This addendum document, issued April 14, 2026, by ARM Group LLC on behalf of the Town of Montross in Westmoreland County, Virginia, modifies the contract documents for the Montross Waterline Extension Part 2 project (ARM Project 23011622). Addendum No. 4 revises road crossing details by replacing jack and bore with steel casing construction methods with horizontal directional drilling (HDD) using 12-inch HDPE SDR 11 casing for all VDOT road crossings. The project encompasses three sections: Carver Street Waterline Extension (Section 1), Kings Highway Water Line Extension to Peach Grove Lane (Section 2), and Kings Highway Peach Grove Lane to Forest Drive (Section 3). Work items include 4,650 linear feet of 6-inch C-900 PVC pipe, 143 linear feet of HDD 12-inch HDPE SDR 11 casing across all sections, ten 6-inch gate valves, sixty service connections, five fire hydrant assemblies, and testing and flushing operations. Section 3 must be substantially completed by August 31, 2026, due to ARPA grant funding requirements, before construction begins on Sections 1 and 2. The bid form requires unit pricing for all line items and identifies mobilization/demobilization, bonding, and material/labor costs as separate bid components.
The contract specifies liquidated damages provisions for failure to meet completion deadlines and requires bidders to submit bid security as either a bid bond or certified check. Bidders must acknowledge receipt of all addenda, certify site familiarity, confirm compliance with federal and state regulations, and verify that subsurface investigations are complete. The revised bid form replaces the original version, and Section 02310 (Jack and Bore) is removed from the technical specifications, with Section 01010 (Summary of Work) updated to reflect the HDD methodology. Technical specifications include sections on erosion and sediment control, submittals, HDD procedures, trenching and backfilling, water distribution systems, seeding, cast-in-place concrete, and contractor training. All work must comply with Virginia Department of Health and Virginia Department of Environmental Quality regulations for potable water supply. The contractor assumes full responsibility for utility locating, material protection, and coordination with utility companies.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Montross Waterline Extension Part 2 April 2026
Addendum No. 4 ARM Project 23011622
A R M G r o u p L L C
Town of Montross
Waterline Extension Part 2
Addendum No. 4
Date Issued: April 14, 2026
Addendum No. 4 changes the road crossing details. This addendum supersedes the corresponding provisions of the original Contract Documents. It is the purpose of the Addendum to incorporate into the project plans and specifications certain additions, deletions, changes, and notifications as hereinafter described.
I. The crossing detail for VDOT roads has been revised. Jack and bore and steel casing have been replaced with horizontal directional drill HDPE SDR 11 casing for the road crossings.
Accordingly, following documents have been updated.
a. Bid Form – Replace with the revised Bid Form.
b. Technical Specifications – Replace Section 01010 Summary of Work. And remove
Section 02310 Jack and Bore from the Technical Specifications.
c. Drawings – Replace the sheets with attached revised sheets.
This Addendum No.4 shall be inserted in and made as part of the contract documents.
- END OF ADDENDUM #4 -
P.N. 023011622.00 ARM Group, LLC.
April 2026 Revised BF-1
BID FORM
Project Identification: Town of Montross Contract Identifications: Waterline Extension
Table of Articles
Article 1 - Bid Recipient Article 2 - Bidder's Acknowledgments Article 3 - Bidder's Representations Article 4 - Further Representations Article 5 - Basis of Bid Article 6 - Time of Completion Article 7 - Attachments to Bid Article 8 - Defined Terms Article 9 - Bid Submittal
Article 1 - Bid Recipient
1.01 This Bid is Submitted To:
Town of Montross 15869 Kings Highway Montross, VA 22520 Attn: Francine G. Taylor, Town Manager
1.02 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with OWNER in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in the Bid and in accordance with the other terms and conditions of the Bidding Documents.
Article 2 - Bidder's Acknowledgments
2.01 Bidder accepts all of the terms and conditions of the Advertisement and Instruction to Bidders, including without limitations those dealing with the dispositions of Bid security. The Bid will remain subject to acceptance for 60 days after the Bid opening, or for such longer period of time that Bidder may agree to in writing upon request of OWNER.
Revised BF-2
Article 3 - Bidder's Representations
3.01 In submitting this Bid, Bidder represents, as set forth in the Agreement, that:
A. Bidder has examined and carefully studied the Bidding Documents, the other related data identified in the Bidding Documents, and the following Addenda, receipt of all which is hereby acknowledged.
Addendum No. Addendum Date
B. Bidder has visited the Site and become familiar with and is satisfied as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work.
C. Bidder is familiar with and is satisfied as to all Federal, State, and local Laws and Regulations that may affect cost, progress, and performance of the Work.
D. Bidder has carefully studied all: (1) reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the Site (except Underground Facilities) which have been identified in the Supplementary Conditions as provided in paragraph
4.02 of the General Conditions, and (2) reports and drawings of a Hazard Environmental Condition, if any, which has been identified in the Supplementary Conditions as provided in paragraph 4.06 of the General Conditions.
E. Bidder has obtained and carefully studied (or assumes responsibility for having done so) all additional or supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface and Underground Facilities) at or contiguous to the Site which may affect cost, progress, or performance of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by the Bidder, including applying the specific means, techniques, sequences, and procedures of construction expressly required by the Bidding Documents to be employed by Bidder, and safety precautions and programs incident thereto.
F. Bidder does not consider that any further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of this Bid for performance of the Work at the price(s) bid and within the times and in accordance with the other terms and conditions of the Bidding Documents.
Revised BF-3
G. Bidder is aware of the general nature of the Work to be performed by OWNER and others at the Site that relates to the Work as indicated in the Bidding Documents.
H. Bidder has correlated the information known to Bidder, information and observations obtained from visits to the Site, reports and drawings identified in the Bidding Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Bidding Documents.
I. Bidder has given ENGINEER written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding Documents, and the written resolution thereof by ENGINEER is acceptable to Bidder.
J. The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance of the Work for which this Bid is submitted.
K. Bidder will submit written evidence of its authority to do business in the
State where the Project is located not later than the date of its execution of the Agreement
Article 4 - Further Representations
4.01 Bidder further represents that:
A. This Bid is genuine and not made in the interest of or on the behalf of any undisclosed individual or entity and is not submitted in conformity with any agreement or rules of any group, association, organization, or corporation.
B. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid;
C. Bidder has not solicited or induced any individual or entity to refrain from bidding; and
D. Bidder has not sought by collusion to obtain for itself any advantage over any other Bidder or over Owner.
Revised BF-4
Article 5 - Basis of Bid
5.01 Construction Sequencing: Due to grant funding requirements associated with the
ARPA program, the work identified as Section 3 shall be constructed and completed prior to commencement of construction activities in Sections 1 and 2.
