Bid Drawings.pdf
PDF 6 MB Posted
- Solicitation number
- TVC23-33900
- Issued by
- Bergen County, Jersey City, New Jersey
About this file
The provided document is a comprehensive set of bid drawings for the Northwest Bergen Regional Health Commission's Second Floor Interior Alterations project located at 63 Franklin Turnpike in Waldwick, New Jersey. The project involves renovating approximately 1,900 square feet of the administration building's second floor, with work spanning multiple disciplines including architectural, mechanical, electrical, plumbing, and fire alarm systems. The bid set is dated January 26, 2024, and includes detailed plans for reconfiguring office spaces, including an open office area, conference room, server room, kitchenette, registration area, and various supporting spaces.
The drawings indicate a comprehensive renovation that includes replacing existing finishes, updating electrical and lighting systems, modifying mechanical systems, and upgrading fire alarm infrastructure. The project involves installing new flooring, walls, ceilings, power and data outlets, lighting fixtures, HVAC equipment, and fire alarm devices while maintaining the existing building's overall structure and core systems. The work appears to be funded through the Borough of Waldwick and is designed to modernize and improve the functionality of the administration building's second floor. The bid documents suggest a focused, strategic approach to interior renovation that prioritizes efficient space utilization, modern workplace design, and compliance with current building and safety codes.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Administration Building - Second Floor Interior Alterations.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT TITLE:
FOR THE:
DRG NO.
Pa tr ic k
S.
S ei w el l
A
IA
, N C
A R
B , L
EE
D
A P
N J
Li c
A
I0
PA
L ic
R A
N
Y Li c
-1
RESERVED FOR NJDCA'S ELECTRONIC STAMP
Hany Y. Salib | AIA, NCARB NJ Lic 21AI01733800 | NY Lic 032590-1 | PA Lic RA404803
Patrick S. Seiwell | AIA, NCARB, LEED AP NJ Lic 21AI01611000 | PA Lic RA403783 | NY Lic 031550-1
Timothy J. Margolin | AIA, NCARB, LEED AP NJ Lic 21AI01656800 | PA Lic RA406787 | NY Lic 037479-1
Phillip J. Cacossa | PE, LEED AP NJ Lic 24GE03704900 | PA Lic PE056000E | NY Lic 079633-1
SIGNATURE
CONSULTANTS
MEP ENGINEER:
P+A, Patti & Anthes Consulting Engineers Lead Principal John Anthes, P.E.
19 West 21st Street, Suite 403 New York, NY 10010
PHONE: (917) 470-9639
EMAIL: John.Anthes@PattiAnthes.com
LOCATION MAPKEY PLAN
A R C H I T E C T S www.drg-architects.com
Design Resources Group Architects, AIA, INC.
Main Office 270 Davidson Avenue, Suite 303 Somerset, NJ 08873 T: 732 560 7900 | F: 732 560 7910
New York 47-10 Austell Place Long Island City, NY 11101 T: 347 774 3750
Pennsylvania PO Box 1309 Doylestown, PA 18901 T: 201 213 3859
C:\Users\drgaia.DRGNJ\Documents\TVC23-33900 Bergen Waldwick_Central_2020_christinamE4X72_christinamE4X72.rvtC:\Users\drgaia.DRGNJ\Documents\TVC23-33900 Bergen Waldwick_Central_2020_christinamE4X72_christinamE4X72.rvt
NORTHWEST BERGEN REGIONAL HEALTH COMMISSION
BOROUGH OF WALDWICK
TVC23-33900
BID SET:
ADMINISTRATION BUILDING SECOND FLOOR INTERIOR ALTERATIONS
01/26/2024
BLOCK:17 LOT:62.02
CVR
63 FRANKLIN TURNPIKE
63 FRANKLIN TURNPIKE
WALDWICK, NJ 07463
WALDWICK, NJ 07463
DRAWING LIST
COVER
CVR COVER SHEET
GENERAL NOTES
G-001 GENERAL INFORMATION, PARTITION TYPES, DOOR
SCHEDULE, DOOR TYPES, DOOR FRAME TYPES, SILL TYPES,
SIGNAGE, WINDOW TYPES, FIRE EXTINGUISHER
DEMOLITION
D-102 SECOND FLOOR DEMOLITION PLAN
ARCHITECTURAL
A-102 SECOND FLOOR PLAN
A-610 SECOND FLOOR FINISH PLAN
A-611 ENLARGED FLOOR FINISH PLANS & ELEVATIONS
A-702 SECOND FLOOR RCP
FIRE PROTECTION
SP-001.00 SPRINKLER COVER SHEET
SP-102.00 SPRINKLER 2ND FLOOR CONSTRUCTION PLAN
SP-501.00 SPRINKLER DETAILS, RISER DIAGRAMS AND SCHEDULES
SP-902.00 SPRINKLER 2ND FLOOR REMOVAL PLAN
PLUMBING
P-001.00 PLUMBING COVER SHEET
P-002.00 PLUMBING SPECIFICATIONS
P-102.00 PLUMBING 2ND FLOOR CONSTRUCTION PLAN
P-501.00 PLUMBING DETAILS RISER DIAGRAMS AND SCHEDULES
MECHANICAL
M-001.00 MECHANICAL NOTES, ABBREVIATIONS, AND SYMBOLS
M-002.00 MECHANICAL SPECIFICATIONS
M-003.00 MECHANICAL SPECIFICATIONS
M-004.00 MECHANICAL SPECIFICATIONS
M-101.00 MECHANICAL 2ND FLOOR CONSTRUCTION PLAN
M-601.00 MECHANICAL SCHEDULES
M-701.00 MECHANICAL DETAILS
ELECTRICAL
E-001.00 ELECTRICAL COVER SHEET
E-002.00 ELECTRICAL GENERAL NOTES
E-003.00 ELECTRICAL SPECIFICATIONS 01 OF 02
E-004.00 ELECTRICAL SPECIFICATIONS 02 OF 02
E-101.00 ELECTRICAL 2ND FLOOR POWER PLAN
E-201.00 ELECTRICAL 2ND FLOOR LIGHTING PLAN
E-501.00 ELECTRICAL ONE-LINE DIAGRAM
E-601.00 ELECTRICAL SCHEDULES
E-701.00 ELECTRICAL DETAILS
E-801.00 ELECTRICAL CONTROLS DIAGRAM
E-901.00 ELECTRICAL 2ND FLOOR REMOVAL PLAN
FIRE ALARM
FA-001.00 FIRE ALARM COVER SHEET
FA-002.00 FIRE ALARM RISER DIAGRAM
FA-101.00 FIRE ALARM 2ND FLOOR CONSTRUCTION PLAN
KEY PLAN
SCALE: N.T.S.
PR
OJ
EC
T
NO
RT
H
X
X COLUMN GRID / COLUMN DESIGNATIONS
ROOM NAME AND ROOM NUMBER DESIGNATIONS
DOOR NUMBER DESIGNATIONS - SEE DOOR AND
FRAME SCHEDULES FOR DETAILS
PARTITION TYPE DESIGNATIONS - SEE PARTITION
LEGEND AND TYPES FOR MORE INFORMATION
KEYED DEMOLITION NOTE DESIGNATION
WINDOW / VISION PANEL FRAME NUMBER DESIGNATIONS
LEVEL AND ELEVATION ABOVE DEFINED DATUM
A101
SIM
DETAIL CALLOUT DESIGNATIONS
DETAIL #
SHEET #
DETAIL #
SHEET #
SECTION/ EXTERIOR ELEVATION CALLOUT DESIGNATIONS
DETAIL #
SHEET #
INTERIOR ELEVATION CALLOUT DESIGNATIONS
INDICATES COLUMN TO RECIEVE FIRE BOARD
TREATMENT IN LIEU OF SPRAY ON TREATMENT
FE-X
PORTABLE FIRE EXTINGUISHER LOCATION SYMBOL TYPE
DESIGNATION. SEE PORTABLE FIRE EXTINGUISHER
SCHEDULE FOR DESCRIPTION OF TYPE.TYPE
DESIGN
RADON "T" VENT LOCATION DESIGNATION
V = DESIGNATES VENT THROUGH ROOF
2' X 4' SUSPENDED ACOUSTICAL CEILING SYSTEM
GYP. BD. CEILING CONSTRUCTION
GYP. BD. CEILING CONSTRUCTION W/ WATER RESISTANT FINISH
SOFFIT HEIGHT DESIGNATION -
HEIGHT ABOVE FINISHED FLOOR BELOW
C.J.
NOTE: THE FOLLOWING SYMBOLS ARE SHOWN ON THE ARCHITECTURAL
PLANS FOR GRAPHICAL PURPOSES ONLY. SEE MECHANICAL, ELECTRICAL
AND PLUMBING DRAWINGS FOR SPECIFICS IN TERMS OF SIZE, TYPE AND
CAPACITY OF ALL MECHANICAL EQUIPMENT.
2' X 4' LIGHTING FIXTURE
SEE ELECTRICAL PLANS FOR COMPLETE DESCRIPTION
2' X 2' LIGHTING FIXTURE
SEE ELECTRICAL PLANS FOR COMPLETE DESCRIPTION
1' X 4' LIGHTING FIXTURE
SEE ELECTRICAL PLANS FOR COMPLETE DESCRIPTION
ROUND LIGHTING FIXTURE
SEE ELECTRICAL PLANS FOR COMPLETE DESCRIPTION
SQUARE LIGHTING FIXTURE
SEE ELECTRICAL PLANS FOR COMPLETE DESCRIPTION
DIFFUSER / CEILING REGISTER (SUPPLY AIR)
SEE H.V.A.C. PLANS FOR COMPLETE DESCRIPTION
CEILING REGISTER (RETURN AIR)
SEE H.V.A.C. PLANS FOR COMPLETE DESCRIPTION
UVUVS
HVAC EQUIPMENT AT FLOOR LEVEL
UV = UNIT VENT
UVS = UNIT VENT SHELVING
SEE HVAC PLANS FOR COMPETE DESCRIPTION
CH
HVAC EQUIPMENT AT FLOOR LEVEL (CAB. HEATER)
SEE HVAC PLANS FOR COMPETE DESCRIPTION
T.V. MONITOR BRACKET LOCATION AT CEILING
SPRINKLER HEAD
SEE PLUMBING PLANS FOR COMPLETE DESCRIPTION
SECURITY CARD READER. SWIPE OR PROXY.
(MOUNTED 48" A.F.F. TO TOP MAX.)
ACCESSIBLE (ADA) DOOR OPERATOR BUTTON.
(MOUNTED 48" A.F.F. TO TOP MAX.)
KEYED CONSTRUCTION NOTE DESIGNATION
KEYED DEMOLITION ABATEMENT NOTE DESIGNATION
LOUVER NUMBER DESIGNATIONS
TOILET ACCESSORY NUMBER DESIGNATIONS
EQUIPMENT NUMBER DESIGNATIONS
F.R.C.J.
CONTROL JOINT DESIGNATION
FIRE RATED CONTROL JOINT DESIGNATION
EXPANSION JOINT DESIGNATIONE.J.
PHOTO NUMBER DESIGNATIONS
A101
A-101
1 1
XXX
X1 X X X
A
X
X
1t
XXX
X
R V
XX'-XX"AC
T
FA
S
GY
P
FA
S
CR
ARCHITECTURAL SYMBOL LEGEND
2' X 2' SUSPENDED ACOUSTICAL CEILING SYSTEM
Room name
150 SF
ABBREVIATION LIST
W W/ W/O
WD.
W.P.
THRU.
T.O.C.
T.O.STL.
T.O.M.
T.O.S.
T&B
TYP.
