Bid docs to be returned.pdf
PDF 3 MB Posted
- Attached to
- LRC SAROCA Facilities
- Solicitation number
- 6100066051
- Issued by
- Lawrence County, Pennsylvania
About this file
Summary of Bid Documents for LRC SAROCA Facilities
This is a comprehensive bid submission package for a standard low-bid construction project issued by the Pennsylvania Department of Military and Veterans Affairs for the construction of four new SAROCA (Small Arms Range Operations Control Area) facilities at Fort Indiantown Gap Pennsylvania National Guard Training Center in Annville, Lebanon County, Pennsylvania. The project encompasses four separate base bid categories: General Construction, HVAC, Plumbing, and Electrical Services. A mandatory pre-bid conference will be held on Wednesday, May 13, 2026, at 11:00 AM at Building 11-12 Conference Room, with attendance required for bid submission eligibility. Written questions are due by 3:30 PM EST on May 29, 2026, and sealed bids must be received by June 8, 2026, at 2:00 PM. Bidders must obtain day passes at the Visitors Center due to access-controlled base entry requirements. The contract work includes all labor, materials, devices, tools, and equipment necessary for full construction in accordance with specifications and contract documents.
The estimated project ranges are General Construction ($800,001–$1,000,000), HVAC ($10,001–$20,000), Plumbing ($20,001–$50,000), and Electrical ($100,001–$200,000), with daily liquidated damages set at $270, $40, $60, and $100 respectively by discipline. The Department of General Services Public Works and the Office of Business Inclusion and Supplier Development have designated this procurement as eligible for Small Diverse Business (SDB) and Veteran Business Enterprise (VBE) participation goals, requiring bidders to complete separate SDB-2 and VBE-2 participation submittals with corresponding utilization schedules, letters of commitment, or good faith efforts waivers for any unmet goals. Additional required certifications include Build America, Buy America Act compliance, debarment and suspension certifications, lobbying certifications, public works employment verification (E-Verify compliance), reciprocal limitations act compliance, and worker protection and investment certifications addressing Pennsylvania labor law compliance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Pre-bid map - Area 11.pdf | ||
| Pre-bid sign in.pdf | ||
| Addendum #1.docx | DOCX document | |
| 42220156_LRC SAROCA_SPECS.pdf | ||
| Instructions to Bidders DMVA - 2024.docx | DOCX document | |
| 6100066051 LRC SAROCA Facilities BDISBO SDB VBE presentation.pdf | ||
| Addendum #2.docx | DOCX document | |
| Notice to Bidders.docx | DOCX document | |
| Wage Rates.pdf | ||
| Request for Information.docx | DOCX document | |
| General Conditions to the Construction Contract DMVA 2024 v6.docx | DOCX document | |
| 42220156_LRC SAROCA_DWGS.pdf | ||
| Administrative Procedures 2023 DMVA.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Department of General Service, Public Works Published: 03/01/2023
BUILD AMERICA, BUY AMERICA ACT CERTIFICATION FORM
(Public Law 117-58, §§ 70901-52)
Date:_______________________
Contract/Project No._______________________________________________________________________
Contractor Firm_______________________________________________________________________
Name:____________________________________________________________________________________
Address:__________________________________________________________________________________
City:________________ State:_____________ Zip Code:__________________
Project Description:_______________________________________________________________________
Pennsylvania law establishes penalties for providing false certifications, including civil penalties; contract termination; and three-year ineligibility to bid on contracts under 62 Pa. C.S. § 531 (Debarment or suspension).
CERTIFICATION
I, the official named below, certify I have read and understand Build America, Buy America Act and this Form and I am duly authorized to execute this certification on behalf of the firm identified below, and the firm identified below will comply with Build America, Buy America Act in the completion of this Project. I further confirm and understand that this Certification is subject to the provisions and penalties of 18 Pa. C.S. § 4904 (Unsworn falsification to authorities).
Signature Date
Name (Printed)
Firm Name (Printed)
DGS Project Number
Bidder Name and Address: Bidder Phone #:
Bidder FAX #:
Bidder Email:
Bidder Federal ID #:
Vendor ID #:
BULLETIN INFORMATION: Bidder acknowledges receipt of the following Addenda(s) and agrees they are part of this Bid Proposal.
Addenda # Issue Date: Addenda # Issue Date:
Addenda # Issue Date: Addenda# Issue Date:
BID PROPOSAL
Department of Military and
Veterans Affairs Bldg 0-47, Fort Indiantown Gap
Annville, PA 17003
Do not write in space below
Date:
Bid Opening Witness:
Legal Review:
CONTRACT NO. 42220156
ELECTRICAL
LRC SAROCA
FACILITIES
FORT INDIANTOWN
GAP, ANNVILLE PA
BASE BIDS
THE BIDDER MUST TYPE/WRITE ITS TOTAL BID PRICE FOR EACH SEPARATE
BASE BID ON THIS “BASE BID” SHEET. DO NOT SOLELY WRITE ANY
ADDITIONAL OR DEDUCTED AMOUNT ON THE BASE BID LINE.
For all ELECTRICAL the sum of
Dollars ($ ). (Written)
Bidder Email:
Bldg 0-47, Fort Indiantown Gap
Annville, PA 17003
Do not write in space below
GENERAL CONSTRUCTION
LRC SAROCA
FACILITIES
For all GENERAL CONSTRUCTION the sum of
Bidder Email:
Bldg 0-47, Fort Indiantown Gap
Annville, PA 17003
Do not write in space below
HVAC
LRC SAROCA
FACILITIES
For all HVAC the sum of
Bidder Email:
Bldg 0-47, Fort Indiantown Gap
Annville, PA 17003
Do not write in space below
PLUMBING
LRC SAROCA
FACILITIES
For all PLUMBING the sum of
SDB-1
INSTRUCTIONS FOR COMPLETING THE SMALL DIVERSE BUSINESS (SDB)
PARTICIPATION SUBMITTAL AND SDB UTILIZATION SCHEDULE.
Revised: January 26, 2024 SDB-1-1
PLEASE READ BEFORE COMPLETING THESE DOCUMENTS
Bidders/Offerors do not need to return SDB-1 with their SDB Participation Submittal
The following instructions include details for completing the SDB Participation Submittal (SDB-2) which Bidders or Offerors must submit in order to be considered responsive.
