Bid_Schedule.xlsx
XLSX spreadsheet 41 KB Posted
- Attached to
- Siding Replacement Federal contract opportunity
- Solicitation number
- 140P6426B0003
About this file
This is a Bid Schedule containing an Independent Government Cost Estimate for the Indiana Dunes National Park Head Quarters Siding and Roof Replacement project (PMIS Building 304973), organized into three main bid packages: a base bid for siding replacement and a two additive items for roof and window replacement. The project involves three buildings: B-101 (Ranger Station), B-104 (Headquarters), and B-105 (Pump House), all located in Porter, Indiana.
The base bid siding work includes demolition and replacement of existing T1-11 siding with fiber cement siding on all three buildings, with scope including 10% OSB replacement, 10% stud replacement to maintain 16-inch maximum clearance, 1-inch insulation and weather barrier installation, and 25% window sill and surrounding wood trim replacement. Quantities are: B-101 at 3,850 square feet, B-104 at 6,383 square feet, and B-105 at 1,017 square feet, plus 728 square feet of concrete tank surface preparation and painting. Bid-Additive 1 covers EPDM flat roof installation on B-101 (4,954 square feet) and B-105 (586 square feet), including new gutters, metal flashing, fascia replacement, and estimated 10% decking and 10% roof framing replacement. Bid-Additive 2 addresses window replacement: 9 windows in Building 101 (varying sizes from 25x44 to 65x45) and 13 windows in Building 104 (primarily 37x42 with one 37x36), all including frame replacement, caulking, and painting. The bid schedule is structured with labor, material, and equipment line items, though all prices are shown as zero, indicating this is a government cost estimate template for contractor pricing. The schedule notes that contractors must verify all quantities and dimensions to ensure complete project coverage.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P6426B0003_Amd_0002.pdf | ||
| Questons_and_Answers__2_0002.pdf | ||
| Revised_Specifications_0002.pdf | ||
| Questions_and_Answers_0001.pdf | ||
| Revised_Bid_Schedule_0001.xlsx | XLSX spreadsheet | |
| Sol_140P6426B0003_Amd_0001.pdf | ||
| Sol_140P6426B0003.pdf | ||
| Specifications.pdf | ||
| Limitations_on_Subcontracting_Report.xlsx | XLSX spreadsheet | |
| Notice_to_Contractors.pdf | ||
| DOL_Wage_Determination.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary
| UNITED STATES DEPARTMENT OF THE INTERIOR | |||||
| National Park Services | |||||
| Indiana Dunes National Park | |||||
| Head Quarters Siding and Roof Replacement | |||||
| Independent Governement Cost Estimate (B-101, B104 & B-105) | |||||
| PMIS | Building | Building No | Task | Line Item Totals | Comments |
| 304973 (Base) | Ranger Station | B-101 | Replace existing T1-11 Siding with Fiber Cement Siding. | $ - 0 | (B-101, B-104, B-105) Replace existing T1-11 Siding with Fiber Cement Siding. Demolition and disposal shall be included within this line item. Estimate 10% OSB to be replace per building. Also add another 10% for studs to maintain a max clearance between studs not greater than 16" for proper siding installation. Include 1" of insulation and weather barrier for the entire building. | |
| Headquarters | B-104 | Replace existing T1-11 Siding with Fiber Cement Siding | ||||
| Pump House | B-105 | Replace existing T1-11 Siding with Fiber Cement Siding. | ||||
| 304973 (Bid-Additive 1) | Ranger Station & Pump House Roof Replacement - Additive 1 | |||||
| (Greater Priority Additive Item) | B-101 & B-105 | Replace EPDM Roof. | $ - 0 | Install New EPDM Flat Roof on B-101 Ranger Station (Include Gutters). (See Specifications and Pictures) Install metal flashing, boots, and replace fascia and any rotten or damaged decking. Estimate 10% decking to be replace per building add another 10% to replace any damage or rotten roof framing. Install New EPDM Flat Roof on B-105 Pump House (Include Gutters). (See Specifications and Pictures) Install metal flashing, boots, and replace fascia and any rotten or damaged decking. Estimate 10% decking to be replace per building add another 10% to replace any damage or rotten roof framing. | ||