U.L.
U.N.O.
V.C.T.
VTR
V.I.F.
VERT.
SIM.
SPEC.
SQ. (IN.; FT.; YD.)
STD.
S.S.
STL.
STRUCT.
S.C.
T.B.
T.C.
TEL.
TEMP.
THK.
R
REINF.
REQD.
R.D.
SCHED.
SECT.
N.T.S.
O.C.
OPNG.
OPP.
PART.
PERF.
PLUMB.
P.C.
PT.
LB.
PREFAB.
PREFIN.
MANUF.
M.B.
MAS.
M.O.
MAT'L.
MAX.
MECH.
M.C.
MTL.
MEMB.
MIN.
N.A.
N.I.C.
HR.
IN.
INFO.
INSUL.
INT.
JT.
LAM.
L.P.
FOUND.
F.S.C.
FTG.
GA.
GALV.
G.C.
GYP.
GYP. BD.
H.V.A.C.
HT.
H.P.
H.M.
HORIZ.
EXT.
E.I.F.S.
E.P.D.M.
FAS.
FT.
F.R.P.
FIN.
F.E.
F.P.
FLSHG.
FL.
F.D.
ELEC.
E.C.
E.W.C.
ELEV.
EQ.
EQUIP.
EXIST.
EXP. JT.
CONT.
CJ
DET.
DWG.
EA.
C.B.
COL.
CONC.
C.M.U.
CONST.
C.C.
CLG.
C.L.
C.T.
BLDG.
BUR
CAB.
ARCH.
A.S.T.M.
B.F.
BD.
ALUM.
A.I.A.
ALT.
A.F.F.
WORKING POINT
WOOD
WITHOUT
WITH
WIDTH
VERTICAL
VERIFY IN FIELD
VENT THRU ROOF
VINYL COMPOSITION TILE
UNLESS NOTED OTHERWISE
UNDERWRITERS LABORATORY
TYPICAL
TOP & BOTTOM
TOP OF SLAB
TOP OF MASONRY
TOP OF STEEL
TOP OF CURB
THROUGH
THICK
TEMPORARY
TELEPHONE
TECHNOLOGY CONTRACTOR
TACKBOARD
STRUCT. STEEL CONTRACTOR
STRUCTURAL
STEEL
SLOP SINK
STANDARD
SQUARE
SPECIFICATION
SIMILAR
SECTION
SCHEDULE
ROOF DRAIN
REQUIRED
REINFORCE
RADIUS
PREFINISHED
PREFABRICATED
POUND
POINT
PLUMBING CONTRACTOR
PLUMBING
PERFORATE
PARTITION
OPPOSITE
OPENING
ON CENTER
NOT TO SCALE
NOT IN CONTRACT
NOT APPLICABLE
MINIMUM
MEMBRANE
METAL
MECHANICAL CONTRACTOR
MECHANICAL
MAXIMUM
MATERIAL
MASONRY OPENING
MASONRY
MARKERBOARD
MANUFACTURER
LOW POINT
LAMINATE
JOINT
INTERIOR
INSULATION
INFORMATION
INCH
HOUR
HORIZONTAL
HOLLOW METAL
HIGH POINT
HEIGHT
HEATING,VENTILATION,AIR CONDITIONING
GYPSUM BOARD
GYPSUM
GENERAL CONTRACTOR
GALVANIZE
GAUGE
FOOTING
FOOD SERVICE CONTRACTOR
FOUNDATION
FLOOR DRAIN
FLOOR
FLASHING
FIREPROOF
FIRE EXTINGUISHER
FINISH
FIBER REINFORCED POLYESTER
FEET / FOOT
FASCIA
ETHYL PROPYLENE
EXTERIOR INSULATED FINISH SYSTEM
EXTERIOR
EXPANSION JOINT
EXISTING
EQUIPMENT
EQUAL
ELEVATION
ELECTRIC WATER COOLER
ELECTRICAL CONTRACTOR
ELECTRICAL
EACH
DRAWING
DETAIL
CONTROL JOINT
CONTINUOUS
CONSTRUCTION
CONCRETE MASONRY UNIT
CONCRETE
COLUMN
CHALKBOARD
CERAMIC TILE
CENTERLINE
CEILING
CASEWORK CONTRACTOR
CABINET
BUILT UP ROOFING
BUILDING
BOARD
BARRIER FREE
AMERICAN SOCIETY FOR TESTING MATERIALS
ARCHITECTURAL
AMERICAN INSTITIUTE OF ARCHITECTS
ALUMINUM
ALTERNATE
ABOVE FINISH FLOOR
MECHANICAL, PLUMBING AND ELETRICAL MEP
TYPICAL FIRE EXTINGUISHER
MOUNTING HEIGHTS
4'- 0"
M
AX
PORTABLE FIRE
EXTINGUISHER SCHEDULE
N.T.S.
STEEL WALL BRACKET
MOUNTING PROVISION REQ'DMARK
FE-1
NOMENCLATURE
EXTINGUISHER
BRACKET MOUNTED
MULTI PURPOSE DRY
CHEMICAL NOM. CAPACITY
10LB. - STEEL CYLINDER W/ GAUGE
4 7 /8"
4 7/8"
5/8" 3 5/8" 5/8"
PARTIAL PLAN DETAIL
FACE LAYER: (1) LAYER 5/8"
GYPSUM FIBER PANEL
ACOUSTICAL SEALANT
3 5/8" 20 GA MTL
STUDS AT 16" O.C.
CONT. MTL TRACK
RESILIENT WALL
BASE, AS SCHEDULED
UNDERSIDE OF EXIST. GYP CEILING.
CONT. MTL TRACK
FINISH FLOOR, AS SCHEDULED
DEFLECTION TRACK
ACOUSTICAL SEALANT
NOTE: SEE FINISH SCHEDULE FOR
EXTENT & TYPE OF FINISH - TYP.
LINE OF ACT CEILING
ROOM SIDE ROOM SIDE
STRUCTURE TYPE KEY
M CMU BLOCK
S METAL STUD
F METAL FURRING
C SHAFTWALL METAL FRAMING
STRUCTURE THICKNESS KEY
0 7/8" (FURRING)
2 2 1/2" (METAL STUD, FURRING)
3 3 5/8" (METAL STUD, FURRING)
4 3 5/8" (CMU BLOCK), 4" (SHAFTWALL STUD)
6 5 5/8" (CMU BLOCK), 6" (METAL STUD, FURRING, SHAFTWALL STUD)
8 7 5/8" (CMU BLOCK)
10 9 5/8" (CMU BLOCK)
12 11 5/8" (CMU BLOCK)
14 13 5/8" (CMU BLOCK)
STRUCTURE TYPE
STRUCTURE THICKNESS
FIRE RATING
FACE CONSTRUCTION MODIFIERS
PARTITION LEGEND
FIRE RATING KEY
0 NO RATING
1 1 HOUR RATING
2 2 HOUR RATING
3 3 HOUR RATING
MODIFIERS KEY
0 NO MODIFIERS
I INTERNAL SOUND ATTENUATION BLANKETS
R RESIL. CHANNEL AT ONE SIDE, SCREW ATTACHED
TO METAL STUD
TF THERMAL: FOIL FACED GLASS FIBER BLANKET
INSULATION
X1 X X X
FACE CONSTRUCTION KEY
0. NO APPLIED FACE CONSTRUCTION
1. (1) LAYER 5/8" GYPSUM FIBER PANEL AT EACH FACE
PARTITION NOTES
1. ALL PARTITION TO RUN TO THE UNDERSIDE OF THE GYP CEILING UNLESS OTHERWISE NOTED.
4 7
/8" ROOM SIDE
4 7/8"
5/8" 3 5/8" 5/8"
PARTIAL PLAN DETAIL
3" INTERNAL SOUND
ATTENUATION BLANKETS
FACE LAYER: (1) LAYER 5/8"
GYPSUM FIBER PANEL
ACOUSTICAL SEALANT
3 5/8" 20 GA MTL
STUDS AT 16" O.C.
CONT. MTL TRACK
RESILIENT WALL
BASE, AS SCHEDULED
UNDERSIDE OF GYP CLG.
CONT. MTL TRACK
FINISH FLOOR, AS SCHEDULED
DEFLECTION TRACK
ACOUSTICAL SEALANT
NOTE: SEE FINISH SCHEDULE FOR
EXTENT & TYPE OF FINISH - TYP.
LINE OF CEILING
ROOM SIDE
SE
E
SC
HE
DU
LE
SEE SCHEDULE SEE SCHEDULE
SE
E
SC
HE
DU
LE
8" TYP.
8" T
YP
F - FLUSH FG - FULL
GLASS
TEMPERED
GLASS
2" 3' - 0" 2"
7'
- 2
7'
- 0
2"
1.0 2.0
2" 6'
- 1 0"
2"
2" 1' - 6" 2" 3' - 0" 2"
7'
- 2
TEMPERED
GLASS
7'
- 0
5'
- 8
2'
- 1 0"
7' - 0 1/2"
2" 1' - 8 1/2"
2"3' - 0"2" 1' - 8 1/2"
2"
8'
- 6
2" 1'
- 2
2" 4'
- 0
2" 2"
TEMP
GLASS
(TG), TYP.
ø 8"
ALUMINUM
TRIM , TYP.
1" 3"
2 1/2"6' - 0"2 1/2"
3'
- 0
4'
- 0
" TEMP GLASS W/
WOOD TRIM FRAME
SURROUND
2 1 /2"
4'
- 0
2 1
/2"
NEW CARPET
SCHLUTER
STRIP OR
EQUAL
EXISTING TILE
1/4 " M
AX
S1
EXIST. TILE
S2
NEW VCT
JAMB JAMB
HEAD
SEALANT AT ENTIRE
PERIMETER BOTH
SIDES (TYP.)
5/8" GYP. BD. ON
3 5/8" METAL
STUDS
H.M. FRAME W/ APPLIED
STOP FOR GLAZING
SPOT GROUT JAMB
ANCHORS AT BOTH SIDES
(TYP.)
AS APPLICABLE
EQ
EQ
5 7 /8"
2" T
YP
2" 5/8"
SEALANT AT
ENTIRE
PERIMETER BOTH
SIDES (TYP.)
H.M. FRAME W/ APPLIED
STOP FOR GLAZING
5 7 /8"
2"
5/8" 2" 5/8"
5/8" GYP. BD. ON
3 5/8" METAL
STUDS
H.M. FRAME W/
APPLIED STOP
FOR GLAZING
EQ.EQ.
5/8
2"
1 15/16" TYP.
COORDINATE TYPICAL SILL DETAILS SHOWN WITH FLOOR FINISHES
DESCRIBED IN THE FINISH SCHEDULES AND APPLY CONDITIONS IN FIELD AS
REQUIRED (TYP.)
ALL TYPICAL DETAILS WILL APPLY TO SIMILAR CONDITIONS THROUGHOUT
THE SCOPE OF THE PROJECT (TYP.)
GENERAL NOTES
COORDINATION DRAWINGS: PREPARE ACCORDING TO REQS IN INDIVIDUAL SECTIONS, AND ADDITIONALLY WHERE INSTALLATION IS NOT COMPLETELY SHOWN ON SHOP DRAWINGS, WHERE LIMITED SPACE AVAILABILITY NECESSITATES COORDINATION, OR IF COORDINATION IS REQUIRED TO FACILITATE INTEGRATION OF
PRODUCTS AND MATERIALS FABRICATED OR INSTALLED BY MORE THAN ONE ENTITY.