The Contractor shall prioritize and schedule construction operations such that all work associated with Section 3 (Peach Grove Ln to Forest Drive) is fully completed no later than August 31, 2026. Work in Sections 1 and 2 shall not begin until Section 3 has been substantially completed unless otherwise approved by the Owner.
5.02 Bidder will complete the Work in accordance with the Contract Documents for the following unit prices:
Item no.
Item Description Quantity Unit Unit Price $ Total Bid $
1 Mobilization/Demobilization 1 LS
2 Bonding 1 LS
Sub-total
Section I - Carver Street Waterline Extension
3 6” C-900 PVC Pipe and fitting 1050 LF
4 HDD 12” HDPE SDR 11 Casing 54 LF
5 6” Gate Valve 3 EA
6 Service Laterals Directional drill HDPE pipe and fittings
700 LF
7 Service Connection including corporation stops and meter box connection
EA
8 Fire Hydrant Assembly & valve 1 EA
9 2” Blow off Valve Assembly 1 LS
10 Connection to existing System 1 EA
11 Flushing, Testing and Bacterial Testing
1 LS
Sub-total
Section II - Kings Highway Water Line Extension to Peach Grove Lane
12 6” C-900 PVC Pipe and fitting 1600 LF
13 HDD 12” HDPE SDR 11 Casing 59 LF
14 6” HDPE D.D. Pipe and fitting 100 LF
15 2” service line with casing and valve
225 LF
16 6” Gate Valve 5 EA
17 Service Laterals Directional drill HDPE pipe and fittings
800 LF
Revised BF-5
18 Service Connection including corporation stops and meter box
19 Fire Hydrant Assembly & valve 1 EA
20 Connection to existing System 2 EA
21 Flushing, Testing and Bacterial Testing
1 LS
Sub-total
Section III - Kings Highway Peach Grove Ln to Forest Drive
22 6” C-900 PVC Pipe and fitting 1,900 LF
23 HDD 12” HDPE SDR 11 Casing 30 LF
24 6” Gate Valve 2 EA
25 Service Laterals Directional drill HDPE pipe and fittings
1300 LF
26 Service Connection including corporation stops and meter box
27 Fire Hydrant Assembly & valve 3 EA
28 Flushing, Testing and Bacterial Testing
1 LS
Sub-total
Total
TOTAL OF ALL BID ITEM PRICES : ____________________________ ($_____________ )
Words Numerical
Article 6 - Time of Completion
6.01 Bidder shall complete the section 3 (Kings highway – Peach Grove Ln to Forest drive) of the project before end of August 2026.
6.02 Bidder agrees that the Work will be substantially completed and ready for final payment in accordance with paragraph 14.07.B of the General Conditions on or before the dates or within the number of calendar days indicated in the Agreement.
6.03 Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the work within the Contract times.
Article 7 - Attachments to Bid
7.01 The following documents are attached to and made a condition of the Bid:
A. Required Bid security in the form of Bid Bond (EJCDC No. C-430) or Certified Check (circle type of security provided).
Revised BF-6
Article 8 - Defined Terms
8.01 The terms used in this Bid with the initial capital letters have the meanings indicated in the Instructions to Bidders, the General Conditions, and the Supplementary Conditions.
Article 9 - Bid Submittal
9.01 This Bid submitted by:
If Bidder is:
An Individual
Name (typed or printed): ___________________________________________
By: ____________________________________________________________ (SEAL)
(Individual’s signature)
Doing business as: _______________________________________________
A Partnership
Partnership Name: _______________________________________________ (SEAL)
By: ____________________________________________________________
(Signature of general partner – attach evidence of authority to sign)
A Corporation
Corporation Name: _______________________________________________ (SEAL)
State of Incorporation: __________ Type (General Business, Professional, Service, Limited Liability): ___________
(Signature – attach evidence of authority to sign)
Title: __________________________________________________________
(CORPORATE SEAL)
Attest: _________________________________________________________
(Signature of Corporate Secretary)
Date of Qualification to do business in ________________ [State Where Project is Located] is ____\____\____.
Revised BF-7
A Joint Venture
Name of Joint Venture: ____________________________________________
First Joint Venture Name: __________________________________________ (SEAL)
(Signature of first joint venture partner – attach evidence of authority to sign)
Second Joint Venture Name: _______________________________________ (SEAL)
(Signature of second joint venture partner – attach evidence of authority to sign)
(Each joint venture must sign. The manner of signing for each individual, partnership, and corporation that is a party to the joint venture should be in the manner indicated above.)
TABLE OF CONTENTS
SECTION TITLE
01010 SUMMARY OF WORK
01020 EROSION AND SEDIMENT CONTROL PLAN
01300 SUBMITTALS
02221 HORIZONTAL DIRECTIONAL DRILL
02225 TRENCHING & BACKFILLING
02310 JACK AND BORE
02665 WATER DISTRIBUTION SYSTEM
02935 SEEDING
03300 CAST IN PLACE CONCRETE
13704 TRAINING
P.N. 23011622 01010-1 ARM Group LLC.
SECTION 01010
SUMMARY OF WORK
PART 1 - GENERAL
1.1 BASIC CONTRACT
A. General
1. The intent and meaning of the Contract Documents require that the
Contractor, under the terms of his contract, shall take such action as necessary and required to provide labor, plant, materials, equipment, transportation, facilities, and appurtenances thereto, which are indicated or reasonably implied by each Drawing and each section of the Specifications, all of which are collectively necessary and required for the execution of the Work.
B. Description of Work at Property as shown on the plans:
The Contractor shall furnish all materials, labor, and supervision to perform services described in Contract Documents to complete the following work:
Item no.
Item Description Quantity Unit
1 Mobilization/Demobilization 1 LS
2 HDD 12” HDPE SDR 11 Casing Pipe 3 LS
3 6” C-900 PVC Pipe and Fitting 4650 LF
4 6” Gate Valves and Box 10 EA
5 2” Blow off Valve Assembly 1 EA
6 Service Connection including corporation stops and meter box connection
60 EA
7 Fire Hydrant Assembly 5 EA
8 Connection to existing System 3 EA
9 Flushing, Testing and Bacterial Testing 1 LS
1.2 PERMITS AND REGULATIONS
A. The Contractor's responsibility includes compliance with federal, state, and local regulations which in any way affect the work or implementation of the project.
P.N. 23011622 01010-2 ARM Group LLC.
B. All work shall be done in accordance with VDH & VDEQ regulations for a potable water supply.
1.3 EXISTING CONDITIONS
A. All information relating to existing subsurface structures and pipes is from the best sources at present available to the Developer. All such information and the drawings of existing construction are furnished only for the information and convenience of Bidders.
