Summary of Bid Document - Town of Montross Waterline Extension Part 2
This is a bid document for the Town of Montross in Westmoreland County, Virginia, managed by ARM Group LLC as the engineer. The project involves underground water distribution system upgrades consisting of approximately 4,650 linear feet of 6-inch C-900 PVC waterline, 3,000 linear feet of service laterals, 60 service connections, three jack-and-bore steel-encased road crossings totaling approximately 140 linear feet, five fire hydrants, valves, fittings, and associated work. A non-mandatory pre-bid conference was scheduled for March 27, 2026, at 10:00 a.m. at the Town of Montross office. Sealed bids were due by 2:00 p.m. prevailing local time on April 17, 2026, either in person or through Virginia's eVA electronic procurement system. Bidders were required to conduct site visits and familiarize themselves with local conditions. The contract will be awarded to the lowest responsive and responsible bidder. The work is divided into three sections, with Section 3 (Peach Grove Lane to Forest Drive) requiring completion by August 31, 2026, before commencement of work in Sections 1 and 2, due to grant funding requirements.
The contract is financed in part by USDA Rural Utilities Service under the Consolidated Farm and Rural Development Act and requires compliance with American Iron and Steel (AIS) requirements mandating domestic production of specified iron and steel products. The successful bidder must furnish 100 percent performance and payment bonds and submit an experience and equipment list with their bid. Bid security in the form of a certified check or bid bond equal to five percent of the bid amount is required. The contract includes liquidated damages of $350 per day for failure to achieve Substantial Completion within 270 days and final completion within 300 days after contract commencement. Progress payments are estimated at 95 percent of completed work with five percent retainage, increasing to no additional retainage after 50 percent completion if progress is satisfactory. The contract documents include EJCDC standard forms and supplementary conditions addressing electronic document exchange, contractor insurance requirements (including commercial general liability, workers' compensation, and pollution liability), and federal compliance requirements including equal employment opportunity, anti-kickback provisions, and environmental protection standards.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID DOCUMENT
TOWN OF MONTROSS
WATERLINE EXTENSION PART 2
TOWN OF MONTROSS
WESTMORELAND COUNTY, VIRGINIA
March 2026
P.N. 23011622
9560 Kings Charter Drive
Ashland, VA 23005
P.N. 23011622 ARM Group LLC.
TOC-1
TABLE OF CONTENTS
FRONT END SECTIONS
NAME OF SECTION NUMBER OF
PAGES
ADVERTISEMENT FOR BIDS 2
INSTRUCTION TO BIDDERS 13
BID FORM 7
NOTICE OF AWARD 1
BID BOND 2
PERFORMANCE BOND 3
PAYMENT BOND 4
CERTIFICATE OF SUBTANTIAL COMPLETION 1 2
STANDARD GENERAL CONDITIONS 80
SUPPLEMENTARY CONDITIONS 47
AGREEMENT BETWEEN OWNER AND CONTRACTOR (STIPULATED PRICE) 6
CONTRACTOR’S APPLICATION FOR PAYMENT 4
CONTRACT CHANGE ORDER 1
P.N. 23011622 ARM Group LLC
AB-1
ADVERTISEMENT FOR BIDS
Town of Montross 15869 Kings Highway Montross, VA 22520 Attn: Francine G. Taylor, Town Manager
Montross Waterline Extension - Part 2
Sealed Bids are invited for water distribution system upgrades generally consisting of approximately 4,650 linear feet of 6-inch C-900 PVC waterline, 3,000 linear feet of service laterals, 60 service connections, three jack-and-bore steel-encased road crossings totaling approximately 140 linear feet, five fire hydrants, valves, fittings, and all associated work necessary to complete the waterline extension and replacement as shown on plans. The Bidder shall commence and sequence the work in accordance with the requirements specified in Article 5 of the Bid Form.
A non-Mandatory Pre-Bid Conference will be held on March 27, 2026, at 10:00 a.m. at the Town of Montross office.
Bids will be received at the Town office until 2:00 p.m., prevailing local time on April 17, 2026, or through the Commonwealth’s statewide electronic procurement system known as eVA (http://eva.virginia.gov) Bids will be opened publicly and read aloud. Bids received after this time will not be accepted.
To learn how to submit an online bid in eVA, please refer to the online supplier training page at: https://eva.virginia.gov/supplier-training-materials.html
The link to the video “Viewing and Responding to Solicitations” can be found on the Supplier Training Materials page at: https://www.youtube.com/watch?v=KSxcAkOekW0
If submitting through eVA, it is the responsibility of the bidder to ensure the bid and all required attachments are properly completed, readable and uploaded to eVA by the stated date and time deadline. Bidders should allow sufficient time to account for any technical difficulties they may encounter during online submission or uploading of documents. In the event of technical difficulties, suppliers should contact eVA Customer Care at 1-866-289-7367 or via email at eVACustomerCare@DGS.Virginia.gov.
Bids may be withdrawn in accordance with applicable provisions of the Code of Virginia.
Digital PDF copies of the Contract Documents may be obtained from eVA or by contacting:
ARM Group, LLC.
9560 Kings Charter Drive Ashland, Virginia 23005
(804) 550-9200 http://eva.virginia.gov/ https://eva.virginia.gov/supplier-training-materials.html https://www.youtube.com/watch?v=KSxcAkOekW0
P.N. 23011622 ARM Group LLC
AB-2
A Certified Check or Bid Bond drawn to the order of the Town of Montross in an amount equal to five percent (5%) of the amount bid must be submitted with the proposal as bid security. All proposals shall be submitted in accordance with the Instructions to Bidders, Article 12 – Preparation of Bid Submission - to be found in the Instructions to Bidders.