The following instructions also include details for completing the SDB Utilization Schedule (SDB-3), which Bidders or Offerors must submit for any portion of the SDB participation goal the Bidder or Offeror commits to meeting.
A Bidder/Offeror’s failure to meet the SDB participation goal in full or their failure to receive an approved Good Faith Efforts waiver for any unmet portion of the SDB participation goal will result in the rejection of the Bid or Proposal as nonresponsive.
I. SDB Participation Goal: The SDB participation goal is set forth in the eMarketplace advertisement and also in the Notice to Bidders. The Bidder/Offeror is encouraged to use a diverse group of subcontractors and suppliers from the SDB classifications to meet the SDB participation goal.
II. SDB Eligibility:
1. Finding SDB firms: Offerors can access the directory of DGS-verified SDB firms from the DGS Supplier Search directory at: http://www.dgs.internet.state.pa.us/suppliersearch.
2. Only SDBs verified by DGS and as defined herein may be counted for purposes of achieving the SDB participation goal. In order to be counted for purposes of achieving the SDB participation goal, the SDB firm, including an SDB prime, must be DGS-verified for the services, materials or supplies that it has committed to perform on the SDB Utilization Schedule (SDB-3). A firm whose SDB verification is pending or incomplete as of the bid or proposal due date and time shall not be counted towards the SDB participation goal. Offerors cannot use self-certified SBs that do not have their SDB verification as of the bid or proposal due date and time to meet the SDB participation goal.
3. SDB Requirements: To be considered an SDB, a firm must be a DGS-verified small minority business enterprise (MBE); woman business enterprise (WBE); LGBT business enterprise (LGBTBE); Disability-owned business enterprise (DOBE); Service-Disabled Veteran-Owned Small Business Enterprise (SDVBE); or otherwise deemed disadvantaged by the Uniform Certification Program.
Additional information on the DGS verification process can be found at:
https://www.dgs.pa.gov/Small%20Diverse%20Business%20Program/Pages/default.aspx
Construction_RFP_IFB_SDB_Participation http://www.dgs.internet.state.pa.us/suppliersearch https://www.dgs.pa.gov/Small%20Diverse%20Business%20Program/Pages/default.aspx
PARTICIPATION SUBMITTAL AND SDB UTILIZATION SCHEDULE.
Revised: January 26, 2024 SDB-1-2
III. Guidelines Regarding SDB Prime Self-Performance.
1. An SDB firm participating as a prime bidder or offeror on a procurement may receive credit towards the SDB Participation goal established for the procurement through their own self-performance.
Example: A solicitation has a 15% SDB participation goal. An SDB prime offeror self-performing contract work valued at only 10% of contract costs (if permitted by the solicitation documents) must still satisfy the remaining 5% SDB participation goal through subcontracting or must request a Good Faith Efforts Waiver for the unmet SDB participation goal. Failure to satisfy the remaining 5% SDB participation goal or failure to obtain a Good Faith Efforts waiver for the unmet portion of the SDB participation goal will result in rejection of that SDB prime’s bid or proposal as nonresponsive.
Construction_RFP_IFB_SDB_Participation
4. Dually verified SDB/VBE firms. If a DGS-verified SDB is dually verified as a VBE, the firm will receive credit towards both the SDB participation goal and the VBE participation goal as set forth on the SDB and VBE Participation Summary Sheet. This credit may exceed the participation goal percentage, as shown in the example below.
Example: The SDB participation goal is 10% and the VBE participation goal is 5%. A subcontractor is DGS-verified as both an SDB and a VBE and will perform 10% of the contract work. The bidder/ offeror can satisfy both the SDB participation goal and the VBE participation goal through that dually verified subcontractor’s performance of 10% of the contract work, unless otherwise agreed to by the parties in writing and approved by BDISBO and the Issuing Office. Based on this example, the percentage commitment indicated on SDB-3 for SDB work on this contract would be 10%, and the VBE percentage commitment indicated on VBE-3 on this contract would be 10% as well. These contractual commitments meet the SDB participation goal of 10% and exceed the 5% VBE participation goal for this contract. Please note that the dually verified SDB/VBE firm only receives 10% of the contract work based on the example above.
Importantly, consideration of SDB and VBE submittals will still be independent of one another even when utilizing one or more dually verified firms.
5. Participation by SDB firms as bidders/offerors or subcontractors. A Bidder/Offeror that qualifies as an SDB and submits a bid or proposal as a bidder/offeror is not prohibited from being included as a subcontractor in separate proposals submitted by other Bidders/Offerors.
An SDB may be included as a subcontractor with as many bidders/offerors as it chooses in separate bids or proposals and a bidder/offeror may not prohibit an SDB from committing to any other bidder/offeror.
6. Questions about SDB verification. Questions regarding the SDB program, including questions about the self-certification and verification processes can be directed to:
Department of General Services Bureau of Diversity, Inclusion and Small Business Opportunities (BDISBO) North Office Building, Room 611, Harrisburg, PA 17125 Phone: (717) 783-3119 Email: RA-BDISBOVerification@pa.gov Website: www.dgs.pa.gov mailto:RA-BDISBOVerification@pa.gov https://www.dgs.pa.gov/
PARTICIPATION SUBMITTAL AND SDB UTILIZATION SCHEDULE.
Revised: January 26, 2024 SDB-1-3
2. For an SDB prime bidder or offeror to receive credit for self-performance, the SDB prime bidder or offeror must list itself in the SDB Utilization Schedule (SDB-3).
3. The SDB prime bidder or offeror must also include the classification category (MBE, WBE, LGBTBE, DOBE, and/or SDVBE) under which it is self-performing and include information regarding the work it will self-perform. For any portion of the SDB participation goal not met through the SDB prime bidder or offeror’s self-performance, the SDB bidder or offeror must also identify on the SDB Utilization Schedule (SDB-3) the other SDB subcontractors, manufacturers, or suppliers it will use to meet the unmet portion of the goal or must request and receive a Good Faith Efforts waiver.
