BId_Form_24-029EN-FC.xlsx

XLSX spreadsheet 17 KB Posted

Attached to
2022 CDBG Street Improvements
Solicitation number
24-029EN-FC-IFB
Issued by
Hillsborough County, Florida

About this file

The document is a Bid Form for the 2022 CDBG Street Improvements project in Plant City, Florida, issued by the local government. The project involves comprehensive street rehabilitation in the Forest Park neighborhoods, encompassing milling and resurfacing of approximately 3.2 lane miles across 8 streets, with a total surface area of roughly 19,000 square yards. The bid form itemizes 20 primary bid items and 2 alternate bid items, including asphalt milling at various depths (1" and 1.5"), asphalt surface course placement, base replacement, curb and sidewalk removal and replacement, pavement striping, and miscellaneous infrastructure adjustments such as manhole and valve box modifications.

The project is partially funded through a Community Development Block Grant (CDBG), which mandates compliance with federal requirements. The bid form provides a detailed breakdown of work items with unit measurements including square yards (SYD), tons (TON), linear feet (LF), and lump sum (LS) categories. While specific pricing is to be determined by the contractor, the form includes placeholders for unit costs across multiple infrastructure improvement components. The scope suggests a comprehensive street rehabilitation effort focusing on pavement condition, accessibility, and infrastructure quality in the Forest Park neighborhood of Plant City, Florida.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Form Item # Description Unit of Measure Quantity Unit Cost Vrinda Sawhney: Keep this blank for contractor to enter unless you have defined unit cost that you need contractor to bid on.

Total
1Bonds and InsuranceLS1$ - 0
2Mobilization / DemobilizationLS1$ - 0
3Maintenance of TrafficLS1$ - 0
4Sediment and Erosion Control / NPDES CGPLS1$ - 0
51" Constant Depth Asphalt Milling of Surface CourseSYD5,200$ - 0
61.5" Constant Depth Asphalt Milling of Surface CourseSYD13,500$ - 0
7Superpave 9.5 (SP 9.5) Asphalt Surface CourseTON2,200$ - 0
8Removal of Existing Asphalt Pavement and BaseCYD325$ - 0
9Base Replacement (6" Recycled Crushed Concrete)SYD1,500$ - 0
10Type B StabilizationSYD1,500$ - 0
11Removal and Replacement of Existing Base and Curb - FDOT Drop CurbLF25$ - 0
12Remove Existing Base and Subgrade for Driveway Apron / Edge ProtectionSYD140$ - 0
13Temporary Pavement Striping and MarkingsLS1$ - 0
14Permanent Thermoplastic Pavement Striping, Markings, and RPMsLS1$ - 0
15Concrete Removal - Curb Ramps & SidewalkSYD10$ - 0
16Concrete Sidewalk - 6" ThickSYD- 0$ - 0
17Manhole Cover AdjustmentEA26$ - 0
18Valve Box AdjustmentEA20$ - 0
19Performance Turf, Sod and Soil - Shoulder Treatment Index 570-010SYD3,750$ - 0
20Gravel Erosion Control BedSYD27$ - 0
Subtotal Primary Bid Items$ - 0
21-AConcrete Removal - Curb Ramps & SidewalkSYD80
22-AConcrete SidewalkSYD300
Subtotal Alternate Bid Items
Total Primary and Alternate Bid Items