B. The Bidder is responsible for ascertaining the character, quantities, and conditions of the various materials and the work to be done.
1.4 PROJECT CONSTRUCTION REQUIREMENTS
A. All materials and equipment held in storage by the Contractor shall be protected from the weather, vandalism, and/or flooding by suitable waterproof coverings, or by placing in storage buildings until ready for installation or until equipment is to be turned over to the Developer.
Equipment that is damaged or becomes inoperable shall be rejected and must be restored or replaced at no additional cost to the Developer.
1. The Contractor shall effectively protect, at his own expense, his work, materials, and equipment for the duration of the construction period.
2. The Contractor shall exercise care in the installation of all equipment to avoid damage of any kind. All equipment shall be protected from dust and moisture prior to and after installation.
B. The Contractor shall make appropriate arrangements with the utility companies to provide for services necessary to complete the work. The Contractor shall comply with all protection requirements for the existing utilities.
1. Prior to construction, the Contractor shall determine in the field the exact location and depth of all affected existing utility lines.
1.5 MISCELLANEOUS ITEMS
A. The Contractor shall ensure that his work covered under this Contract complies with all required erosion and sedimentation control regulations.
B. The Contractor shall inform his subcontractors of the conditions listed in this SUMMARY OF WORK, since the Contractor shall be held responsible
P.N. 23011622 01010-3 ARM Group LLC.
for the work of his subcontractors.
C. Coordinate use of premises with Developer.
D. Assume full responsibility for the protection and safekeeping of product under this Contract, stored on site.
E. Obtain and pay for the use of additional storage or work areas needed for operations.
1.6 SPECIAL PRECAUTIONS
A. General
1. The Contractor shall protect all pavement, structures, and trees outside of construction limits.
2. The Contractor shall, when working in areas where overhead wires are encountered, take special precautions. If necessary, wires shall be removed, and temporary services placed. The cost of this work shall be included in the Bid price.
B. Existing Utilities
1. The Contractor shall make appropriate arrangements with the utility companies, 10 days before he starts construction, to provide for services necessary to complete the work. The Contractor shall comply with all protection requirements for the existing utilities.
a. Prior to construction, the Contractor shall determine in the field the exact location and depth of all affected existing utility lines.
P.N. 23011622 01010-4 ARM Group LLC.
b. In order to determine if a deviation in horizontal or vertical location of the pipes may be required, the Contractor shall plot the actual location and depths of utilities on the Contractor's record drawings. The Contractor shall report to the Engineer, a minimum of five days before the start of construction if interference is apparent.
* * * * * END OF SECTION * * * * *
O E
O
EO
E O
E O
E
OE
OE
OE
O E
O E
O E
O E
O E
O E
O E
O E
OE
OE
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
X
X
O E
O E
OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE
OE
OE
OE
OE
OE
OE
OE
UE
T T T T T T T TT T T T T T T
T T T T T T T T T T T T T T T T T
T T
OE
OE
OE
OE
OE OE
OE
W W W W W W W W W W W W W W W W W W W W W
W W W W
W W W
W W W
W W W W W
W W W W
W W
W W
W W
W W
FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM
FM
FM
FM
FM
FM
FM
FM
FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FMSSSSSSSSSSSSSSSSSS
S
S S
S S
S S
S
SSSSSSSSSSSSSSSSSSSSSSSSSSSSS
W
W W
W
W W
PROPOSED 6" PVC
C-900 WATERLINE
KINGS HIGHWAY - ROUTE 3
55' RIGHT OF WAY
PE
A
C H
G R
O
VE
LA
N
E
10' PERMANENT
UTILITY EASMENT.
VARIABLE WIDTH
PERMANENT
UTILITY EASEMENT
D.B. ,PG.
TM 34A1-3-1GREENE INCD.B. 356, Pg. 151D.B. 102, PG 114 (Plat)
TM 34A1-1-1-9
RANDY D. ALVERSON
KIMBERLY ALVERSON
D.B. 816, Pg. 541 D.B. 309, Pg. 382
TM 34A1-1-1-8
LARRY E PHILLIPS
D.B. 900, Pg. 1650
D.B. 309, Pg. 382 (Plat)
TM 34A1-1-1-7C
LARRY E PHILLIPS
D.B. 900, Pg. 1650
D.B. 309, Pg. 382 (Plat)
TM 34A1-1-1-7B
WILLIAM CARROLL PEARSON
D.B. 467, Pg. 839 D.B. 111, Pg. 390 (Plat) TM-34A1-1-1-7
PATRICIA L. BALDERSON
D.B. 502 Pg. 184
D.B. 130, Pg. 294 (Plat)
TM 34A1-1-1-7A
ARLDEN M. LEWIS
DORIS M. LEWIS
D.B. 304, Pg. 802
D.B. 111, Pg. 395 (Plat)
TM 34A1-1-1-6
VIRGINIA ELECTRIC
& POWER COMPANY
D.B. 287, Pg. 761
STA. 25+98.70
PROPOSED
6"X6" TEE
(2) 6" GATE VALVE AND
BOX
STA, 26+84
CONTRACTOR SHALL
CUT AND CAP
EXISTING 4" WATER MAIN
AND INSTALL PROPOSED
6" 45° BEND &
6"X4" REDUCER
STA. 24+43
PROPOSED
6"X2" TEE
2" GATE VALVE AND BOX
6" GATE VALVES AND BOX
REPLACE AND CONNECT
EXISTING 3/4" SERVICE
LATERALS (TYPICAL)
STA. 19+88
6" TEE
FIRE HYDRANT ASSEMBLY
EXISTING
FIRE HYDRANT ASSEMBLY
TO BE REPLACED
(TYPICAL)
REMOVE AND STORE
EXISTING SIGN, REINSTALL
AFTER INSTALLATION OF
WATERLINERECONNECT EXISTING
3/4" WATERLINE SERVICE
EXISTING WATERLINE
TO BE ABANDONED IN
PLACE (SEE NOTE 8,
SHEET G-1)
EXISTING WATERLINE
TO BE ABANDONED IN
PLACE (SEE NOTE 8,
SHEET G-1)
REPLACE EXISTING 3/4"
VALVE AND BOX
PROPOSED 59 L.F. OF
HORIZONTAL DIRECTIONAL
DRILL 12" HDPE SDR 11
CASING PIPE
PROPOSED
6" WATERLINE
PROPOSED
6" 22.5° BEND
PROPOSED
6" GATE VALVE AND BOX
PROPOSED 59 L.F. OF
4" HDPE DIRECTIONAL
DRILL CASING PIPE
59 L.F. OF PROPOSED
2" HPDE WATERLINE
REPLACE AND CONNECT
1" SERVICE LATERALS
LOCATE AND CONNECT TO
EXISTING 2" WATER
SERVICE LINE.