IV. Calculating SDB participation
1. SDB subcontractors. An SDB subcontractor, through its own employees, shall perform at least 50% of the amount of the subcontract. 100% of the total subcontract amount shall be counted towards the SDB participation goal, unless the SDB subcontractor is performing one of the functions listed in paragraphs 2-4 below.
SDB manufacturers. An SDB manufacturer is a firm that operates or maintains a factory or establishment that produces, on the premises, the materials, supplies, articles or equipment required under the contract and of the general character described by the specifications.
100% of the total cost of the materials or supplies purchased from the SDB manufacturer shall be counted towards the SDB participation goal.
2. SDB stocking suppliers. An SDB stocking supplier is a firm that owns, operates or maintains a store, warehouse or other establishment in which the materials, supplies, articles or equipment of the general character described by the specifications and required under the contract are bought, kept in stock and regularly sold or leased to the public in the usual course of business. 60% of the total cost of the materials or supplies purchased from the SDB stocking supplier shall be counted towards the SDB participation goal.
Example for illustrative purposes of applying the 60% rule:
Overall contract value: $2,000,000 Total value of supplies: $100,000 Apply 60% Rule: $100,000 x 60% = $60,000 Divide 60% Rule result by contract value: $60,000/$2,000,000 = 3% In this example, 3% would be counted towards the SDB participation goal for the SDB supplier.
3. SDB nonstocking suppliers. An SDB nonstocking supplier does not carry inventory but orders materials from a manufacturer, manufacturer’s representative or a stocking supplier.
For a nonstocking supplier to receive credit, the nonstocking supplier shall perform a useful business function by engaging in meaningful work (that is, negotiating price; determining quality and quantity; ordering materials; and paying for the materials). Industry practices and other relevant factors will be considered. Only the amount of the fee or commission charged by the SDB nonstocking supplier for assistance in the procurement of the materials and supplies shall be counted towards the SDB participation goal. The fees or commissions must also be reasonable and not excessive as compared with fees customarily allowed for similar services.
Construction_RFP_IFB_SDB_Participation
PARTICIPATION SUBMITTAL AND SDB UTILIZATION SCHEDULE.
Revised: January 26, 2024 SDB-1-4
V. Additional Required Documentation.
1. The Bidder or Offeror must submit along with its SDB Participation Submittal (SDB-2) a letter of commitment (LOC) (SDB-3.1) for each subcontractor included in its SDB Utilization Schedule (SDB-3). At a minimum, each LOC must contain the following unless otherwise specified by the solicitation documents:
a. The dollar amount of the commitment made to the SDB; and
b. A description of the services or supplies the SDB will provide; and
c. The timeframe during the contract term when the SDB will perform or provide the services and/or supplies; and
d. The name and telephone number of the Bidder or Offeror’s point of contact for SDB participation; and
e. The name, address, and telephone number of the primary contact person for the SDB;
and
f. Signatures of representatives of both the Bidder/Offeror and the SDB subcontractor who are authorized to contractually bind their firm.
g. Bidder/Offeror shall pay SDBs, after receipt of a proper invoice and all other required documentation from an SDB, within 10 days after receipt of payment from the Commonwealth.
VI. Document Submittal Errors.
1. Fatal errors. The following errors will result in rejection of a bid or proposal as non-responsive:
a. Failure to submit a completed SDB Participation Submittal (SDB-2);
b. Failure to submit an SDB Utilization Schedule (SDB-3), unless the bidder or offer is seeking a complete Good Faith Efforts waiver;
c. Failure to make commitments to and list DGS-verified SDBs that will be used to meet the SDB participation goal, unless the bidder or offeror’s commitments to other DGS-verified SDBs meet or exceed the SDB Participation goal;
d. Failure to submit a Good Faith Efforts waiver request when not fully meeting the SDB participation goal.
Construction_RFP_IFB_SDB_Participation
Example: A bidder/offeror lists a subcontractor that possesses a third-party certificate issued by one of the DGS-approved third party certifying entities; however, the subcontractor did not complete its DGS SDB verification as of the bid or proposal due date and time. The bidder/offeror does not receive credit for any commitments made to the subcontractor and has therefore not met the SDB participation goal. The bidder/offeror cannot cure this error.
Therefore, the bid or proposal must be rejected as non-responsive.
PARTICIPATION SUBMITTAL AND SDB UTILIZATION SCHEDULE.
Revised: January 26, 2024 SDB-1-5
2. Potentially curable errors. The Issuing Office and BDISBO may provide Bidders or Offerors the opportunity to provide clarifications or to correct errors not listed as fatal errors above. If the additionally submitted information does not adequately address or clarify the submittal, the bid or proposal may be rejected. Bidders or Offerors are not permitted to add additional SDBs or make material changes as part of its clarifications or corrections in order to meet the SDB participation goal.
3. Solicitations with Multiple Base Bids. If the Bid or Proposal contains multiple Base Bids, an Offeror must complete and submit a separate SDB Participation Submittal (SDB-2) and accompanying required documentation for EACH Base Bid, including Base Bids labeled “same as,” for which it is submitting a bid or proposal. Each separate SDB Participation Submittal and accompanying required documentation must be labeled to identify the corresponding Base Bid. Failure to submit an SDB Participation Submittal and accompanying required documentation for each Base Bid may result in the rejection of the bid or proposal for each Base Bid for which an SDB Participation Submittal was not submitted.
Revised: January 26, 2024 SDB-2-1
SDB-2
SDB PARTICIPATION SUBMITTAL
Bidder/Offeror: ________________________ Solicitation # : _______________________ Solicitation Title: ___________________________________________________________ Discipline: _____________________________ (.1 GC, .2 HVAC, .3 Plumbing, or .4 Electrical) Base Bid: _________ (identify the corresponding Base Bid for this SDB Participation Submittal)
CHECK ONE, AND ONLY ONE, BOX. FAILURE TO COMPLY WILL RESULT IN
REJECTION OF YOUR BID/PROPOSAL.
Click on bold titles to navigate to that specific page.
☐ I agree to meet the SDB participation goal in full.
I have completed and am submitting with my bid or proposal an SDB Utilization Schedule (SDB- 3), which is required in order to be considered for award.
☐ I am requesting a partial waiver of the SDB participation goal.