The successful bidder for this contract must furnish a 100 percent Performance Bond, and a 100 percent Labor and Material Bond. Each Bidder is required to submit an experience and equipment list with their bid.
Town of Montross hereby reserves the right, which is understood and agreed to by all Bidders, to refuse any or all bids submitted; and also reserves the right to waive any informality in bids received, but any contract awarded will be to the lowest responsive and responsible bidder.
No Bidder may withdraw his bid within sixty (60) calendar days after the actual date of the bid opening.
Date: March 10, 2026
Francine G. Taylor, Town Manager
This Page Intentionally Left Blank
(Separator Page)
EJCDC® C-200, Instructions to Bidders for Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
TOC Page1 of 1
INSTRUCTIONS TO BIDDERS FOR CONSTRUCTION CONTRACT
TABLE OF CONTENTS
Page
Article 1— Defined Terms
Article 2— Bidding Documents
Article 3— Qualifications of Bidders
Article 4— Pre-Bid Conference
Article 5— Site and Other Areas; Existing Site Conditions; Examination of Site; Owner’s Safety Program;
Other Work at the Site
Article 6— Bidder’s Representations and Certifications
Article 7— Interpretations and Addenda
Article 8— Bid Security
Article 9— Contract Times
Article 10— Substitute and “Or Equal” Items
Article 11— Subcontractors, Suppliers, and Others
Article 12— Preparation of Bid
Article 13— Basis of Bid
Article 14— Submittal of Bid
Article 15— Modification and Withdrawal of Bid
Article 16— Opening of Bids
Article 17— Bids to Remain Subject to Acceptance
Article 18— Evaluation of Bids and Award of Contract
Article 19— Bonds and Insurance
Article 20— Signing of Agreement
Article 21— Sales and Use Taxes
Article 22— Contracts to Be Assigned
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, ARTICLE 1—DEFINED TERMS
1.01 Terms used in these Instructions to Bidders have the meanings indicated in the General Conditions and Supplementary Conditions. Additional terms used in these Instructions to Bidders have the meanings indicated below:
A. Issuing Office—The office from which the Bidding Documents are to be issued, and which registers plan holders.
B. Bidder - one who submits a Bid directly to Owner as distinct from a sub-bidder, who submits a bid to a Bidder.
C. Successful Bidder - the lowest, responsible and responsive Bidder to whom Owner (on the basis of Owner's evaluation as hereinafter provided) makes an award.
ARTICLE 2—BIDDING DOCUMENTS
2.01 Bidder shall obtain a complete set of Bidding Requirements and proposed Contract Documents (together, the Bidding Documents). See the Agreement for a list of the Contract Documents. It is Bidder’s responsibility to determine that it is using a complete set of documents in the preparation of a Bid. Bidder assumes sole responsibility for errors or misinterpretations resulting from the use of incomplete documents, by Bidder itself or by its prospective Subcontractors and Suppliers.
2.02 Bidding Documents are made available for the sole purpose of obtaining Bids for completion of the Project and permission to download or distribution of the Bidding Documents does not confer a license or grant permission or authorization for any other use. Authorization to download documents, or other distribution, includes the right for plan holders to print documents solely for their use, and the use of their prospective Subcontractors and Suppliers, provided the plan holder pays all costs associated with printing or reproduction. Printed documents may not be re-sold under any circumstances.
2.03 Bidder may register as a plan holder and obtain complete sets of Bidding Documents, in the number and format stated in the Advertisement or invitation to bid, from the Issuing Office.
Bidders may rely that sets of Bidding Documents obtained from the Issuing Office are complete, unless an omission is blatant. Registered plan holders will receive Addenda issued by Owner.
2.04 Plan rooms (including construction information subscription services, and electronic and virtual plan rooms) may distribute the Bidding Documents, or make them available for examination.
Those prospective bidders that obtain an electronic (digital) copy of the Bidding Documents from a plan room are encouraged to register as plan holders from the Bidding Documents Website or Issuing Office. Owner is not responsible for omissions in Bidding Documents or other documents obtained from plan rooms, or for a Bidder’s failure to obtain Addenda from a plan room.
2.05 Electronic Documents
A. When the Bidding Requirements indicate that electronic (digital) copies of the Bidding Documents are available, such documents will be made available to the Bidders as Electronic Documents in the manner specified.
1. Bidding Documents will be provided in Adobe PDF (Portable Document Format) (.pdf) that is readable by Adobe Acrobat Reader Version 2020 or later. It is the intent of the Engineer and Owner that such Electronic Documents are to be exactly representative of
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, the paper copies of the documents. However, because the Owner and Engineer cannot totally control the transmission and receipt of Electronic Documents nor the Contractor’s means of reproduction of such documents, the Owner and Engineer cannot and do not guarantee that Electronic Documents and reproductions prepared from those versions are identical in every manner to the paper copies.
B. Unless otherwise stated in the Bidding Documents, the Bidder may use and rely upon complete sets of Electronic Documents of the Bidding Documents, described in Paragraph 2.05.A above. However, Bidder assumes all risks associated with differences arising from transmission/receipt of Electronic Documents versions of Bidding Documents and reproductions prepared from those versions and, further, assumes all risks, costs, and responsibility associated with use of the Electronic Documents versions to derive information that is not explicitly contained in printed paper versions of the documents, and for Bidder’s reliance upon such derived information.
