Revised_Bid_Schedule_0001.xlsx
XLSX spreadsheet 41 KB Posted
- Attached to
- Siding Replacement Federal contract opportunity
- Solicitation number
- 140P6426B0003
About this file
This is a Revised Bid Schedule (Independent Government Cost Estimate) for a siding and roof replacement project at Indiana Dunes National Park in Porter, Indiana. The document provides detailed bid line items and quantities for three primary scope areas: siding replacement across three buildings (B-101 Ranger Station, B-104 Headquarters, and B-105 Pump House), roof replacement as Option 1 for Buildings B-101 and B-105, and window replacement as Option 2 for Buildings B-101 and B-104. The siding work includes demolition and disposal of existing T1-11 siding, replacement with fiber cement siding, OSB and stud replacement (estimated at 10% each), installation of 1-inch insulation and weather barrier, and concrete wall repair and painting for certain buildings. Square footage quantities specified are 3,850 SF for B-101, 6,383 SF for B-104, 1,017 SF for B-105, and 728 SF for concrete tank surface preparation and painting at the pump house.
The roof replacement option (Option 1) involves EPDM flat roof installation with gutters, metal flashing, boots, fascia, and decking replacement (estimated 10% decking and 10% roof framing replacement) for the Ranger Station (4,954 SF) and Pump House (586 SF units), along with vinyl soffit replacement (700 LF) at B-101. The window replacement option (Option 2) specifies replacement of nine windows at the Ranger Station with dimensions ranging from 25x44 to 65x45 inches, and thirteen windows at Headquarters with dimensions of 37x42 and 37x36 inches, including rotten wood frame replacement, caulking, and painting. The solicitation is a firm-fixed price contract set aside 100% for Total Small Businesses under NAICS code 236220 with a project magnitude between $500,000 and $1,000,000, and Construction Wage Rate Requirements for Porter County, Indiana will apply. All line item prices and totals in the bid schedule are currently shown as $0, indicating this is a blank template for contractor pricing submissions.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P6426B0003_Amd_0002.pdf | ||
| Questons_and_Answers__2_0002.pdf | ||
| Revised_Specifications_0002.pdf | ||
| Questions_and_Answers_0001.pdf | ||
| Sol_140P6426B0003_Amd_0001.pdf | ||
| Sol_140P6426B0003.pdf | ||
| Specifications.pdf | ||
| Limitations_on_Subcontracting_Report.xlsx | XLSX spreadsheet | |
| Notice_to_Contractors.pdf | ||
| Bid_Schedule.xlsx | XLSX spreadsheet | |
| DOL_Wage_Determination.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary
| UNITED STATES DEPARTMENT OF THE INTERIOR | |||||
| National Park Services | |||||
| Indiana Dunes National Park | |||||
| Head Quarters Siding and Roof Replacement | |||||
| Independent Governement Cost Estimate (B-101, B104 & B-105) | |||||
| PMIS | Building | Building No | Task | Original IGCE | Comments |
| 304973 | Ranger Station | B-101 | Replace existing T1-11 Siding with Fiber Cement Siding. | $ - 0 | (B-101, B-104, B-105) Replace existing T1-11 Siding with Fiber Cement Siding. Demolition and disposal shall be included within this line item. Estimate 10% OSB to be replace per building. Also add another 10% for studs to maintain a max clearance between studs not greater than 16" for proper siding installation. Include 1" of insulation and weather barrier for the entire building. |
| Head Quarters | B-104 | Replace existing T1-11 Siding with Fiber Cement Siding | |||
| Pump House | B-105 | Replace existing T1-11 Siding with Fiber Cement Siding. | |||
| 304973 (Option 1) | Ranger Station & Pump House Roof Replacement - Option 1 | B-101 & B-105 | Replace EPDM Roof. | $ - 0 | Install New EPDM Flat Roof on B-101 Ranger Station (Include Gutters). (See Specifications and Pictures) Install metal flashing, boots, and replace fascia and any rotten or damaged decking. Estimate 10% decking to be replace per building add another 10% to replace any damage or rotten roof framing. Install New EPDM Flat Roof on B-105 Pump House (Include Gutters). (See Specifications and Pictures) Install metal flashing, boots, and replace fascia and any rotten or damaged decking. Estimate 10% decking to be replace per building add another 10% to replace any damage or rotten roof framing. |