AS
PH
AL
T
C O
N C
R
ET
E
SI
D
AW
AL
K
AS
PH
AL
T
AS
PH
AL
T
AS
PH
AL
T
G R
AV
EL
G R
AV
EL
GRAVEL
G R
AV
EL
ASPHALT
TM 33-38F
NASH, DOUGLAS D.
D.B. 892, Pg. 1
VARIABLE WIDTH
TEMPORARY
CONSTRUCTION
EASEMENT
VARIABLE WIDTH
PERMANENT
UTILITY EASEMENT
RELOCATE
EXISTING
WATER METER
APPROXIMATELY 15'X10'
RECEIVING PIT OF JACK
AND BORE.
CONTRACTOR SHALL
RESTORE THE ASPHALT
TO MATCH EXISTING
CONDITION.
18+00 19+00 20+00 21+00
22+00
23+00
24+00
25+00
W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W
W W W W W
W W W W
W
W W
W
W
W
WW
W
W W
W
W W
W W
W W W W W
W 0+00 0+50
1+00
0+00
+0
26+84
ROBERT ACKERMAN & AMY
ACKERMAN
TAX MAP 34A1-1-1-4
D.B. 917, Pg. 897 D.C. 287, Pg. 761
EL
EV
A
TI
O N
IN
F
EE
T
EL
EV
A
TI
O N
IN
F
EE
T
HORZ. 1"=30' VERT. 1"=6'
RT3 WATERLINE EXTENSION PROFILE
19+00 19+50 20+00 20+50 21+00 21+50 22+00 22+50 23+00 23+50 24+00 24+50 25+00 25+50 26+00 26+50 27+00 27+50
EXISTING GRADE
ABOVE WATER LINE
3.5'
MIN.
PROPOSED 6" PVC
C-900 WATERLINE
ST
A.
9+
6"
X6 " T
EE
FI
R E
H
YD
R
AN
T
AS
SE
M
BL
Y
RESTRAINT
FROM 19+68
TO 20+08
ST
A.
5+
6"
X6 " T
EE
6"
G
AT
E
VA
LV
E
AN
D
B O
X
ST
A.
4+
6"
X2 " T
EE
2"
G
AT
E
VA
LV
E
AN
D
B O
X 6"
G
AT
E
VA
LV
ES
A N
D B
O
XE
S
RESTRAINT
FROM 24+23
TO 24+63
RESTRAINT
FROM 25+78
TO 25+98
ST
A.
6+
6"
2.
5° B
EN
D
6" G
AT
E
VA
LV
E
AN
D B
O X
ST
A.
6+
C
O N
TR
AC
TO
R
T O
L O
C
AT
E
AN
D C
O N
N
EC
T
TO
E
XI
ST
IN
G
" W
AT
ER
LI
N E
4"
5° B
EN
D
5'
(MIN.)
59 L.F. OF HDD 12"
HDPE SDR 11
CASING PIPE
5'
(MIN.)
KI
N
G S
H
IG
H W
AY
R O
U
TE
' R
IG
H T
O F
W
AY
EXISTING 4"
WATERLINE
EXISTING 8"
SANITARY SEWER
EXISTING 2"
FORCE MAIN
TO
W
N O
F M
O N
TR
O
SS
W
ES
TM
O R
EL
A
N D
C O
U N
TY
, V
IR
G
IN
IA
W A
TE
R
LI
N
E
EX
TE
N
SI
O
N P
A R
T
TO
W
N O
F M
O N
TR
O
SS
P:
\T ow n of M on tro ss \0
.0
To w n of
M on tro ss
W at er L in e
Ex t P ar t 2
\D ra w in gs \P ro du ct io n\
_W at er lin e
Pl an a nd
P ro fil e.
dw g
P lo tte d:
A pr il
, 2
N o.
Re vi sio n
Da te
By de si gn ed ch ec ke d dr aw n da te pr oj ec t n o.
Th is d ra w in g, it s c on te nt s, an d ea ch c om po ne nt o f t hi s d ra w in g ar e th e pr op er ty o f an d pr op rie ta ry to
A R
M G ro up
L
LC
a nd sh al l n ot b e re pr od uc ed o r u se d in a ny m an ne r e xc ep t f or th e pu rp os e id en tif ie d on th e
Ti tle
B lo ck , a nd o nl y by o r o n be ha lf of th is c lie nt fo r t he id en tif ie d pr oj ec t u nl es s o th er w is e au th or iz ed b y th e ex pr es s, w rit te n co ns en t o f A R
M G ro up
L
LC
Sh ee t D
JF
\M
A
M
SC D
JF
-1
0-
2.
En gi ne er s an d Sc ie nt is ts w w w .a rm gr ou p.
ne t
K in gs C ha rt er D ri ve
A sh la nd
, V A
(8
0-
A R
M G ro u p L
L C
4-
-2
Re vi se d Pe r A dd en du m
3-
-2
Re vi se d Pe r A dd en du m
4-
-2
SCALE IN FEET
30 60 90
PLAN VIEW
K
IN
G S
H
IG
H W
A Y
R
T
PL
A
N A
N D
P R
O
FI
LE
-2
C-3
NOTE:
1. PAVEMENT CUTS ON THIS PROJECT ARE NOT PERMITTED BY VDOT.
2. CONTRACTOR SHALL REPAIR ALL DRIVEWAYS TO ORIGINAL CONDITION.
3. THE CONTRACTOR SHALL SAW CUT WHEN WATERLINE CROSSES ASPHALT AND CONCRETE PAVEMENT.
4. THE CONTRACTOR SHALL LOCATE AND RECONNECT ALL SERVICE LINES.
5. ALL SERVICE LATERALS ARE 3/4" UNLESS OTHERWISE NOTED.
6. IF METER BOXES ARE OUTSIDE THE EASEMENTS, INSTALL NEW METER BOXES INSIDE THE EASEMENT AND
RELOCATE THE METER.