C. After the Contract is awarded, the Owner will provide or direct the Engineer to provide for the use of the Contractor documents that were developed by Engineer as part of the Project design process, as Electronic Documents in native file formats.
1. Electronic Documents that are available in native file format.
2. Release of such documents will be solely for the convenience of the Contractor. No such document is a Contract Document.
3. Unless the Contract Documents explicitly identify that such information will be available to the Successful Bidder (Contractor), nothing herein will create an obligation on the part of the Owner or Engineer to provide or create such information, and the Contractor is not entitled to rely on the availability of such information in the preparation of its Bid or pricing of the Work. In all cases, the Contractor shall take appropriate measures to verify that any electronic/digital information provided in Electronic Documents is appropriate and adequate for the Contractor’s specific purposes.
4. In no case will the Contractor be entitled to additional compensation or time for completion due to any differences between the actual Contract Documents and any related document in native file format.
ARTICLE 3—QUALIFICATIONS OF BIDDERS
3.01 To demonstrate Bidder’s qualifications to perform the Work, after submitting its Bid and within five days of Owner’s request, Bidder must submit the following information:
A. Written evidence establishing its qualifications such as financial data, previous experience, and present commitments.
B. A written statement that Bidder is authorized to do business in the state where the Project is located, or a written certification that Bidder will obtain such authority prior to the Effective Date of the Contract.
C. Bidder’s state or other contractor license number, if applicable.
D. Subcontractor and Supplier qualification information.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, E. Other required information regarding qualifications.
3.02 A Bidder’s failure to submit required qualification information within the times indicated may disqualify Bidder from receiving an award of the Contract.
3.03 No requirement in this Article 3 to submit information will prejudice the right of Owner to seek additional pertinent information regarding Bidder’s qualifications.
ARTICLE 4—PRE-BID CONFERENCE
4.01 A non-mandatory pre-bid conference will be held at the time and location indicated in the Advertisement or invitation to bid. Representatives of Owner and Engineer will be present to discuss the Project. Bidders are encouraged to attend and participate in the conference; however, attendance at this conference is not required to submit a Bid.
4.02 Information presented at the pre-Bid conference does not alter the Contract Documents. Owner will issue Addenda to make any changes to the Contract Documents that result from discussions at the pre-Bid conference. Information presented, and statements made at the pre-bid conference will not be binding or legally effective unless incorporated in an Addendum.
ARTICLE 5—SITE AND OTHER AREAS; EXISTING SITE CONDITIONS; EXAMINATION OF SITE; OWNER’S
SAFETY PROGRAM; OTHER WORK AT THE SITE
5.01 Site and Other Areas
A. The Site is identified in the Bidding Documents. By definition, the Site includes rights-of-way, easements, and other lands furnished by Owner for the use of the Contractor. Any additional lands required for temporary construction facilities, construction equipment, or storage of materials and equipment, and any access needed for such additional lands, are to be obtained and paid for by Contractor.
5.02 Existing Site Conditions
A. Subsurface and Physical Conditions; Hazardous Environmental Conditions
1. The Supplementary Conditions identify the following regarding existing conditions at or adjacent to the Site:
a. Those reports of explorations and tests of subsurface conditions at or adjacent to the Site that contain Technical Data.
b. Those drawings known to Owner of existing physical conditions at or adjacent to the Site, including those drawings depicting existing surface or subsurface structures at or adjacent to the Site (except Underground Facilities), that contain Technical Data.
c. Reports and drawings known to Owner relating to Hazardous Environmental Conditions that have been identified at or adjacent to the Site.
d. Technical Data contained in such reports and drawings.
2. Owner will make copies of reports and drawings referenced above available to any Bidder on request. These reports and drawings are not part of the Contract Documents, but the Technical Data contained therein upon whose accuracy Bidder is entitled to rely, as provided in the General Conditions, has been identified and established in the
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, Supplementary Conditions. Bidder is responsible for any interpretation or conclusion Bidder draws from any Technical Data or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings.
3. If the Supplementary Conditions do not identify Technical Data, the default definition of Technical Data set forth in Article 1 of the General Conditions will apply.
4. Geotechnical Baseline Report/Geotechnical Data Report: The Bidding Documents may or may not contain a Geotechnical Baseline Report (GBR) and Geotechnical Data Report
(GDR).
a. As set forth in the Supplementary Conditions, the GBR describes certain select subsurface conditions that are anticipated to be encountered by Contractor during construction in specified locations (“Baseline Conditions”). The GBR is a Contract Document.
b. The Baseline Conditions in the GBR are intended to reduce uncertainty and the degree of contingency in submitted Bids. However, Bidders cannot rely solely on the Baseline Conditions. Bids should be based on a comprehensive approach that includes an independent review and analysis of the GBR, all other Contract Documents, Technical Data, other available information, and observable surface conditions. Not all potential subsurface conditions are baselined.
c. Nothing in the GBR is intended to relieve Bidders of the responsibility to make their own determinations regarding construction costs, bidding strategies, and Bid prices, nor of the responsibility to select and be responsible for the means, methods, techniques, sequences, and procedures of construction, and for safety precautions and programs incident thereto.
d. As set forth in the Supplementary Conditions, the GDR is a Contract Document containing data prepared by or for the Owner in support of the GBR.