1. PROJECT-SPECIFIC INFORMATION, DRAWN ACCURATELY TO A SCALE LARGE ENOUGH TO INDICATE AND RESOLVE CONFLICTS. DO NOT BASE COORDINATION DRAWINGS ON STANDARD PRINTED DATA. INCLUDE THE FOLLOWING INFORMATION, AS APPLICABLE:
A. USE APPLICABLE DRAWINGS AS A BASIS FOR PREPARATION OF COORDINATION DRAWINGS. PREPARE SECTIONS, ELEVATIONS, AND DETAILS AS NEEDED
TO DESCRIBE RELATIONSHIP OF VARIOUS SYSTEMS AND COMPONENTS.
B. COORDINATE THE ADDITION OF TRADE-SPECIFIC INFORMATION TO THE COORDINATION DRAWINGS BY MULTIPLE CONTRACTORS IN A SEQUENCE THAT
BEST PROVIDES FOR COORDINATION OF THE INFORMATION AND RESOLUTION OF CONFLICTS BETWEEN INSTALLED COMPONENTS BEFORE SUBMITTING
FOR REVIEW.
C. INDICATE FUNCTIONAL AND SPATIAL RELATIONSHIPS OF COMPONENTS OF ARCHITECTURAL, STRUCTURAL, CIVIL, MECHANICAL, AND ELECTRICAL
SYSTEMS.
D. NDICATE SPACE REQUIREMENTS FOR ROUTINE MAINTENANCE AND FOR ANTICIPATED REPLACEMENT OF COMPONENTS DURING THE LIFE OF THE
INSTALLATION.
E. SHOW LOCATION AND SIZE OF ACCESS DOORS REQUIRED FOR ACCESS TO CONCEALED DAMPERS, VALVES, AND OTHER CONTROLS.
F. INDICATE REQUIRED INSTALLATION SEQUENCES.
G. INDICATE DIMENSIONS SHOWN ON THE DRAWINGS. SPECIFICALLY NOTE DIMENSIONS THAT APPEAR TO BE IN CONFLICT WITH SUBMITTED EQUIPMENT
AND MINIMUM CLEARANCE REQUIREMENTS. PROVIDE ALTERNATE SKETCHES TO ARCHITECT INDICATING PROPOSED RESOLUTION OF SUCH CONFLICTS.
MINOR DIMENSION CHANGES AND DIFFICULT INSTALLATIONS WILL NOT BE CONSIDERED CHANGES TO THE CONTRACT.
ARCHITECT WILL REVIEW COORDINATION DRAWINGS TO CONFIRM THAT THE WORK IS BEING COORDINATED, BUT NOT FOR THE DETAILS OF THE COORDINATION, WHICH ARE CONTRACTOR'S RESPONSIBILITY. IF ARCHITECT DETERMINES THAT COORDINATION DRAWINGS ARE NOT BEING PREPARED IN SUFFICIENT SCOPE OR DETAIL, OR ARE OTHERWISE DEFICIENT ARCHITECT WILL SO INFORM CONTRACTOR, WHO SHALL MAKE CHANGES AS DIRECTED AND RESUBMIT.
COORDINATION
EXECUTION - SPECIFICATION SECTION 017300
1. DETAILS SHOWN APPLY TO SIMILAR CONDITIONS THROUGHOUT THE PROJECT.
2. ALL EXPOSED C.M.U. CORNERS SHALL HAVE BULLNOSE EDGES.
3. ANYTHING SHOWN ON THE DRAWINGS AND NOT SPECIFICALLY MENTIONED IN THE SPECIFICATIONS OR VICE VERSE, SHALL BE CONSIDERED AS BEING
SPECIFIED IN BOTH.
4. THE GENERAL CHARACTER OF THE DETAIL WORK IS SHOWN ON THE DRAWINGS BUT MINOR MODIFICATIONS MAY BE MADE IN LARGE SCALE DETAILS.
5. WHERE THE WORD "SIMILAR" OCCURS ON THE DRAWINGS, IT SHALL BE USED IN ITS GENERAL SENSE AND NOT AS MEANING IDENTICAL, AND ALL DETAILS
SHALL BE WORKED OUT IN RELATION TO THEIR LOCATION AND THEIR CONNECTION TO OTHER PARTS OF THE WORK.
6. WHERE ON ANY DRAWINGS A PORTION OF THE WORK IS DRAWN OUT AND THE REMAINDER IS INDICATED IN OUTLINE, THE PARTS DRAWN OUT SHALL APPLY
ALSO TO OTHER LIKE PORTIONS OF THE WORK. WHERE DETAIL IS INDICATED BY STARTING ONLY, SUCH DETAIL SHALL BE CONTINUED THROUGHOUT THE COURSES OR PARTS IN WHICH IT OCCURS AND SHALL ALSO APPLY TO ALL SIMILAR PARTS OF THE WORK UNLESS OTHERWISE INDICATED.
7. IN CASE OF DIFFERENCES BETWEEN SMALL AND LARGE SCALE DRAWINGS, THE LARGER SCALE DRAWINGS SHALL GOVERN. DIMENSIONS GIVEN SHALL TAKE
PRECEDENCE OVER SCALE MEASUREMENTS.
8. ANY DISCREPANCIES SHALL BE REFERRED TO THE ARCHITECT FOR ADJUSTMENT BEFORE ANY WORK AFFECTED THEREBY HAS BEEN PERFORMED.
9. IF ANY ERRORS, INCONSISTENCIES OR OMISSIONS APPEAR IN THE DRAWINGS, SPECIFICATIONS OR OTHER CONTRACT DOCUMENTS, WHICH SHOULD
REASONABLY HAVE BEEN DISCOVERED AND CONCERNING WHICH INTERPRETATION HAD NOT BEEN OBTAINED FROM THE ARCHITECT DURING THE BIDDING PERIOD, THE CONTRACTOR SHALL, WITHIN TEN (10) CALENDAR DAYS AFTER RECEIVING WRITTEN "NOTICE OF AWARD" NOTIFY THE ARCHITECT IN WRITING OF SUCH ERROR, INCONSISTENCY OR OMISSION. IN THE EVENT THE CONTRACTOR FAILS TO GIVE SUCH NOTICE, HE WILL BE HELD RESPONSIBLE FOR THE RESULTS OF ANY SUCH ERRORS, INCONSISTENCIES OR OMISSIONS AND THE COST OF RECTIFYING SAME. INTERPRETATION OF THIS PROCEDURE AFTER THE TEN CALENDAR DAY PERIOD WILL BE MADE BY THE ARCHITECT AND HIS DECISION WILL BE FINAL.
10. EACH CONTRACTOR SHALL LAY OUT HIS OWN WORK AND BE RESPONSIBLE FOR ALL LINES, ELEVATIONS AND MEASUREMENTS OF THE BUILDING, AND OTHER WORK EXECUTED BY HIM UNDER THE CONTRACT. HE MUST EXERCISE PROPER PRECAUTION TO VERIFY THE FIGURES SHOWN ON THE DRAWINGS BEFORE LAYING OUT THE WORK AND WILL BE HELD RESPONSIBLE FOR ANY ERRORS RESULTING FROM HIS FAILURE TO EXERCISE SUCH PRECAUTION.
11. WHERE THE TERM "TYPICAL" IS USED IN THE CONSTRUCTION DOCUMENTS, THE APPLICATION / CONSTRUCTION OF THE DETAILS AND THEIR COMPONENTS SHALL BE THE SAME AT SIMILAR LOCATIONS THROUGHOUT THE PROJECT. ANY QUESTIONS WITH REGARD TO THE USE OF THE TERM "TYPICAL" SHALL BE
INTERPRETED BY THE ARCHITECT AND HIS DECISION WILL BE FINAL.
1. SEE SPECIFICATIONS
STATE PLAN #
STATUS/REVISIONS
SCALE DRAWN
DATE CHECKED
AS NOTED
SHEET NO.
SHEET TITLE
DRG NO.
PROJECT TITLE
TO THE:
FOR THE:
NO DESCRIPTIONDATE
RESERVED FOR NJDCA'S ELECTRONIC STAMP
Pa tr ic k
S.
S ei w el l |
A
IA
, N
CA
RB
, L
EE
D
AP
N J L ic
AI
, P
A Lic
R A4
N
Y Lic
0-
Hany Y. Salib | AIA, NCARB NY Lic 032590-1 | NJ Lic 21AI01733800 | PA Lic RA404803
Patrick S. Seiwell | AIA, NCARB, LEED AP NY Lic 031550-1 | NJ Lic 21AI01611000 | PA Lic RA403783
Timothy J. Margolin | AIA, NCARB, LEED AP NY Lic 037479-1 | NJ Lic 21AI01656800 | PA Lic RA406787
Phillip J. Cacossa | PE, LEED AP NY Lic 079633-1 | NJ Lic 24GE03704900 | PA Lic PE056000E www.drg-architects.com
A R C H I T E C T S
Design Resources Group Architects, AIA, INC.
Main Office 270 Davidson Avenue, Suite 303 Somerset, NJ 08873 T: 732 560 7900 | F: 732 560 7910
New York 47-10 Austell Place Long Island City, NY 11101 T: 347 774 3750
Pennsylvania PO Box 1309 Doylestown, PA 18901 T: 201 213 3859
C:\Users\drgaia.DRGNJ\Documents\TVC23-33900 Bergen Waldwick_Central_2020_christinamE4X72_christinamE4X72.rvt
GENERAL INFORMATION,
PARTITION TYPES, DOOR
SCHEDULE, DOOR TYPES,
DOOR FRAME TYPES, SILL
TYPES, SIGNAGE, WINDOW
TYPES, FIRE EXTINGUISHER
CM
Checker12-14-2023
BID SET
01/26/2024
NORTHWEST BERGEN REGIONAL
HEALTH COMMISSION
BOROUGH OF WALDWICK
ADMINISTRATION BUILDING SECOND
FLOOR INTERIOR ALTERATIONS
TVC23-33900
G-001
63 FRANKLIN TURNPIKE
63 FRANKLIN TURNPIKE
WALDWICK, NJ 07463
WALDWICK, NJ 07463
ALL DETAILS AND GRAPHIC REPRESENTATIONS SHOWN ON THIS
SHEET MAY OR MAY NOT APPLY TO THIS PARTICULAR PROJECT. SEE
ARCHITECTURAL DRAWINGS, "A" SERIES, FOR SPECIFIC REFERENCE
OR APPLICATION SHOWN AND / OR NOTED.
SCALE: 1" = 1'-0"
PARTITION TYPE S3 / 0 / 1 / 0S3 0
1 0
DOOR SCHEDULE
DO
OR
N O.
