2025-24_Drawings.pdf

PDF 5 MB Posted

Attached to
Timberlin Golf Course Sand Bunker Restoration Project
Solicitation number
2025-24
Issued by
Hartford County, Connecticut

About this file

The provided document is a set of construction drawings for the Timberlin Golf Course Sand Bunker Restoration Project, prepared by Golf Design Unlimited. The drawings detail proposed modifications to 18 individual golf course holes, with each page featuring a detailed schematic layout and an aerial photograph of the specific hole. The drawings include comprehensive technical specifications for sand bunker reconstruction, drainage systems, silt fence installation, and other course improvement elements. Each hole's drawing provides specific details such as sod quantities, perimeter measurements, drainage plans, and proposed changes to existing landscape features.

The technical drawings include precise engineering specifications for various golf course infrastructure elements. Notable details include sand bunker reconstruction with capillary concrete liners, drainage sump configurations, 4-inch drainage profile details, and silt fence installation methods. The drawings specify materials like sod quantities, perforated drain tiles, topsoil layers, and specific grading and contouring requirements. Each hole's design incorporates careful consideration of existing drainage patterns, vegetation removal, and new landscaping approaches. The documents are dated January 10, 2025, and were drawn by DS (likely a designer's initials), with revision dates of 4-1-25 and 4-1-25, suggesting recent updates to the original design plans.

View the file

Other files

File Type Posted
Timberlin_Golf_Course_Sand_Bunker_Restoration_Project.pdf PDF
Bid_Form.pdf PDF
Bid_Details.pdf PDF
Prevailing_Wage_Rates_(Heavy).pdf PDF
Installation_Instructions.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Timberlin 8 Pro Final

6" N-12 Pipe

NEW & REBUILD SAND BUNKER DETAIL

with Capillary Concrete Liner (No Scale)

Min. 5'

Sod

Subsoil

Endcap

Subsoil Peagravel

Plastic Green Grate (6" Min.)

Sand (as above)

4" Perforated Drain Tile

6" Topsoil

4" Non-Perforated or Perforated Pipe to Drainage Sump, Ditch or Pond.

6" Topsoil

View of 8" N-12 Pipe w/ Grate

4" Tamped Sand

SEE

ENLARGEMENT

ABOVE

4" Perforated Drain Tile

6" - 12"

2"

12"

Subsoil

Sodded Slope

6" Topsoil 2" Capillary Concrete

2" Sand into Trench 4" Pea Gravel above Tile

SECTION 'A-A'

BUNKER PERIMETER

SODDED

(SEE SPECIFICATIONS)

Sod at 90 degree angle

Sod-- Minimum 2 Strips or Whole Area

Sand Capillary Concrete

(Under Sod & Under Sand)

0.5% Min. Fall

BB

A

A 6" Catch Basin 4' to 5' away from bunker edge

DRAIN TILE

PLAN VIEW

SECTION 'B-B'

File details come from the government source that posted it. Updated .