M
AT
C H
LI
N
E (S
EE
S
H
EE
T C
-2
SH
EE
T 3A
SH
EE
T
SH
EE
T
SH
EE
T
AutoCAD SHX Text %%236
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text %%236
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text y
AutoCAD SHX Text %%237
AutoCAD SHX Text %%237
AutoCAD SHX Text %%237
AutoCAD SHX Text %%236
AutoCAD SHX Text %%225
AutoCAD SHX Text
MAILBOX
AutoCAD SHX Text %%225
AutoCAD SHX Text
MAILBOX
AutoCAD SHX Text %%225
AutoCAD SHX Text
MAILBOX
AutoCAD SHX Text %%225
AutoCAD SHX Text
MAILBOX
AutoCAD SHX Text %%225
AutoCAD SHX Text
MAILBOX
AutoCAD SHX Text x
AutoCAD SHX Text %%237
AutoCAD SHX Text %%251
AutoCAD SHX Text %%251
AutoCAD SHX Text
AutoCAD SHX Text h
AutoCAD SHX Text h
AutoCAD SHX Text h
AutoCAD SHX Text e
AutoCAD SHX Text e
AutoCAD SHX Text e
AutoCAD SHX Text %%237
AutoCAD SHX Text %%237
AutoCAD SHX Text %%237
AutoCAD SHX Text %%237
AutoCAD SHX Text %%237
AutoCAD SHX Text %%237
AutoCAD SHX Text %%237
AutoCAD SHX Text %%237
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text
LIC. NO. 29183
AutoCAD SHX Text
M. SCOTT COURTNEY
OE
OE
OE
OE
S S S S S S S
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
O E
OE OE OE OE OE OE OE OE
S S
UEUE
UE
UE
U E
U E
U E
UE
UE
UE
UE
UE
UE
UE
UE
TTTTT T T T T
WWWWWWWWWWWW
W
W
W
W
W
W
W
W
W
W W
W W
W W
W W
W W
W W
FOREST DRIVE
FO
R
ES
T
D R
IV
E
PU
B
LI
C
R O
A D
6" TEE
FIRE HYDRANT ASSEMBLY
(TYPICAL OF ALL HYDRANTS)
PROPOSED 6" PVC
C-900 WATERLINE
INV. 138.91
15" RCP
INV. 138.58
H
Y D
W W
W W W W
W W
W W
W W
W W
W
W
W
W
W
W
W
W
W W W W W W W W W W W W W W W W W W W W W
W
10+50 11+00
11+50 12+00
12+50
13+00
13+50
14+00
14+50 15+00
15+50 16+00 16+50 17+00 17+50 18+00 18+50
TM 33-43B
MITCHELL MARIE B
DB 251 PG 742
PLAT DB 251 PG 742
TM 33A-1-6
WITTMAN, KATHRYN S & ROBERT
DB 921 PG 131
PLAT BD 134 PG 183 TM 33A-1-7
TORRES-SANCHEZ, JOSE A &
GARCIA-DELBRA, JOSE M
DB 837 PG 168
PLAT DB 129 PG 254
TM 33A-1-8
BROYLES, ASHLEIGH V
DB 979 PG 1474
PLAT DB 129 PG 254
TM 33A-1-5
WITTMAN ROBERT J & KATHRYN S
DB 310 PG 38
PLAT DB 247 PG 181
FOREST DRIVE
PROPOSED
6" 11.25° BENDS
PROPOSED
6" 11.25° BENDS
PROPOSED
6" 11.25° BENDS
PROPOSED
6" 11.25° BENDS
PROPOSED
6" 11.25° BENDS
PROPOSED
6" 11.25° BENDS
PROPOSED
6" 22.5° BENDS
REPLACE AND CONNECT
EXISTING 3/4" SERVICE
LATERALS (TYPICAL)
REPLACE AND CONNECT
EXISTING 3/4" SERVICE
LATERALS (TYPICAL)
REPLACE AND CONNECT
EXISTING 3/4" SERVICE
LATERALS (TYPICAL)
REPLACE AND CONNECT
EXISTING 3/4" SERVICE
LATERALS (TYPICAL)
REPLACE AND CONNECT
EXISTING 3/4" SERVICE
LATERALS (TYPICAL)
PROPOSED 30 L.F. OF
HORIZONTAL DIRECTIONAL DRILL
12" HDPE SDR 11 CASING PIPE
EL
EV
A
TI
O N
IN
F
EE
T
9+00 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 16+00 16+50 17+00 17+50
FO
R
ES
T
D R
IV
E
EXISTING 15" RCP
INV. 138.91
26'
ST
A.
0+
6"
5°
H O
R
IZ
O N
TA
L
BE
N
D
ST
A.
0+
6"
5°
H O
R
IZ
O N
TA
L
BE
N
D
ST
A.
0+
6"
5°
H O
R
IZ
O N
TA
L
BE
N
D
ST
A.
0+
6"
5°
H O
R
IZ
O N
TA
L
BE
N
D
ST
A.
0+
6"
X6 " T
EE
F
IR
E
H
YD
R
AN
T
AS
SE
M
BL
Y
6" G
AT
E
VA
LV
E
AN
D B
O X
ST
A.
1+
6"
0°
H O
R
IZ
O N
TA
L
BE
N
D
ST
A.
1+
6"
G
AT
E
VA
LV
E
AN
D
B O
X
5'
(MIN.)
PROPOSED 6" PVC
C-900 WATERLINE
RESTRAINT
FROM 10+37
TO 10+85
EXISTING 4" DI WATER PIPE
EL
EV
A
TI
O N
IN
F
EE
T
8+50 HORZ. 1"=30' VERT. 1"=6'
ALIGNMENT - RT 3 TO FOREST DRIVE WATERLINE EXTENSION PROFILE
RESTRAINT
FROM 11+20
TO 11+60
EXISTING GRADE
ABOVE WATER LINE
3.5'
MIN.
3.5'
MIN.
ST
A.
+7
6"
1.
° H
O R
IZ
O
N
TA
L
BE
N D
ST
A.
2+
6"
1.
° H
O R
IZ
O
N
TA
L
BE
N D
ST
A.
2+
6"
1.
° H
O R
IZ
O
N
TA
L
BE
N D
ST
A.
3+
6"
1.
° H
O R
IZ
O
N
TA
L
BE
N D
ST
A.
3+
6"
1.
° H
O R
IZ
O
N
TA
L
BE
N D
ST
A.
3+
6"
1.
° H
O R
IZ
O
N
TA
L
BE
N D
ST
A.
4+
6"
1.
° H
O R
IZ
O
N
TA
L
BE
N D
ST
A.
4+
6"
2.
