closes.
4.) Technical Proposal – Past Performance: Is there a proposal deliverable for this section beyond the PPQ and/or CPAR?
Answer: No, the Government will review the CPAR records through the Government website as part of the past performance review. If the offeror is utilizing a CPAR in lieu of the PPQ for the past experience section, please include the final CPAR with the proposal submission. As with the
PPQ, the Government will verify the CPAR submitted; however, the CPAR will be verified through the Government’s past performance database.
5.) Page 8 of 26 of the solicitation section (1) Past Experience states, “The Past Performance
Questionnaires shall be completed by the reference and submitted to the Contracting Officer by the reference.” However, on the Past Performance Questionnaire itself under INSTRUCTIONS
FOR CLIENTS COMPLETING THIS QUESTIONNAIRE, it states, “PBS requests that the client completes this questionnaire and submits it directly back to the offeror. The offeror will submit the completed questionnaire to PBS with their proposal and may duplicate this questionnaire for future submission on PBS solicitation.” Please clarify which is the case.
Answer: The client shall complete the PPQ and return it to the offeror. The offeror shall include the PPQs received with the proposal. The client is not required to submit the PPQ directly to the
Contracting Officer.
6.) For Section 3, Key Personnel, what does the government mean by “on-site lead”?
Answer: Since this project is mostly electrical in nature, the on-site lead would be the head electrician working on the project (i.e., journeyman, master electrician, electrical engineer, etc.).
The same individual may be utilized for both the superintendent and on-site lead if they would be filling both roles on the project.
7.) Would it be possible to get a copy of the sign in sheet from the job walk on Monday?
Answer: The sign in sheet will be provided when the project manager returns to the office.