About this file
This is Addendum No. 5 to the Bid Form for the Town of Montross Waterline Extension Part 2 project in Virginia, issued by ARM Group LLC on April 16, 2026. The addendum revises bid items and quantities for a waterline extension project serving the Town of Montross, located at 15869 Kings Highway, Montross, VA 22520. The project consists of three sections: Section I (Carver Street Waterline Extension), Section II (Kings Highway Water Line Extension to Peach Grove Lane), and Section III (Kings Highway Peach Grove Lane to Forest Drive). The bid form includes 31 line items encompassing pipe installation, horizontal directional drilling, gate valves, service laterals, service connections, fire hydrant assemblies, and testing. Critical to the project schedule is a mandatory construction sequencing requirement driven by ARPA grant funding: Section 3 must be fully completed no later than August 31, 2026, before any construction activities commence in Sections 1 and 2. Bid security is required in the form of either a bid bond or certified check, and bidders must submit written evidence of authority to conduct business in Virginia no later than the date of contract execution.
Bidders are responsible for all cost estimates based on their own site investigations, subsurface examinations, and familiarity with federal, state, and local regulations affecting the work. The bid form requires bidders to acknowledge receipt of all addenda, confirm site visits, and attest that no collusion or bid-rigging has occurred. Bidders must complete work substantially in accordance with contract documents and accept liquidated damages provisions for failure to meet completion deadlines. The project is funded through ARPA grant requirements, which establish the strict sequencing mandate for Section 3 completion. All bid prices must be submitted in both numerical and word format, with separate subtotals calculated for each of the three project sections. The bid will remain subject to acceptance for 60 days after opening unless the bidder agrees to a longer period.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Montross Waterline Extension Part 2 April 2026
Addendum No. 5 ARM Project 23011622
A R M G r o u p L L C
Town of Montross
Waterline Extension Part 2
Addendum No. 5
Date Issued: April 16, 2026
Addendum No. 5 updates the Bid Form. This addendum supersedes the corresponding provisions of the original Contract Documents. It is the purpose of the Addendum to incorporate into the project plans and specifications certain additions, deletions, changes, and notifications as hereinafter described.
I. The Bid Form has been updated to revise certain bid items and quantities in Section III of the bid table. Please replace the Bid Form with the attached updated version.
Addendum No. 5 supersedes the Bid Form revised under Addendum No. 4 and shall be inserted in and made as part of the contract documents.
- END OF ADDENDUM #5 -
P.N. 023011622.00 ARM Group, LLC.
April 2026 Revised BF-1
BID FORM
Project Identification: Town of Montross Contract Identifications: Waterline Extension
Table of Articles
Article 1 - Bid Recipient Article 2 - Bidder's Acknowledgments Article 3 - Bidder's Representations Article 4 - Further Representations Article 5 - Basis of Bid Article 6 - Time of Completion Article 7 - Attachments to Bid Article 8 - Defined Terms Article 9 - Bid Submittal
Article 1 - Bid Recipient
1.01 This Bid is Submitted To:
Town of Montross 15869 Kings Highway Montross, VA 22520 Attn: Francine G. Taylor, Town Manager
1.02 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with OWNER in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in the Bid and in accordance with the other terms and conditions of the Bidding Documents.
Article 2 - Bidder's Acknowledgments
2.01 Bidder accepts all of the terms and conditions of the Advertisement and Instruction to Bidders, including without limitations those dealing with the dispositions of Bid security. The Bid will remain subject to acceptance for 60 days after the Bid opening, or for such longer period of time that Bidder may agree to in writing upon request of OWNER.
Revised BF-2
Article 3 - Bidder's Representations
3.01 In submitting this Bid, Bidder represents, as set forth in the Agreement, that:
A. Bidder has examined and carefully studied the Bidding Documents, the other related data identified in the Bidding Documents, and the following Addenda, receipt of all which is hereby acknowledged.
Addendum No. Addendum Date
B. Bidder has visited the Site and become familiar with and is satisfied as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work.
C. Bidder is familiar with and is satisfied as to all Federal, State, and local Laws and Regulations that may affect cost, progress, and performance of the Work.
D. Bidder has carefully studied all: (1) reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the Site (except Underground Facilities) which have been identified in the Supplementary Conditions as provided in paragraph
4.02 of the General Conditions, and (2) reports and drawings of a Hazard Environmental Condition, if any, which has been identified in the Supplementary Conditions as provided in paragraph 4.06 of the General Conditions.
E. Bidder has obtained and carefully studied (or assumes responsibility for having done so) all additional or supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface and Underground Facilities) at or contiguous to the Site which may affect cost, progress, or performance of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by the Bidder, including applying the specific means, techniques, sequences, and procedures of construction expressly required by the Bidding Documents to be employed by Bidder, and safety precautions and programs incident thereto.
F. Bidder does not consider that any further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of this Bid for performance of the Work at the price(s) bid and within the times and in accordance with the other terms and conditions of the Bidding Documents.
Revised BF-3
G. Bidder is aware of the general nature of the Work to be performed by OWNER and others at the Site that relates to the Work as indicated in the Bidding Documents.
H. Bidder has correlated the information known to Bidder, information and observations obtained from visits to the Site, reports and drawings identified in the Bidding Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Bidding Documents.
I. Bidder has given ENGINEER written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding Documents, and the written resolution thereof by ENGINEER is acceptable to Bidder.