5° H
O R
IZ
O
N
TA
L
BE
N D
30 L.F. OF HDD 12" HDPE
SDR 11 CASING PIPE
OE
OE
OE
OE
S S S S S S S
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
OE
OE
OE
OE
OE
OE
OE
OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE
S S S S S S S S S S S
U E
U E
U E
UE
UE
UE
TTTTTTTTTTTTTTT T T T T T T T T T T T T T
W W W W W W W W
W
W
W
W W
W W
W W
W W
W W
W W
KINGS HIGHWAY - ROUTE 3
55' RIGHT OF WAY
PROPOSED
(4) 6" 45° BENDS
FO
R
ES
T
D R
IV
E
PU
B
LI
C
R O
A D
REPLACE AND CONNECT
EXISTING 3/4" SERVICE
LATERALS (TYPICAL)
6" TEE
FIRE HYDRANT ASSEMBLY
(TYPICAL OF ALL HYDRANTS)
INV. 138.91
PERMANENT
UTILITY EASEMENT
C-3B
PROPOSED 6" PVC
C-900 WATERLINE
H
Y D
W
W W
W W
W W
W W
W W W W W W W W W
W W W W
W W
W W
W W
W W
W
W
W
W
9+00 9+50 10+00 10+50 11+00
11+50 12+00
12+50
13+00
13+50
TM 33A-1-4
MITCHELL JAMES W & JOAN E
MITCHELL
DB 798 PG 171
PLAT DB 246 PG 463
TM 33A-1-3
MITCHELL JAMES W & JOAN E
MITCHELL
DB 203 PG 554
PLAT DB 246 PG 463
TM 33A-1-5
WITTMAN ROBERT J & KATHRYN S
DB 310 PG 38
PLAT DB 247 PG 181
PROPOSED
6" 11.25° BENDS
PROPOSED
6" 11.25° BENDS
PROPOSED
6" 11.25° BENDS
PROPOSED
6" 11.25° BENDS
PROPOSED 30 L.F. OF
HORIZONTAL DIRECTIONAL DRILL
12" HDPE SDR 11 CASING PIPE
TO
W
N O
F M
O N
TR
O
SS
W
ES
TM
O R
EL
A
N D
C O
U N
TY
, V
IR
G
IN
IA
W A
TE
R
LI
N
E
EX
TE
N
SI
O
N P
A R
T
TO
W
N O
F M
O N
TR
O
SS
P:
\T ow n of M on tro ss \0
.0
To w n of
M on tro ss
W at er L in e
Ex t P ar t 2
\D ra w in gs \P ro du ct io n\
_W at er lin e
Pl an a nd
P ro fil e.
dw g
P lo tte d:
A pr il
, 2
N o.
Re vi sio n
Da te
By de si gn ed ch ec ke d dr aw n da te pr oj ec t n o.
Th is d ra w in g, it s c on te nt s, an d ea ch c om po ne nt o f t hi s d ra w in g ar e th e pr op er ty o f an d pr op rie ta ry to
A R
M G ro up
L
LC
a nd sh al l n ot b e re pr od uc ed o r u se d in a ny m an ne r e xc ep t f or th e pu rp os e id en tif ie d on th e
Ti tle
B lo ck , a nd o nl y by o r o n be ha lf of th is c lie nt fo r t he id en tif ie d pr oj ec t u nl es s o th er w is e au th or iz ed b y th e ex pr es s, w rit te n co ns en t o f A R
M G ro up
L
LC
Sh ee t D
JF
\M
A
M
SC D
JF
-1
0-
2.
En gi ne er s an d Sc ie nt is ts w w w .a rm gr ou p.
ne t
K in gs C ha rt er D ri ve
A sh la nd
, V A
(8
0-
A R
M G ro u p L
L C
4-
-2
Re vi se d Pe r A dd en du m
3-
-2
Re vi se d Pe r A dd en du m
4-
-2
K
IN
G S
H
IG
H W
A Y
R
T
TO
F
O R
ES
T
D R
IV
E
PL
A
N A
N D
P R
O
FI
LE
C-3B
NOTE:
1. PAVEMENT CUTS ON THIS PROJECT ARE NOT PERMITTED BY VDOT.
2. CONTRACTOR SHALL REPAIR ALL DRIVEWAYS TO ORIGINAL CONDITION.
3. THE CONTRACTOR SHALL SAW CUT WHEN WATERLINE CROSSES ASPHALT AND CONCRETE PAVEMENT.
4. THE CONTRACTOR SHALL LOCATE AND RECONNECT ALL SERVICE LINES.
5. ALL SERVICE LATERALS ARE 3/4" UNLESS OTHERWISE NOTED.
6. IF METER BOXES ARE OUTSIDE THE EASEMENTS, INSTALL NEW METER BOXES INSIDE THE EASEMENT AND
RELOCATE THE METER.
SCALE IN FEET
30 60 90
PLAN VIEW
SCALE IN FEET
30 60 90
PLAN VIEW
SH
EE
T 3C
SH
EE
T 3B
SH
EE
T 3B
SH
EE
T 3A
THIS SHEETMATCHLINE
THIS SHEETMATCHLINE
AutoCAD SHX Text x
AutoCAD SHX Text %%236
AutoCAD SHX Text d
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text %%237
AutoCAD SHX Text %%237
AutoCAD SHX Text %%251
AutoCAD SHX Text %%251
AutoCAD SHX Text %%237
AutoCAD SHX Text f
AutoCAD SHX Text f
AutoCAD SHX Text f
AutoCAD SHX Text f
AutoCAD SHX Text f
AutoCAD SHX Text f
AutoCAD SHX Text %%237
AutoCAD SHX Text %%237
AutoCAD SHX Text %%237
AutoCAD SHX Text N
AutoCAD SHX Text %%236
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text %%237
AutoCAD SHX Text %%251
AutoCAD SHX Text %%251
AutoCAD SHX Text f
AutoCAD SHX Text f
AutoCAD SHX Text %%237
AutoCAD SHX Text %%237
AutoCAD SHX Text N
AutoCAD SHX Text
LIC. NO. 29183
OEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOE
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
OE
OE
OE
OE
OE
OE
O
E O
E
X X
X
S S
S S
S S
S S
S S
S S
S S
S S
O E
O E
OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE
OE
OE
OE
O E
O E
O E
O E
O E
O E
O E
O E
O E
O
EO
E
OE
OE
OE
OE
O E
OE
OE
X
FMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFM
WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW
WWWW
W W
W W
W W
W W
W W
W W
W X X
XX
X X
X X
OE
OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE
X X
X
W
W W
W W
S S
S S
S S
S S
S S
W W
FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM
W W
W W
W
WWWWW
12" RCP
" R
C P
15" RCP24
" R
C P
15" RCP
BUILDING
PROPOSED 6" PVC
C-900 WATERLINE
15' WIDTH PERMANENT
UTILITY EASEMENT
54 L.F. OF HDD 12"
HDPE SDR 11
CASING PIPE
5'
TYP.