ROOM DOOR FRAME
FI
RE
R
AT
IN
G
HA
RD
W
AR
E
SE
T
SIGNAGE REMARKSNO NAME LE
AF
(S
) WIDTH
HEIGHT MATERIAL TYPE GLASS MAT TYPE
DETAILS
HEAD JAMB SILL
200A 200 OPEN OFFICE AREA 3' - 0" 7' - 2" WD F - WD 1.0 1 1 S2 01 -
201A 201 SERVER RM 3' - 0" 7' - 2" WD F - WD 1.0 1 1 S1 03 -
205A 205 OFFICE 3' - 0" 7' - 2" WD F - WD 1.0 1 1 S1 02 -
206A 206 STORAGE 3' - 0" 7' - 2" WD F - WD 1.0 1 1 S2 04 -
207A 207 CONFERENCE RM 3' - 0" 7' - 2" WD FG TEMP WD 1.0 1 1 S1 02 S - 2
207C 208 PUBLIC ENTRY 6' - 0" 7' - 2" F
208A 208 PUBLIC ENTRY 3' - 0" 7' - 0" WD WD TEMP WD 2.0 1 1 S2 01 S - 1
SCALE: 1" = 1'-0"
PARTITION TYPE S3 / 0 / 1 / IS3 0
1 I
SCALE: 1/4" = 1'-0"G-001
3 DOOR TYPES
SCALE: 1/4" = 1'-0"G-001
4 FRAME TYPES
SCALE: 1/4" = 1'-0"G-001
WINDOW TYPE 2 -
INTERIOR ELEVATION @
RECEPTION COUNTER
SCALE: 1/4" = 1'-0"G-001
WINDOW TYPE 1 -
INTERIOR ELEVATION @
VISION PANEL
SCALE: 1 1/2" = 1'-0"G-001
5 INTERIOR DOOR SILL DETAIL
SCALE: 1 1/2" = 1'-0"G-001
8 DOOR AND VISION PANEL FRAME DETAILS
SCALE: 1 1/2" = 1'-0"G-001
10 SIGNAGE - TYPES
SCALE: 1/2" = 1'-0"G-001
11 SIGNAGE - LOCATION
UPPER
LOBBY
ST
AI
R
STAIR
BOROUGH COUNCIL
CHAMBER 204B
204A
ELEVATOR
ALCOVE
MEN
204F
WOMEN
204E
J.C.
204D
OFFICE
202A
OFFICE
202B
BOOTH
202C
LOBBY/WAITING
DRINKING FOUNTAINS
MAY BE REPLACED
WITH BOTTLE
STATION
JUDGE
204C
EXISTING
BENCHES
TO REMAIN
DN
EXISTING WALL TO BE DEMOLISHED
KEYED DEMOLITION NOTE
ELEVATION REFERENCED FROM
FIRST FLOOR DATUM (O' - 0")
ACOUSTICAL CEILING DEMOLITION
GYPSUM BOARD CEILING DEMOLITION
X
1. PRIOR TO DEMOLITION, THE CONTRACTOR SHALL CONDUCT A
FIELD REVIEW OF ALL DEMOLITION ITEMS WITH THE OWNER
AND / OR OWNER'S REPRESENTATIVE FOR THE CONDITION
OF EQUIPMENT, CABINETRY, AND OTHER ITEMS TO BE
DISPOSED OF AND / OR RETAINED AND STORED IN A
LOCATION DIRECTED BY THE OWNER.
2. CONTRACTOR SHALL COORDINATE SAW CUTTING AND
TRENCHING FOR MECHANICAL, ELECTRICAL, AND PLUMBING
INFRASTRUCTURE WITH THE MEP DRAWINGS.
3. SEE MECHANICAL, ELECTRICAL, AND PLUMBING DRAWINGS
FOR ASSOCIATED DEMOLITION ITEMS.
4. CONTRACTOR SHALL REMOVE ALL MISCELLANEOUS ITEMS,
INCLUDING BUT NOT LIMITED TO, SCREWS, NAILS, CLIPS,
WIRES, BOLTS, BRACKETS, ETC. AT ALL AREAS OF
RENOVATION / ALTERATION.
5. CONTRACTOR SHALL EXAMINE, PATCH, REPAIR AND PREPARE
ALL ADJACENT SURFACES AND SUBSTRATES AS REQUIRED
TO RECEIVE NEW CONSTRUCTION AND / OR FINISHES AS
INDICATED IN THE CONSTRUCTION DOCUMENTS. REFER TO
SPECIFICATION 017300 EXECUTION, SECTION 3.6 " CUTTING,
PATCHING & REPAIR (NEW & EXISTING CONSTRUCTION)" FOR
SUBSTRATE PATCHING AND REPAIR INFORMATION.
6. THE INDIVIDUAL "KEYED DEMOLITION NOTES" SHALL APPLY
TO THIS PROJECT ONLY AS KEYED ON THE DRAWING. ANY
UNUSED KEYED DEMOLITION NOTES SHALL BE CONSIDERED
"NOT APPLICABLE".
GENERAL NOTES:
GENERAL SYMBOLS:
EXISTING WALL TO REMAIN
X
PHOTO TAG
KEYED DEMOLITION
NOTES:
REMOVE EXISTING INTERIOR PARTITIONS.
2 REMOVE EXISTING DOOR(S), AND THEIR ASSOCIATED FRAMES.
3 REMOVE EXISTING FLOOR FINISH IN ITS ENTIRETY INCLUDING BASE.
4 REMOVE EXISTING CERAMIC FLOOR TILE AND BASE IN AREAS OF
PARTITION REMOVALS.
5 REMOVE PORTION OF EXISTING PARTITON TO PROVIDE NEW
DOOR OPENING.
6 EXISTING DOOR & FRAME TO BE REMOVED & SALVAGED FOR
REUSE. TO BE REVERSED IN EXISTING OPENING.
7 EXISTING GYPSUM BOARD ON BOTTOM TRUSS CHORDS TO
REMAIN, TYP.
4'
- 6
SHADED AREA
NOT IN SCOPE
7 TYP.
STATE PLAN #
STATUS/REVISIONS
SCALE DRAWN
DATE CHECKED
AS NOTED
SHEET NO.
SHEET TITLE
DRG NO.
PROJECT TITLE
TO THE:
FOR THE:
NO DESCRIPTIONDATE
RESERVED FOR NJDCA'S ELECTRONIC STAMP
Pa tr ic k
S.
S ei w el l |
A
IA
, N
CA
RB
, L
J L ic
AI
, P
A Lic
R A4
N
Y Lic
0-
Hany Y. Salib | AIA, NCARB NY Lic 032590-1 | NJ Lic 21AI01733800 | PA Lic RA404803
Patrick S. Seiwell | AIA, NCARB, LEED AP NY Lic 031550-1 | NJ Lic 21AI01611000 | PA Lic RA403783
Timothy J. Margolin | AIA, NCARB, LEED AP NY Lic 037479-1 | NJ Lic 21AI01656800 | PA Lic RA406787
Phillip J. Cacossa | PE, LEED AP NY Lic 079633-1 | NJ Lic 24GE03704900 | PA Lic PE056000E www.drg-architects.com
A R C H I T E C T S
Design Resources Group Architects, AIA, INC.
Main Office 270 Davidson Avenue, Suite 303 Somerset, NJ 08873 T: 732 560 7900 | F: 732 560 7910
New York 47-10 Austell Place Long Island City, NY 11101 T: 347 774 3750
Pennsylvania PO Box 1309 Doylestown, PA 18901 T: 201 213 3859
C:\Users\drgaia.DRGNJ\Documents\TVC23-33900 Bergen Waldwick_Central_2020_christinamE4X72_christinamE4X72.rvt
SECOND FLOOR DEMOLITION
PLAN
Author
Checker09/04/18
BID SET
01/26/2024
NORTHWEST BERGEN REGIONAL
HEALTH COMMISSION
BOROUGH OF WALDWICK
ADMINISTRATION BUILDING SECOND
FLOOR INTERIOR ALTERATIONS
TVC23-33900
D-102
63 FRANKLIN TURNPIKE
63 FRANKLIN TURNPIKE
WALDWICK, NJ 07463
WALDWICK, NJ 07463
KEY PLAN
SCALE: N.T.S.
PR
OJ
EC
T
NO
RT
H
SCALE: 1/4" = 1'-0"D-102
1 SECOND FLOOR DEMOLITION PLAN
UPPER
LOBBY
ST
AI
R
STAIR
BOROUGH COUNCIL
CHAMBER 204B
204A
ELEVATOR
ALCOVE
MEN
204F
WOMEN
204E
J.C.
204D
OFFICE
202A
OFFICE
202B
BOOTH
202C
LOBBY/WAITING
DRINKING FOUNTAINS
MAY BE REPLACED
WITH BOTTLE
STATION
JUDGE
204C
EXISTING
BENCHES
TO REMAIN
DN
G
FI
G
FI
TV
GENERAL NOTES:
GENERAL SYMBOLS:
EXISTING WALL TO REMAIN
NEW WALL / DEMOLISHED WALL
INFILL
KEYED CONSTRUCTION
NOTE
ELEVATION REFERENCED FROM
FIRST FLOOR DATUM (O' - 0")
KEYED CONSTRUCTION
NOTES:
X
1. CONTRACTOR'S WORK SHALL BE FULLY INTEGRATED IN
ACCORDANCE WITH THE PLANS, SPECIFICATIONS, SHOP
DRAWINGS, SUBMITTALS, MANUFACTURE'S DATA AND
WARRANTY REQUIREMENTS, AND THE GENERAL CONDITIONS
OF THE PROJECT.
2. CONTRACTOR SHALL VERIFY THE LOCATIONS OF LAYOUT
CONTROLS POINTS, WORKING POINTS, BENCH MARKS, AND
MONUMENTS (ELEVATIONS) WITH THE INFORMATION PROVIDED
IN THE PLANS PRIOR TO THE COMMENCEMENT OF ANY WORK.
PROMPTLY NOTIFY THE ARCHITECT IN THE CASE OF ANY
DISCREPANCIES.
3. THE INFORMATION LISTED AS "EXISTING" WITH REGARD TO
DIMENSIONS AND CONDITIONS IS NOT GUARANTEED.
4. CONTRACTOR SHALL FIELD VERIFY EXISTING DIMENSIONS AND
CONDITIONS AND CONFIRM THE SAME PRIOR TO THE
FABRICATION AND INSTALLATION OF ALL MATERIALS,
PRODUCTS, AND COMPONENTS. DO NOT SCALE DRAWINGS TO
OBTAIN REQUIRED DIMENSIONS.
5. CONTRACTOR SHALL EXAMINE ALL APPLICABLE SUBSTRATES
AND THE CONDITIONS UNDER WHICH THE WORK IS TO BE
PERFORMED AND VERIFY THAT THE WORK MAY PROPERLY
COMMENCE. DO NOT PROCEED WITH THE WORK UNTIL
UNSATISFACTORY CONDITIONS HAVE BEEN RESOLVED.
COMMENCEMENT OF THIS WORK BY THE CONTRACTOR WILL BE
CONSIDERED AS ACCEPTANCE OF THE CONDITIONS OF THESE
SUBSTRATES. ANY WORK REQUIRED TO BE REMEDIATE WORK
INSTALLED OUTSIDE THESE PARAMETERS SHALL BE
CORRECTED BY THE CONTRACTOR AT NO ADDITIONAL COST TO
THE OWNER.
6. COORDINATE EXACT LOCATIONS OF FIXTURES AND OUTLETS
WITH FINISH ELEMENTS.
7. WHERE MOUNTING HEIGHTS OF FIXTURES, EQUIPMENT, AND
ACCESSORIES ARE NOT INDICATED, MOUNT AS DIRECTED BY
THE ARCHITECT.
8. PROVIDE ALL ANCHORS / FASTENERS REQUIRED AND USE
METHODS NECESSARY TO SECURELY FASTEN WORK. ALLOW
FOR THERMAL EXPANSION, CONTRACTION AND BUILDING
MOVEMENT.
9. CONTRACTOR(S) SHALL COORDINATE IN ADVANCE OF
CONSTRUCTION ALL CLEARANCES REQUIRED FOR THE
INSTALLATION OF ALL MECHANICAL, ELECTRICAL, AND
PLUMBING INFRASTRUCTURE THROUGH STRUCTURAL
ASSEMBLIES, INCLUDING BUT NOT LIMITED TO, SLABS ON
GRADE, FLOORS, ROOFS, WALLS, ETC.
10. DOORS / WALLS / EQUIPMENT CONSTRUCTION SHALL PROVIDE
FOR THE APPROPRIATE MANEUVERING CLEARANCES TO
SATISFY THE "PUSH SIDE" AND "PULL SIDE" CRITERIA
ESTABLISHED IN THE ICC / ANSI A117.1 - 2009 FIGURE 404.2.3.1.
