Bid C24_10 Doors_ Frames_ Hardware and Instal.pdf

PDF 159 KB Posted

Attached to
Bid C24-10"As Needed" Doors, Frames, Hardware and Installation Services for Contracts under $100, 000
Solicitation number
PE-62600-NONST-2024-000000010
Issued by
Chatham County, Georgia

About this file

This document is a bid tabulation for Bid C24-10 Doors, Frames, Hardware and Installation Services (Annual Contract) issued by the Savannah-Chatham County Public School System. The bid includes hourly labor rates for installers during normal business hours, after hours, and on weekends/holidays, as well as unit prices for various hollow metal and pre-finished wood doors, frames, and door hardware. The estimated annual quantities are provided for each item. The bid opening date was in December, and 3 addenda were issued for this project.

The bid was awarded to Savannah Architectural Supply, Inc., a local minority-owned business enterprise (LMWBE). The bid included a 15% mark-up for any equipment, materials, or parts used in the installation of doors, with a 45-day delivery after receipt of order (ARO) and a 3-day installation timeframe after delivery. No information is provided about funding requirements, sources, or other salient details.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Savannah-Chatham County Public School System

Bid Tabulation

Bid C24-10 Doors, Frames, Hardware and Installation Services (Annual Contract)

Bid Opening Date & Time: DECEMBER @ 11:00 AM

Note: _3_ addenda were issued on this project

Item # Description

Savannah Architectural

Supply

HOURLY RATE FOR INSTALLER

MONDAY-FRIDAY 8:00 AM - 4:30 PM

ESTIMATED ANNUAL HOURS 40

UOM HOUR

UNIT PRICE 160.00

EXTENDED COST 6,400.00

HOURLY RATE FOR INSTALLER

AFTER NORMAL BUSINESS HOURS AND

SATURDAYS

ESTIMATED ANNUAL HOURS 16

UOM HOUR

UNIT PRICE 230.00

EXTENDED COST 3,680.00

HOURLY RATE FOR INSTALLER

SUNDAYS AND HOLIDAYS

ESTIMATED ANNUAL HOURS 16

UOM HOUR

UNIT PRICE 275.00

EXTENDED COST 4,400.00

TOTAL CATEGORY 1 - LABOR RATES 14,480.00

Bid C24-10 Doors, Frames, Hardware and Installation Services (Annual Contract)

Bid Opening Date & Time: DECEMBER @ 11:00 AM

Note: _3_ addenda were issued on this project

Item # Description

Savannah Architectural

Supply

3-0 X 7-0 HOLLOW METAL DOOR

(PREPPED FOR HARDWARE)

ESTIMATED ANNUAL QUANTITY 5

UOM EA

UNIT PRICE 475.00

EXTENDED COST 2,375.00

MANUFACTURER Republic

PART NUMBER DM18

3-0 X 6-8 HOLLOW METAL DOOR

(PREPPED FOR HARDWARE)

ESTIMATED ANNUAL QUANTITY 2

UOM EA

UNIT PRICE 450.00

EXTENDED COST 900.00

MANUFACTURER Republic

PART NUMBER DM18

3-0 X 7-0 PRE-FINISHED WOOD DOOR

(PREPPED FOR HARDWARE)

ESTIMATED ANNUAL QUANTITY 5

UOM EA

UNIT PRICE 425.00

EXTENDED COST 2,125.00

MANUFACTURER USA Door

PART NUMBER SPC

3-0 X 6-8 PRE-FINISHED WOOD DOOR

(PREPPED FOR HARDWARE)

ESTIMATED ANNUAL QUANTITY 2

UOM EA

UNIT PRICE 425.00

EXTENDED COST 850.00

MANUFACTURER USA Door

PART NUMBER SPC

5 3-0 X 7-0 HOLLOW METAL KD FRAME

ESTIMATED ANNUAL QUANTITY 5

UOM EA

UNIT PRICE 192.00

EXTENDED COST 960.00

MANUFACTURER Republic

PART NUMBER MH16

Bid C24-10 Doors, Frames, Hardware and Installation Services (Annual Contract)

Bid Opening Date & Time: DECEMBER @ 11:00 AM

Note: _3_ addenda were issued on this project

Item # Description

Savannah Architectural

Supply

6 3-0 X 7-0 HOLLOW METAL WELDED

ESTIMATED ANNUAL QUANTITY 2

UOM EA

UNIT PRICE 190.00

EXTENDED COST 380.00

MANUFACTURER Republic

PART NUMBER MH16

7 CLASSROOM DOOR LEVER HARDWARE

ESTIMATED ANNUAL QUANTITY 5

UOM EA

UNIT PRICE 512.40

EXTENDED COST 2,562.00

MANUFACTURER Falcon

PART NUMBER Dane

8 PANIC BAR HARDWARE

ESTIMATED ANNUAL QUANTITY 3

UOM EA

UNIT PRICE 737.80

EXTENDED COST 2,213.40

MANUFACTURER Falcon

PART NUMBER Rim 25

TOTAL CATEGORY 2 - DOORS, FRAMES,

HARDWARE

12,365.40

GRAND TOTAL (CATEGORIES 1 & 2) 26,845.40

"Partial" or "Total" Bid Total

MARK-UP FROM COST FOR ANY EQUIPMENT,

MATERIALS, PARTS USED IN INSTALLATION OF

DOORS (NTE 20%)

15%

DELIVERY (ARO): 45

INSTALLATION (AFTER DELIVERY OF DOORS): 3

Documents Signed (Y/N) Y

Addendums Acknowledged (Y/N) Not stated

LMWBE Designation L

Tabulation by: KATHLEEN WATSON-SCOTT_____________________________________ CERTIFIED BY: JOAN CARTER______________________________________

NUMBER OF VENDORS NOTIFIED SCCPSS:_5__ TO LMWBE:_0__ = A___ W__ H___ I___S___L___N___M___

NUMBER OF VENDORS NOTIFIED GPR:_357__ TO LMWBE:_68__ = A_55_ AA_5_ NA _2_ H_4_ PI/A_2_ M__ NC_289_

NUMBER OF BIDS RECEIVED:_1_ FROM LMWBE:_1_ = A___ W__ H___ I___S___L_1__N___M___

KEY-DISTRICT MINORITY DESIGNATIONS: A=AFRICAN AMERICAN, W=WOMAN, H=HISPANIC, I=AMERICAN INDIAN, S=ASIAN AMERICAN, L=LOCAL, N=NON-LOCAL, M=MAJORITY

Bid C24-10 Doors, Frames, Hardware and Installation Services (Annual Contract)

Bid Opening Date & Time: DECEMBER @ 11:00 AM

Note: _3_ addenda were issued on this project

Item # Description

Savannah Architectural

Supply

KEY-GRP MINORITY DESIGNATIONS: A=AFRICAN AMERICAN, AA=ASIAN AMERICAN, NA=NATIVE AMERICAN, H=HISPANIC/LATINO, PI/A=PACIFIC ISLAND/AMERICAN, M=NON-MINORITY, NC=NOT CLASSIFIED

Vendors Submitting Bid Responses:

1 Savannah Architectural Supply, Inc.; 155 Edwards Court, Bloomingdale, GA 31302 912-234-1811 Phone 912-234-1948 Fax cl@savannaharch.com