After making good faith outreach efforts as more fully described in the Guidance for Documenting Good Faith Efforts to Meet the SDB Participation Goal, I am unable to achieve the total SDB participation goal for this solicitation and am requesting a partial waiver of the SDB participation goal.
I have completed and am submitting with my bid or proposal both of the following, which are required in order to be considered for award:
1. an SDB Utilization Schedule (SDB-3) for that portion of the SDB participation goal that I will meet; AND
2. a Good Faith Efforts Waiver Request for the portion of the SDB participation goals that I am unable to meet.
☐ I am requesting a full waiver of the SDB participation goal After making good faith outreach efforts as more fully described in the Guidance for Documenting Good Faith Efforts to Meet the SDB Participation Goal, I am unable to achieve any part of the SDB participation goal for this solicitation and am requesting a full waiver of the SDB participation goal.
I have completed and am submitting with my bid or proposal a Good Faith Efforts Waiver Request for the complete SDB participation goal, which is required in order to be considered for award.
NOTE: SDB primes who are submitting as bidders or offerors must complete an SDB Utilization Schedule (SDB-3) identifying any self-performance towards the SDB participation goal.
Revised: January 26, 2024 SDB-3-1
SDB-3
SDB UTILIZATION SCHEDULE
Bidder/Offeror: _____________________________________
Solicitation # : _______________________ Solicitation Title:______________________________________________________ List in the chart below SDBs (including where applicable a prime bidder or offeror is self-performing a portion of the work) that will be used to meet the SDB participation goal (add additional pages if necessary). Submit a Letter of Commitment (SDB-3.1) for each SDB subcontractor, supplier, or manufacturer (add additional Letters of Commitment as necessary).
SDB Name
SAP Vendor Number (6-digit number provided by SDB)
SDB Verification Number (located on DGS SDB verification)
Type of SDB
(check all that apply)
Description of Work to be Performed
(Statement of Work/Specification reference)
% Commitment
(or % of work to be self-performed by
SDB bidder/offeror)
Dollar Value of Commitment (after applying any calculation per
SDB-1, Section IV, Calculating SDB participation)
Name: ABC IT Solutions SAP Vendor Number: 123456 SDB Verification Number: 123456-2023-09-SB-M
MBE IT staffing resources % $
Name:
SAP Vendor Number:
SDB Verification Number:
___ MBE
___ WBE
___ LGBTBE
___ DOBE
___ SDVBE
Name:
SAP Vendor Number:
SDB Verification Number:
___ MBE
___ WBE
___ LGBTBE
___ DOBE
___ SDVBE
Name:
SAP Vendor Number:
SDB Verification Number:
___ MBE
___ WBE
___ LGBTBE
___ DOBE
___ SDVBE
Name:
SAP Vendor Number:
SDB Verification Number:
___ MBE
___ WBE
___ LGBTBE
___ DOBE
___ SDVBE
Attach additional sheets if necessary Total % SDB commitment: ______
Total $ amount:
Revised: January 26, 2024 SDB-3-1
SDB-3.1
LETTER OF COMMITMENT
This Letter of Commitment serves as confirmation of the commitment by the prime Bidder or Offeror to utilize the Small Diverse Business (SDB) on the below-referenced Solicitation/Project.
Solicitation #: __________________ Solicitation Name: _____________________________________
Bidder/Offeror Information SDB Information Name
Address
Point of Contact
Telephone #
Email address
Services/Supplies and Time Frame. If Bidder/Offeror is the successful vendor, the SDB shall perform or provide the following services or supplies during the term of the prime contract, as more specifically set forth below:
Services or supplies the SDB will provide:
Specific Time Frame the SDB will provide the services or supplies:
Dollar Value of Commitment. These service or supplies for contract/fee indicated in the table below shall be for the term of the contract.
Sincerely, Acknowledged
Bidder/Offeror Point of Contact Printed name SDB Point of Contact Printed name
Bidder/Offeror Point of Contact Signature SDB Point of Contact Signature
* The work performed by a firm that is dually verified as both an SDB and VBE will be counted by BDISBO towards fulfilling both the SDB and VBE commitments unless otherwise agreed to by the parties in writing and approved by BDISBO and the Issuing Office. See SDB-1 Instructions, Section II, Paragraph 4 for example of how work performed by a firm that is dually verified is credited.
SDB verified*. By signing below, the SDB represents that it meets the SDB requirements set forth in the Solicitation and all required documentation has been provided to the Bidder/Offeror for its SDB submission.
Revised: January 26, 2024 SDB-4-1
SDB-4
GUIDANCE FOR DOCUMENTING GOOD FAITH EFFORTS TO MEET THE SMALL
DIVERSE BUSINESS (SDB) PARTICIPATION GOAL
Bidders/Offerors do not need to return SDB-4 with their SDB Participation Submittal
In order for its bid or proposal to be responsive, the Bidder or Offeror must either (1) meet the SDB participation goal and document its commitments for participation of SDB firms, or (2) when it does not meet the SDB participation goal, submit a Good Faith Efforts waiver request as set forth in Section IV below and the Good Faith Efforts Documentation to Support Waiver Request (SDB-5) of the SDB Participation Goal.
I. Definitions
Good Faith Efforts - The “Good Faith Efforts” requirement means that when requesting a waiver, the Offeror must demonstrate that it took all necessary and reasonable steps to achieve the SDB participation goal. Those steps are considered necessary and reasonable when their scope, intensity, and relevance could reasonably be expected to obtain sufficient SDB participation, even if those steps were not fully successful. The Issuing Agency and Department of General Services’ Bureau of Diversity, Inclusion and Small Business Opportunities (BDISBO) will determine whether or not the Offeror requesting a Good Faith Efforts waiver made adequate Good Faith Efforts by considering the quality, quantity, and intensity of the Offeror’s efforts. Mere pro forma efforts are not Good Faith Efforts to meet the SDB participation requirements. The determination concerning the sufficiency of the Offeror's Good Faith Efforts is subjective; meeting quantitative formulas is not required.
Identified Items of Work – all reasonably identifiable subcontractable work opportunities under a resulting contract for performance by subcontractors. If applicable for the procurement, offerors may also include manufacturing and the provision of supplies by stocking suppliers or nonstocking suppliers as Identified Items of Work.