THE INFORMATION IN REFERENCE TO THE PRECEDING SHALL
BE SUBMITTED WITH THE ASSOCIATED DOOR AND FRAME
SUBMITTALS REQUIRED BY THE CONTRACT.
ALL LOOSE FURNITURE AND EQUIPMENT, INCLUDING
WORK STATION PANELS, ARE N.I.C. AND SHALL BE
SUPPLIED & INSTALLED BY OWNER. FURNITURE /
EQUIPMENT IS SHOWN FOR INFORMATIONAL &
COORDINATION PURPOSE ONLY.
2 VERIFY LOCATION OF OUTLET / DATA WITH
FURNITURE VENDOR.
122 SF
STORAGE
6A
200A
28 SF
SERVER RM
818 SF
OPEN OFFICE AREA
201A
4'
- 6
50 SF
MEDS
52 SF
KITCHENETTE
43 SF
REGISTRATION
193 SF
OFFICE
200 SF
CONFERENCE RM
61 SF
PUBLIC ENTRY
G-001
S3 0
1 0 TYP.
FE-1
FE-1
FE-1
SHADED AREA
NOT IN SCOPE
8'
- 0
12' - 9" 49' - 0" 9' - 5"
5"
3' - 9"
205A
208A
6'
- 0
1/ 2"
2'
- 0
S3 0 1 I
S3 0 1 I
207A
5'
- 0
3' - 6"
5' - 0"
4"
MI
N.
1'
- 0
3' - 0"
4' - 0" 3' - 6"
4'
- 2
3'
- 2
ALIGN
AL
IG
N
AL
IG
N
AL
IG
N
ALIGN
S3 0 1 0
S3 0 1 I
S3 0 1 I
REF.
REF.
REF.
COPY
MACH.
CL CL
A-611
A-611
A-611
A-611
A-611
G-001
4"
3/
4"
23 1/2"
2 2 2 2
STATE PLAN #
STATUS/REVISIONS
SCALE DRAWN
DATE CHECKED
AS NOTED
SHEET NO.
SHEET TITLE
DRG NO.
PROJECT TITLE
TO THE:
FOR THE:
NO DESCRIPTIONDATE
RESERVED FOR NJDCA'S ELECTRONIC STAMP
Pa tr ic k
S.
S ei w el l |
A
IA
, N
CA
RB
, L
J L ic
AI
, P
A Lic
R A4
N
Y Lic
0-
Hany Y. Salib | AIA, NCARB NY Lic 032590-1 | NJ Lic 21AI01733800 | PA Lic RA404803
Patrick S. Seiwell | AIA, NCARB, LEED AP NY Lic 031550-1 | NJ Lic 21AI01611000 | PA Lic RA403783
Timothy J. Margolin | AIA, NCARB, LEED AP NY Lic 037479-1 | NJ Lic 21AI01656800 | PA Lic RA406787
Phillip J. Cacossa | PE, LEED AP NY Lic 079633-1 | NJ Lic 24GE03704900 | PA Lic PE056000E www.drg-architects.com
A R C H I T E C T S
Design Resources Group Architects, AIA, INC.
Main Office 270 Davidson Avenue, Suite 303 Somerset, NJ 08873 T: 732 560 7900 | F: 732 560 7910
New York 47-10 Austell Place Long Island City, NY 11101 T: 347 774 3750
Pennsylvania PO Box 1309 Doylestown, PA 18901 T: 201 213 3859
C:\Users\drgaia.DRGNJ\Documents\TVC23-33900 Bergen Waldwick_Central_2020_christinamE4X72_christinamE4X72.rvt
SECOND FLOOR PLAN
Author
Checker09/04/2018
BID SET
01/26/2024
NORTHWEST BERGEN REGIONAL
HEALTH COMMISSION
BOROUGH OF WALDWICK
ADMINISTRATION BUILDING SECOND
FLOOR INTERIOR ALTERATIONS
TVC23-33900
A-102
63 FRANKLIN TURNPIKE
63 FRANKLIN TURNPIKE
WALDWICK, NJ 07463
WALDWICK, NJ 07463
KEY PLAN
SCALE: N.T.S.
PR
OJ
EC
T
NO
RT
H
SCALE: 1/4" = 1'-0"A-102
1 SECOND FLOOR PLAN
UPPER
LOBBY
ST
AI
R
STAIR
BOROUGH COUNCIL
CHAMBER 204B
204A
ELEVATOR
ALCOVE
MEN
204F
WOMEN
204E
J.C.
204D
OFFICE
202A
OFFICE
202B
BOOTH
202C
LOBBY/WAITING
DRINKING FOUNTAINS
MAY BE REPLACED
WITH BOTTLE
STATION
JUDGE
204C
EXISTING
BENCHES
TO REMAIN
DN
FINISH LEGEND:
ACT = ACOUSTICAL CEILING TILE
CPT = CARPET (TILE)
GWB/P = GYPSUM WALLBOARD / PAINTED
MP = METAL PAN
RB = RESILIENT BASE
VCT = VINYL COMPOSITE TILE
XC = EXISTING CEILING
FLOOR FINISH LEGEND:
CPT1 = CARPET TILE
VCT1 = VINYL COMPOSITE TILE
RB1 = RESILIENT BASE
PA2 - PAINT
ACCENT COLOR & TRIM
PA1 = PAINT, FIELD COLOR
EXISTING FINISH
VCT1
CPT1
CPT1
CPT1RB1
RB1
RB1 RB1 RB1RB1 RB1
RB1
VCT1
50 SF
MEDS
28 SF
SERVER RM
52 SF
KITCHENETTE
61 SF
PUBLIC ENTRY
200 SF
CONFERENCE RM
193 SF
OFFICE
818 SF
OPEN OFFICE AREA
200 122 SF
STORAGE
43 SF
REGISTRATION
VCT1
PA1
A-6115B
5A
8'
- 0
A-6111A
A-611
2A A-611 3A
A-6114A
PA1
PA2
PA2
VCT1PA1 PA1 PA1
PA2
PA2
PA1 RB1
PA2
PA1
4B
STATE PLAN #
STATUS/REVISIONS
SCALE DRAWN
DATE CHECKED
AS NOTED
SHEET NO.
SHEET TITLE
DRG NO.
PROJECT TITLE
TO THE:
FOR THE:
NO DESCRIPTIONDATE
RESERVED FOR NJDCA'S ELECTRONIC STAMP
Pa tr ic k
S.
S ei w el l |
A
IA
, N
CA
RB
, L
J L ic
AI
, P
A Lic
R A4
N
Y Lic
0-
Hany Y. Salib | AIA, NCARB NY Lic 032590-1 | NJ Lic 21AI01733800 | PA Lic RA404803
Patrick S. Seiwell | AIA, NCARB, LEED AP NY Lic 031550-1 | NJ Lic 21AI01611000 | PA Lic RA403783
Timothy J. Margolin | AIA, NCARB, LEED AP NY Lic 037479-1 | NJ Lic 21AI01656800 | PA Lic RA406787
Phillip J. Cacossa | PE, LEED AP NY Lic 079633-1 | NJ Lic 24GE03704900 | PA Lic PE056000E www.drg-architects.com
A R C H I T E C T S
Design Resources Group Architects, AIA, INC.
Main Office 270 Davidson Avenue, Suite 303 Somerset, NJ 08873 T: 732 560 7900 | F: 732 560 7910
New York 47-10 Austell Place Long Island City, NY 11101 T: 347 774 3750
Pennsylvania PO Box 1309 Doylestown, PA 18901 T: 201 213 3859
C:\Users\drgaia.DRGNJ\Documents\TVC23-33900 Bergen Waldwick_Central_2020_christinamE4X72_christinamE4X72.rvt
SECOND FLOOR FINISH PLAN
Author
Checker09/04/2018
BID SET
01/26/2024
NORTHWEST BERGEN REGIONAL
HEALTH COMMISSION
BOROUGH OF WALDWICK
ADMINISTRATION BUILDING SECOND
FLOOR INTERIOR ALTERATIONS
TVC23-33900
A-610
63 FRANKLIN TURNPIKE
63 FRANKLIN TURNPIKE
WALDWICK, NJ 07463
WALDWICK, NJ 07463
KEY PLAN
SCALE: N.T.S.
PR
OJ
EC
T
NO
RT
H
SCALE: 1/4" = 1'-0"A-610
1 SECOND FLOOR FINISH PLAN
ROOM FINISH SCHEDULE
ROOM NUMBER ROOM NAME FLOOR BASE WALL CEILING
CEILING
HEIGHT REMARKS
SECOND FLOOR PLAN
200 OPEN OFFICE AREA CPT RB GWB/P ACT 8' - 6"
201 SERVER RM VCT RB GWB/P ACT 8' - 6"
202 MEDS VCT RB GWB/P ACT 8' - 6"
203 KITCHENETTE VCT RB GWB/P ACT 8' - 6"
204 REGISTRATION CPT RB GWB/P ACT 8' - 6"
205 OFFICE CPT RB GWB/P ACT 8' - 6"
206 STORAGE VCT RB GWB/P PA PAINT EXISTING GYP CLG
207 CONFERENCE RM CPT RB GWB/P ACT 8' - 6"
208 PUBLIC ENTRY CPT RB GWB/P ACT 8' - 6"
A-6111A
6'
- 0
2' - 1"
A-611
2A
A-611 3A
2' - 1"
5'
- 7
1/ 2"
1'
- 6
2'
- 6
1'
- 6
A-6114A
2'
- 6
3'
- 1 1/
2"
2' - 1"
5'
- 7
1/ 2"
2'
- 6
REFRIGERATOR
BY OWNER
4B
A-6115B
5A
2' - 1"
2'
- 0
7' - 0"
6'
- 0
6' - 0"
6' - 0" 2' - 0" 2' - 0" 2' - 0"
2' - 0" 2' - 0" 2' - 0"
2'
- 1
0" 4"
1'
- 4
2'
- 6
" COPY
MACHINE TO
BE SELECTED
BY OWNER
1' - 0" 2' - 0" 2' - 0"
CL CL CL
PL PL PL
A.
F.
F.
RB1
A.
F.
F.
EQEQ
CL
1/
2"
23 1/2"
NEW IT CABINET
BY OWNER
2' - 6"
2'
- 1
0" 4"
1'
- 4
2'
- 6
2' - 6" 3' - 1 11/16"
7'
- 0
A.
F.
F .
EQ EQ
REFRIGERATOR
BY OWNER
RB1
2'
- 5
7' - 0"
2'
- 1
0"
A.
F.
F.
"CL
RB1
PL
SS
2'
- 5
1/ 2"
4"
2'
- 9
1/ 2"
1'
- 4
1/ 2"
2'
- 6
5' - 6"
1' - 6" 2' - 6" 1' - 6"
6'
- 8
PL PL PL
CL
A.
F.
F .
CL CL
PL PL PL
SS
RB1
6' - 0"
2'
- 5
2'
- 1
0" 5'
- 8
5"
PL
SS
CL
EQ EQ
RB1
CL CL
PLPL
SS
PL
18" 30" 18"
18" 30" 18"
CL
EQ EQ
FIRE
EXTINGUISHER
SOAP
DISPENSER
PL PL PL
STATE PLAN #
STATUS/REVISIONS
SCALE DRAWN
DATE CHECKED
AS NOTED
SHEET NO.
SHEET TITLE
DRG NO.