B. Underground Facilities: Underground Facilities are shown or indicated on the Drawings, pursuant to Paragraph 5.05 of the General Conditions, and not in the drawings referred to in Paragraph 5.02.A of these Instructions to Bidders. Information and data regarding the presence or location of Underground Facilities are not intended to be categorized, identified, or defined as Technical Data.
5.03 Other Site-related Documents
A. In addition to the documents regarding existing Site conditions referred to in Paragraph 5.02.A, the following other documents relating to conditions at or adjacent to the Site are known to Owner and made available to Bidders for reference.
Owner will make copies of these other Site-related documents available to any Bidder on request.
B. Owner has not verified the contents of these other Site-related documents, and Bidder may not rely on the accuracy of any data or information in such documents. Bidder is responsible for any interpretation or conclusion Bidder draws from the other Site-related documents.
C. The other Site-related documents are not part of the Contract Documents.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, D. Bidders are encouraged to review the other Site-related documents, but Bidders will not be held accountable for any data or information in such documents. The requirement to review and take responsibility for documentary Site information is limited to information in (1) the Contract Documents and (2) the Technical Data.
5.04 Site Visit and Testing by Bidders
A. Bidder is required to visit the Site and conduct a thorough visual examination of the Site and adjacent areas. During the visit the Bidder must not disturb any ongoing operations at the Site.
B. A Site visit is scheduled following the pre-bid conference. Maps to the Site will be available at the pre-Bid conference.
C. Site visit is open to all bidders to visit the site at any time. Maps to the Site will be made available upon request.
D. Bidders visiting the Site are required to arrange their own transportation to the Site.
E. All access to the Site other than during a regular Site visit must be coordinated through the following Owner or Engineer contact for visiting the Site: ARM Group LLC. Bidder must conduct the required Site visit during normal working hours.
F. Bidder is not required to conduct any subsurface testing, or exhaustive investigations of Site conditions.
G. On request, and to the extent Owner has control over the Site, and schedule permitting, the Owner will provide Bidder general access to the Site to conduct such additional examinations, investigations, explorations, tests, and studies as Bidder deems necessary for preparing and submitting a successful Bid. Owner will not have any obligation to grant such access if doing so is not practical because of existing operations, security or safety concerns, or restraints on Owner’s authority regarding the Site. Bidder is responsible for establishing access needed to reach specific selected test sites.
H. Bidder must comply with all applicable Laws and Regulations regarding excavation and location of utilities, obtain all permits, and comply with all terms and conditions established by Owner or by property owners or other entities controlling the Site with respect to schedule, access, existing operations, security, liability insurance, and applicable safety programs.
I. Bidder must fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies.
5.05 Owner’s Safety Program
A. Site visits and work at the Site may be governed by an Owner safety program. If an Owner safety program exists, it will be noted in the Supplementary Conditions.
5.06 Other Work at the Site
A. Reference is made to Article 8 of the Supplementary Conditions for the identification of the general nature of other work of which Owner is aware (if any) that is to be performed at the Site by Owner or others (such as utilities and other prime contractors) and relates to the Work contemplated by these Bidding Documents. If Owner is party to a written contract for
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, such other work, then on request, Owner will provide to each Bidder access to examine such contracts (other than portions thereof related to price and other confidential matters), if any.
ARTICLE 6—BIDDER’S REPRESENTATIONS AND CERTIFICATIONS
6.01 Express Representations and Certifications in Bid Form, Agreement
A. The Bid Form that each Bidder will submit contains express representations regarding the Bidder’s examination of Project documentation, Site visit, and preparation of the Bid, and certifications regarding lack of collusion or fraud in connection with the Bid. Bidder should review these representations and certifications, and assure that Bidder can make the representations and certifications in good faith, before executing and submitting its Bid.
B. If Bidder is awarded the Contract, Bidder (as Contractor) will make similar express representations and certifications when it executes the Agreement.
ARTICLE 7—INTERPRETATIONS AND ADDENDA
7.01 Owner or Engineer on its own initiative may issue Addenda to clarify, correct, supplement, or change the Bidding Documents.
7.02 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing.
7.03 Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than seven calendar days prior to the date for opening of Bids may not be answered.
7.04 Only responses set forth in an Addendum will be binding. Oral and other interpretations or clarifications will be without legal effect. Responses to questions are not part of the Contract Documents unless set forth in an Addendum that expressly modifies or supplements the Contract Documents.
ARTICLE 8—BID SECURITY
8.01 A Bid must be accompanied by Bid security made payable to Owner in an amount of five percent of Bidder’s maximum Bid price (determined by adding the base bid and all alternates) and in the form of a Bid bond issued by a surety meeting the requirements of Paragraph 6.01 of the General Conditions. Such Bid bond will be issued in the form included in the Bidding Documents.
8.02 The Bid security of the apparent Successful Bidder will be retained until Owner awards the contract to such Bidder, and such Bidder has executed the Contract, furnished the required Contract security, and met the other conditions of the Notice of Award, whereupon the Bid security will be released. If the Successful Bidder fails to execute and deliver the Contract and furnish the required Contract security within 15 days after the Notice of Award, Owner may consider Bidder to be in default, annul the Notice of Award, and the Bid security of that Bidder will be forfeited, in whole in the case of a penal sum bid bond, and to the extent of Owner’s
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, damages in the case of a damages-form bond. Such forfeiture will be Owner’s exclusive remedy if Bidder defaults.