| 304973 (Option 2) | Head Quarters & Ranger Station Windows Replacement - Option 2 | B-104 | Replace Windows | $ - 0 | Building 101: Replace Windows and rotten wood frame, & (windows wood sides, top and sill) (9 Windows in total) (Two - 65x45, Two - 26x49, One-39x49, Two-36x42 and Two-25x44), Include caulking and painting. Building 104: Replace Windows and rotten wood frame, & (windows wood sides, top and sill) (9 Windows in total) (Twelve - 37x42, and One - 37x36), Include caulking and painting. |
Grand Total --> $ - 0
Bid Schedule Siding
| UNITED STATES DEPARTMENT OF THE INTERIOR | ||||||||||||||
| National Park Services | ||||||||||||||
| Indiana Dunes National Park | ||||||||||||||
| Head Quarters Siding Replacement | ||||||||||||||
| Independent Governement Cost Estimate (B-101, B104 & B-105) | ||||||||||||||
| DESCRIPTION | LABOR | MATERIAL | EQUIPMENT | SUB-TOTAL | ||||||||||
| ITEM NO. | DESCRIPTION | QNTY* | UNITS | PRICE | AMOUNT | QNTY | UNITS | PRICE | AMOUNT | QNTY | UNITS | PRICE | AMOUNT |
| 1 | Mobilization | 1 | LS | $ - 0 | $ - 0 | 1 | LS | $ - 0 | $ - 0 | 1 | LS | $ - 0 | $ - 0 | $ - 0 |
| 2 | B-101 - Ranger Station, Replace existing T1-11 Siding with Fiber Cement Siding. Demolition and disposal shall be included within this line item. Estimate 10% OSB to be replace per building. Also add another 10% for studs to maintain a max clearance between studs not greater than 16" for proper siding installation. Included 25% of the Windows sill and surrounding windows wood trim to be replace. | 3850 | Area (S.F) | $ - 0 | $ - 0 | 3850 | Area (S.F) | $ - 0 | $ - 0 | 1 | LS | $ - 0 | $ - 0 | $ - 0 |
| 3 | B-104 - Headquarters: Replace existing T1-11 Siding with Fiber Cement Siding. Demolition and disposal shall be included within this line item. Estimate 10% OSB to be replace per building. Also add another 10% for studs to maintain a max clearance between studs not greater than 16" for proper siding installation. Include 1" of insulation and weather barrier for the entire building. Include repair and pinting of concrete walls. Included 25% of the Windows sill and surrounding windows wood trim to be replace. | 6383 | Area (S.F) | $ - 0 | $ - 0 | 6383 | Area (S.F) | $ - 0 | $ - 0 | 1 | LS | $ - 0 | $ - 0 | $ - 0 |
| 4 | B-105 - Pump House, Replace existing T1-11 Siding with Fiber Cement Siding. Demolition and disposal shall be included within this line item. Estimate 10% OSB to be replace per building. Also add another 10% for studs to maintain a max clearance between studs not greater than 16" for proper siding installation. Include 1" of insulation and weather barrier for the entire building. Include repair and pinting of concrete walls. Included 25% of the Windows sill and surrounding windows wood trim to be replace. | 1017 | Area (S.F) | $ - 0 | $ - 0 | 1017 | Area (S.F) | $ - 0 | $ - 0 | 1 | LS | $ - 0 | $ - 0 | $ - 0 |
| 5 | B-105 - Pump House, Prepare surface and paint concrete tank surface area (17' x 30') Height (2'-10") | 728 | Area (S.F) | $ - 0 | $ - 0 | 728 | Area (S.F) | $ - 0 | $ - 0 | 1 | LS | $ - 0 | $ - 0 | $ - 0 |
| 6 | SUBTOTAL | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| * All the quantities and dimensions have been estimated. Is responsibility of the contractor to verify all the quantities and dimensions to provide a bid that will cover the completion of the entire project. | ||||||||
| CD = | CREW PER DAY | Sub-Total = | $ - 0 | |||||
| LS = | LUMP SUM | Bid Bond (%) = | 0.00% | $ - 0 | ||||
| LF = | LINEAR FEET | Contracting Method Adjustment (%) | 0% | $ - 0 | ||||
| SF = | SQUARE FOOT | Overhead (%) | 0% | $ - 0 | ||||
| Profit (%) | 0% | $ - 0 |
Grand Total = $ - 0
&Z&F Printed: &D &T
Option 1 Roof
| UNITED STATES DEPARTMENT OF THE INTERIOR | ||||||||||||||
| National Park Services | ||||||||||||||
| Indiana Dunes National Park | ||||||||||||||
| Ranger Station & Pumphouse - Roof Replacement | ||||||||||||||