PROJECT TITLE
TO THE:
FOR THE:
NO DESCRIPTIONDATE
RESERVED FOR NJDCA'S ELECTRONIC STAMP
Pa tr ic k
S.
S ei w el l |
A
IA
, N
CA
RB
, L
J L ic
AI
, P
A Lic
R A4
N
Y Lic
0-
Hany Y. Salib | AIA, NCARB NY Lic 032590-1 | NJ Lic 21AI01733800 | PA Lic RA404803
Patrick S. Seiwell | AIA, NCARB, LEED AP NY Lic 031550-1 | NJ Lic 21AI01611000 | PA Lic RA403783
Timothy J. Margolin | AIA, NCARB, LEED AP NY Lic 037479-1 | NJ Lic 21AI01656800 | PA Lic RA406787
Phillip J. Cacossa | PE, LEED AP NY Lic 079633-1 | NJ Lic 24GE03704900 | PA Lic PE056000E www.drg-architects.com
A R C H I T E C T S
Design Resources Group Architects, AIA, INC.
Main Office 270 Davidson Avenue, Suite 303 Somerset, NJ 08873 T: 732 560 7900 | F: 732 560 7910
New York 47-10 Austell Place Long Island City, NY 11101 T: 347 774 3750
Pennsylvania PO Box 1309 Doylestown, PA 18901 T: 201 213 3859
C:\Users\drgaia.DRGNJ\Documents\TVC23-33900 Bergen Waldwick_Central_2020_christinamE4X72_christinamE4X72.rvt
ENLARGED FLOOR FINISH
PLANS & ELEVATIONS
CM
WB12-14-2023
NORTHWEST BERGEN REGIONAL
HEALTH COMMISSION
BOROUGH OF WALDWICK
ADMINISTRATION BUILDING SECOND
FLOOR INTERIOR ALTERATIONS
TVC23-33900
A-611
63 FRANKLIN TURNPIKE
63 FRANKLIN TURNPIKE
WALDWICK, NJ 07463
WALDWICK, NJ 07463
DOE SUBMISSION
00/00/0000
SCALE: 1/2" = 1'-0"A-611
ENLARGED PLAN - OPEN OFFICE
AREA PLAN RM 200
SCALE: 1/2" = 1'-0"A-611
2 ENLARGED PLAN - SERVER ROOM 201
SCALE: 1/2" = 1'-0"A-611
3 ENLARGED PLAN - MEDS ROOM 202
SCALE: 1/2" = 1'-0"A-611
4 ENLARGED PLAN A - KITCHENETTE 203
SCALE: 1/2" = 1'-0"A-611
5 ENLARGED PLAN - REGISTRATION OFFICE 204
SCALE: 1/2" = 1'-0"A-611
1A ELEVATION - OPEN OFFICE AREA 200
SCALE: 1/2" = 1'-0"A-611
2A ELEVATION B - SERVER RM 201
SCALE: 1/2" = 1'-0"A-611
4A KICHENETTE - ELEVATION A
SCALE: 1/2" = 1'-0"A-611
5A ELEVATION A - REGISTRATION OFFICE 204
SCALE: 1/2" = 1'-0"A-611
3A ELEVATION - MEDS ROOM 202
SCALE: 1/2" = 1'-0"A-611
5B ELEVATION B - REGISTRATION OFFICE 204
0' 1' 2' 4' 0' 1' 2' 4' 0' 1' 2' 4' 0' 1' 2' 4'
0' 1' 2' 4'
0' 1' 2' 4'
0' 1' 2' 4'
0' 1' 2' 4'
0' 1' 2' 4' 0' 1' 2' 4'
0' 1' 2' 4'
SCALE: 1/2" = 1'-0"A-611
4B KITCHENETTE - ELEVATION B
0' 1' 2' 4'
GENERAL NOTES:
1. COORDINATION DRAWINGS: G.C. SHALL SUBMIT REFLECTED
CEILING PLAN WITHIN 90 DAYS AFTER AWARD OF CONTRACTS,
DRAWN ACCURATELY TO SCALE AND COORDINATED WITH
RELATED MECHANICAL, ELECTRICAL, PLUMBING, AND OTHER
WORK ABOVE, PENETRATING, OR CONNECTED TO THE CEILING.
SHOW CEILING MEMBERS, METHOD OF ANCHORAGE TO
BUILDING, STRUCTURE OF HANGERS, SIZE AND LOCATION OF
INITIAL ACCESS MODULES FOR ACOUSTICAL TILE CEILINGS (IF
ANY), FIXTURES, DIFFUSERS, GRILLES, AND SPECIAL MOLDINGS,
ETC.
2. SYMBOLS AND GRAPHICAL REPRESENTATIONS OF ALL
MECHANICAL, ELECTRICAL, AND PLUMBING EQUIPMENT WHICH
IS AT, OR PASSES THROUGH, THE CEILING PLANE ARE FOR
GENERAL LAYOUT PURPOSES ONLY. SEE THE MEP DRAWINGS
FOR FURTHER INFORMATION RELATED TO ACTUAL EQUIPMENT
QUANTITIES AND LOCATIONS. GENERAL CONTRACTOR IS
RESPONSIBLE FOR THE COORDINATION OF ALL OF THESE
COMPONENTS BASED ON NOTE NUMBER 1.
3. ALL CEILING ELEVATIONS DENOTED BY XX'-XX" ARE AS
MEASURED FROM FINISHED FLOOR DIRECTLY BELOW. CEILING
ELEVATIONS IN CORRIDORS SHALL BE COORDINATED WITH
EXACT CONSTRUCTED HEIGHT OF DOOR / WINDOW FRAME
HEAD HEIGHT. CEILING MAY BE RAISED OR LOWERED +/-1/2"
SO THAT FINISHED CEILING IS AT BOTTOM OF DOOR / WINDOW
FRAME HEAD HEIGHT WHERE CONDITIONS EXIST.
4. SEE DRAWINGS G-701 FOR TYPICAL CEILING SYSTEM AND
MISCELLANEOUS DETAILS
5. UNLESS OTHERWISE NOTED, ALL CEILINGS, ELECTRICAL
DEVICES, GRILLES, AND THE LIKE REMOVED FOR PLUMBING,
MECHANICAL, AND ELECTRICAL SYSTEM INSTALLATION SHALL
BE REINSTALLED OR REPLACED WITH EQUALS.
6. PENDANT LIGHTS: THE BOTTOM OF FIXTURE TO BE 8'-0" AFF.
THERE NEEDS TO BE AT A MINIMUM 12" BETWEEN THE CEILING
GRID AND THE TOP OF FIXTURE.
REFLECTED CEILING
PLAN NOTES:
A. PROVIDE GYP. BD. REVEAL MOLDING (SEE SPECS) AT ALL C.M.U.
BLOCK (OR GLAZED BLOCK) / GYP. BD. FASCIA AND SOFFIT
CONDITIONS. REVEAL MOLDING SHALL RUN IN CONTINUOUS
HORIZONTAL LINES AND WHERE EXPOSED VISUALLY IN
CONTINUOUS VERTICAL LINES. SEE TYPICAL DETAILS ON G7.1.
TYPICAL AT ALL NEW / RENOVATED GYP. BD. FASCIA AND
SOFFIT CONSTRUCTION.
B. WHERE CONTRACTOR OPTS NOT TO USE GYP. BD. SUSPENSION
CEILING SYSTEM CONTRACTOR SHALL PROVIDE GYP. BD.
SOFFIT CONSTRUCTION. 5/8" GYP. BD. ON 20 GAUGE 3 5/8"
METAL STUDS AT 16" O.C. W/ ANGLE BRACING TO STRUCTURE
ABOVE IN CONCEALED AREAS. SOFFIT WIDTHS SHOWN ON
PLANS.
C. FOR CEILING HEIGHT IN STAIR AREAS, SEE STAIR SECTIONS
AND DETAILS.
D. CONTROL JOINTS SHALL BE CONTINUOUS VERTICALLY AND
HORIZONTALLY THROUGH ALL GYP. BD. SOFFITS AND FASCIAS
(TYP.)
XP
MP
XC
GWB/P
ACT
EPP
EXP
= METAL PAN
= GYPSUM WALLBOARD / PAINTED
= EXISTING PLASTER
= EXISTING CEILING
= EXPOSED PAINTED STRUCTURE
= EXPOSED PAINTED PLASTER
= ACOUSTICAL CEILING TILE
XP/PA = EXPOSED PLASTER TO BE PAINTED
XCON = EXISTING CONCRETE
CEILING FINISH
LEGEND:
PC
PA
= PAINTED CONCRETE
= PAINT
OPEN EXIST TO
CEILING ABOVE
8' - 6" 8' - 6"
RELOCATE EXIST.
LIGHT FIXTURE
EXISTEXIST
8' - 6"
8' - 6"
8' - 6" 8' - 6" 8' - 6"
8' - 6"
ELECTRICAL AND MECHANICAL FIXTURE NOTES:
IN ADDITION TO THE BRACING SYSTEM SHOWN BELOW, PROVIDE THE
FOLLOWING:
1. EACH INDIVIDUAL FIXTURE AND ATTACHMENT WITH WEIGHT OF 56 LBS
OR LESS SHALL HAVE (2) TWO NO. 12 GAUGE WIRE HANGERS ATTACHED
AT DIAGONAL CORNERS OF THE FIXTURE ATTACHED TO THE
STRUCTURE ABOVE. THESE WIRES MUST BE SLACK.
2. EACH INDIVIDUAL FIXTURE AND ATTACHMENT WITH WEIGHT OF 56 LBS
OR GREATER SHALL BE INDEPENDENTLY SUPPORTED (I.E. AT 4
CORNERS) TO THE STRUCTURE.
3/8" MIN.
3/8" MIN.
7/8" MIN.
8" MAX.
FACE OF WALL
#12 GAUGE
WIRE TYP.
SPACER BAR OR OTHER
SUITABLE SYSTEM, TO KEEP
PERIMETER COMPONENTS
FROM SPREADING APART.
(TEE COMPONENT TO TEE
COMPONENT)
TYPICAL TREATMENT OF CROSS RUNNERS, MAIN RUNNERS AND
WALL CLOSURES AT TERMINAL ENDS
NOTE:
HANGER WIRES "N" AND "S" ARE IN THE SAME VERTICAL PLANE AS THE MAIN RUNNER.
HANGER WIRES "E" AND "W" ARE IN VERTICAL PLANES PERPENDICULAR TO THE MAIN RUNNER.
45 DEGREES
DEGREES
D
EG
RE
ES
#12 GAUGE SPLAY WIRE
BRACING IN PLANE OF EACH
RUNNER. VERTICAL ANGLE
45 DEGREES EN
W S
MAIN RUNNER
CROSS RUNNER
2" MAX.
NOTE:
PROVIDE SPLAY BRACING AS SHOWN (4 DIFFERENT
DIRECTIONS) AT 12'-0" O.C. MINIMUM OF (1) ONE LOCATION IN
CEILING AREAS THAT CANNOT ACCOMMODATE 12'-0" CENTERS
45 DEGREES
2" MAX.
NOTE:
GYP. BD. CEILING SUSP. SYSTEM TO RUN
THROUGH C.J. PER MANUF. RECOMMENDATIONS
GYP. BD. CONTROL JOINT.
PAINTED. COLOR TO MATCH
GYP. BD. FINISH. FOR
LOCATION OF C.J.'S SEE
REFLECTED CEILING PLANS
5/8" GYP. BD.
GYP. BD. CLG. SUSP. SYSTEM
DETAIL SHALL BE SIMILAR AT
CONVENTIONAL METAL
FRAMING SYSTEMS. (TYP.)
