About this file
The document is a Bid Form for the 2022 CDBG Street Improvements project in Plant City, Florida, issued by the local government. The project involves comprehensive street rehabilitation in the Forest Park neighborhoods, encompassing milling and resurfacing of approximately 3.2 lane miles across 8 streets, with a total surface area of roughly 19,000 square yards. The bid form itemizes 20 primary bid items and 2 alternate bid items, including asphalt milling at various depths (1" and 1.5"), asphalt surface course placement, base replacement, curb and sidewalk removal and replacement, pavement striping, and miscellaneous infrastructure adjustments such as manhole and valve box modifications.
The project is partially funded through a Community Development Block Grant (CDBG), which mandates compliance with federal requirements. The bid form provides a detailed breakdown of work items with unit measurements including square yards (SYD), tons (TON), linear feet (LF), and lump sum (LS) categories. While specific pricing is to be determined by the contractor, the form includes placeholders for unit costs across multiple infrastructure improvement components. The scope suggests a comprehensive street rehabilitation effort focusing on pavement condition, accessibility, and infrastructure quality in the Forest Park neighborhood of Plant City, Florida.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Form Item # Description Unit of Measure Quantity Unit Cost Vrinda Sawhney: Keep this blank for contractor to enter unless you have defined unit cost that you need contractor to bid on.
| Total | |||||
| 1 | Bonds and Insurance | LS | 1 | $ - 0 | |
| 2 | Mobilization / Demobilization | LS | 1 | $ - 0 | |
| 3 | Maintenance of Traffic | LS | 1 | $ - 0 | |
| 4 | Sediment and Erosion Control / NPDES CGP | LS | 1 | $ - 0 | |
| 5 | 1" Constant Depth Asphalt Milling of Surface Course | SYD | 5,200 | $ - 0 | |
| 6 | 1.5" Constant Depth Asphalt Milling of Surface Course | SYD | 13,500 | $ - 0 | |
| 7 | Superpave 9.5 (SP 9.5) Asphalt Surface Course | TON | 2,200 | $ - 0 | |
| 8 | Removal of Existing Asphalt Pavement and Base | CYD | 325 | $ - 0 | |
| 9 | Base Replacement (6" Recycled Crushed Concrete) | SYD | 1,500 | $ - 0 | |
| 10 | Type B Stabilization | SYD | 1,500 | $ - 0 | |
| 11 | Removal and Replacement of Existing Base and Curb - FDOT Drop Curb | LF | 25 | $ - 0 | |
| 12 | Remove Existing Base and Subgrade for Driveway Apron / Edge Protection | SYD | 140 | $ - 0 | |
| 13 | Temporary Pavement Striping and Markings | LS | 1 | $ - 0 | |
| 14 | Permanent Thermoplastic Pavement Striping, Markings, and RPMs | LS | 1 | $ - 0 | |
| 15 | Concrete Removal - Curb Ramps & Sidewalk | SYD | 10 | $ - 0 | |
| 16 | Concrete Sidewalk - 6" Thick | SYD | - 0 | $ - 0 | |
| 17 | Manhole Cover Adjustment | EA | 26 | $ - 0 | |
| 18 | Valve Box Adjustment | EA | 20 | $ - 0 | |
| 19 | Performance Turf, Sod and Soil - Shoulder Treatment Index 570-010 | SYD | 3,750 | $ - 0 | |
| 20 | Gravel Erosion Control Bed | SYD | 27 | $ - 0 | |
| Subtotal Primary Bid Items | $ - 0 | ||||
| 21-A | Concrete Removal - Curb Ramps & Sidewalk | SYD | 80 | ||
| 22-A | Concrete Sidewalk | SYD | 300 | ||
| Subtotal Alternate Bid Items | |||||
| Total Primary and Alternate Bid Items |