Identified SDBs– all of the SDBs the Offeror has identified as available to perform the Identified Items of Work and should include all DGS-verified SDBs that are reasonably identifiable.
Offeror – for purposes of this Good Faith Efforts Documentation to Support Waiver Request, the term “Offeror” includes any entity responding to a solicitation, including invitations for bids, requests for proposals, and other types of best value solicitations.
SDB – “SDB” refers to Minority Business Enterprises (MBE), Women Business Enterprises (WBE), Disability-Owned Business Enterprises (DOBE), LGBT-Owned Business Enterprises (LGBTBE), Service-Disabled Veteran-Owned Small Business Enterprise (SDVBE) verified by BDISBO, or otherwise deemed disadvantaged by the Uniform Certification Program.
SDB participation goal – “SDB participation goal” refers to the SDB participation goal set for a procurement for MBE, WBE, LGBTBE, DOBE, and SDVBE utilization.
II. Types of Actions Agency and BDISBO will Consider
The following is a list of types of actions the procuring agency and BDISBO will consider as part of the Offeror's Good Faith Efforts when the Offeror is unable to meet, in full, the SDB
GUIDANCE FOR DOCUMENTING GOOD FAITH EFFORTS TO MEET THE SMALL
DIVERSE BUSINESS (SDB) PARTICIPATION GOAL
Revised: January 26, 2024 SDB-4-2 participation goal. This list is not intended to be a mandatory checklist, nor is it intended to be exclusive or exhaustive. Other factors or types of efforts may be relevant in appropriate cases.
A. Identify Proposal Items as Work for SDBs
1. Identified Items of Work
(a) Offerors should reasonably identify sufficient items of work to be performed by SDBs.
(b) Where appropriate, Offerors should break out contract work items into economically feasible units to facilitate SDB participation, rather than perform these work items with their own forces. The ability or desire of a prime contractor to perform the work of a contract with its own organization does not relieve the Offeror of the responsibility to make Good Faith Efforts to meet the SDB participation goal.
B. Identify SDBs to Solicit
1. Identified SDBs
(a) Offerors must reasonably identify the SDBs that are available to perform the Identified Items of Work.
(b) Any SDBs identified as available by the Offeror should be certified to perform the Identified Items of Work.
C. Solicit SDBs
1. Offerors must solicit a reasonable number of identified SDBs for all Identified Items of Work by providing written notice. The Offeror must:
(a) provide the written solicitation to the Identified SDBs at least 10 days prior to Bid or Proposal due date to allow sufficient time for the Identified SDB to respond;
(b) send the written solicitation by first-class mail, facsimile, or e-mail using contact information in the BDISBO Directory, unless the Offeror has a valid basis for using different contact information; and
(c) provide adequate information about the plans, specifications, anticipated time schedule for portions of the work to be performed by the Identified SDB, and other requirements of the contract to assist Identified SDBs in responding. (This information may be provided by including hard copies in the written solicitation or by electronic means as described in C.3 below.)
DIVERSE BUSINESS (SDB) PARTICIPATION GOAL
Revised: January 26, 2024 SDB-4-3
2. “All” Identified SDBs includes any SDB Firms the Offeror identifies as potentially available to perform the Identified Items of Work, but it does not include Identified SDBs who are no longer certified to perform the work as of the date the Offeror provides written solicitations.
3. “Electronic Means” includes, for example, information provided via a website or file transfer protocol (FTP) site containing the plans, specifications, and other requirements of the contract. If an interested SDB cannot access the information provided by electronic means, the Offeror must make the information available in a manner that is accessible to the interested SDB.
4. Offerors must follow up on initial written solicitations by contacting Identified SDBs to determine their interest in bidding. The follow up contact may be made:
(a) by telephone using the contact information in BDISBO’s Directory, unless the Offeror has a valid basis for using different contact information; or
(b) in writing via a method that differs from the method used for the initial written solicitation.
5. In addition to the written solicitation set forth in C.1 and the follow up required in C.4, offerors must use all other reasonable and available means to solicit the interest of Identified SDBs certified to perform the work of the contract. Examples of other means include:
(a) attending any Supplier Forums, or Pre-Proposal or Pre-Bid conferences at which SDBs could be informed of contracting and subcontracting opportunities; and
(b) if recommended by the procurement, advertising with or effectively using the services of at least two diversity-focused entities or media, including trade associations, minority/women/disability/LGBT community organizations, minority/women/disability/LGBT contractors' groups, and local, state, and federal minority/women/disability/LGBT business assistance offices.
D. Negotiate with Interested SDBs
Offerors must negotiate in good faith with interested SDBs.
1. Evidence of negotiation includes, without limitation, the following:
(a) the names, addresses, and telephone numbers of SDBs that were considered;
(b) a description of the information provided regarding the plans and specifications for the work selected for subcontracting and the means used to provide that information; and
DIVERSE BUSINESS (SDB) PARTICIPATION GOAL
Revised: January 26, 2024 SDB-4-4
(c) evidence as to why additional agreements could not be reached for SDBs to perform the work.
2. In negotiating with subcontractors, the offeror should consider a subcontractor’s price and capabilities as well as the SDB participation goal.
3. Additional costs incurred in finding and using SDBs are not sufficient justification for the Offeror's failure to meet the SDB participation goal, as long as such costs are reasonable. Factors to take into consideration when determining whether an SDB’s quote is excessive or unreasonable include, without limitation, the following:
(a) dollar difference between the SDB subcontractor’s quote and the average of other subcontractors' quotes received by the Offeror;
(b) percentage difference between the SDB subcontractor’s quote and the average of other subcontractors' quotes received by the Offeror;
(c) percentage that the SDB subcontractor’s quote represents of the total contract cost;
(d) whether the work described in the SDB and Non-SDB subcontractor quotes (or portions thereof) submitted for review is the same or comparable; and
(e) number of quotes received by the Offeror for that portion of the work.
4. The factors in paragraph 3 above are not intended to be mandatory, exclusive, or exhaustive, and other evidence of an excessive or unreasonable price may be relevant.
5. The Offeror may not use its price for self-performing work as a basis for rejecting an SDB’s quote as excessive or unreasonable.
