This document is a bid tabulation for Cast in Place Concrete for Putnam County, Florida, dated Thursday, September 18, 2025, designated as Bid 25-23. The bid solicits pricing for various concrete services including form and finish (with and without reinforcing), installation of welded wire fabric, installation and tying of rebar, and concrete and steel delivery to site. Thickness options range from 4" to 8" and up to 12" in some categories. Multiple local construction and concrete companies submitted bids, including Do All Concrete & Construction, 8-Koi, Fisher Concrete, Icon Construction, Lebron Concrete Pumping, 3 C's Construction, and Velocity Civil Construction.
The bid tabulation reveals detailed pricing structures for labor and materials, with per square foot rates varying by vendor and concrete thickness. Most vendors offered pricing with cost-plus percentages ranging from 7% to 20%, with installation and material delivery rates. Some vendors like Florida East Coast Construction submitted no bid, while MacClellan Construction LLC was marked as non-responsive. The bid requires submission of 1 original, 1 copy, and 1 USB drive. A notable detail is that Lebron Concrete Pumping used the original bid form instead of the revised form from Addendum 1, which may impact their bid's validity. The document provides a comprehensive comparison of pricing across different concrete service categories and vendors.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Form and Finish (no reinforcing)
Form and Finish (with reinforcing)
Installation of Welded Wire Fabric
Installation and Tying of Rebar Concrete Delivered to Site
Steel Delivered to Site, Rebar or Welded Wire Fabric
1 Original, 1 Copy, 1 USB
4" Thick: $3.00 per sf 6" Thick: $3.00 per sf 8" Thick: $3.00 per sf
4" Thick: $3.00 per sf 6" Thick: $3.00 per sf 8" Thick: $3.00 per sf $3.00 per sf $3.50 per sf Cost plus 20 % Cost plus 20 % Yes
4" Thick: $3.89 per sf 6" Thick: $4.59 per sf 8" Thick: $5.31 per sf
4" Thick: $3.89 per sf 6" Thick: $4.59 per sf 8" Thick: $5.31 per sf $0.48 per sf $0.66 per sf Cost plus 8.9 % Cost plus 8.9 % Yes
4" Thick: $6.00 per sf 6" Thick: $7.00 per sf 8" Thick: $8.00 per sf
4" Thick: wire:$7.00/sf, rebar: $8.50/sf 6" Thick: wire: $8.00/sf, rebar: $9.50/sf
8" Thick: wire: $9.00/sf, rebar: $10.50/sf $1.00 per sf $2.50 per sf Cost plus 20 % Cost plus 20 % Yes
N/A
4" Thick: $2.00 per sf 6" Thick: $2.18 per sf 8" Thick: $2.58 per sf
4" Thick: $3.75 per sf 6" Thick: $4.50 per sf 8" Thick: $4.87 per sf $0.75 per sf $1.40 per sf Cost plus 18 % Cost plus 18 % Yes
Form and finish (no reinforcing) up to 12" thick: $4.50 per sf
Form and Finish (with reinforcing): installation of rebar up to 12" thick concrete: $6.50 per sf
Form and finish (With reinforcing) installation of welded wire fabric reinforcement (Steel cost not included): $6.00 form and finish (with reinforcing):
installation of welded wire fabric and rebar: $7.50 Cost plus 15 % Cost plus 15 % Yes
4" Thick: $1.89 per sf 6" Thick: $1.89 per sf 8" Thick: $1.89 per sf
4" Thick: $1.99 per sf 6" Thick: $1.99 per sf 8" Thick: $2.10 per sf $0.15 per sf $0.15 per sf Cost plus 18 % Cost plus 7 % Yes
4" Thick: $8.00 per sf 6" Thick: $12.00 per sf 8" Thick: $14.00 per sf
4" Thick: $18.00 per sf 6" Thick: $22.00 per sf 8" Thick: $24.00 per sf $6.50 per sf $10.00 per sf Cost plus 20 % Cost plus 20 % Yes Velocity Civil Construction
* Lebron used the original bid form, not the revised bid form from Addendum 1.
Cast in Place Concrete for Putnam County Thursday, September 18, 2025
3 C's Construction
Lebron Concrete Pumping*
MacClellan Construction LLC
Price for Labor Only Price for Material Only
Fisher Concrete
Florida East Coast Construction
Icon Construction
No Bid
Non Responsive
Bid 25-23
Name of Vendor
Do All Concrete & Construction
8-Koi
Sheet1