BId_Form_24-029EN-FC.pdf
PDF 100 KB Posted
- Attached to
- 2022 CDBG Street Improvements
- Solicitation number
- 24-029EN-FC-IFB
- Issued by
- Hillsborough County, Florida
About this file
This document is a detailed Bid Form for the 2022 CDBG Street Improvements project in Plant City, Florida, specifically targeting the Forest Park neighborhoods. The bid form contains 22 line items covering a comprehensive street improvement project involving approximately 3.2 lane miles and 19,000 square yards of roadway. The project scope includes asphalt milling, pavement resurfacing, base replacement, concrete work, traffic maintenance, erosion control, and various associated infrastructure improvements. Key quantities include 5,200 square yards of 1" asphalt milling, 13,500 square yards of 1.5" asphalt milling, 2,200 tons of Superpave asphalt surface course, 1,500 square yards of base replacement, and additional elements such as manhole and valve box adjustments, striping, and shoulder treatments.
The project is partially funded through a Community Development Block Grant (CDBG), which requires adherence to federal requirements. The bid form provides a comprehensive itemized list with quantities and units of measure for each component, though unit costs are not specified in this document. The project includes both primary and alternate bid items, with additional work such as concrete removal for curb ramps and sidewalks. The itemized approach allows for precise bidding and enables potential contractors to understand the full scope of work required for the street improvements in the Forest Park area of Plant City, Florida.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2022_CDBG_Street_Improvements.pdf | ||
| 24-029EN-FC-IFB_Tampa_Times_Ad_legal.docx | DOCX document | |
| 24-029EN-FC-IFB_Draft_Contract_2022_CDBG_Street_Improvements_Contract.pdf | ||
| DOL_Wage_Determination_06.11.2024.pdf | ||
| HUD_Form_4010_updated_10.2023.pdf | ||
| Project_Specifications-R1.pdf | ||
| Project_Exhibits-R1.pdf | ||
| BId_Form_24-029EN-FC.xlsx | XLSX spreadsheet | |
| Worksheet_for_Construction_Agreement_6-6-24.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Item # Description Unit of Measure Quantity Unit Cost Total 1 Bonds and Insurance LS 1 -$ 2 Mobilization / Demobilization LS 1 -$ 3 Maintenance of Traffic LS 1 -$ 4 Sediment and Erosion Control / NPDES CGP LS 1 -$ 5 1" Constant Depth Asphalt Milling of Surface Course SYD 5,200 -$ 6 1.5" Constant Depth Asphalt Milling of Surface Course SYD 13,500 -$ 7 Superpave 9.5 (SP 9.5) Asphalt Surface Course TON 2,200 -$ 8 Removal of Existing Asphalt Pavement and Base CYD 325 -$ 9 Base Replacement (6" Recycled Crushed Concrete) SYD 1,500 -$
10 Type B Stabilization SYD 1,500 -$ 11 Removal and Replacement of Existing Base and Curb - FDOT Drop Curb LF 25 -$ 12 Remove Existing Base and Subgrade for Driveway Apron / Edge Protection SYD 140 -$ 13 Temporary Pavement Striping and Markings LS 1 -$ 14 Permanent Thermoplastic Pavement Striping, Markings, and RPMs LS 1 -$ 15 Concrete Removal - Curb Ramps & Sidewalk SYD 10 -$ 16 Concrete Sidewalk - 6" Thick SYD - -$ 17 Manhole Cover Adjustment EA 26 -$ 18 Valve Box Adjustment EA 20 -$ 19 Performance Turf, Sod and Soil - Shoulder Treatment Index 570-010 SYD 3,750 -$ 20 Gravel Erosion Control Bed SYD 27 -$
Subtotal Primary Bid Items -$ 21-A Concrete Removal - Curb Ramps & Sidewalk SYD 80 22-A Concrete Sidewalk SYD 300
Subtotal Alternate Bid Items Total Primary and Alternate Bid Items
Bid Form
File details come from the government source that posted it. Updated .