BID_FORM.docx
DOCX document 21 KB Posted
- Attached to
- Bryant School Paving and Site Work
- Solicitation number
- BMB036263
- Issued by
- Fairfield County, Bridgeport City, Connecticut
About this file
This is a Bid Form document for the City of Bridgeport, Connecticut Department of Public Purchases soliciting bids for comprehensive paving and site work improvements at Bryant School located at 230 Poplar Street. The project includes demolition of existing playscape structures and perimeter fencing, site excavation and preparation, installation of approved subbase material, drainage system installation, repaving of asphalt lots with Class 1 asphalt per DOT specifications, demolition and engineering of a retaining wall (approximately 300 linear feet), walkway replacement by Poplar Street (approximately 47 by 4 feet), sidewalk replacement along Maplewood Avenue (approximately 175 by 10 feet), replacement of asphalt with concrete on Maplewood Avenue (approximately 45 by 8 feet), and perimeter fencing replacement of approximately 365 linear feet using eight-foot-high black-coated chain-link fence. Bidders must submit electronic bids through the City's OpenGov e-Procurement Portal by 2:00 pm Eastern Standard Time on Tuesday, March 24, 2026, with public opening occurring at the same time. A mandatory site walk-through is scheduled for Wednesday, February 25, 2026 at 10:00 am. The written question submission deadline is 2:00 pm on Monday, March 9, 2026. Work must be completed during the summer break period from June 23 through August 10, 2026.
The bid form requires contractors to submit a lump sum base bid plus four alternative bid prices for specific scope items. Contractors must obtain all permits and pay associated fees, identify all subcontractors with labor rates, and include lead time for equipment and supplies. A 10 percent bid bond or certified check is required if the bid is $50,000 or more. Connecticut prevailing wage rates must be included if the total bid exceeds $100,000. The successful bidder must post a 100 percent performance bond for contract prices of $50,000 or more and a 100 percent payment bond for contract prices exceeding $100,000. All pricing must remain firm and valid through October 30, 2026. Contractors must be established firms with a minimum of five years in business, maintain a local office with adequate inventory, employ trained personnel, and hold Connecticut licensure with all employees properly certified. Payment terms are Net 45 Days, and the City reserves the right to reject any or all bids, make awards to multiple bidders, or award not based solely on low bid.
View the file
Other files
Show all 47
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID FORM
Bid # BMB -BRYANT PAVING & SITEWORK
BASE BID:
Refer to Bid Documents Contractor shall include all monies and fees to complete the Work, including permits, bonds, equipment, standard warranty, freight, shipping and delivery charges, labor, installation, and or set-up costs, safety checks and all related materials. Contractor must obtain and pay for all permits. All sub-contractors must be identified and their labor rates submitted with bid, if applicable.
Lump Sum
____________________________________________________Dollars_______________________________Cents
ALTERNATE 1- Walkway Replacement by Poplar Street
____________________________________________________Dollars_______________________________Cents
ALTERNATE 2- Replacement of Sidewalk along Maplewood Avenue side of Bryant School
____________________________________________________Dollars_______________________________Cents
ALTERNATE 3- Maplewood Ave – Replacement of asphalt with concrete
____________________________________________________Dollars_______________________________Cents ALTERNATE 4- Add Privacy Slats to all fencing
____________________________________________________Dollars_______________________________Cents
PLEASE NOTE THAT STATE OF CONNECTICUT PREVAILING WAGES MUST BE USED IF TOTAL BID EXCEEDS $100,000.
LEAD TIME FOR EQUIPMENT & SUPPLIES
Please include the Number of Days to procure and deliver the material needed to complete the Work _______________________________days Note: Work to be completed during Summer Break June 23- August 10, 2026
Please attach a tentative schedule for the Work to this Bid Form
File details come from the government source that posted it. Updated .