| 304973 (Bid-Additive 2) | Headquarters & Ranger Station Windows Replacement - Additive 2 | B-104 | Replace Windows | $ - 0 | Building 101: Replace Windows and rotten wood frame, & (windows wood sides, top and sill) (9 Windows in total) (Two - 65x45, Two - 26x49, One-39x49, Two-36x42 and Two-25x44), Include caulking and painting. Building 104: Replace Windows and rotten wood frame, & (windows wood sides, top and sill) (9 Windows in total) (Twelve - 37x42, and One - 37x36), Include caulking and painting. |
Grand Total --> $ - 0
Base-Bid Schedule Siding
| UNITED STATES DEPARTMENT OF THE INTERIOR | ||||||||||||||
| National Park Services | ||||||||||||||
| Indiana Dunes National Park | ||||||||||||||
| Head Quarters Siding and Roof Replacement | ||||||||||||||
| Independent Governement Cost Estimate (B-101, B104 & B-105) | ||||||||||||||
| DESCRIPTION | LABOR | MATERIAL | EQUIPMENT | SUB-TOTAL | ||||||||||
| ITEM NO. | DESCRIPTION | QNTY* | UNITS | PRICE | AMOUNT | QNTY | UNITS | PRICE | AMOUNT | QNTY | UNITS | PRICE | AMOUNT |
| 1 | Mobilization | 1 | LS | $ - 0 | $ - 0 | 1 | LS | $ - 0 | $ - 0 | 1 | LS | $ - 0 | $ - 0 | $ - 0 |
| 2 | B-101 - Ranger Station, Replace existing T1-11 Siding with Fiber Cement Siding. Demolition and disposal shall be included within this line item. Estimate 10% OSB to be replace per building. Also add another 10% for studs to maintain a max clearance between studs not greater than 16" for proper siding installation. Include 1" of insulation and weather barrier for the entire building. Included 25% of the Windows sill and surrounding windows wood trim to be replace. | 3850 | Area (S.F) | $ - 0 | $ - 0 | 3850 | Area (S.F) | $ - 0 | $ - 0 | 1 | LS | $ - 0 | $ - 0 | $ - 0 |
| 3 | B-104 - Headquarters: Replace existing T1-11 Siding with Fiber Cement Siding. Demolition and disposal shall be included within this line item. Estimate 10% OSB to be replace per building. Also add another 10% for studs to maintain a max clearance between studs not greater than 16" for proper siding installation. Include 1" of insulation and weather barrier for the entire building. Include repair and pinting of concrete walls. Included 25% of the Windows sill and surrounding windows wood trim to be replace. | 6383 | Area (S.F) | $ - 0 | $ - 0 | 6383 | Area (S.F) | $ - 0 | $ - 0 | 1 | LS | $ - 0 | $ - 0 | $ - 0 |
| 4 | B-105 - Pump House, Replace existing T1-11 Siding with Fiber Cement Siding. Demolition and disposal shall be included within this line item. Estimate 10% OSB to be replace per building. Also add another 10% for studs to maintain a max clearance between studs not greater than 16" for proper siding installation. Include 1" of insulation and weather barrier for the entire building. Include repair and pinting of concrete walls. Included 25% of the Windows sill and surrounding windows wood trim to be replace. | 1017 | Area (S.F) | $ - 0 | $ - 0 | 1017 | Area (S.F) | $ - 0 | $ - 0 | 1 | LS | $ - 0 | $ - 0 | $ - 0 |
| 5 | B-105 - Pump House, Prepare surface and paint concrete tank surface area (17' x 30') Height (2'-10") | 728 | Area (S.F) | $ - 0 | $ - 0 | 728 | Area (S.F) | $ - 0 | $ - 0 | 1 | LS | $ - 0 | $ - 0 | $ - 0 |
| 6 | SUBTOTAL | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| * All the quantities and dimensions have been estimated. Is responsibility of the contractor to verify all the quantities and dimensions to provide a bid that will cover the completion of the entire project. | ||||||||
| CD = | CREW PER DAY | Sub-Total = | $ - 0 | |||||
| LS = | LUMP SUM | Bid Bond (%) = | 0.00% | $ - 0 | ||||
| LF = | LINEAR FEET | Contracting Method Adjustment (%) | 0% | $ - 0 | ||||
| SF = | SQUARE FOOT | Overhead (%) | 0% | $ - 0 | ||||
| Profit (%) | 0% | $ - 0 |
Grand Total = $ - 0
&Z&F Printed: &D &T
Bid-Additive 1 Roof
| UNITED STATES DEPARTMENT OF THE INTERIOR | ||||||||||||||
| National Park Services | ||||||||||||||
| Indiana Dunes National Park | ||||||||||||||
| Head Quarters / Custodial Services - Roof Replacement | ||||||||||||||