8.03 The Bid security of other Bidders that Owner believes to have a reasonable chance of receiving the award may be retained by Owner until the earlier of 7 days after the Effective Date of the Contract or 60 days after the Bid opening, whereupon Bid security furnished by such Bidders will be released.
8.04 Bid security of other Bidders that Owner believes do not have a reasonable chance of receiving the award will be released within 7 days after the Bid opening.
ARTICLE 9—CONTRACT TIMES
9.01 The number of days within which, or the dates by which, the Work is to be (a) substantially completed and (b) ready for final payment, and (c) Milestones (if any) are to be achieved, are set forth in the Agreement.
9.02 Provisions for liquidated damages, if any, for failure to timely attain a Milestone, Substantial Completion, or completion of the Work in readiness for final payment, are set forth in the Agreement.
ARTICLE 10—SUBSTITUTE AND “OR EQUAL” ITEMS
10.01 Except to the extent superseded by Federal Regulations, the offering of substitute materials and equipment will be governed by Section 2.2 - 4315 of the Code of Virginia, (1950), as amended, the General Conditions, the Bid and Division 1 of the Specifications.
10.02 The Contract for the Work, as awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents without consideration during the bidding and Contract award process of possible substitute or “or-equal” items. In cases in which the Contract allows the Contractor to request that Engineer authorize the use of a substitute or “or-equal” item of material or equipment, application for such acceptance may not be made to and will not be considered by Engineer until after the Effective Date of the Contract.
10.03 All prices that Bidder sets forth in its Bid will be based on the presumption that the Contractor will furnish the materials and equipment specified or described in the Bidding Documents, as supplemented by Addenda. Any assumptions regarding the possibility of post-Bid approvals of “or-equal” or substitution requests are made at Bidder’s sole risk.
ARTICLE 11—SUBCONTRACTORS, SUPPLIERS, AND OTHERS
11.01 A Bidder must be prepared to retain specific Subcontractors and Suppliers for the performance of the Work if required to do so by the Bidding Documents or in the Specifications. If a prospective Bidder objects to retaining any such Subcontractor or Supplier and the concern is not relieved by an Addendum, then the prospective Bidder should refrain from submitting a Bid.
11.02 The apparent Successful Bidder, and any other Bidder requested, must submit to Owner a list of the Subcontractors or Suppliers proposed for the Work within five days after Bid opening.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
11.03 If requested by Owner, such list must be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such Subcontractor or Supplier. If Owner or Engineer, after due investigation, has reasonable objection to any proposed Subcontractor, Supplier, individual, or entity, Owner may, before the Notice of Award is given, request apparent Successful Bidder to submit an acceptable substitute, without an increase in Bid price.
11.04 If apparent Successful Bidder declines to make any such substitution, Owner may award the Contract to the next lowest Bidder that proposes to use acceptable Subcontractors and Suppliers.
Declining to make requested substitutions will constitute grounds for forfeiture of the Bid security of any Bidder. Any Subcontractor or Supplier, so listed and against which Owner or Engineer makes no written objection prior to the giving of the Notice of Award will be deemed acceptable to Owner and Engineer subject to subsequent revocation of such acceptance as provided in Paragraph 7.07 of the General Conditions.
ARTICLE 12—PREPARATION OF BID
12.01 The Bid Form is included with the Bidding Documents.
A. All blanks on the Bid Form must be completed in ink and the Bid Form signed in ink. Erasures or alterations must be initialed in ink by the person signing the Bid Form. A Bid price must be indicated for each section, Bid item, alternate, adjustment unit price item, and unit price item listed therein.
B. If the Bid Form expressly indicates that submitting pricing on a specific alternate item is optional, and Bidder elects to not furnish pricing for such optional alternate item, then Bidder may enter the words “No Bid” or “Not Applicable.”
12.02 If Bidder has obtained the Bidding Documents as Electronic Documents, then Bidder shall prepare its Bid on a paper copy of the Bid Form printed from the Electronic Documents version of the Bidding Documents. The printed copy of the Bid Form must be clearly legible, printed on 8½ inch by 11-inch paper and as closely identical in appearance to the Electronic Document version of the Bid Form as may be practical. The Owner reserves the right to accept Bid Forms which nominally vary in appearance from the original paper version of the Bid Form, providing that all required information and submittals are included with the Bid.
12.03 A Bid by a corporation must be executed in the corporate name by a corporate officer (whose title must appear under the signature), accompanied by evidence of authority to sign. The corporate address and state of incorporation must be shown and the corporate seal must be affixed and attested by the secretary or an assistant secretary.
12.04 A Bid by a partnership must be executed in the partnership name and signed by a partner (whose title must appear under the signature), accompanied by evidence of authority to sign. The official address of the partnership must be shown.
12.05 A Bid by a limited liability company must be executed in the name of the firm by a member or other authorized person and accompanied by evidence of authority to sign. The state of formation of the firm and the official address of the firm must be shown.
12.06 A Bid by an individual must show the Bidder’s name and official address.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
12.07 A Bid by a joint venture must be executed by an authorized representative of each joint venturer in the manner indicated on the Bid Form. The joint venture must have been formally established prior to submittal of a Bid, and the official address of the joint venture must be shown.