| Independent Governement Cost Estimate Building B101 & B105 (Roof - Option 1) | ||||||||||||||
| DESCRIPTION | LABOR | MATERIAL | EQUIPMENT | SUB-TOTAL | ||||||||||
| ITEM NO. | DESCRIPTION | QNTY* | UNITS | PRICE | AMOUNT | QNTY | UNITS | PRICE | AMOUNT | QNTY | UNITS | PRICE | AMOUNT |
| 1 | Mobilization | 1 | LS | $ - 0 | $ - 0 | 1 | LS | $ - 0 | $ - 0 | 1 | LS | $ - 0 | $ - 0 | $ - 0 |
| 2 | Demolition: Removal and disposal of the existing roof B-101 & B-105 | 1 | LS | $ - 0 | $ - 0 | 1 | LS | $ - 0 | $ - 0 | 1 | LS | $ - 0 | $ - 0 | $ - 0 |
| 3 | Install New EPDM Flat Roof on B-101 Ranger Station (Include Gutters). (See Specifications and Pictures) Install metal flashing, boots, and replace fascia and any rotten or damaged decking. Estimate 10% decking to be replace per building add another 10% to replace any damage or rotten roof framing. | 4954 | SF | $ - 0 | $ - 0 | 4954 | SF | $ - 0 | $ - 0 | 1 | LS | $ - 0 | $ - 0 | $ - 0 |
| 4 | Replace Vinyl Soffit B-101 with same material and shape. Seal all sorrounding to avoid bug intrusion. | 700 | LF | $ - 0 | $ - 0 | 700 | SF | $ - 0 | $ - 0 | 1 | LS | $ - 0 | $ - 0 | $ - 0 |
| 5 | Install New EPDM Flat Roof on B-105 Pump House (Include Gutters). (See Specifications and Pictures) Install metal flashing, boots, and replace fascia and any rotten or damaged decking. Estimate 10% decking to be replace per building add another 10% to replace any damage or rotten roof framing. | 586 | LS | $ - 0 | $ - 0 | 586 | LS | $ - 0 | $ - 0 | 1 | LS | $ - 0 | $ - 0 | $ - 0 |
| 1 | SUBTOTAL | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| * All the quantities and dimensions have been estimated. Is responsibility of the contractor to verify all the quantities and dimensions to provide a bid that will cover the completion of the entire project. | ||||||||
| CD = | CREW PER DAY | Sub-Total = | $ - 0 | |||||
| LS = | LUMP SUM | Bid Bond (%) = | 0.00% | $ - 0 | ||||
| LF = | LINEAR FEET | Contracting Method Adjustment (%) | 0% | $ - 0 | ||||
| SF = | SQUARE FOOT | Overhead (%) | 0% | $ - 0 | ||||
| Profit (%) | 0% | $ - 0 |
Grand Total = $ - 0
Option 2 Windows
| UNITED STATES DEPARTMENT OF THE INTERIOR | ||||||||||||||
| National Park Services | ||||||||||||||
| Indiana Dunes National Park | ||||||||||||||
| Head Quarters /Ranger Station - Window Replacement | ||||||||||||||
| Independent Governement Cost Estimate Building 101 & 105 (Windows - Option 2) | ||||||||||||||
| DESCRIPTION | LABOR | MATERIAL | EQUIPMENT | SUB-TOTAL | ||||||||||
| ITEM NO. | DESCRIPTION | QNTY* | UNITS | PRICE | AMOUNT | QNTY | UNITS | PRICE | AMOUNT | QNTY | UNITS | PRICE | AMOUNT |
| 1 | Mobilization | 1 | LS | $ - 0 | $ - 0 | 1 | LS | $ - 0 | $ - 0 | 1 | LS | $ - 0 | $ - 0 | $ - 0 |
| 2 | Demolition: Removal and disposal of the existing windows. (B-101 & B-104) | 1 | LS | $ - 0 | $ - 0 | 1 | LS | $ - 0 | $ - 0 | 1 | LS | $ - 0 | $ - 0 | $ - 0 |
| 3 | Building 101: Replace Windows and rotten wood frame, & (windows wood sides, top and sill) (9 Windows in total) (Two - 65x45, Two - 26x49, One-39x49, Two-36x42 and Two-25x44), Include caulking and painting. | 9 | EA | $ - 0 | $ - 0 | 9 | LS | $ - 0 | $ - 0 | 1 | LS | $ - 0 | $ - 0 | $ - 0 |
| 4 | Building 104: Replace Windows and rotten wood frame, & (windows wood sides, top and sill) (13 Windows in total) (Twelve - 37x42, and One - 37x36), Include caulking and painting. | 13 | EA | $ - 0 | $ - 0 | 13 | LS | $ - 0 | $ - 0 | 1 | LS | $ - 0 | $ - 0 | $ - 0 |
| 1 | SUBTOTAL | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| * All the quantities and dimensions have been estimated. Is responsibility of the contractor to verify all the quantities and dimensions to provide a bid that will cover the completion of the entire project. | ||||||||
| CD = | CREW PER DAY | Sub-Total = | $ - 0 | |||||
| LS = | LUMP SUM | Bid Bond (%) = | 0.00% | $ - 0 | ||||
| LF = | LINEAR FEET | Contracting Method Adjustment (%) | 0% | $ - 0 | ||||
| SF = | SQUARE FOOT | Overhead (%) | 0% | $ - 0 | ||||
| Profit (%) | 0% | $ - 0 |
Grand Total = $ - 0 image1.png
File details come from the government source that posted it. Updated .