J. The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance of the Work for which this Bid is submitted.
K. Bidder will submit written evidence of its authority to do business in the
State where the Project is located not later than the date of its execution of the Agreement
Article 4 - Further Representations
4.01 Bidder further represents that:
A. This Bid is genuine and not made in the interest of or on the behalf of any undisclosed individual or entity and is not submitted in conformity with any agreement or rules of any group, association, organization, or corporation.
B. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid;
C. Bidder has not solicited or induced any individual or entity to refrain from bidding; and
D. Bidder has not sought by collusion to obtain for itself any advantage over any other Bidder or over Owner.
Revised BF-4
Article 5 - Basis of Bid
5.01 Construction Sequencing: Due to grant funding requirements associated with the
ARPA program, the work identified as Section 3 shall be constructed and completed prior to commencement of construction activities in Sections 1 and 2.
The Contractor shall prioritize and schedule construction operations such that all work associated with Section 3 (Peach Grove Ln to Forest Drive) is fully completed no later than August 31, 2026. Work in Sections 1 and 2 shall not begin until Section 3 has been substantially completed unless otherwise approved by the Owner.
5.02 Bidder will complete the Work in accordance with the Contract Documents for the following unit prices:
Item no.
Item Description Quantity Unit Unit Price $ Total Bid $
1 Mobilization/Demobilization 1 LS
2 Bonding 1 LS
Sub-total
Section I - Carver Street Waterline Extension
3 6” C-900 PVC Pipe and fitting 1050 LF
4 HDD 12” HDPE SDR 11 Casing 54 LF
5 6” Gate Valve 3 EA
6 Service Laterals Directional drill HDPE pipe and fittings
700 LF
7 Service Connection including corporation stops and meter box connection
EA
8 Fire Hydrant Assembly & valve 1 EA
9 2” Blow off Valve Assembly 1 LS
10 Connection to existing System 1 EA
11 Flushing, Testing and Bacterial Testing
1 LS
Sub-total
Section II - Kings Highway Water Line Extension to Peach Grove Lane
12 6” C-900 PVC Pipe and fitting 1600 LF
13 HDD 12” HDPE SDR 11 Casing 59 LF
14 6” HDPE D.D. Pipe and fitting 100 LF
15 2” service line with casing and valve
225 LF
16 6” Gate Valve 5 EA
17 Service Laterals Directional drill HDPE pipe and fittings
800 LF
Revised BF-5
18 Service Connection including corporation stops and meter box
19 Fire Hydrant Assembly & valve 1 EA
20 Connection to existing System 2 EA
21 Flushing, Testing and Bacterial Testing
1 LS
Sub-total
Section III - Kings Highway Peach Grove Ln to Forest Drive
22 6” C-900 PVC Pipe and fitting 1,620 LF
23 HDD 12” HDPE SDR 11 Casing 30 LF
24 6” HDPE D.D. Pipe and fitting 280 LF
25 2” service line with casing and valve
59 LF
26 2” C-900 PVC pipe and fitting 235 LF
27 6” Gate Valve 2 EA
28 Service Laterals Directional drill HDPE pipe and fittings
1100 LF
29 Service Connection including corporation stops and meter box
30 Fire Hydrant Assembly & valve 3 EA
31 Flushing, Testing and Bacterial Testing
1 LS
Sub-total
Total
TOTAL OF ALL BID ITEM PRICES : ____________________________ ($_____________ )
Words Numerical
Article 6 - Time of Completion
6.01 Bidder shall complete the section 3 (Kings highway – Peach Grove Ln to Forest drive) of the project before end of August 2026.
6.02 Bidder agrees that the Work will be substantially completed and ready for final payment in accordance with paragraph 14.07.B of the General Conditions on or before the dates or within the number of calendar days indicated in the Agreement.
6.03 Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the work within the Contract times.
Article 7 - Attachments to Bid
7.01 The following documents are attached to and made a condition of the Bid:
Revised BF-6
A. Required Bid security in the form of Bid Bond (EJCDC No. C-430) or
Certified Check (circle type of security provided).
Article 8 - Defined Terms
8.01 The terms used in this Bid with the initial capital letters have the meanings indicated in the Instructions to Bidders, the General Conditions, and the Supplementary Conditions.
Article 9 - Bid Submittal
9.01 This Bid submitted by:
If Bidder is:
An Individual
Name (typed or printed): ___________________________________________
By: ____________________________________________________________ (SEAL)
(Individual’s signature)
Doing business as: _______________________________________________
A Partnership
Partnership Name: _______________________________________________ (SEAL)
By: ____________________________________________________________
(Signature of general partner – attach evidence of authority to sign)
A Corporation
Corporation Name: _______________________________________________ (SEAL)
State of Incorporation: __________ Type (General Business, Professional, Service, Limited Liability): ___________
(Signature – attach evidence of authority to sign)
Title: __________________________________________________________
(CORPORATE SEAL)
Attest: _________________________________________________________
(Signature of Corporate Secretary)
Revised BF-7
Date of Qualification to do business in ________________ [State Where Project is Located] is ____\____\____.
A Joint Venture
Name of Joint Venture: ____________________________________________
First Joint Venture Name: __________________________________________ (SEAL)
(Signature of first joint venture partner – attach evidence of authority to sign)
Second Joint Venture Name: _______________________________________ (SEAL)
(Signature of second joint venture partner – attach evidence of authority to sign)
(Each joint venture must sign. The manner of signing for each individual, partnership, and corporation that is a party to the joint venture should be in the manner indicated above.)