12.08 All names must be printed in ink below the signatures.
12.09 The Bid must contain an acknowledgment of receipt of all Addenda, the numbers of which must be filled in on the Bid Form.
12.10 Postal and e-mail addresses and telephone number for communications regarding the Bid must be shown.
12.11 The Bid must contain evidence of Bidder’s authority to do business in the state where the Project is located, or Bidder must certify in writing that it will obtain such authority within the time for acceptance of Bids and attach such certification to the Bid.
12.12 If Bidder is required to be licensed to submit a Bid or perform the Work in the state where the Project is located, the Bid must contain evidence of Bidder’s licensure, or Bidder must certify in writing that it will obtain such licensure within the time for acceptance of Bids and attach such certification to the Bid. Bidder’s state contractor license number, if any, must also be shown on the Bid Form.
ARTICLE 13—BASIS OF BID
13.01 Lump Sum
A. Bidders must submit a Bid on a lump sum basis for item lines as set forth in the Bid Form.
ARTICLE 14—SUBMITTAL OF BID
14.01 The Bidding Documents include one separate unbound copy of the Bid Form, and, if required, the Bid Bond Form. The unbound copy of the Bid Form is to be completed and submitted with the Bid security and the other documents required to be submitted under the terms of Article 2 of the Bid Form.
14.02 A Bid must be received no later than the date and time prescribed and at the place indicated in the Advertisement or invitation to bid and must be enclosed in a plainly marked package with the Project title, and, if applicable, the designated portion of the Project for which the Bid is submitted, the name and address of Bidder, and must be accompanied by the Bid security and other required documents. If a Bid is sent by mail or other delivery system, the sealed envelope containing the Bid must be enclosed in a separate package plainly marked on the outside with the notation “BID ENCLOSED.” A mailed Bid must be addressed to the location designated in the Advertisement.
14.03 Bids received after the date and time prescribed for the opening of bids, or not submitted at the correct location or in the designated manner, will not be accepted and will be returned to the Bidder unopened.
14.04 Attention is called to Title 54.1, Chapter 11 of the Code of Virginia, (1950), as amended. All Bids must carry the Contractor's Virginia License Number. The License Number must be placed on the face of the envelope containing the Bid.
14.05 All Bids must be accompanied by a certified check or a Bidders Bond in the amount of 5% of the
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, total Bid made payable to the Owner.
14.06 Any Bid which is incomplete, conditional, obscure, or which is not in conformance with the Specifications may be rejected, or any such irregularities if they do not affect quality, quantity, price, or delivery schedule may be waived at the sole option of the Owner.
ARTICLE 15—MODIFICATION AND WITHDRAWAL OF BID
15.01 An unopened Bid may be withdrawn by an appropriate document duly executed in the same manner that a Bid must be executed and delivered to the place where Bids are to be submitted prior to the date and time for the opening of Bids. Upon receipt of such notice, the unopened Bid will be returned to the Bidder.
15.02 If a Bidder wishes to modify its Bid prior to Bid opening, Bidder must withdraw its initial Bid in the manner specified in Paragraph 15.01 and submit a new Bid prior to the date and time for the opening of Bids.
15.03 No Bid may be withdrawn for a period of 60 days after the date of opening of Bids except in accordance with Section 2.2 - 4330 of the Code of Virginia, (1950), as amended. The Owner as Contracting Authority has selected Procedure (i) of the above cited Section of the Code. The bidder will have two days after the opening of Bids within which to claim in writing any mistake as defined in said Section and withdraw his Bid, provided such mistake be proved from the Contractor's Work Papers. If a Bidder wishes to modify its Bid prior to Bid opening, Bidder must withdraw its initial Bid in the manner specified in Paragraph 15.01 and submit a new Bid prior to the date and time for the opening of Bids.
ARTICLE 16—OPENING OF BIDS
16.01 Bids will be opened at the time and place indicated in the advertisement or invitation to bid and, unless obviously non-responsive, read aloud publicly. An abstract of the amounts of the base Bids and major alternates, if any, will be made available to Bidders after the opening of Bids.
ARTICLE 17—BIDS TO REMAIN SUBJECT TO ACCEPTANCE
17.01 All Bids will remain subject to acceptance for the period of time stated in the Bid Form, but Owner may, in its sole discretion, release any Bid and return the Bid security prior to the end of this period.
ARTICLE 18—EVALUATION OF BIDS AND AWARD OF CONTRACT
18.01 Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner also reserves the right to waive all minor Bid informalities not involving price, time, or changes in the Work.
18.02 Owner will reject the Bid of any Bidder that Owner finds, after reasonable inquiry and evaluation, to not be responsible.
18.03 If Bidder purports to add terms or conditions to its Bid, takes exception to any provision of the Bidding Documents, or attempts to alter the contents of the Contract Documents for purposes of the Bid, whether in the Bid itself or in a separate communication to Owner or Engineer, then
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, Owner will reject the Bid as nonresponsive.
18.04 If Owner awards the contract for the Work, such award will be to the responsible Bidder submitting the lowest responsive Bid.
18.05 Evaluation of Bids
A. In evaluating Bids, Owner will consider whether the Bids comply with the prescribed requirements, and such alternates, unit prices, and other data, as may be requested in the Bid Form or prior to the Notice of Award.
