The provided document is a set of construction drawings for the Timberlin Golf Course Sand Bunker Restoration Project, prepared by Golf Design Unlimited. The drawings detail proposed modifications to 18 individual golf course holes, with each page featuring a detailed schematic layout and an aerial photograph of the specific hole. The drawings include comprehensive technical specifications for sand bunker reconstruction, drainage systems, silt fence installation, and other course improvement elements. Each hole's drawing provides specific details such as sod quantities, perimeter measurements, drainage plans, and proposed changes to existing landscape features.
The technical drawings include precise engineering specifications for various golf course infrastructure elements. Notable details include sand bunker reconstruction with capillary concrete liners, drainage sump configurations, 4-inch drainage profile details, and silt fence installation methods. The drawings specify materials like sod quantities, perforated drain tiles, topsoil layers, and specific grading and contouring requirements. Each hole's design incorporates careful consideration of existing drainage patterns, vegetation removal, and new landscaping approaches. The documents are dated January 10, 2025, and were drawn by DS (likely a designer's initials), with revision dates of 4-1-25 and 4-1-25, suggesting recent updates to the original design plans.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Timberlin_Golf_Course_Sand_Bunker_Restoration_Project.pdf | ||
| Bid_Form.pdf | ||
| Bid_Details.pdf | ||
| Prevailing_Wage_Rates_(Heavy).pdf | ||
| Installation_Instructions.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Timberlin 8 Pro Final
6" N-12 Pipe
NEW & REBUILD SAND BUNKER DETAIL
with Capillary Concrete Liner (No Scale)
Min. 5'
Sod
Subsoil
Endcap
Subsoil Peagravel
Plastic Green Grate (6" Min.)
Sand (as above)
4" Perforated Drain Tile
6" Topsoil
4" Non-Perforated or Perforated Pipe to Drainage Sump, Ditch or Pond.
6" Topsoil
View of 8" N-12 Pipe w/ Grate
4" Tamped Sand
SEE
ENLARGEMENT
ABOVE
4" Perforated Drain Tile
6" - 12"
2"
12"
Subsoil
Sodded Slope
6" Topsoil 2" Capillary Concrete
2" Sand into Trench 4" Pea Gravel above Tile
SECTION 'A-A'
BUNKER PERIMETER
SODDED
(SEE SPECIFICATIONS)
Sod at 90 degree angle
Sod-- Minimum 2 Strips or Whole Area
Sand Capillary Concrete
(Under Sod & Under Sand)
0.5% Min. Fall
BB
A
A 6" Catch Basin 4' to 5' away from bunker edge
DRAIN TILE
PLAN VIEW
SECTION 'B-B'