PROPOSED 6" PVC
C-900 WATERLINE
PROPOSED
6" TEE
(2) 6" GATE VALVE AND BOXES
TM 34-137A
CARVER PARTNERS L P
D.B. 428, Pg. 738
TM 34A1-4-29
JOHN H. THOMPSON
D.B. 787, Pg. 1309 D.B. 104, Pg. 579 (Plat)
TM 34A1-4-27R
SCOTT T. BROSKE
MEGAN L. BROSKE
D.B. 891, Pg. 686 P.C. 1, Slide 1772
D.B. 104, Pg. 579 (Plat)
TM 34A1-4-26
KIMBERLY M. SMITH
D.B. 781, Pg. 746 D.B. 104, Pg. 579 (Plat)
TM 34A1-4-25
MARY F. BOWEN-CRAWFORD
D.B. 894, Pg. 122 D.B. 104, Pg. 579 (Plat)
TM 34A1-4-24
MARY P. CHINNIS (Trustee)
D.B. 545, Pg. 32 D.B. 104, Pg. 579 (Plat)
TM
4A 1-
4-
F.
CA
RE
Y
HO
W
LE
TT
AS
SO
CI
AT
ES
IN
C
D.
B.
, P g.
P.
C.
, S lid e
TM 34-137B
THOMAS C. BROOKS III
KIMBERLY J. BROOKS
D.B. 947 Pg. 1783 D.B. 308, Pg. 817 (Plat)
TM 34A2-3-31
THOMAS C. BROOKS III
KIMBERLY J. BROOKS
D.B. 947 Pg. 1783 D.B. 179, Pg. 430 (Plat)
TM 34A1-4-1
NICHOLAS HERRING
JENNIFER HERRING
D.B. 912, Pg. 505 D.B. 104, Pg. 579 (Plat)
TM 34A1-4-2
NICHOLAS HERRING
JENNIFER HERRING
D.B. 912, Pg. 505 D.B. 104, Pg. 579 (Plat)
TM 34A1-4-3
NICHOLAS HERRING
JENNIFER HERRING
D.B. 912, Pg. 505
TM 34A2-1-3-1A
TOWN OF MONTROSS
D.B. 117, Pg. 237 D.B. 241, Pg. 706 (Plat)
TM 34A1-4-3A
PAUL L. FILKOSKI
JENNIFER L. FILKOSKI
D.B. 915, Pg. 264 P.C. 1, Slide 1400
TM 34A1-4-4
PAUL L. FILKOSKI
JENNIFER L. FILKOSKI
D.B. 915, Pg. 264 P.C. 1, Slide 1400
D.B. 104, Pg. 579 (Plat)
TM 34A1-4-21
DOROTHY J. A. JOHNSON
D.B. 958, Pg. 921 D.B. 104, Pg. 579 (Plat)
TM 34A1-4-20
JAMES T DAVIES IV
LORA A. DAVIES
D.B. 943, Pg. 2411
D.B. 104, Pg. 579 (Plat)
TM 34A1-4-19
JAMES T DAVIES IV
LORA A. DAVIES
D.B. 943, Pg. 2411
D.B. 104, Pg. 579 (Plat)
TM 34A1-4-18
LESLIE B. SISSON
SANDRA G. SISSON
D.B. 947, Pg. 107
D.B. 104, Pg. 579 (Plat)
TM 34A1-4-16
JOSEPH THIBODEAU (Trustee) DEBRA THIBODEAU (Trustee)
D.B. 966, Pg. 460 D.B. 104, Pg. 579 (Plat)
WESTMORELAND COUNTY
BOARD OF SUPERVISORS
TM
4A 1-
4-
LA
RR
Y W
. C
RA
W
FO
RD
D.
B.
, P g.
P.
C.
, S lid e
TM
4A 1-
4-
B
LE
SL
IE
B . S
IS
SO
N
SA
ND
RA
G . S
IS
SO
N D.
B.
, P g.
TM
4A 1-
4-
A M
AR
Y
P.
C
HI
NN
IS
(T ru st ee
D.
B.
, P g.
TM
4A 1-
4-
LA
RR
Y W
. C
RA
W
FO
RD
D.
B.
, P g.
P.
C.
, S lid e
TM
4A 1-
4-
A
LA
RR
Y
W . C
RA
W
FO
RD
D.
B.
, P g.
P.
C.
, S lid e
20' WIDTH PERMANENT
UTILITY EASEMENT
STA.10+00.00
8"X6" TAPPING SLEEVE
AND VALVE
CARVER STREET
ROUTE T 1204
25 mph SPEED LIMIT
(40' RIGHT OF WAY)
C-4
PROPOSED 2"
BLOW OFF ASSEMBLY
(SEE DETAIL W-5.0,
SHEET C-6)
EXISTING
FIRE HYDRANT ASSEMBLY
TO BE ABANDONED AND
REMOVED
PROPOSED
6" 11.25° BEND
PROPOSED 6" PVC
C-900 WATERLINE
PROPOSED
6" TEE
FIRE HYDRANT ASSEMBLY LOCATE AND RECONNECT
TO EXISTING 3/4" SERVICE
LATERAL (TYPICAL) RELOCATE EXISTING
METER ASSEMBLY AND
METER BOX
RECONNECT WATER SERVICE
EXISTING 8"
WATERLINE
RELOCATE EXISTING
METER ASSEMBLY AND
METER BOX
RECONNECT WATER SERVICE
12" RCP
INV.=132.55
INV.=124.74
INV.=133.39
INV.=135.20
INV.=129.76INV.=127.74
INV.=128.48
INV.=128.04
PROPOSED 2"
BLOW OFF ASSEMBLY
(SEE DETAIL W-5.0,
SHEET C-6)
EXISTING
WATERLINE TO BE
ABANDONED IN PLACE
EXISTING
WATERLINE TO BE
ABANDONED IN PLACE
EXISTING
WATERLINE TO BE
ABANDONED IN PLACE
STORM SEWER
INV.=126.49 AT
WL CROSSING
133.46
3/4" SERVICE
LATERAL (TYPICAL)
1" SERVICE
LATERAL
18+63
+0
+0
14+00 16+00 18+00
H
Y D
10+00
11+00
12+00
12+04
W W
W W
W W
W W
W W
W W
W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W
WW
W
W W
W W
W W
W
W W
W W
W
W W
W W
W W
W W
W
W W
W W
W
W W
W
W
W W
W
WW
W
W
EL
EV
A
TI
O N
IN
F
EE
T
EL
EV
A
TI
O N
IN
F
EE
T
HORZ. 1"=30' VERT. 1"=6'
CARVER STREET WATERLINE EXTENSION PROFILE
10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 16+00 16+50 17+00 17+50 18+00 18+50 18+75
C
EN
TE
R
LI
N
E O
F C
AR
VE
R S
TR
EE
T
EXISTING GRADE
ABOVE WATER LINE
3.5'
MIN.
PROPOSED 6" PVC
C-900 WATERLINE
ST
A.
8+
2"
B
LO
W O
FF
A
SS
EM
BL
Y
5'
(MIN.)
5'
(MIN.)
54 L.F. OF HDD
12" HDPE SDR 11
CASING PIPE
EXISTING GRADE
ABOVE WATER LINE
3.5'
MIN.
