Bid 24_19 Water Treatment Systems List _ Atta.pdf
PDF 124 KB Posted
- Solicitation number
- PE-62600-NONST-2024-000000022
- Issued by
- Chatham County, Georgia
About this file
This document appears to be a list of water treatment systems for various school buildings in the Savannah-Chatham County Public School System. The list includes details on the boiler and chiller systems for each school, such as the type of system, volume/gallons, zone, season, and size. The schools covered include Bartlett, Beach HS, Coastal GA Comp, Coastal MS, Derenne MS, East Broad ES, Ellis ES, Garden City ES, Garrison ES, Georgetown ES, Hodge ES, Howard ES, Hesse ES, Islands HS, Isle of Hope, Johnson HS, Marshpoint ES, Mercer MS, Myers MS, Ogelthorpe Academy, Rice Creek ES, Savannah Arts Academy, Savannah HS, Shuman MS, Southwest ES, Southwest MS, Spencer ES, Woodville Thompkins HS, Woodville Thompkins Lower, West Chatham ES, West Chatham MS, and Windsor Forest HS.
The document provides detailed technical specifications for each school's water treatment systems, including the boiler loops, closed loops with cooling towers, and air-cooled chillers. It appears to be an attachment or supporting document for a contract or bid opportunity related to the maintenance and/or replacement of these water treatment systems across the school district.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WATER TREATMENT SYSTEMS
BOILER CHILLER
SCHOOL
TYPE OF
SYSTEM
VOL./
GAL ZONE SEASON SIZE
BARTLETT BOILER LOOP
850 CENTRAL WINTER
BARTLETT
CLOSED LOOP W/
COOLING TOWER
1350 CENTRAL ALL
BEACH HS BOILER LOOP 1350 WEST WINTER
BEACH HS
CLOSED LOOP W/
COOLING TOWER
850 EAST ALL
COASTAL GA COMP
CLOSED LOOP W/
COOLING TOWER
750 WEST ALL
COASTAL MS BOILER LOOP 850 EAST ALL
COASTAL MS
CLOSED LOOP W/
COOLING TOWER
1400 EAST ALL
DERENNE MS BOILER LOOP
1750 CENTRAL ALL
DERENNE MS AIR COOLED CHILLER
N/A CENTRAL ALL (2)150 TONS
EAST BROAD ES BOILER LOOP 1750 EAST WINTER
EAST BROAD ES
CLOSED LOOP W/
COOLING TOWER
850 EAST ALL
ELLIS ES BOILER LOOP
900 CENTRAL WINTER
ELLIS ES AIR COOLED CHILLER
1350 CENTRAL ALL 125 TONS
GARDEN CITY ES
CLOSED LOOP W/
COOLING TOWER
1350 WEST ALL
GARDEN CITY ES BOILER LOOP 850 WEST WINTER
GARRISON ES BOILER LOOP 850 CENTRAL WINTER
GARRISON ES
CLOSED LOOP W/
COOLING TOWER
850 CENTRAL ALL
GEORGETOWN ES BOILER LOOP 900 CENTRAL WINTER
GEORGETOWN ES
CLOSED LOOP W/
COOLING TOWER
1350 CENTRAL ALL
HODGE ES BOILER LOOP 850 CENTRAL WINTER
HODGE ES
CLOSED LOOP W/
COOLING TOWER
1350 CENTRAL ALL
HOWARD ES BOILER LOOP 850 EAST WINTER
HOWARD ES
CLOSED LOOP W/
COOLING TOWER
1350 EAST ALL
HESSE ES BOILER LOOP 850 CENTRAL WINTER
HESSE ES
CLOSED LOOP W/
COOLING TOWER
1350 CENTRAL ALL
ISLANDS HS (Electronic Treatment) BOILER LOOP
900 EAST WINTER
ISLANDS HS
CLOSED LOOP W/
COOLING TOWER
1650 EAST ALL
ISLE OF HOPE (Electronic Treatment)
CLOSED LOOP W/
COOLING TOWER
1350 EAST ALL
ISLE OF HOPE BOILER LOOP 850 EAST WINTER
JOHNSON HS
CLOSED LOOP W/
COOLING TOWER
6000 EAST ALL
JOHNSON HS BOILER LOOP 2500 EAST WINTER
MARSHPOINT ES
CLOSED LOOP W/
COOLING TOWER
1400 EAST ALL
MARSHPOINT ES BOILER LOOP 850 EAST WINTER
MERCER MS
CLOSED LOOP W/
COOLING TOWER
1350 WEST ALL
MERCER MS BOILER LOOP 850 WEST WINTER
MYERS MS AIR COOLED CHILLER
1750 EAST ALL (2)150 TONS
MYERS MS BOILER LOOP 900 EAST WINTER
OGELTHORPE ACADEMY BOILER LOOP 850 EAST WINTER
OGELTHORPE ACADEMY
CLOSED LOOP W/
COOLING TOWER
1350 EAST ALL
RICE CREEK ES BOILER LOOP 850 WEST WINTER
RICE CREEK ES
CLOSED LOOP W/
COOLING TOWER
1350 WEST ALL
SAVANNAH ARTS ACADEMY WATER SOFTENER CENTRAL ALL
SAVANNAH ARTS ACADEMY BOILER LOOP 2500 CENTRAL ALL
SAVANNAH ARTS ACADEMY
WATER COOLED
CHILLER W/ COOLING
TOWER
6000 CENTRAL ALL (2)200 TONS
SAVANNAH HS BOILER LOOP 3000 EAST ALL
SAVANNAH HS
WATER COOLED
CHILLER W/ COOLING
TOWER
6000 EAST ALL (2)200 TONS
SHUMAN MS BOILER LOOP 850 EAST WINTER
SHUMAN MS
CLOSED LOOP W/
COOLING TOWER
1350 EAST ALL
SOUTHWEST ES BOILER LOOP 850 CENTRAL ALL
SOUTHWEST ES AIR COOLED CHILLER
1400 CENTRAL ALL (2)150 TONS
SOUTHWEST MS BOILER LOOP CENTRAL WINTER
SOUTHWEST MS
CLOSED LOOP W/
COOLING TOWER
1400 CENTRAL ALL
SPENCER ES BOILER LOOP 1350 EAST WINTER
SPENCER ES
CLOSED LOOP W/
COOLING TOWER
850 EAST ALL
WOODVILLE THOMPKINS HS BOILER LOOP 900 WEST WINTER
WOODVILLE THOMPKINS HS
CLOSED LOOP W/
COOLING TOWER
1400 WEST ALL
WOODVILLE THOMPKINS LOWER BOILER LOOP
850 WEST WINTER
WOODVILLE THOMPKINS LOWER
CLOSED LOOP W/
COOLING TOWER
1400 WEST ALL
WEST CHATHAM ES BOILER LOOP 850 WEST ALL
WEST CHATHAM ES AIR COOLED CHILLER
1500 WEST ALL (2) 150 TONS
WEST CHATHAM MS BOILER LOOP 850 WEST WINTER
WEST CHATHAM MS
CLOSED LOOP W/
COOLING TOWER
1400 WEST ALL
WINDSOR FOREST HS BOILER LOOP 900 CENTRAL WINTER
WINDSOR FOREST HS
CLOSED LOOP W/
COOLING TOWER
1600 CENTRAL ALL
File details come from the government source that posted it. Updated .