Bid_Form.pdf

PDF 216 KB Posted

Attached to
Timberlin Golf Course Sand Bunker Restoration Project
Solicitation number
2025-24
Issued by
Hartford County, Connecticut

About this file

This document is a Contractor Bid Sheet for the Timberlin Golf Course Sand Bunker Restoration Project in Connecticut. The bid provides two primary scenarios for golf course renovation: Scenario 'A' covering all 18 holes and Scenario 'B' focusing only on greenside sand bunkers. The project involves comprehensive golf course infrastructure improvements, including rebuilding/removing 51 sand bunkers (Scenario 'A') or 30 sand bunkers (Scenario 'B'), installing drainage systems, placing bunker sand, sodding fairways and rough areas, and relocating irrigation heads. The bid sheet includes detailed specifications for each project element, with estimated quantities for items such as silt fencing, drainage pipes, catch basins, gravel sumps, and sodding.

The bid sheet includes additional qualification requirements for contractors, mandating a minimum of five years of golf course construction experience and completion of at least 30 sand bunker constructions in the past three years. Contractors must also have experience installing Capillary Concrete liners in sand bunkers. The document includes spaces for contractors to list previous golf course projects, references, and sub-contractors. An "Add/Alternates" section provides options for additional work, such as installing drainage pipes, catch basins, and fairway sodding on specific holes. The bid is set at prevailing wage rates, and Timberlin Golf Course reserves the right to reject or accept any part or all of the bid.

View the file

Other files

File Type Posted
Timberlin_Golf_Course_Sand_Bunker_Restoration_Project.pdf PDF
Bid_Details.pdf PDF
Prevailing_Wage_Rates_(Heavy).pdf PDF
Installation_Instructions.pdf PDF
2025-24_Drawings.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor's Name ____________________________________________________________________

TIMBERLIN GOLF COURSE

SAND BUNKER RESTORATION PROJECT

CONTRACTOR BID SHEET

The undersigned proposes to construct the following items according to the Plans, Specifications, Construction Details and Field Design of Golf Design Unlimited. The

Contractor shall furnish all material and shall provide all labor, approved equipment, and services and shall include all and any sales tax if applicable, overhead and profit and complete all work for the Unit Prices below.

Timberlin GC reserves the right to reject or accept any part of or all of any bid. The bid will be

PREVAILING WAGE.

SCENARIO ‘A’ – All 18 Holes

Estimated Unit

Estimated

Item Item Description Quantity Price Bid

Total

100.0 - Silt Fence 300 l.f. _________

200.1 – Rebuild/New Sand Bunker 51 each _________

(1,070 s.f. avg. with average 70 l.f. perforated drainage inside and two 6” vents included)

200.2 – Remove Sand Bunker 10 each _________

300.1 – Sodding (Tall Turf Type Fescue for Rough) 120,000 s.f. _________

300.2 – Sodding (Bentgrass for Fairways) 1,000 s.f. _________

400.1 – 4” Non-perforated Drainage (from sand bunker) 1,515 l.f. _________

400.2 – 4” Perforated Drainage (outside of sand bunkers) 200 l.f. _________

400.3 – 12” Catch Basins 5 each _________

400.4 – Gravel Sump (4’ x 4’ x 4’) 17 each _________

500.1 – Load, Haul & Place Bunker Sand (54,000 s.f.) 1,400 ton _________

500.2 – Load, Haul & Place Topsoil (supplied by owner) 50 c.y. _________

500.3 – Load, Haul & Place Fill (supplied by owner) 50 c.y. _________

600.0 – Extra Shaping 3 hours _________

700.0 – Sand Bunker Irrigation (Hunter I-80’s) 55 heads _________

(paid per head re-used and moved including pipe)

Total Scenario ‘A’

(Above written in numbers)

(Above written in words)

SCENARIO ‘B’ – Greenside Sand Bunkers Only

Estimated

100.0 - Silt Fence 200 l.f. _________

200.1 – Rebuild/New Sand Bunker 30 each _________

(1,065 s.f. avg. with avg. 70’ perforated drainage inside and two 6” vents included)

200.2 – Remove Sand Bunker 3 each _________

300.1 – Sodding (Tall Turf Type Fescue for Rough) 70,000 s.f. _________

300.2 – Sodding (Bentgrass for Fairways) 1,000 s.f. _________

400.1 – 4” Non-perforated Drainage (from sand bunker) 890 l.f. _________

400.2 – 4” Perforated Drainage (outside of sand bunkers) 100 l.f. _________

400.3 – 12” Catch Basins 5 each _________

400.4 – Gravel Sump (4’ x 4’ x 4’) 10 each _________

500.1 – Load, Haul & Place Bunker Sand (33,000 s.f.) 855 ton _________

500.2 – Load, Haul & Place Topsoil (supplied by owner) 50 c.y. _________

500.3 – Load, Haul & Place Fill (supplied by owner) 50 c.y. _________

600.0 – Extra Shaping 3 hours _________

700.0 – Sand Bunker Irrigation (Hunter I-80’s) 25 heads _________

(paid per head re-used and moved including pipe)

Total Scenario ‘B’

(Above written in numbers)

______ (Above written in words)

Add/Alternates

Estimated

Add1.0 4” Solid Drainage Pipe 50 l.f. _________

Add2.0 4” Perforated Drainage Pipe 700 l.f. _________

Add3.0 12” Catch Basins 15 each _________

Add4.0 Gravel Sump (4’ x 4’ x 4’) 1 each _________

Add5.0 Install Fairway Sod (#3, 11, 16, 18) 53,000 s.f. _________

QUALIFICATION REQUIREMENTS FOR CONTRACTOR

Qualifications for the project the Contractor must meet: the Contractor shall have golf course construction experience with a minimum of five years. The Contractor must have completed start to finish construction of 30 (thirty) sand bunkers in the past 3 (three) years. The Contractor

MUST have experience installing Capillary Concrete liners in sand bunkers. The supervisor for this project must have the same experience. Make sure to fill out form concerning qualifications and submit with bid and do not include more info.

Contractor (submitting bid) _____________________________________________________

Please list golf courses where you have installed drainage and rebuilt sand bunkers:

Golf Course:_____________________________________________

Address:________________________________________________

Golf Course Architect:_____________________________________________

Contact at Course:_________________________________________

Golf Course:_____________________________________________

Address:________________________________________________

Golf Course Architect:_____________________________________________

Contact at Course:_________________________________________

The Contractor shall also list any important sub-contractors he will be using.

Sub-Contractor _____________________________________ phone ______________for

File details come from the government source that posted it. Updated .