UNDERSIDE OF
EXIST. GYP. CEILING
UNDERSIDE OF ACT
CEILING
SEE PARTITION
TYPES FOR DETAILS
ACOUSTICAL SEALANT
STATE PLAN #
STATUS/REVISIONS
SCALE DRAWN
DATE CHECKED
AS NOTED
SHEET NO.
SHEET TITLE
DRG NO.
PROJECT TITLE
TO THE:
FOR THE:
NO DESCRIPTIONDATE
RESERVED FOR NJDCA'S ELECTRONIC STAMP
Pa tr ic k
S.
S ei w el l |
A
IA
, N
CA
RB
, L
J L ic
AI
, P
A Lic
R A4
N
Y Lic
0-
Hany Y. Salib | AIA, NCARB NY Lic 032590-1 | NJ Lic 21AI01733800 | PA Lic RA404803
Patrick S. Seiwell | AIA, NCARB, LEED AP NY Lic 031550-1 | NJ Lic 21AI01611000 | PA Lic RA403783
Timothy J. Margolin | AIA, NCARB, LEED AP NY Lic 037479-1 | NJ Lic 21AI01656800 | PA Lic RA406787
Phillip J. Cacossa | PE, LEED AP NY Lic 079633-1 | NJ Lic 24GE03704900 | PA Lic PE056000E www.drg-architects.com
A R C H I T E C T S
Design Resources Group Architects, AIA, INC.
Main Office 270 Davidson Avenue, Suite 303 Somerset, NJ 08873 T: 732 560 7900 | F: 732 560 7910
New York 47-10 Austell Place Long Island City, NY 11101 T: 347 774 3750
Pennsylvania PO Box 1309 Doylestown, PA 18901 T: 201 213 3859
C:\Users\drgaia.DRGNJ\Documents\TVC23-33900 Bergen Waldwick_Central_2020_christinamE4X72_christinamE4X72.rvt
SECOND FLOOR RCP
Author
Checker09/04/2018
BID SET
01/26/2024
NORTHWEST BERGEN REGIONAL
HEALTH COMMISSION
BOROUGH OF WALDWICK
ADMINISTRATION BUILDING SECOND
FLOOR INTERIOR ALTERATIONS
TVC23-33900
A-702
63 FRANKLIN TURNPIKE
63 FRANKLIN TURNPIKE
WALDWICK, NJ 07463
WALDWICK, NJ 07463
KEY PLAN
SCALE: N.T.S.
PR
OJ
EC
T
NO
RT
H
SCALE: 1/4" = 1'-0"A-702
1 SECOND FLOOR REFLECTED CEILING PLAN
NOT TO SCALEA-702
TYPICAL SEISMIC RESTRAINING DETAILS FOR
SUSPENDED ACOUSTICAL CEILING SYSTEMS (ZONE 2)
NOT TO SCALEA-702
SECTION DETAIL @ GYP.
BD. CONTROL JOINT
NOT TO SCALEA-702
SECTION DETAIL - TERMINATION OF GYP. BD.
WALLS TO UNDERSIDE OF EXISTING GYP
CEILING
SCOPE OF WORK
ABD AUTOMATIC BALL DRIP
AFC ABOVE FINISHED CEILING
AFF ABOVE FINISHED FLOOR
BFP BACK FLOW PREVENTER
BOP BOTTOM OF PIPE
CL CENTERLINE
CLG CEILING
COMB COMBINATION
CP CONTROL PANEL
DCDA DOUBLE CHECK DETECTOR ASSEMBLY
DCV DOUBLE CHECK VALVE
DN DOWN
DSP DRY SPRINKLER
DPS DRY PIPE SYSTEM
DPV DRY PIPE VALVE
DR DRAIN
DU DRYER UNIT
DWG DRAWING
EL ELEVATION
EX EXISTING
F FIRE SERVICE
FCVA FLOOR CONTROL VALVE ASSEMBLY
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FFE FINISHED FLOOR ELEVATION
FHC FIRE HOSE CABINET
FHR FIRE HOSE RACK
FHV FIRE HOSE VALVE
FM FACTORY MUTUAL
FP FIRE PUMP
FS FLOW SWITCH
FSP FIRE STAND PIPE
FT FOOT, FEET
HB HOSE BIBB
HDS HEADS
HR HOUR
HZ HIGH ZONE
IE INVERT ELEVATION
INV INVERT
JP JOCKEY PUMP
JS JANITORS SINK
LZ LOW ZONE
MS MOP SINK
MTD MOUNTED
NIC NOT IN CONTRACT
NTS NOT TO SCALE
OD OVERFLOW DRAIN
OS&Y OUTSIDE SCREW & YOKE
PG PRESSURE GAUGE
PLMB PLUMBING
PO PLUGGED OUTLET
PRV PRESSURE REDUCING VALVE
PS PRESSURE SWITCH
RCV RISER CONTROL VALVE
RPZ REDUCED PRESSURE ZONE BFP ASSEMBLY
SQ.FT. SQUARE FOOT (FEET)
SPECS SPECIFICATIONS
SP SPRINKLER
SS SERVICE SINK
STD STANDARD
TEMP TEMPERATURE
TS TAMPER SWITCH
TYP TYPICAL
UL UNDERWRITERS LABORATORIES
VO VALVED OUTLET
WM WATER METER
WP WATER PROOF
ABBREVIATIONS LIST IS PROVIDED FOR CONVENIENCE ONLY. NOT ALL SYMBOLS
OR ABBREVIATIONS ARE NECESSARILY USED IN THIS PROJECT.
SPRINKLER ABBREVIATIONS
DWG NO. DRAWING NAME #
IS
SU
E/ R
EV
IS
IO
N
D
AT
E
SPRINKLER DRAWING LIST
SP-902.00 SPRINKLER 2ND FLOOR REMOVAL PLAN 04
SP-102.00 SPRINKLER 2ND FLOOR CONSTRUCTION PLAN
XSP-001.00 SPRINKLER COVER SHEET 01
IS
SU
ED
F
O R
P R
O G
R
ES
S
- 0
1/
/2
SP-501.00 SPRINKLER DETAILS, RISER DIAGRAM AND SCHEDULES
1. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND JOB CONDITIONS AND
SHALL REPORT TO ENGINEER ANY DISCREPANCIES OR OMISSIONS THAT
WOULD INTERFERE WITH SATISFACTORY COMPLETION OF THE WORK.
2. COORDINATE THE FIRE PROTECTION SYSTEM WITH WORK OF ALL OTHER
TRADES PRIOR TO ANY FABRICATION OR INSTALLATION. PROVIDE ALL
FITTINGS, OFFSETS, AND TRANSITIONS AS REQUIRED FOR A COMPLETE
WORKABLE INSTALLATION.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REVIEWING A FULL SET
OF BID DOCUMENTS AND VISIT THE SITE TO MAKE HIMSELF AWARE OF THE
TOTAL JOB BEFORE SUBMITTING HIS PRICE, FAILURE TO COMPLY SHALL
NOT HOLD THE OWNER RESPONSIBLE FOR ANY ADDITIONAL COST.
CONTRACTOR SHALL BE RESPONSIBLE FOR ARRANGING WITH FACILITY'S
BUILDING MANAGEMENT FOR HANDLING MATERIALS, AS WELL AS FOR
ALLOWABLE WORKING HOURS AND DELIVERIES.
4. NOTIFY BUILDING MANAGER AT LEAST 48 HOURS BEFORE NEW WORK OR
BEFORE SHUT DOWN OF EXISTING SERVICES. RISER SHUT DOWNS SHALL
BE PERFORMED AT TENANT'S COST, AT DESIGNATED TIMES UNDER
BUILDING MANAGER'S SUPERVISION AND ONLY WITH HIS APPROVAL.
5. CONTRACTOR SHALL SUBMIT ALL SHOP DRAWINGS AND MANUFACTURERS'
CUTS AND SAMPLES TO ARCHITECT PRIOR TO COMMENCEMENT OF SUCH
WORK.
6. THE CONTRACTOR SHALL INDICATE ON HIS SHOP DRAWING THAT ALL
PIPING LAYOUTS ARE COORDINATED WITH THE MEP AND STRUCTURAL
CONDITIONS. INCLUDE ON EACH WORKING DRAWING LAYOUT
CERTIFICATE, THAT ALL RELATED CONDITIONS HAVE BEEN CHECKED, AND
THAT NO CONFLICT EXISTS. SUBMISSION WILL NOT BE APPROVED
WITHOUT SUCH CERTIFICATION.
7. CONTRACTOR SHALL SUBMIT SPRINKLER HYDRAULIC CALCULATIONS FOR
THE ENGINEER'S REVIEW TO VERIFY THE ADEQUACY OF THE INDICATED
PIPE SIZES.
8. SPRINKLER CONTRACTOR SHALL CONDUCT A HYDRANT FLOW TEST OR
OBTAIN FLOW TEST DATA TO VERIFY THE AVAILABLE WATER SUPPLY
PRESSURE AND FLOW RATE ON THE INCOMING FIRE SERVICE.
9. DRAWINGS ARE NOT TO BE SCALED.
10. CONTRACTOR SHALL COMPLY WITH ALL BUILDING DEPARTMENT AND
REGULATORY AGENCIES AND CODE REQUIREMENTS. CONTRACTOR SHALL
BE RESPONSIBLE FOR SECURING ALL NECESSARY PERMITS AND
APPROVALS OF ALL TRADES.
11. CONTRACTOR SHALL CARRY AND DOCUMENT LIABILITY, ACCIDENT AND
PROPERTY DAMAGE INSURANCE AS REQUIRED BY COOPERATIVE
CORPORATION AND OBSERVE THEIR PERMITTED HOURS FOR WORK.
12. CONTRACTOR SHALL EXERCISE EXTREME CARE IN PROTECTING AREAS
ADJACENT TO CONSTRUCTION AREAS SHALL FULLY PROTECT THEM FROM
ANY DAMAGE RESULTING FROM CONTRACTOR'S WORKMEN,
SUBCONTRACTORS OR AGENTS, AND SHALL BE RESPONSIBLE FOR
REPAIRING, CLEANING OR REPLACING ANY SUCH DAMAGE.
13. ALL DIMENSIONS GIVEN ARE FINISH DIMENSIONS UNLESS OTHERWISE
STATED.
14. UNLESS SPECIFICALLY STATED OTHERWISE, CONTRACTOR SHALL
FURNISH ALL LABOR, MATERIALS, APPURTENANCES, EQUIPMENT AND
SERVICES TO COMPLETE ALL WORK AS INDICATED ON DRAWINGS AND/OR
SPECIFIED ON NOTES.
15. UNLESS SPECIFICALLY STATED OTHERWISE, CONTRACTOR SHALL FOLLOW
MANUFACTURER'S DIRECTIONS, INSTRUCTIONS AND RECOMMENDATIONS
FOR ALL MATERIALS AND PROCESSES USED IN THIS CONTRACT.
16. RELOCATE ALL EXISTING SPRINKLER MAIN AND BRANCH PIPING IN THE
AREA OF WORK THAT IS IN CONFLICT WITH THE LIGHTING FIXTURES AND
HVAC DUCTWORK.
17. THE CONTRACTOR SHALL ALLOW FOUR (4) ADDITIONAL SPRINKLERS PER
BRANCH TO BE INSTALLED BELOW AND ABOVE THE DUCTS IN MECHANICAL
ROOMS.
18. SPRINKLER HEADS SHALL NOT BE LOCATED DIRECTLY OVER ANY
ELECTRICAL AND TELEPHONE EQUIPMENT.