PROPOSED 6" PVC
C-900 WATERLINE
50' VDOT
RIGHT OF WAY
ST
A.
0+
.0
8"
T
AP
S
LE
EV
E
AN
D
V
AL
VE
8"
X6 " R
ED
U
C
ER
6" G
AT
E
VA
LV
E
AN
D B
O X
RESTRAINT
FROM 10+00
TO 10+42
RESTRAINT
FROM 17+29
TO 18+11
ST
A.
7+
6"
X6 " T
EE
FI
R E
H
YD
R
AN
T
AS
SE
M
BL
Y
ST
A.
2+
6"
T
EE
(2 ) 6
" G
AT
E
VA
LV
ES
A N
D B
O
XE
S
RESTRAINT
FROM 12+50
TO 12+73
ST
A.
0+
6"
1.
° H
O R
IZ
O
N
TA
L
BE
N D
ST
A.
1+
6"
X6 " T
EE
FI
R E
H
YD
R
AN
T
AS
SE
M
BL
Y
RESTRAINT
FROM 11+80
TO 11+95
TO
W
N O
F M
O N
TR
O
SS
W
ES
TM
O R
EL
A
N D
C O
U N
TY
, V
IR
G
IN
IA
W A
TE
R
LI
N
E
EX
TE
N
SI
O
N P
A R
T
TO
W
N O
F M
O N
TR
O
SS
P:
\T ow n of M on tro ss \0
.0
To w n of
M on tro ss
W at er L in e
Ex t P ar t 2
\D ra w in gs \P ro du ct io n\
_W at er lin e
Pl an a nd
P ro fil e.
dw g
P lo tte d:
A pr il
, 2
N o.
Re vi sio n
Da te
By de si gn ed ch ec ke d dr aw n da te pr oj ec t n o.
Th is d ra w in g, it s c on te nt s, an d ea ch c om po ne nt o f t hi s d ra w in g ar e th e pr op er ty o f an d pr op rie ta ry to
A R
M G ro up
L
LC
a nd sh al l n ot b e re pr od uc ed o r u se d in a ny m an ne r e xc ep t f or th e pu rp os e id en tif ie d on th e
Ti tle
B lo ck , a nd o nl y by o r o n be ha lf of th is c lie nt fo r t he id en tif ie d pr oj ec t u nl es s o th er w is e au th or iz ed b y th e ex pr es s, w rit te n co ns en t o f A R
M G ro up
L
LC
Sh ee t D
JF
\M
A
M
SC D
JF
-1
0-
2.
En gi ne er s an d Sc ie nt is ts w w w .a rm gr ou p.
ne t
K in gs C ha rt er D ri ve
A sh la nd
, V A
(8
0-
A R
M G ro u p L
L C
4-
-2
Re vi se d Pe r A dd en du m
3-
-2
Re vi se d Pe r A dd en du m
4-
-2
SCALE IN FEET
30 60 90
PLAN VIEW
C A
R V
ER
S
TR
EE
T
PL
A N
A N
D P
R O
FI
LE
C-4
NOTE:
1. PAVEMENT CUTS ON THIS PROJECT ARE NOT PERMITTED BY VDOT.
2. CONTRACTOR SHALL REPAIR ALL DRIVEWAY TO ORIGINAL
CONDITION.
3. THE CONTRACTOR SHALL SAW CUT WHEN WATERLINE CROSSES
ASPHALT AND CONCRETE PAVEMENT.
4. THE CONTRACTOR SHALL LOCATE AND RECONNECT ALL SERVICE
LINES.
5. ALL SERVICE LATERALS ARE 3/4" UNLESS OTHERWISE NOTED.
6. IF METER BOXES ARE OUTSIDE THE EASEMENTS, INSTALL NEW
METER BOXES INSIDE THE EASEMENT AND RELOCATE THE METER.
AutoCAD SHX Text
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text %%237
AutoCAD SHX Text %%237
AutoCAD SHX Text %%237
AutoCAD SHX Text
AutoCAD SHX Text d
AutoCAD SHX Text %%225
AutoCAD SHX Text
MAILBOX
AutoCAD SHX Text %%225
AutoCAD SHX Text
MAILBOX
AutoCAD SHX Text K
AutoCAD SHX Text y
AutoCAD SHX Text
AutoCAD SHX Text K
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text d
AutoCAD SHX Text d
AutoCAD SHX Text d
AutoCAD SHX Text e
AutoCAD SHX Text e
AutoCAD SHX Text e
AutoCAD SHX Text e
AutoCAD SHX Text e
AutoCAD SHX Text h
AutoCAD SHX Text h
AutoCAD SHX Text h
AutoCAD SHX Text h
AutoCAD SHX Text h
AutoCAD SHX Text h
AutoCAD SHX Text h
AutoCAD SHX Text h
AutoCAD SHX Text h
AutoCAD SHX Text h
AutoCAD SHX Text h
AutoCAD SHX Text h
AutoCAD SHX Text h
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text %%225
AutoCAD SHX Text
MAILBOX
AutoCAD SHX Text %%225
AutoCAD SHX Text
MAILBOX
AutoCAD SHX Text %%225
AutoCAD SHX Text
MAILBOX
AutoCAD SHX Text %%225
AutoCAD SHX Text
MAILBOX
AutoCAD SHX Text %%225
AutoCAD SHX Text
MAILBOX
AutoCAD SHX Text x
AutoCAD SHX Text %%79
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text %%237
AutoCAD SHX Text %%237
AutoCAD SHX Text %%237
AutoCAD SHX Text %%237
AutoCAD SHX Text %%237
AutoCAD SHX Text %%237
AutoCAD SHX Text %%237
AutoCAD SHX Text %%237
AutoCAD SHX Text %%237
AutoCAD SHX Text %%237
AutoCAD SHX Text %%237
AutoCAD SHX Text %%237
AutoCAD SHX Text %%237
AutoCAD SHX Text %%237
AutoCAD SHX Text %%237
AutoCAD SHX Text %%237
AutoCAD SHX Text N
AutoCAD SHX Text K
AutoCAD SHX Text K
AutoCAD SHX Text
LIC. NO. 29183
| Addendum #4_ Jack and Bore Removal 4-14-26 |
| Binder1 |
| 03-Bid Form |
| Mastertitle Tech Specs Cover Page |
| 01010 - Summary of Work |
| Drawings |
| 23011622_Waterline Plan and Profile-C-3_PLAN & PROFILE |
| 23011622_Waterline Plan and Profile-C-3B_FOREST DR |
| 23011622_Waterline Plan and Profile-C-4_PLAN & PROFILE - CARVER |
File details come from the government source that posted it. Updated .