6. The “average of the other subcontractors’ quotes received” by the Offeror refers to the average of the quotes received from all subcontractors. Offeror should attempt to receive quotes from at least three subcontractors, including one quote from an SDB and one quote from a non-SDB.
7. The Offeror shall not reject an SDB as unqualified without sound justification based on a thorough investigation of the SDB’s capabilities. For each SDB that is rejected as unqualified or that placed a subcontract quotation or offer that the Offeror concludes is not acceptable, the Offeror must provide a written detailed statement outlining the justification for its conclusion. The Offeror also must document the steps taken to verify the capabilities of the SDB and non-SDB Firms quoting similar work.
DIVERSE BUSINESS (SDB) PARTICIPATION GOAL
Revised: January 26, 2024 SDB-4-5
(a) The factors to take into consideration when assessing the capabilities of an SDB include, but are not limited to the following: financial capability, physical capacity to perform, available personnel and equipment, existing workload, experience performing the type of work, conduct and performance in previous contracts, and ability to meet reasonable contract requirements.
(b) The SDB’s standing within its industry, membership in specific groups, organizations, or associations and political or social affiliations (for example union vs. non-union employee status) are not legitimate causes for the rejection or non-solicitation of Proposals in the efforts to meet the SDB participation goal.
E. Assisting Interested SDBs
When appropriate under the circumstances, the procuring agency and BDISBO will consider whether the Offeror made reasonable efforts to assist interested SDBs in obtaining:
1. The bonding, lines of credit, or insurance required by the procuring agency or the Offeror; and
2. Necessary equipment, supplies, materials, or related assistance or services.
III. Other Considerations
In making a determination of Good Faith Efforts, the procuring agency and BDISBO may consider engineering estimates, catalogue prices, general market availability and availability of certified SDBs in the area in which the work is to be performed, other Proposals or offers and subcontract Proposals or offers substantiating significant variances between SDB and non-SDB costs of participation, and their impact on the overall cost of the contract to the Commonwealth and any other relevant factors.
The procuring agency and BDISBO may consider whether the Offeror decided to self-perform potentially subcontractable work with its own forces. The procuring agency and BDISBO also may consider the performance of other Offerors in meeting the SDB participation goal. For example, when the apparent successful Offeror fails to meet the SDB participation goal, but others meet it, this raises the question of whether, with additional reasonable efforts, the apparent successful Offeror could have met the SDB participation goal. If the apparent successful Offeror fails to meet the SDB participation goal but meets or exceeds the average SDB participation obtained by other Offerors, this, when viewed in conjunction with other factors, could be evidence of the apparent successful Offeror having made Good Faith Efforts.
IV. Documenting Good Faith Efforts
At a minimum, the Offeror seeking a Good Faith Efforts waiver of the SDB participation goal or a portion thereof must provide written documentation of its Good Faith Efforts along with its bid or proposal. The written documentation shall include the following:
DIVERSE BUSINESS (SDB) PARTICIPATION GOAL
Revised: January 26, 2024 SDB-4-6
A. Items of Work (complete SDB-5, Part 1 – Identified Items of Work Offeror Made Available to SDBs)
A detailed statement of the efforts made to select portions of the contract work proposed to be performed by SDBs in order to increase the likelihood of achieving the SDB participation goal.
B. Outreach/Solicitation/Negotiation
1. A detailed statement of the efforts made to contact and negotiate with SDBs including:
(a) the names, addresses, and telephone numbers of the SDBs who were contacted, with the dates and manner of contacts (letter, fax, e-mail, telephone, etc.)
(complete SDB-5, Part 2 – Identified SDB Firms and Records of Solicitations.
Include letters, fax cover sheets, e-mails, etc. documenting solicitations); and
(b) a description of the information provided to SDBs regarding the plans, specifications, and anticipated time schedule for portions of the contract work to be performed and the means used to provide that information.
2. The record of the Offeror's compliance with the outreach efforts set forth in SDB-5, Part 3 - Outreach Efforts Compliance Statement.
C. Rejected SDBs (complete SDB-5, Part 4 - Additional Information Regarding Rejected SDB Quotes)
1. For each SDB that the Offeror concludes is not acceptable or qualified, provide a detailed statement of the reasons for this conclusion, including the steps taken to verify the capabilities of the SDB and non-SDB firms quoting similar work.
2. For each SDB that the Offeror concludes has provided an excessive or unreasonable price, a detailed statement of the reasons for the Offeror’s conclusion, including the quotes received from all SDB and non-SDB firms proposing on the same or comparable work. (Include copies of all quotes received.)
D. Unavailable SDBs (complete SDB-5, Part 5 – SDB Subcontractor Unavailability Certificate)
1. For each SDB that the Offeror contacted but found to be unavailable, submit an SDB Subcontractor Unavailability Certificate signed by the SDB, an email from the SDB indicating the SDB is unavailable, or a statement from the Offeror that the SDB refused to sign the SDB Subcontractor Unavailability Certificate.
DIVERSE BUSINESS (SDB) PARTICIPATION GOAL
Revised: January 26, 2024 SDB-4-7
E. Other Documentation
1. Submit any other documentation requested by BDISBO or the Procuring Agency to ascertain the Offeror's Good Faith Efforts.
2. Submit any other documentation the Offeror believes will help BDISBO or the Procuring Agency ascertain its Good Faith Efforts.
SDB-5
GOOD FAITH EFFORTS DOCUMENTATION TO SUPPORT WAIVER REQUEST OF SDB PARTICIPATION GOAL
Revised: January 26, 2024 SDB-5-1
Project Description:
Commonwealth Agency Name:
Solicitation #:
Solicitation Due Date and Time:
Bidder/Offeror Company Name:
Bidder/Offeror Contact Name:
Bidder/Offeror Contact Email:
Bidder/Offeror Contact Phone Number:
Part 1 – Identified Items of Work Offeror Made Available to SDBs
Identify those items of contract work that the Offeror made available to SDBs. This includes, where appropriate, those items the Offeror identified and subdivided into economically feasible units to facilitate the SDB participation. For each item listed, show the anticipated percentage of the total contract cost. Offeror must demonstrate that enough work to meet the SDB participation goal was made available to SDBs, and the total percentage of the items of work identified for SDB participation met or exceeded the SDB participation goal set for the procurement.
Identified Items of Work Was this work listed in the solicitation?
Does Offeror normally self-perform this work?
Was this work made available to SDB Firms? If not, explain why.
____ yes ____ no
____ yes ____ no
____ yes ____ no
____ yes ____ no
____ yes ____ no
____ yes ____ no
____ yes ____ no
____ yes ____ no
____ yes ____ no
____ yes ____ no
____ yes ____ no
____ yes ____ no
____ yes ____ no
____ yes ____ no
____ yes ____ no
Attach additional sheets if necessary.
Revised: January 26, 2024 SDB-5-2
Part 2 – Identified SDBs and Record of Solicitations
Identify the SDBs solicited to provide quotes for the Identified Items of Work made available for SDB participation. Include the name of the SDB solicited, items of work for which quotes were solicited, date and manner of initial and follow-up solicitations, whether the SDB provided a quote, and whether the SDB is being used toward meeting the SDB participation goal. SDBs used to meet the SDB participation goal must be listed on the SDB Utilization Schedule (SDB-2).
Note: Copies of all written solicitations and documentation of follow-up calls to SDBs must be attached to this form. For each Identified SDB listed below, Offeror should submit an SDB Subcontractor Unavailability Certificate signed by the SDB or a statement from the Offeror that the SDB refused to sign the SDB Subcontractor Unavailability Certificate.
Name of Identified SDB and Classification
Describe Item of Work Solicited
Initial Solicitation Date & Method
Follow-up Solicitation Date & Method
Details for Follow-up Calls Quote Received?
Quote Used?
Reason Quote Rejected
SDB Name:
__ MBE
__ WBE
__ LGBTBE
__ DOBE
__ SDVBE
Date:
__ mail __ email __ fax
Date:
__ mail __ email __ fax
Date and Time of Call:
Spoke with:
Left Message:
__ yes __ no
__ yes __ no
__ Used other SDB __ Used non-SDB __ Self performing
SDB Name:
__ MBE
__ WBE
__ LGBTBE
__ DOBE
__ SDVBE
Date:
__ mail __ email __ fax
Date:
__ mail __ email __ fax
Date and Time of Call:
Spoke with:
Left Message:
__ yes __ no
__ yes __ no
__ Used other SDB __ Used non-SDB __ Self performing
Attach additional sheets as necessary.
GOOD FAITH EFFORTS DOCUMENTATION TO SUPPORT WAIVER REQUEST OF
SDB PARTICIPATION GOAL
Revised: January 26, 2024 SDB-5-3
Part 3 – SDB Outreach Compliance Statement
1. List the Identified Items of Work for subcontracting opportunities for the solicitation along with specific work categories:
2. Attach to this form copies of written solicitations (with Bid or Proposal instructions) used to solicit Identified SDBs for these subcontract opportunities.
3. Offeror made the following attempts to contact the Identified SDBs:
4. Bonding Requirements (Please Check One):
________ This project does not involve bonding requirements.
________ Offeror assisted Identified SDBs to fulfill or seek waiver of bonding requirements.
(DESCRIBE EFFORTS):
5. Pre-Bid/Proposal Conference or Supplier Forum (Please Check One):
________ Offeror did attend the pre-Bid/Proposal conference or Supplier Forum
________ No pre-Bid/Proposal conference or Supplier Forum was held
________ Offeror did not attend the pre-Bid/Proposal conference or Supplier Forum
Revised: January 26, 2024 SDB-5-4
Part 4 – Additional Information Regarding Rejected SDB Quotes
This form must be completed if Part 2 indicates that an SDB quote was rejected because the Offeror is using a non-SDB or is self-performing the Identified Items of Work. List the Identified Items of Work, state whether the work will be self-performed or performed by a non-SDB, and if applicable, state the name of the non-SDB firm. Also include the names of all SDBs and non-SDB firms that provided a quote and the amount of each quote.
Describe Identified Items of Work not being performed by SDBs (include specific section from bid or proposal)
Self-performing or using non-SDB (provide name of non- SDB if applicable)
Amount of non-SDB quote
Name of other firms that provided quotes and whether they are SDB
Amount quoted
Reason why SDB quote was rejected along with brief explanation
__ self-performing __ using Non-SDB Name:
__ SDB
__ Non-SDB Name:
__ price __ capabilities __ other
__ self-performing __ using Non-SDB Name:
__ SDB
__ Non-SDB Name:
__ price __ capabilities __ other
__ self-performing __ using Non-SDB Name:
__ SDB
__ Non-SDB Name:
__ price __ capabilities __ other
__ self-performing __ using Non-SDB Name:
__ SDB
__ Non-SDB Name:
__ price __ capabilities __ other
__ self-performing __ using Non-SDB Name:
__ SDB
__ Non-SDB Name:
__ price __ capabilities __ other
Revised: January 26, 2024 SDB-5-5
GOOD FAITH EFFORTS DOCUMENTATION TO SUPPORT WAIVER REQUEST OF
SDB PARTICIPATION GOAL
Part 5 – SDB Subcontractor Unavailability Certificate
1. It is hereby certified that the firm of _____________________________________________________ (Name of SDB) located at_____________________________________________________________________________ (Number) (Street)
(City) (State) (Zip) was offered an opportunity to bid on Solicitation No. ______________________________________ by __________________________________________________________________________________ (Name of Bidder/Offeror’s Firm)
2. ______________________________________(SDB), is either unavailable for the work/service or unable to prepare a Proposal for this project for the following reason(s):
(Signature of SDB’s Representative) (Title) (Date)
(DGS SDB Certification #) (Telephone #)
********************************************************************************** 3.
If the SDB does not complete this form, the bidder/offeror must complete the following:
To the best of my knowledge and belief, the above-listed SDB is either unavailable for the work/service for this project, is unable to prepare a Proposal, or did not respond to a request for a price Proposal and has not completed the above portion of this submittal.
(Signature of Bidder/Offeror) (Title) (Date)
VBE-1
INSTRUCTIONS FOR COMPLETING THE VETERAN BUSINESS ENTERPRISE
(VBE) PARTICIPATION SUBMITTAL AND VBE UTILIZATION SCHEDULE.
Revised: January 26, 2024 VBE-1-1
PLEASE READ BEFORE COMPLETING THESE DOCUMENTS
Bidders/Offerors do not need to return VBE-1 with their VBE Participation Submittal
The following instructions include details for completing the VBE Participation Submittal (VBE-2) which Bidders or Offerors must submit in order to be considered responsive.
The following instructions also include details for completing the VBE Utilization Schedule (VBE-3), which Bidders or Offerors must submit for any portion of the VBE participation goal the Bidder or Offeror commits to meeting.
A Bidder/Offeror’s failure to meet the VBE participation goal in full or their failure to receive an approved Good Faith Efforts waiver for any unmet portion of the VBE participation goal will result in the rejection of the Bid or Proposal as nonresponsive.
I. VBE Participation Goal: The VBE participation goal is set forth in the eMarketplace advertisement and also in the Notice to Bidders. The Bidder/Offeror is encouraged to use a diverse group of subcontractors and suppliers to meet the VBE participation goal.
II. VBE Eligibility:
1. Finding VBE firms: Offerors can access the directory of DGS-verified VBE firms from the DGS Supplier Search directory at: http://www.dgs.internet.state.pa.us/suppliersearch.
2. Only VBEs verified by DGS and as defined herein may be counted for purposes of achieving the VBE participation goal. In order to be counted for purposes of achieving the VBE participation goal, the VBE firm, including a VBE prime, must be DGS-verified for the services, materials or supplies that it has committed to perform on the VBE Utilization Schedule (VBE-3). A firm whose VBE verification is pending or incomplete as of the bid or proposal due date and time shall not be counted towards the VBE participation goal. Offerors cannot use self-certified SBs that do not have their VBE verification as of the bid or proposal due date and time to meet the VBE participation goal.
3. VBE Requirements: To be considered a VBE, a firm must be a DGS-verified Veteran- Owned Small Business Enterprise or Service-Disabled Veteran-Owned Small Business Enterprise.
Additional information on the DGS verification process can be found at:
https://www.dgs.pa.gov/Small%20Diverse%20Business%20Program/Pages/default.aspx
Construction_RFP_IFB_VBE_Participation http://www.dgs.internet.state.pa.us/suppliersearch https://www.dgs.pa.gov/Small%20Diverse%20Business%20Program/Pages/default.aspx
(VBE) PARTICIPATION SUBMITTAL AND VBE UTILIZATION SCHEDULE.
Revised: January 26, 2024 VBE-1-2 Construction_RFP_IFB_VBE_Participation
4. Dually verified SDB/VBE firms. If a DGS-verified SDB is dually verified as a VBE, the firm will receive credit towards both the SDB participation goal and the VBE participation goal as set forth on the SDB and VBE Participation Summary Sheet. This credit may exceed the participation goal percentage, as shown in the example below.
Example: The SDB participation goal is 10% and the VBE participation goal is 5%. A subcontractor is DGS-verified as both an SDB and a VBE and will perform 10% of the contract work. The bidder/offeror can satisfy both the SDB participation goal and the VBE participation goal through that dually verified subcontractor’s performance of 10% of the contract work, unless otherwise agreed to by the parties in writing and approved by BDISBO and the Issuing Office. Based on this example, the percentage commitment indicated on SDB-3 for SDB work on this contract would be 10%, and the VBE percentage commitment indicated on VBE-3 on this contract would be 10% as well. These contractual commitments meet the SDB participation goal of 10% and exceed the 5% VBE participation goal for this contract.
Please note that the dually verified SDB/VBE firm only receives 10% of the contract work based on the example above.
Importantly, consideration of SDB and VBE submittals will still be independent of one another even when utilizing one or more dually verified firms.
5. Participation by VBE firms as bidders/offerors or subcontractors. A Bidder/Offeror that qualifies as a VBE and submits a bid or proposal as a bidder/offeror is not prohibited from being included as a subcontractor in separate proposals submitted by other Bidders/Offerors. A VBE may be included as a subcontractor with as many bidders/offerors as it chooses in separate bids or proposals and a bidder/offeror may not prohibit a VBE from committing to any other bidder/ offeror.
6. Questions about VBE verification. Questions regarding the VBE program, including questions about the self-certification and verification processes can be directed to:
Department of General Services Bureau of Diversity, Inclusion and Small Business Opportunities (BDISBO) North Office Building, Room 611, Harrisburg, PA 17125 Phone: (717) 783-3119 Email: RA-BDISBOVerification@pa.gov Website: www.dgs.pa.gov
III. Guidelines Regarding SDB Prime Self-Performance.
1. A VBE firm participating as a prime bidder or offeror on a procurement may receive credit towards the VBE Participation goal established for the procurement through their own self-performance.
Example: A solicitation has a 15% VBE participation goal. A VBE prime offeror self-performing contract work valued at only 10% of contract costs (if permitted by the solicitation documents) must still satisfy the remaining 5% VBE participation goal through subcontracting or must request a Good Faith Efforts Waiver for the unmet VBE participation goal. Failure to satisfy the remaining 5% VBE participation goal or failure to obtain a Good Faith Efforts waiver for the unmet portion of the VBE participation goal will result in rejection of that VBE prime’s bid or proposal as nonresponsive.
https://www.dgs.pa.gov/
(VBE) PARTICIPATION SUBMITTAL AND VBE UTILIZATION SCHEDULE.
Revised: January 26, 2024 VBE-1-3
2. For a VBE prime bidder or offeror to receive credit for self-performance, the VBE prime bidder or offeror must list itself in the VBE Utilization Schedule (VBE-3).
3. The VBE prime bidder or offeror must also include the classification category (Veteran- Owned Small Business or Service-Disabled Veteran-Owned Small Business) under which it is self-performing and include information regarding the work it will self-perform. For any portion of the VBE participation goal not met through the VBE prime bidder or offeror’s self-performance, the VBE bidder or offeror must also identify on the VBE Utilization Schedule (VBE-3) the other VBE subcontractors, manufacturers, or suppliers it will use to meet the unmet portion of the goal or must request and receive a Good Faith Efforts waiver.
IV. Calculating VBE participation
1. VBE…