| Independent Governement Cost Estimate Building B101 & B105 (Roof - Additive 1) | ||||||||||||||
| DESCRIPTION | LABOR | MATERIAL | EQUIPMENT | SUB-TOTAL | ||||||||||
| ITEM NO. | DESCRIPTION | QNTY* | UNITS | PRICE | AMOUNT | QNTY | UNITS | PRICE | AMOUNT | QNTY | UNITS | PRICE | AMOUNT |
| 1 | Mobilization | 1 | LS | $ - 0 | $ - 0 | 1 | LS | $ - 0 | $ - 0 | 1 | LS | $ - 0 | $ - 0 | $ - 0 |
| 2 | Demolition: Removal and disposal of the existing roof B-108. | 1 | LS | $ - 0 | $ - 0 | 1 | LS | $ - 0 | $ - 0 | 1 | LS | $ - 0 | $ - 0 | $ - 0 |
| 3 | Install New EPDM Flat Roof on B-101 Ranger Station (Include Gutters). (See Specifications and Pictures) Install metal flashing, boots, and replace fascia and any rotten or damaged decking. Estimate 10% decking to be replace per building add another 10% to replace any damage or rotten roof framing. | 4954 | SF | $ - 0 | $ - 0 | 4954 | SF | $ - 0 | $ - 0 | 1 | LS | $ - 0 | $ - 0 | $ - 0 |
| 4 | Replace Vinyl Soffit B-101 with same material and shape. Seal all sorrounding to avoid bug intrusion. | 700 | LF | $ - 0 | $ - 0 | 700 | SF | $ - 0 | $ - 0 | 1 | LS | $ - 0 | $ - 0 | $ - 0 |
| 5 | Install New EPDM Flat Roof on B-105 Pump House (Include Gutters). (See Specifications and Pictures) Install metal flashing, boots, and replace fascia and any rotten or damaged decking. Estimate 10% decking to be replace per building add another 10% to replace any damage or rotten roof framing. | 586 | LS | $ - 0 | $ - 0 | 586 | LS | $ - 0 | $ - 0 | 1 | LS | $ - 0 | $ - 0 | $ - 0 |
| 1 | SUBTOTAL | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| * All the quantities and dimensions have been estimated. Is responsibility of the contractor to verify all the quantities and dimensions to provide a bid that will cover the completion of the entire project. | ||||||||
| CD = | CREW PER DAY | Sub-Total = | $ - 0 | |||||
| LS = | LUMP SUM | Bid Bond (%) = | 0.00% | $ - 0 | ||||
| LF = | LINEAR FEET | Contracting Method Adjustment (%) | 0% | $ - 0 | ||||
| SF = | SQUARE FOOT | Overhead (%) | 0% | $ - 0 | ||||
| Profit (%) | 0% | $ - 0 |
Grand Total = $ - 0
Bid-Additive 2 Windows
| UNITED STATES DEPARTMENT OF THE INTERIOR | ||||||||||||||
| National Park Services | ||||||||||||||
| Indiana Dunes National Park | ||||||||||||||
| Head Quarters / Custodial Services - Roof Replacement | ||||||||||||||
| Independent Governement Cost Estimate Building 101 & 105 (Windows - Addtive 2) | ||||||||||||||
| DESCRIPTION | LABOR | MATERIAL | EQUIPMENT | SUB-TOTAL | ||||||||||
| ITEM NO. | DESCRIPTION | QNTY* | UNITS | PRICE | AMOUNT | QNTY | UNITS | PRICE | AMOUNT | QNTY | UNITS | PRICE | AMOUNT |
| 1 | Mobilization | 1 | LS | $ - 0 | $ - 0 | 1 | LS | $ - 0 | $ - 0 | 1 | LS | $ - 0 | $ - 0 | $ - 0 |
| 2 | Demolition: Removal and disposal of the existing windows. (B101 & B105) | 1 | LS | $ - 0 | $ - 0 | 1 | LS | $ - 0 | $ - 0 | 1 | LS | $ - 0 | $ - 0 | $ - 0 |
| 3 | Building 101: Replace Windows and rotten wood frame, & (windows wood sides, top and sill) (9 Windows in total) (Two - 65x45, Two - 26x49, One-39x49, Two-36x42 and Two-25x44), Include caulking and painting. | 9 | EA | $ - 0 | $ - 0 | 9 | LS | $ - 0 | $ - 0 | 1 | LS | $ - 0 | $ - 0 | $ - 0 |
| 4 | Building 104: Replace Windows and rotten wood frame, & (windows wood sides, top and sill) (13 Windows in total) (Twelve - 37x42, and One - 37x36), Include caulking and painting. | 13 | EA | $ - 0 | $ - 0 | 13 | LS | $ - 0 | $ - 0 | 1 | LS | $ - 0 | $ - 0 | $ - 0 |
| 1 | SUBTOTAL | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| * All the quantities and dimensions have been estimated. Is responsibility of the contractor to verify all the quantities and dimensions to provide a bid that will cover the completion of the entire project. | ||||||||
| CD = | CREW PER DAY | Sub-Total = | $ - 0 | |||||
| LS = | LUMP SUM | Bid Bond (%) = | 0.00% | $ - 0 | ||||
| LF = | LINEAR FEET | Contracting Method Adjustment (%) | 0% | $ - 0 | ||||
| SF = | SQUARE FOOT | Overhead (%) | 0% | $ - 0 | ||||
| Profit (%) | 0% | $ - 0 |
Grand Total = $ - 0 image1.png