19. ELECTRICAL AND TELEPHONE EQUIPMENT SHALL BE PROTECTED BY A
SHIELD TO DEFLECT WATER AWAY FROM SUCH EQUIPMENT. SHIELD SHALL
BE GALVANIZED STEEL, ALUMINUM OR BRASS.
20. ACCESS DOORS ARE TO BE PROVIDED ADJACENT TO ALL VALVES.
21. SPRINKLERS IN MECHANICAL ROOM SHALL HAVE A TEMPERATURE RATING
OF 212°F. LOCATIONS, NECESSARY FOR INSPECTION AND
MAINTENANCE.
22. SPRINKLER PIPING SHALL BE INSTALLED AS PER APPROVED SHOP
DRAWINGS.
23. CONTRACTOR SHALL BASE ALL HYDRAULIC CALCULATIONS ON THE
AVAILABLE PRESSURE AND WATER FLOW DATA AT EXISTING FLOOR
CONTROL ASSEMBLY.
24. EACH CONTRACTOR IS RESPONSIBLE TO PROVIDE ALL PENETRATIONS,
CUTTING, PATCHING, SLEEVES, AND FIRESTOPPING REQUIRED TO
COMPLETE THE INSTALLATION OF ALL WORK INCLUDED UNDER THEIR
CONTRACT IN ACCORDANCE WITH THE FIRE EGRESS AND SECURITY PLAN
DRAWINGS.
25. ALL UPRIGHT SPRINKLER HEADS IN MECHANICAL AND STORAGE ROOMS
SHALL HAVE HEAD GUARDS.
26. PROVIDE HYDRAULICALLY DESIGNED SPRINKLER SYSTEM FOR ALL PIPING
NOT SIZED.
27. LOCATE ALL HORIZONTAL PIPING ABOVE SUSPENDED CEILING, UNLESS
THERE IS NO CEILING.
28. AUTOMATIC SPRINKLERS SHALL NOT BE INSTALLED IN ELEVATOR MACHINE
ROOMS AS PER NEW YORK CITY BUILDING CODE.
29. PROVIDE SPRINKLER HEADS UNDER DUCTS OVER 4'-0" IN WIDTH IN AREAS
WITHOUT HUNG CEILING.
30. UPON COMPLETION OF THE WORK, CONTRACTOR SHALL COMPLETELY
CLEAN THE CONSTRUCTION AREA SUITABLE FOR THE OWNER'S USE,
INCLUDING REMOVAL OF ALL LABELS (AFTER ARCHITECT'S INSPECTION),
CLEANING OF ALL THE EQUIPMENT, CONSTRUCTION WORK, WINDOWS AND
OTHER WORK, NEW AND OLD, IN THAT CONSTRUCTION AREA.
31. BUILDING DEPARTMENT APPROVED PLANS SHALL BE TURNED OVER TO
OWNER AT THE COMPLETION OF THE JOB.
32. AT THE FINAL COMPLETION OF THE JOB, CONTRACTOR SHALL SUBMIT TO
THE FACILITY AND TO ENGINEER A NOTARIZED AFFIDAVIT STATING
COMPLIANCE WITH ALL PROVISIONS OF THIS CONTRACT, INCLUDING ALL
NOTES, EXCEPT FOR THOSE CHANGES SPECIFICALLY APPROVED IN
WRITING BY THE ARCHITECT.
33. CONTRACTOR SHALL GUARANTEE ALL WORK PERFORMED UNDER THIS
CONTRACT FOR ONE YEAR, STARTING FROM DATE OF FINAL ACCEPTANCE
OF ALL WORK.
34. CONTRACTOR SHALL PROVIDE ALL FITTINGS AND PIPING REQUIRED TO
MODIFY EXISTING SPRINKLER MAIN TO ALLOW FOR INSTALLATION OF HVAC
DUCT WORK AND LIGHTING FIXTURES.
35. THE MINIMUM SPRINKLER BRANCH PIPE SIZE SHALL BE 1".
36. SPRINKLER HEADS SHALL BE ± 1/2" FROM CENTER OF TILE CONTRACTOR
SHALL ALLOW FOR ALL REQUIRED FITTINGS TO ACHIEVE THIS GOAL AND
INCLUDE IT IN HIS CONTRACT PRICE.
37. ALL DRY TYPE SPRINKLER HEADS SHALL BE INSTALLED IN TEE TYPE
FITTINGS ONLY.
38. IN AREAS OF WORK IF ANY EXISTING SPRINKLERS ARE TO REMAIN, THE
NEW SPRINKLERS ARE TO MATCH THE EXISTING MANUFACTURER, TYPE,
TEMPERATURE AND RESPONSE.
GENERAL SPRINKLER NOTES
1. DRAWINGS ARE DIAGRAMMATIC AND INDICATE GENERAL ARRANGEMENT.
2. VERIFY ALL GOVERNING DIMENSIONS, PIPE SIZES AND LOCATION OF THE
PIPING AND EQUIPMENT TO BE REMOVED.
3. NOTIFY BUILDING MANAGER AT LEAST 48 HOURS BEFORE DEMOLITION
WORK OR BEFORE SHUT DOWN OF EXISTING SERVICES. RISER SHUT
DOWNS SHALL BE PERFORMED AT TENANT'S COST, AT DESIGNATED TIMES
UNDER BUILDING MANAGER'S SUPERVISION AND ONLY WITH HIS
APPROVAL.
4. ALL EQUIPMENT, PIPING, ETC. TO BE REMOVED, SHALL BE DISPOSED OF,
RELOCATED, TURNED OVER TO THE TENANT OR SALVAGED AS DIRECTED
BY THE BUILDING OWNER.
5. UPON COMPLETION OF ALL NEW WORK NO ABANDONED PIPING SHALL
REMAIN. EXISTING BRANCH PIPING SERVING REMOVED SPRINKLER SHALL
BE COMPLETELY REMOVED TO MAIN BRANCH AND CAPPED AT TEE WITH
NEW FITTINGS.
6. THE EXISTING SYSTEMS SHALL BE LEFT IN PERFECT WORKING ORDER
UPON COMPLETION OF ALL NEW WORK.
7. LOCATIONS AND SIZES OF EXISTING PIPING ARE APPROXIMATE. FIELD
VERIFY EXACT SIZES AND LOCATIONS OF ALL EXISTING PIPING AT THE
SITE.
8. NO REMOVED EXISTING PIPING FITTINGS, VALVES, FIXTURES, ETC. SHALL
BE REUSED UNLESS OTHERWISE APPROVED BY THE ENGINEER.
9. THE CONTRACTOR SHALL NOT INTERRUPT ANY OF THE SERVICES OF THE
EXISTING BUILDING NOR INTERFERE WITH THE SERVICES IN ANY WAY
WITHOUT THE EXPRESS PERMISSION IN WRITING BY THE BUILDING
MANAGER. SUCH INTERRUPTIONS AND INTERFERENCES SHALL BE MADE
AS BRIEF AS POSSIBLE AND ONLY AT THE TIME STATED BY THE BUILDING
MANAGER.
10. COORDINATE SPRINKLER HEAD LOCATION WITH EXISTING CEILING TILE
AND SOFFIT CONSTRUCTION ON SITE.
11. REFER TO ARCHITECTURAL DRAWINGS FOR ALL CEILING HEIGHTS AND
SPRINKLER HEAD LOCATION ON CEILING TILE.
12. CONTRACTOR & ITS SUB'S SHALL BE RESPONSIBLE FOR LOCATING ALL
EXISTING SPRINKLERS AND RELATED PIPING AND REMOVING SPRINKLERS
AND RELATED PIPING AS REQUIRED TO MEET NEW PROPOSED SPRINKLER
HEAD LAYOUT.
13. AS PART OF THIS CONTRACT, THE CONTRACTOR SHALL INCLUDE A
FIREWATCH FOR THE DURATION OF THE SPRINKLER SHUT-DOWN. WHERE
APPROVED BY BUILDING MANAGEMENT, A TEMPORARY SPRINKLER LOOP
MAY BE PROVIDED IN LIEU OF THE REQUIRED FIRE WATCH. THERE SHALL
BE NO APPROVED CHANGE ORDERS FOR THIS SCOPE.
14. CONTRACTOR SHALL EXERCISE EXTREME CARE IN PROTECTING AREAS
ADJACENT TO CONSTRUCTION AREAS, SHALL FULLY PROTECT THEM FROM
ANY DAMAGE RESULTING FROM CONTRACTOR'S WORKMEN,
SUBCONTRACTORS OR AGENTS, SHALL BE RESPONSIBLE FOR
REPAINTING, CLEANING OR REPLACING ANY SUCH DAMAGE.
15. THE CONTRACTOR SHALL VISIT THE JOB SITE AND THOROUGHLY
FAMILIARIZE HIMSELF WITH ALL EXISTING CONDITIONS AND FIRE
PROTECTION SYSTEMS PRIOR TO THE BEGINNING OF DEMOLITION WORK.
16. SPRINKLER COVERAGE OF THE EXISTING SPRINKLER SYSTEM OUTSIDE
THE AREA OF WORK SHALL BE MAINTAINED AT ALL TIMES DURING
CONSTRUCTION.
17. IN THE EVENT OF ANY DISCREPANCY BETWEEN THE DEMOLITION PLAN
AND THE CONSTRUCTION PLANS, CONSTRUCTION PLANS AND INTENT
SHALL GOVERN.
SPRINKLER REMOVAL NOTES
1. THE SPRINKLER SYSTEM IN THIS BUILDING SHALL BE IN ACCORDANCE
WITH THE 2022 NEW YORK CITY BUILDING CODE AND NFPA 13-2016.
2. OCCUPANCY CRITERIA
A. LIGHT HAZARD - OFFICE SPACE, SEATING AREA, AND CONFERENCE
ROOMS DENSITY 0.10 GPM PER SQ. FT. OVER MOST HYDRAULICALLY
DEMANDING 1500 SQ. FT. MAXIMUM COVERAGE PER SPRINKLER HEAD 225
SQ. FT. 52,000 SQ.FT. MAXIMUM AREA LIMITATION.
B. ORDINARY HAZARD GROUP 1 - MECHANICAL AND ELECTRICAL
EQUIPMENT ROOMS. DENSITY 0.15 GPM PER SQ. FT. OVER MOST
HYDRAULICALLY DEMANDING 1500 SQ. FT. MAXIMUM COVERAGE PER
SPRINKLER HEAD 130 SQ. FT. 52,000 SQ. FT. MAXIMUM AREA LIMITATION.
C. WATER CURTAIN SPRINKLER SYSTEMS - SPRINKLERS SHALL BE
HYDRAULICALLY DESIGNED TO PROVIDE A DISCHARGE OF 3 GPM PER
LINEAR FOOT OF WATER CURTAIN, WITH NO SPRINKLER DISCHARGING
LESS THAN 15 GPM. SPRINKLERS SHALL BE SPACED NOT MORE THAN 6 FT
APART.
3. MINIMUM PRESSURE AND WATER DISCHARGE:
A. THE MINIMUM PRESSURE AT ANY SPRINKLER HEAD SHALL BE 7 PSI.
4. HYDRAULICALLY CALCULATED SYSTEMS SHALL MEET THE FOLLOWING
CRITERIA:
A. EXACT LOCATION OF SPRINKLER HEADS IN FINISHED AREAS WITH
SUSPENDED CEILINGS SHALL BE AS INDICATED ON ARCHITECTURAL
REFLECTED CEILING PLANS WITH HEADS IN CENTER OF TILES.
B. WHENEVER ROLLED GROOVED CONNECTIONS ARE USED, ALLOWANCE
FOR ADDITIONAL PRESSURE LOSS AT GROOVES SHALL BE MADE AS
FOL…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .