About this file

The document is a Bid Form for the Midwest City Library Chiller Replacement project, issued by the Metropolitan Library System in Oklahoma County. The bid calls for the replacement of the existing chiller system, with a specified completion and testing deadline of March 1, 2023. The bidder is required to enter into a contract within 10 days of bid acceptance and must accomplish the work in accordance with the provided Bidding Documents.

The bid includes a base bid amount and an alternate bid (Alternate 1) for additional scope, which involves replacing existing pumps, expansion tank, and other components as described in the drawings. The document emphasizes that time is of the essence for this project, and the bidder must comply with the provisions outlined in the Bidding Documents. Specific dollar amounts for the base bid and alternate are to be filled in by the bidding contractor, allowing for competitive pricing and flexibility in the project's implementation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Metropolitan Library System Midwest City Library Chiller Replacement

BID FORM-Revised

DATE , 2023

PROJECT Midwest City Chiller Replacement

PROPOSAL OF

hereinafter called "Bidder", a (corporation) (partnership) (sole proprietorship) (Bidder strike out inapplicable terms)

TO Metropolitan Library System – Oklahoma County (hereinafter called "Owner")

The undersigned, in compliance with your Advertisement for Bids, submits the following Bid.

1.1 REPRESENTATIONS

A. Bidder will accept the provisions of the Bidding Documents.

B. Bidder will enter into and execute a contract with the Owner within 10 days after notification of the acceptance of this Bid.

C. Bidder shall accomplish the Work in accordance with the Bidding Documents.

1.2 TIME OF COMPLETION

A. The contractor is advised that time is of the essence.

B. Bidder will achieve Completion and Testing by Monday March 1, 2023.

1.3 BID AMOUNTS

A. Base Bid Amount: Bidder proposes to construct this project for the stipulated sum of:

Dollars ( )

B. Alternate 1: Replace existing pumps, expansion tank, new air separator and any other scope described in the drawings:

Bidder proposes to construct this project for the stipulated sum of

Dollars( )

Metropolitan Library System Midwest City Library Chiller Replacement
BID FORM-Revised
PROJECT Midwest City Chiller Replacement
PROPOSAL OF
1.1 REPRESENTATIONS
1.2 TIME OF COMPLETION
1.3 BID AMOUNTS