B. In the comparison of Bids, alternates will be applied in the same order of priority as listed in the Bid Form. To determine the Bid prices for purposes of comparison, Owner will announce to all bidders a “Base Bid plus alternates” budget after receiving all Bids, but prior to opening them. For comparison purposes alternates will be accepted, following the order of priority established in the Bid Form, until doing so would cause the budget to be exceeded. After determination of the Successful Bidder based on this comparative process and on the responsiveness, responsibility, and other factors set forth in these Instructions, the award may be made to said Successful Bidder on its base Bid and any combination of its additive alternate Bids for which Owner determines funds will be available at the time of award.
C. For the determination of the apparent low Bidder when unit price bids are submitted, Bids will be compared on the basis of the total of the products of the estimated quantity of each item and unit price Bid for that item, together with any lump sum items.
1. This procedure is only used to determine the lowest bid for comparison and contractor selection purposes. The Contract Price for compensation and payment purposes remains the Bid price shown in the Bid Form.
18.06 In evaluating whether a Bidder is responsible, Owner will consider the qualifications of the Bidder and may consider the qualifications and experience of Subcontractors and Suppliers proposed for those portions of the Work for which the identity of Subcontractors and Suppliers must be submitted as provided in the Bidding Documents.
18.07 Owner may conduct such investigations as Owner deems necessary to establish the responsibility, qualifications, and financial ability of Bidders and any proposed Subcontractors or Suppliers.
ARTICLE 19—BONDS AND INSURANCE
19.01 Article 6 of the General Conditions, as may be modified by the Supplementary Conditions, sets forth Owner’s requirements as to performance and payment bonds, other required bonds (if any), and insurance. When the Successful Bidder delivers the executed Agreement to Owner, it must be accompanied by required bonds and insurance documentation.
19.02 Article 8, Bid Security, of these Instructions, addresses any requirements for providing bid bonds as part of the bidding process.
ARTICLE 20—SIGNING OF AGREEMENT
20.01 When Owner issues a Notice of Award to the Successful Bidder, it will be accompanied by the unexecuted counterparts of the Agreement along with the other Contract Documents as identified in the Agreement. Within 15 days thereafter, Successful Bidder must execute and deliver the required number of counterparts of the Agreement and any bonds and insurance documentation required to be delivered by the Contract Documents to Owner. Within 10 days
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, thereafter, Owner will deliver one fully executed counterpart of the Agreement to Successful Bidder, together with printed and electronic copies of the Contract Documents as stated in Paragraph 2.02 of the General Conditions.
ARTICLE 21—SALES AND USE TAXES
21.01 Owner is exempt from state sales and use taxes on materials and equipment to be incorporated in the Work. Said taxes must not be included in the Bid. Refer to Paragraph SC-7.10 of the Supplementary Conditions for additional information.
P.N. 023011622.00 ARM Group, LLC.
Revised BF-1
BID FORM
Project Identification: Town of Montross Contract Identifications: Waterline Extension
Table of Articles
Article 1 - Bid Recipient Article 2 - Bidder's Acknowledgments Article 3 - Bidder's Representations Article 4 - Further Representations Article 5 - Basis of Bid Article 6 - Time of Completion Article 7 - Attachments to Bid Article 8 - Defined Terms Article 9 - Bid Submittal
Article 1 - Bid Recipient
1.01 This Bid is Submitted To:
Town of Montross 15869 Kings Highway Montross, VA 22520 Attn: Francine G. Taylor, Town Manager
1.02 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with OWNER in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in the Bid and in accordance with the other terms and conditions of the Bidding Documents.
Article 2 - Bidder's Acknowledgments
2.01 Bidder accepts all of the terms and conditions of the Advertisement and Instruction to Bidders, including without limitations those dealing with the dispositions of Bid security. The Bid will remain subject to acceptance for 60 days after the Bid opening, or for such longer period of time that Bidder may agree to in writing upon request of OWNER.
Revised BF-2
Article 3 - Bidder's Representations
3.01 In submitting this Bid, Bidder represents, as set forth in the Agreement, that:
A. Bidder has examined and carefully studied the Bidding Documents, the other related data identified in the Bidding Documents, and the following Addenda, receipt of all which is hereby acknowledged.
Addendum No. Addendum Date
B. Bidder has visited the Site and become familiar with and is satisfied as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work.
C. Bidder is familiar with and is satisfied as to all Federal, State, and local Laws and Regulations that may affect cost, progress, and performance of the Work.
D. Bidder has carefully studied all: (1) reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the Site (except Underground Facilities) which have been identified in the Supplementary Conditions as provided in paragraph
4.02 of the General Conditions, and (2) reports and drawings of a Hazard Environmental Condition, if any, which has been identified in the Supplementary Conditions as provided in paragraph 4.06 of the General Conditions.
E. Bidder has obtained and carefully studied (or assumes responsibility for having done so) all additional or supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface and Underground Facilities) at or contiguous to the Site which may affect cost, progress, or performance of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by the Bidder, including applying the specific means, techniques, sequences, and procedures of construction expressly required by the Bidding Documents to be employed by Bidder, and safety precautions and programs incident thereto.
F. Bidder does not consider that any further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of this Bid for performance of the Work at the price(s) bid and within the times and in accordance with the other terms and conditions of the Bidding Documents.
Revised BF-3
G. Bidder is aware of the general nature of the Work to be performed by OWNER and others at the Site that relates to the Work as indicated in the Bidding Documents.
H. Bidder has correlated the information known to Bidder, information and observations obtained from visits to the Site, reports and drawings identified in the Bidding Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Bidding Documents.
