Bid_25-23._Bid_Tally.pdf
PDF 111 KB Posted
- Attached to
- Cast in Place Concrete in Putnam County
- Solicitation number
- Bid 25-23
- Issued by
- Polk County, Florida
About this file
This document is a bid tabulation for Cast in Place Concrete for Putnam County, Florida, dated Thursday, September 18, 2025, identified as Bid 25-23. The bid solicits pricing for concrete services including form and finish (with and without reinforcing), installation of welded wire fabric, installation and tying of rebar, and concrete and steel delivery to site. The bid covers concrete work in various thicknesses (4", 6", and 8"), with different pricing for labor and material components.
Seven vendors submitted responses, with pricing varying significantly across different service categories. Do All Concrete & Construction, 8-Koi, Fisher Concrete, Icon Construction, 3 C's Construction, Velocity Civil Construction, and Lebron Concrete Pumping provided bids, while Florida East Coast Construction submitted a "No Bid" response. MacClellan Construction LLC was marked as "Non Responsive." Pricing ranges from $1.89 to $14.00 per square foot for form and finish services, with additional costs for reinforcing, installation, and material delivery. Most vendors offered a cost-plus pricing model with percentages ranging from 7% to 20%. Each vendor confirmed ability to provide one original bid document, one copy, and one USB drive with their submission.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Form and Finish (no reinforcing)
Form and Finish (with reinforcing)
Installation of Welded Wire Fabric
Installation and Tying of Rebar Concrete Delivered to Site
Steel Delivered to Site, Rebar or Welded Wire Fabric
1 Original, 1 Copy, 1 USB
4" Thick: $3.00 per sf 6" Thick: $3.00 per sf 8" Thick: $3.00 per sf
4" Thick: $3.00 per sf 6" Thick: $3.00 per sf 8" Thick: $3.00 per sf $3.00 per sf $3.50 per sf Cost plus 20 % Cost plus 20 % Yes
4" Thick: $3.89 per sf 6" Thick: $4.59 per sf 8" Thick: $5.31 per sf
4" Thick: $3.89 per sf 6" Thick: $4.59 per sf 8" Thick: $5.31 per sf $0.48 per sf $0.66 per sf Cost plus 8.9 % Cost plus 8.9 % Yes
4" Thick: $6.00 per sf 6" Thick: $7.00 per sf 8" Thick: $8.00 per sf
4" Thick: wire:$7.00/sf, rebar: $8.50/sf 6" Thick: wire: $8.00/sf, rebar: $9.50/sf
8" Thick: wire: $9.00/sf, rebar: $10.50/sf $1.00 per sf $2.50 per sf Cost plus 20 % Cost plus 20 % Yes
N/A
4" Thick: $2.00 per sf 6" Thick: $2.18 per sf 8" Thick: $2.58 per sf
4" Thick: $3.75 per sf 6" Thick: $4.50 per sf 8" Thick: $4.87 per sf $0.75 per sf $1.40 per sf Cost plus 18 % Cost plus 18 % Yes
Form and finish (no reinforcing) up to 12" thick: $4.50 per sf
Form and Finish (with reinforcing): installation of rebar up to 12" thick concrete: $6.50 per sf
Form and finish (With reinforcing) installation of welded wire fabric reinforcement (Steel cost not included): $6.00 form and finish (with reinforcing):
installation of welded wire fabric and rebar: $7.50 Cost plus 15 % Cost plus 15 % Yes
4" Thick: $1.89 per sf 6" Thick: $1.89 per sf 8" Thick: $1.89 per sf
4" Thick: $1.99 per sf 6" Thick: $1.99 per sf 8" Thick: $2.10 per sf $0.15 per sf $0.15 per sf Cost plus 18 % Cost plus 7 % Yes
4" Thick: $8.00 per sf 6" Thick: $12.00 per sf 8" Thick: $14.00 per sf
4" Thick: $18.00 per sf 6" Thick: $22.00 per sf 8" Thick: $24.00 per sf $6.50 per sf $10.00 per sf Cost plus 20 % Cost plus 20 % Yes Velocity Civil Construction
* Lebron used the original bid form, not the revised bid form from Addendum 1.
Cast in Place Concrete for Putnam County Thursday, September 18, 2025
3 C's Construction
Lebron Concrete Pumping*
MacClellan Construction LLC
Price for Labor Only Price for Material Only
Fisher Concrete
Florida East Coast Construction
Icon Construction
No Bid
Non Responsive
Bid 25-23
Name of Vendor
Do All Concrete & Construction
8-Koi
Sheet1