I. Bidder has given ENGINEER written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding Documents, and the written resolution thereof by ENGINEER is acceptable to Bidder.
J. The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance of the Work for which this Bid is submitted.
K. Bidder will submit written evidence of its authority to do business in the
State where the Project is located not later than the date of its execution of the Agreement
Article 4 - Further Representations
4.01 Bidder further represents that:
A. This Bid is genuine and not made in the interest of or on the behalf of any undisclosed individual or entity and is not submitted in conformity with any agreement or rules of any group, association, organization, or corporation.
B. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid;
C. Bidder has not solicited or induced any individual or entity to refrain from bidding; and
D. Bidder has not sought by collusion to obtain for itself any advantage over any other Bidder or over Owner.
Revised BF-4
Article 5 - Basis of Bid
5.01 Construction Sequencing: Due to grant funding requirements associated with the
ARPA program, the work identified as Section 3 shall be constructed and completed prior to commencement of construction activities in Sections 1 and 2.
The Contractor shall prioritize and schedule construction operations such that all work associated with Section 3 (Peach Grove Ln to Forest Drive) is fully completed no later than August 31, 2026. Work in Sections 1 and 2 shall not begin until Section 3 has been substantially completed unless otherwise approved by the Owner.
5.02 Bidder will complete the Work in accordance with the Contract Documents for the following unit prices:
Item no.
Item Description Quantity Unit Unit Price $ Total Bid $
1 Mobilization/Demobilization 1 LS
2 Bonding 1 LS
Sub-total
Section I - Carver Street Waterline Extension
3 6” C-900 PVC Pipe and fitting 1050 LF
4 Jack & Bore with EP-1 Steel Casing for 6”
50 LF
5 6” Gate Valve 3 EA
6 Service Laterals Directional drill HDPE pipe and fittings
700 LF
7 Service Connection including corporation stops and meter box connection
EA
8 Fire Hydrant Assembly & valve 2 EA
9 Connection to existing System 1 EA
10 Flushing, Testing and Bacterial Testing
1 LS
Sub-total
Section II - Kings Highway Water Line Extension to Peach Grove Lane
11 6” C-900 PVC Pipe and fitting 1600 LF
12 Jack & Bore with EP-1 Steel Casing for 6”
60 LF
13 6” HDPE D.D. Pipe and fitting 100 LF
14 2” service line with casing and valve
225 LF
15 6” Gate Valve 5 EA
16 Service Laterals Directional drill HDPE pipe and fittings
800 LF
17 Service Connection including 21 EA
Revised BF-5 corporation stops and meter box
18 Fire Hydrant Assembly & valve 1 EA
19 Connection to existing System 2 EA
20 Flushing, Testing and Bacterial Testing
1 LS
Sub-total
Section III - Kings Highway Peach Grove Ln to Forest Drive
21 6” C-900 PVC Pipe and fitting 1,900 LF
22 Jack & Bore with EP-1 Steel Casing for 6”
60 LF
23 6” Gate Valve 2 EA
24 Service Laterals Directional drill HDPE pipe and fittings
1300 LF
25 Service Connection including corporation stops and meter box
EA
26 Fire Hydrant Assembly & valve 2 EA
27 Flushing, Testing and Bacterial Testing
1 LS
Sub-total
Total
TOTAL OF ALL BID ITEM PRICES : ____________________________ ($_____________ )
Words Numerical
Article 6 - Time of Completion
6.01 Bidder shall complete the section 3 (Kings highway – Peach Grove Ln to Forest drive) of the project before end of August 2026.
6.02 Bidder agrees that the Work will be substantially completed and ready for final payment in accordance with paragraph 14.07.B of the General Conditions on or before the dates or within the number of calendar days indicated in the Agreement.
6.03 Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the work within the Contract times.
Article 7 - Attachments to Bid
7.01 The following documents are attached to and made a condition of the Bid:
A. Required Bid security in the form of Bid Bond (EJCDC No. C-430) or Certified Check (circle type of security provided).
Revised BF-6
Article 8 - Defined Terms
8.01 The terms used in this Bid with the initial capital letters have the meanings indicated in the Instructions to Bidders, the General Conditions, and the Supplementary Conditions.
Article 9 - Bid Submittal
9.01 This Bid submitted by:
If Bidder is:
An Individual
Name (typed or printed): ___________________________________________
By: ____________________________________________________________ (SEAL)
(Individual’s signature)
Doing business as: _______________________________________________
A Partnership
Partnership Name: _______________________________________________ (SEAL)
By: ____________________________________________________________
(Signature of general partner – attach evidence of authority to sign)
A Corporation
Corporation Name: _______________________________________________ (SEAL)
State of Incorporation: __________ Type (General Business, Professional, Service, Limited Liability): ___________
(Signature – attach evidence of authority to sign)
Title: __________________________________________________________
(CORPORATE SEAL)
Attest: _________________________________________________________
(Signature of Corporate Secretary)
Date of Qualification to do business in ________________ [State Where Project is Located] is ____\____\____.
Revised BF-7
A Joint Venture
Name of Joint Venture: ____________________________________________
First Joint Venture Name: __________________________________________ (SEAL)
(Signature of first joint venture partner – attach evidence of authority to sign)
Second Joint Venture Name: _______________________________________ (SEAL)
(Signature of second joint venture partner – attach evidence of authority to sign)
(Each joint venture must sign. The manner of signing for each individual, partnership, and corporation that is…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .