Bid_#2027-12_PD_Drone__Project_Manual_Specs.pdf
PDF 3 MB Posted
- Attached to
- Police Department Drone Installation
- Solicitation number
- Bid # 2027-12
- Issued by
- Mclean County, Illinois
About this file
This is a Project Manual (Volume 1) for the City of Bloomington Police Department Drone Installation, prepared by Dewberry Engineers Inc. and issued for bidding and permit on June 15, 2026. The project encompasses electrical work specifications for divisions 07 through 27, including EPDM roofing installation, joint sealants, and comprehensive electrical systems. The scope of work includes roofing membrane installation with 60-mil EPDM material, base flashings, roof insulation (polyisocyanurate board with compressive strength of 20 psi), cover boards, and walkway products. Electrical work specifications detail low-voltage power conductors and cables, grounding and bonding systems, hangers and supports, raceways and boxes, identification systems, panelboards, wiring devices, circuit disconnects, surge protective devices, and telecommunications infrastructure including horizontal cabling and grounding. The project requires compliance with the National Electrical Code, NFPA 70, and multiple referenced standards including ASTM, NECA, and IEEE specifications. Installation details specify that all conductors must be installed in code-conforming conduit unless otherwise noted, with minimum wire gauge of #12 copper, and all materials must be listed and labeled per NEC Article 100.
The project specifications establish performance requirements including a 25-year manufacturer's warranty for roofing components and a two-year installer's warranty covering all roofing system elements. Wind uplift load capacity is specified at 90 psf with zone-specific requirements (63.6 lbf/sq. ft. for field areas and 83.9 lbf/sq. ft. for perimeter areas). Electrical materials must be manufactured in the USA or from Free Trade Agreement countries unless specifically noted otherwise. The project requires preconstruction laboratory testing for joint sealants and field-adhesion testing with detailed documentation and quality control reporting. All work must comply with the Illinois Prevailing Wage Act, and the City of Bloomington requires a project labor agreement for this public works project estimated in excess of $50,000. Sealed bids were due by Friday, August 28, 2026, at 11:30 am CST through the City's e-Procurement Portal, OpenGov.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT MANUAL
(Volume 1 of 1)
DIVISIONS 07 THROUGH 27
Issued for Bidding and Permit
City of Bloomington
Police Dept. Drone Installation
For:
City of Bloomington – Police Department
305 South East Street
Bloomington, Illinois 61701
BY:
ARCHITECTURE
Dewberry Engineers Inc.
IL Reg. No. 184.005007-0006
401 SW Water Street
Suite 701
Peoria, Illinois 61602-1530
(309) 282-8000
(309) 282-8001 fax
DATE: June 15, 2026 Dewberry Engineers Inc. PN: 50193648 jftacek Placed Image jftacek Placed Image jftacek Typewriter
CONFIDENTIAL - SECURITY MEASURES
City of Bloomington Police Department Drone Installation
June 15, 2026
TABLE OF CONTENTS TOC - 1
Dewberry Engineers Inc. 50193648
Division Section Title Pages
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
075323
079200
ETHYLENE-PROPYLENE-DIENE-MONOMER (EPDM) ROOFING
JOINT SEALANTS
DIVISION 26 - ELECTRICAL
260500 COMMON WORK RESULTS FOR ELECTRICAL 5
260519 LOW VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLE 5
260526 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS 4
260529 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS 6
260533 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS 8
260553 IDENTIFICATION FOR ELECTRICAL SYSTEMS 8
262416 PANELBOARDS 6
262726 WIRING DEVICES 4
262820 CIRCUIT AND MOTOR DISCONNECTS 3
264313 SURGE PROTECTIVE DEVICES FOR LOW-VOLTAGE ELECT 5
DIVISION 27 – COMMUNICATIONS
270500
270526
271500
COMMON WORK RESULTS FOR TELECOMMUNICATIONS
GROUNDING AND BONDING FOR TELECOMMUNICATIONS
HORIZONTAL CABLING FOR TELECOMMUNICATIONS
END OF TABLE OF CONTENTS
June 15th, 2026
ETHYLENE-PROPYLENE-DIENE-MONOMER (EPDM) ROOFING 075323 - 1
SECTION 075323 - ETHYLENE-PROPYLENE-DIENE-MONOMER (EPDM) ROOFING
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Adhered ethylene-propylene-diene-terpolymer (EPDM) roofing.
2. Accessory roofing materials.
3. Substrate board.
4. Vapor retarder.
5. Roof insulation.
6. Cover board.
7. Walkways.
B. Section includes installation of sound-absorbing insulation strips in ribs of roof deck. Sound-absorbing insulation strips are furnished under Section 053100 "Steel Decking."
C. Related Requirements:
1. Section 079200 "Joint Sealants" for joint sealants, joint fillers, and joint preparation.
1.2 DEFINITIONS
A. Roofing Terminology: Definitions in ASTM D1079 and glossary of NRCA's "The NRCA Roofing Manual: Membrane Roof Systems" apply to work of this Section.
1.3 PREINSTALLATION MEETINGS
A. Preinstallation Roofing Conference: Conduct conference at [Project site] <Insert location>.
1. Meet with Owner, Architect, Owner's insurer if applicable, testing and inspecting agency representative, roofing Installer, roofing system manufacturer's representative, deck Installer, air barrier Installer, and installers whose work interfaces with or affects roofing, including installers of roof accessories and roof-mounted equipment.
2. Review methods and procedures related to roofing installation, including manufacturer's written instructions.
3. Review and finalize construction schedule, and verify availability of materials, Installer's personnel, equipment, and facilities needed to make progress and avoid delays.
4. Examine deck substrate conditions and finishes, including flatness and fastening.
5. Review structural loading limitations of roof deck during and after roofing.
6. Review base flashings, special roofing details, roof drainage, roof penetrations, equipment curbs, and condition of other construction that affects roofing system.
7. Review governing regulations and requirements for insurance and certificates if applicable.
ETHYLENE-PROPYLENE-DIENE-MONOMER (EPDM) ROOFING 075323 - 2
8. Review temporary protection requirements for roofing system during and after installation.
9. Review roof observation and repair procedures after roofing installation.
1.4 ACTION SUBMITTALS
A. Product Data: For each type of product.
1. For insulation and roof system component fasteners, include copy of SPRI's Directory of Roof Assemblies listing.
B. Shop Drawings: Include roof plans, sections, details, and attachments to other work, including the following:
1. Layout and thickness of insulation.
2. Base flashings and membrane terminations.
3. Flashing details at penetrations.
4. Tapered insulation, thickness, and slopes.
5. Roof plan showing orientation of steel roof deck and orientation of roof membrane and fastening spacings and patterns for mechanically fastened roofing system.
6. Insulation fastening patterns for corner, perimeter, and field-of-roof locations.
7. Tie-in with air barrier.
C. Samples for Verification: For the following products:
1. Roof membrane and flashings of color required.
2. Walkway pads or rolls, of color required.
D. Wind Uplift Resistance Submittal: For roofing system, indicating compliance with wind uplift performance requirements.
1.5 INFORMATIONAL SUBMITTALS
A. Qualification Data: For Installer and manufacturer.
B. Manufacturer Certificates:
1. Performance Requirement Certificate: Signed by roof membrane manufacturer, certifying that roofing system complies with requirements specified in "Performance Requirements" Article.
a. Submit evidence of complying with performance requirements.
2. Special Warranty Certificate: Signed by roof membrane manufacturer, certifying that all materials supplied under this Section are acceptable for special warranty.
C. Product Test Reports: For components of roof membrane and insulation, for tests performed by a qualified testing agency, indicating compliance with specified requirements.
ETHYLENE-PROPYLENE-DIENE-MONOMER (EPDM) ROOFING 075323 - 3
D. Evaluation Reports: For components of roofing system, from ICC-ES.
E. Sample Warranties: For manufacturer's special warranties.
1.6 CLOSEOUT SUBMITTALS
A. Maintenance Data: For roofing system to include in maintenance manuals.
B. Certified statement from existing roof membrane manufacturer stating that existing roof warranty has not been affected by Work performed under this Section.
1.7 QUALITY ASSURANCE
A. Manufacturer Qualifications: A qualified manufacturer that is listed in SPRI's Directory of Roof Assemblies for roofing system identical to that used for this Project.
B. Installer Qualifications: A qualified firm that is approved, authorized, or licensed by roofing system manufacturer to install manufacturer's product and that is eligible to receive manufacturer's special warranty.
1.8 DELIVERY, STORAGE, AND HANDLING
A. Deliver roofing materials to Project site in original containers with seals unbroken and labeled with manufacturer's name, product brand name and type, date of manufacture, approval or listing agency markings, and directions for storing and mixing with other components.
B. Store liquid materials in their original undamaged containers in a clean, dry, protected location and within the temperature range required by roofing system manufacturer. Protect stored liquid material from direct sunlight.
1. Discard and legally dispose of liquid material that cannot be applied within its stated shelf life.
C. Protect roof insulation materials from physical damage and from deterioration by sunlight, moisture, soiling, and other sources. Store in a dry location. Comply with insulation manufacturer's written instructions for handling, storing, and protecting during installation.
D. Handle and store roofing materials, and place equipment in a manner to avoid permanent deflection of deck.
1.9 FIELD CONDITIONS
A. Weather Limitations: Proceed with installation only when existing and forecasted weather conditions permit roofing system to be installed in accordance with manufacturer's written instructions and warranty requirements.
ETHYLENE-PROPYLENE-DIENE-MONOMER (EPDM) ROOFING 075323 - 4
1.10 WARRANTY
A. Special Warranty: Manufacturer agrees to repair or replace components of roofing system that fail in materials or workmanship within specified warranty period.
1. Special warranty includes roof membrane, base flashings, roof insulation, fasteners, cover boards, and other components of roofing system.
2. Warranty Period: 25 years from Date of Substantial Completion.
B. Special Project Warranty: Submit roofing Installer's warranty, on warranty form at end of this Section, signed by Installer, covering the Work of this Section, including all components of roofing system such as roof membrane, base flashing, roof insulation, fasteners cover boards, substrate boards, and walkway products, for the following warranty period:
1. Warranty Period: Two years from Date of Substantial Completion.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. General Performance: Installed roofing system and base flashings to withstand specified uplift pressures, thermally induced movement, and exposure to weather without failure due to defective manufacture, fabrication, installation, or other defects in construction. Roofing and flashings to remain watertight.
1. Accelerated Weathering: Roof membrane to withstand 2000 hours of exposure when tested in accordance with ASTM G152, ASTM G154, or ASTM G155.
2. Impact Resistance: Roof membrane to resist impact damage when tested in accordance with ASTM D3746, ASTM D4272.
B. Material Compatibility: Roofing materials to be compatible with one another and adjacent materials under conditions of service and application required, as demonstrated by roof membrane manufacturer based on testing and field experience.
1. Zone 1 (Roof Area Field): -63.6 lbf/sq. ft.
a. Location: At least 31.2 ft from roof edge
2. Zone 2 (Roof Area Perimeter): -83.9 lbf/sq. ft.
b. Location: At least 31.2 ft from roof edge
3. Location: At least 31.2 ft from roof edge
c. Location: At least 31.2 ft from roof edge
ETHYLENE-PROPYLENE-DIENE-MONOMER (EPDM) ROOFING 075323 - 5
C. SPRI's Directory of Roof Assemblies Listing: Roof membrane, base flashings, and component materials comply with requirements in SPRI's Directory of Roof Assemblies for roof assembly identical for that specified for this Project.
1. Wind Uplift Load Capacity: 90 psf
D. Exterior Fire-Test Exposure: ASTM E108 or UL 790, Class A; for application and roof slopes indicated; testing by a qualified testing agency. Identify products with appropriate markings of applicable testing agency.
E. Fire-Resistance Ratings: Comply with fire-resistance-rated assembly designs indicated. Identify products with appropriate markings of applicable testing agency.
2.2 ETHYLENE-PROPYLENE-DIENE-TERPOLYMER (EPDM) ROOFING
1. Basis-of-Design Product: Subject to compliance with requirements, provide Versico Roofing Systems ; VersiGard EPDM Membrane. or a comparable product by one of the following:
a. Carlisle SynTec Incorporated.
b. Firestone Building Products.
c. Johns Manville; a Berkshire Hathaway company.
2. Thickness: 60 mils (1.1 mm), nominal.
3. Exposed Face Color: Black
4. Source Limitations: Obtain components for roofing system from roof membrane manufacturer or manufacturers approved by roof membrane manufacturer.
2.3 ACCESSORY ROOFING MATERIALS
A. General: Accessory materials recommended by roofing system manufacturer for intended use and compatible with other roofing components.
1. Adhesive and Sealants: Comply with VOC limits of authorities having jurisdiction.
B. Sheet Flashing: 60-mil- (1.5-mm-) thick EPDM, partially cured or cured, according to application.
C. Slip Sheet: Manufacturer's standard of thickness required for application.
D. Prefabricated Pipe Flashings: As recommended by roof membrane manufacturer.
E. Roof Vents: As recommended by roof membrane manufacturer.
1. Size: Not less than 4-inch (100-mm) diameter.
F. Bonding Adhesive: Manufacturer's standard.
ETHYLENE-PROPYLENE-DIENE-MONOMER (EPDM) ROOFING 075323 - 6
G. Low-Rise, Urethane, Fabric-Backed Membrane Adhesive: Roof system manufacturer's standard spray-applied, low-rise, two-component urethane adhesive formulated for compatibility and use with fabric-backed membrane roofing.
H. Seaming Material: Manufacturer's standard, synthetic-rubber polymer primer and 3-inch- (75-mm-) wide minimum, butyl splice tape with release film or Factory-applied seam tape, width as recommended by manufacturer.
I. Lap Sealant: Manufacturer's standard, single-component sealant, colored to match membrane roofing.
J. Water Cutoff Mastic: Manufacturer's standard butyl mastic sealant.
K. Metal Termination Bars: Manufacturer's standard, predrilled stainless steel or aluminum bars, approximately 1 by 1/8 inch (25 by 3 mm) thick; with anchors.
L. Fasteners: Factory-coated steel fasteners and metal or plastic plates complying with corrosion-resistance provisions designed for fastening components to substrate, and acceptable to roofing system manufacturer.
M. Miscellaneous Accessories: Provide pourable sealers, preformed cone and vent sheet flashings, molded pipe boot flashings, preformed inside and outside corner sheet flashings, reinforced EPDM securement strips, T-joint covers, in-seam sealants, termination reglets, cover strips, and other accessories.
2.4 ROOF INSULATION
A. General: Preformed roof insulation boards manufactured or approved by EPDM roof membrane manufacturer.
B. Polyisocyanurate Board Insulation: ASTM C1289, Type II, Class 2, Grade 2, glass-fiber mat facer on both major surfaces.
1. Manufacturers: Subject to compliance with requirements, provide one of the following:
a. Atlas Roofing Corporation.
b. Carlisle SynTec Incorporated.
c. Firestone Building Products.
d. Johns Manville; a Berkshire Hathaway company.
e. Versico Roofing Systems.
Coordinate compressive strength with grade of insulation retained in "Polyisocyanurate Board Insulation" Paragraph above. First option is for Grade 2; second option is for Grade 3
2. Compressive Strength: 20 psi (138 kPa).
Adhered insulation usually requires first option in "Size" Subparagraph below.
3. Size: 48 by 96 inches (1219 by 2438 mm).
http://www.specagent.com/Lookup?ulid=8994 http://www.specagent.com/Lookup?uid=123457146828 http://www.specagent.com/Lookup?uid=123457146820 http://www.specagent.com/Lookup?uid=123457146822 http://www.specagent.com/Lookup?uid=123457146826
ETHYLENE-PROPYLENE-DIENE-MONOMER (EPDM) ROOFING 075323 - 7
4. Thickness:
a. Base Layer: 3 inches.
b. Upper Layer: As needed to obtain required R-value and as shown on drawings.
2.5 INSULATION ACCESSORIES
A. General: Roof insulation accessories recommended by insulation manufacturer for intended use and compatibility with other roofing system components.
B. Fasteners: Factory-coated steel fasteners and metal or plastic plates complying with corrosion-resistance provisions designed for fastening roof insulation to substrate, and acceptable to roofing system manufacturer.
C. Insulation Adhesive: Insulation manufacturer's recommended adhesive formulated to attach roof insulation to substrate or to another insulation layer as follows:
1. Modified asphaltic, asbestos-free, cold-applied adhesive.
2. Bead-applied, low-rise, one-component or multicomponent urethane adhesive.
D. Cover Board: ASTM C1177/C1177M, glass-mat, water-resistant gypsum substrate, or ASTM C1278/C1278M, fiber-reinforced gypsum board.
1. Products: Subject to compliance with requirements and to meet the system warranty requirements, provide one of the following:
a. Georgia-Pacific Gypsum LLC; Dens Deck Prime.
b. National Gypsum Company; DEXcell Glass Mat Roof Board.
c. USG Corporation; Securock Glass Mat Roof Board.
2. Thickness: 1/2 inch (13 mm).
3. Surface Finish: Factory primed.
CONTRACTORS OPTION FOR COVER BOARD:
E. Cover Board: ASTM C1289 Type II, Class 4, Grade 1, 1/2-inch- (13-mm-) thick polyisocyanurate, with a minimum compressive strength of 80 psi (551 kPa). Glass-fiber mat facer on both major surfaces.
1. Basis-of-Design Product: Subject to compliance with requirements, provide Versico
Roofing Systems ; SecurShield HD or a comparable product by one of the following:
a. Atlas Roofing Corporation.
b. Carlisle SynTec Incorporated.
c. Johns Manville; a Berkshire Hathaway company
2. Thickness: 1/2 inch (13 mm).
3. R-Value: Minimum 2.5 per ½” thickness.
http://www.specagent.com/Lookup?ulid=5112 http://www.specagent.com/Lookup?uid=123457146878 http://www.specagent.com/Lookup?uid=123457146880 http://www.specagent.com/Lookup?uid=123457146882 http://www.specagent.com/Lookup?ulid=5109 http://www.specagent.com/Lookup?uid=123457147093 http://www.specagent.com/Lookup?uid=123457147093 http://www.specagent.com/Lookup?uid=123457147129 http://www.specagent.com/Lookup?uid=123457147121 http://www.specagent.com/Lookup?uid=123457147127
ETHYLENE-PROPYLENE-DIENE-MONOMER (EPDM) ROOFING 075323 - 8
2.6 WALKWAYS
Retain "Flexible Walkways" or "Walkway Roof Pavers" Paragraph below for preformed roof walkway products. Revise to suit other walkway products if required.
A. Flexible Walkways: Factory-formed, nonporous, heavy-duty, slip-resisting, surface-textured walkway pads or rolls, approximately 3/16 inch (5 mm) thick and acceptable to roofing system manufacturer.
1. Size: Approximately 36 by 60 inches (914 by 1524 mm).
2. Color: Black.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine substrates, areas, and conditions, with Installer present, for compliance with requirements and other conditions affecting performance of the Work.
1. Verify that roof openings and penetrations are in place, curbs are set and braced, and roof-drain bodies are securely clamped in place.
2. Verify that wood blocking, curbs, and nailers are securely anchored to roof deck at penetrations and terminations and that nailers match thicknesses of insulation.
3. Verify that surface plane flatness and fastening of steel roof deck complies with requirements in Section 053100 "Steel Decking."
B. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 PREPARATION
A. Clean substrate of dust, debris, moisture, and other substances detrimental to roofing system installation in accordance with roofing system manufacturer's written instructions. Remove sharp projections.
B. Prevent materials from entering and clogging roof drains and conductors and from spilling or migrating onto surfaces of other construction. Remove roof-drain plugs when no work is taking place or when rain is forecast.
3.3 INSTALLATION OF ROOFING, GENERAL
A. Install roofing system according to roofing system manufacturer's written instructions.
B. Complete terminations and base flashings and provide temporary seals to prevent water from entering completed sections of roofing system at end of workday or when rain is forecast.
Remove and discard temporary seals before beginning work on adjoining roofing.
ETHYLENE-PROPYLENE-DIENE-MONOMER (EPDM) ROOFING 075323 - 9
C. Install roof membrane and auxiliary materials to tie in to existing roofing to maintain weathertightness of transition[ and to not void warranty for existing roofing system].
3.4 INSTALLATION OF INSULATION
A. Coordinate installing roofing system components so insulation is not exposed to precipitation or left exposed at end of workday.
B. Comply with roofing system and insulation manufacturer's written instructions for installing roof insulation.
C. Installation Over Metal Decking:
1. Install base layer of insulation with joints staggered not less than 24 inches (610 mm) in adjacent rows end joints staggered not less than 12 inches (305 mm) in adjacent rows.
a. Locate end joints over crests of decking.
b. Trim insulation neatly to fit around penetrations and projections, and to fit tight to intersecting sloping roof decks.
c. Make joints between adjacent insulation boards not more than 1/4 inch (6 mm) in width.
d. At internal roof drains, slope insulation to create a square drain sump with each side equal to the diameter of the drain bowl plus 24 inches (610 mm).
1) Trim insulation so that water flow is unrestricted.
e. Fill gaps exceeding 1/4 inch (6 mm) with insulation.
f. Cut and fit insulation within 1/4 inch (6 mm) of nailers, projections, and penetrations.
2. Install upper layers of insulation and tapered insulation with joints of each layer offset not less than 12 inches (305 mm) from previous layer of insulation.
a. Staggered end joints within each layer not less than 24 inches (610 mm) in adjacent rows.
b. Install with long joints continuous and with end joints staggered not less than 12 inches (305 mm) in adjacent rows.
c. Trim insulation neatly to fit around penetrations and projections, and to fit tight to intersecting sloping roof decks.
d. Make joints between adjacent insulation boards not more than 1/4 inch (6 mm) in width.
e. At internal roof drains, slope insulation to create a square drain sump with each side equal to the diameter of the drain bowl plus 24 inches (610 mm).
f. Trim insulation so that water flow is unrestricted.
g. Fill gaps exceeding 1/4 inch (6 mm) with insulation.
h. Cut and fit insulation within 1/4 inch (6 mm) of nailers, projections, and penetrations.
ETHYLENE-PROPYLENE-DIENE-MONOMER (EPDM) ROOFING 075323 - 10
3.5 INSTALLATION OF COVER BOARDS
A. Install cover boards over insulation with long joints in continuous straight lines with end joints staggered between rows. Offset joints of insulation below a minimum of 6 inches (150 mm) in each direction.
1. Trim cover board neatly to fit around penetrations and projections, and to fit tight to intersecting sloping roof decks.
2. At internal roof drains, conform to slope of drain sump.
a. Trim cover board so that water flow is unrestricted.
3. Cut and fit cover board tight to nailers, projections, and penetrations.
4. Adhere cover board to substrate using adhesive in accordance with SPRI's Directory of
Roof Assemblies listed roof assembly requirements for specified Wind Uplift Load Capacity.
3.6 INSTALLATION OF ADHERED ROOF MEMBRANE
A. Adhere roof membrane over area to receive roofing in accordance with roofing system manufacturer's written instructions.
B. Unroll membrane roof membrane and allow to relax before installing.
C. Start installation of roofing in presence of roofing system manufacturer's technical personnel.
D. Accurately align roof membrane, and maintain uniform side and end laps of minimum dimensions required by manufacturer. Stagger end laps.
E. Bonding Adhesive: Apply to substrate and underside of roof membrane at rate required by manufacturer, and allow to partially dry before installing roof membrane. Do not apply to splice area of roof membrane.
F. In addition to adhering, mechanically fasten roof membrane securely at terminations, penetrations, and perimeters.
G. Apply roof membrane with side laps shingled with slope of roof deck where possible.
H. Adhesive Seam Installation: Clean both faces of splice areas, apply splicing cement.
1. Firmly roll side and end laps of overlapping roof membrane to ensure a watertight seam installation.
2. Apply lap sealant and seal exposed edges of roofing terminations.
3. Apply a continuous bead of in-seam sealant before closing splice if required by roofing system manufacturer.
I. Tape Seam Installation: Clean and prime both faces of splice areas, apply splice tape.
ETHYLENE-PROPYLENE-DIENE-MONOMER (EPDM) ROOFING 075323 - 11
1. Firmly roll side and end laps of overlapping roof membrane to ensure a watertight seam installation.
2. Apply lap sealant and seal exposed edges of roofing terminations.
J. Repair tears, voids, and lapped seams in roof membrane that do not comply with requirements.
K. Spread sealant or mastic bed over deck-drain flange at roof drains, and securely seal roof membrane in place with clamping ring.
3.7 INSTALLATION OF SELF-ADHERING ROOF MEMBRANE
A. Adhere roof membrane over area to receive roofing in accordance with roofing system manufacturer's written instructions.
B. Unroll roof membrane and allow to relax before installing.
C. Start installation of roofing in presence of roofing system manufacturer's technical personnel and Owner's testing and inspection agency.
D. Accurately align roof membrane, and maintain uniform side and end laps of minimum dimensions required by manufacturer. Stagger end laps.
E. Fold roof membrane to expose half of sheet width's bottom surface.
1. Remove release liner on exposed half of sheet.
2. Roll roof membrane over substrate while avoiding wrinkles.
F. Fold remaining half of roof membrane to expose bottom surface.
1. Remove release liner on exposed half of sheet.
2. Roll roof membrane over substrate while avoiding wrinkles.
G. In addition to adhering, mechanically fasten roof membrane securely at terminations, penetrations, and perimeter of roofing.
H. Apply roof membrane with side laps shingled with slope of roof deck where possible.
I. Adhesive Seam Installation: Clean both faces of splice areas, apply splicing cement.
1. Firmly roll side and end laps of overlapping roof membrane to ensure a watertight seam installation.
2. Apply lap sealant and seal exposed edges of roofing terminations.
3. Apply a continuous bead of in-seam sealant before closing splice if required by roofing system manufacturer.
J. Tape Seam Installation: Clean and prime both faces of splice areas, apply splice tape.
1. Firmly roll side and end laps of overlapping roof membrane to ensure a watertight seam installation.
ETHYLENE-PROPYLENE-DIENE-MONOMER (EPDM) ROOFING 075323 - 12
2. Apply lap sealant and seal exposed edges of roofing terminations.
K. Factory-Applied Seam Tape Installation: Clean and prime surface to receive tape.
1. Firmly roll side and end laps of overlapping roof membrane to ensure a watertight seam installation.
2. Apply lap sealant and seal exposed edges of roofing terminations.
L. Repair tears, voids, and lapped seams in roof membrane that do not comply with requirements.
M. Spread sealant or mastic bed over deck-drain flange at roof drains, and securely seal roof membrane in place with clamping ring.
N. Adhere protection sheet over roof membrane at locations indicated.
3.8 INSTALLATION OF BASE FLASHING
A. Install sheet flashings and preformed flashing accessories, and adhere to substrates in accordance with roofing system manufacturer's written instructions.
B. Apply bonding adhesive to substrate and underside of sheet flashing at required rate, and allow to partially dry. Do not apply to seam area of flashing.
C. Flash penetrations and field-formed inside and outside corners with cured or uncured sheet flashing.
D. Clean splice areas, apply splicing cement, and firmly roll side and end laps of overlapping sheets to ensure a watertight seam installation. Apply lap sealant and seal exposed edges of sheet flashing terminations.
E. Terminate and seal top of sheet flashings and mechanically anchor to substrate through termination bars.
3.9 INSTALLATION OF WALKWAYS
A. Flexible Walkways: Install walkway products in accordance with manufacturer's written instructions.
1. Install flexible walkways at the following locations:
a. Locations indicated on Drawings and as required by roof membrane manufacturer's warranty requirements.
2. Provide 6-inch (76-mm) clearance between adjoining pads.
3. Adhere walkway products to substrate with compatible adhesive in accordance with roofing system manufacturer's written instructions.
ETHYLENE-PROPYLENE-DIENE-MONOMER (EPDM) ROOFING 075323 - 13
3.10 PROTECTING AND CLEANING
A. Protect roofing system from damage and wear during remainder of construction period. When remaining construction does not affect or endanger roofing system, inspect roofing system for deterioration and damage, describing its nature and extent in a written report, with copies to Architect and Owner.
B. Correct deficiencies in or remove roofing system that does not comply with requirements, repair substrates, and repair or reinstall roofing system to a condition free of damage and deterioration at time of Substantial Completion and in accordance with warranty requirements.
C. Clean overspray and spillage from adjacent construction using cleaning agents and procedures recommended by manufacturer of affected construction.
3.11 ROOFING INSTALLER'S WARRANTY
A. WHEREAS _______________________________ of ___________________________, herein called the "Roofing Installer," has performed roofing and associated work ("work") on the following project:
1. Owner: <Insert name of Owner>.
2. Owner Address: <Insert address>.
3. Building Name/Type: <Insert information>.
4. Building Address: <Insert address>.
5. Area of Work: <Insert information>.
6. Acceptance Date: _________________.
7. Warranty Period: <Insert time>.
8. Expiration Date: __________________.
B. AND WHEREAS Roofing Installer has contracted (either directly with Owner or indirectly as a subcontractor) to warrant said work against leaks and faulty or defective materials and workmanship for designated Warranty Period, C. NOW THEREFORE Roofing Installer hereby warrants, subject to terms and conditions herein set forth, that during Warranty Period Roofing Installer will, at Roofing Installer's own cost and expense, make or cause to be made such repairs to or replacements of said work as are necessary to correct faulty and defective work and as are necessary to maintain said work in a watertight condition.
D. This Warranty is made subject to the following terms and conditions:
1. Specifically excluded from this Warranty are damages to work and other parts of the building, and to building contents, caused by:
a. lightning;
b. peak gust wind speed exceeding <Insert mph (m/s)>;
c. fire;
d. failure of roofing system substrate, including cracking, settlement, excessive deflection, deterioration, and decomposition;
ETHYLENE-PROPYLENE-DIENE-MONOMER (EPDM) ROOFING 075323 - 14
e. faulty construction of parapet walls, copings, chimneys, skylights, vents, equipment supports, and other edge conditions and penetrations of the work;
f. vapor condensation on bottom of roofing; and
g. activity on roofing by others, including construction contractors, maintenance personnel, other persons, and animals, whether authorized or unauthorized by Owner.
2. When work has been damaged by any of foregoing causes, Warranty shall be null and void until such damage has been repaired by Roofing Installer and until cost and expense thereof have been paid by Owner or by another responsible party so designated.
3. Roofing Installer is responsible for damage to work covered by this Warranty but is not liable for consequential damages to building or building contents resulting from leaks or faults or defects of work.
4. During Warranty Period, if Owner allows alteration of work by anyone other than Roofing Installer, including cutting, patching, and maintenance in connection with penetrations, attachment of other work, and positioning of anything on roof, this Warranty shall become null and void on date of said alterations, but only to the extent said alterations affect work covered by this Warranty. If Owner engages Roofing Installer to perform said alterations, Warranty shall not become null and void unless Roofing Installer, before starting said work, shall have notified Owner in writing, showing reasonable cause for claim, that said alterations would likely damage or deteriorate work, thereby reasonably justifying a limitation or termination of this Warranty.
5. During Warranty Period, if original use of roof is changed and it becomes used for, but was not originally specified for, a promenade, work deck, spray-cooled surface, flooded basin, or other use or service more severe than originally specified, this Warranty shall become null and void on date of said change, but only to the extent said change affects work covered by this Warranty.
6. Owner shall promptly notify Roofing Installer of observed, known, or suspected leaks, defects, or deterioration and shall afford reasonable opportunity for Roofing Installer to inspect work and to examine evidence of such leaks, defects, or deterioration.
7. This Warranty is recognized to be the only warranty of Roofing Installer on said work and shall not operate to restrict or cut off Owner from other remedies and resources lawfully available to Owner in cases of roofing failure. Specifically, this Warranty shall not operate to relieve Roofing Installer of responsibility for performance of original work according to requirements of the Contract Documents, regardless of whether Contract was a contract directly with Owner or a subcontract with Owner's General Contractor.
E. IN WITNESS THEREOF, this instrument has been duly executed this ___________ day of
1. Authorized Signature: _______________________________________.
2. Name: ______________________________________.
3. Title: _______________________________________.
END OF SECTION 075323
JOINT SEALANTS 079200 - 1
SECTION 079200 - JOINT SEALANTS
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Urethane joint sealants.
1.2 ACTION SUBMITTALS
A. Product Data:
1. Urethane joint sealants.
B. Samples for Initial Selection: Manufacturer's standard color charts consisting of strips of cured sealants showing the full range of colors available for each product exposed to view.
C. Joint-Sealant Schedule: Include the following information:
1. Joint-sealant application, joint location, and designation.
2. Joint-sealant manufacturer and product name.
3. Joint-sealant formulation.
4. Joint-sealant color.
1.3 INFORMATIONAL SUBMITTALS
A. Preconstruction Laboratory Test Schedule: Include the following information for each joint sealant and substrate material to be tested:
1. Joint-sealant location and designation.
2. Manufacturer and product name.
3. Type of substrate material.
4. Proposed test.
5. Number of samples required.
B. Preconstruction Laboratory Test Reports: For each joint sealant and substrate material to be tested from sealant manufacturer, indicating the following:
1. Materials forming joint substrates and joint-sealant backings have been tested for compatibility and adhesion with joint sealants.
2. Interpretation of test results and written recommendations for primers and substrate preparation are needed for adhesion.
C. Preconstruction Field-Adhesion-Test Reports: Indicate which sealants and joint preparation methods resulted in optimum adhesion to joint substrates based on testing specified in "Preconstruction Testing" Article.
JOINT SEALANTS 079200 - 2
D. Field Quality-Control Reports: For field-adhesion-test reports, for each sealant application tested.
E. Sample warranties.
1.4 CLOSEOUT SUBMITTALS
A. Manufacturers' special warranties.
B. Installer's special warranties.
1.5 QUALITY ASSURANCE
A. Installer Qualifications: Authorized representative who is trained and approved by manufacturer.
B. Testing Agency Qualifications: Qualified in accordance with ASTM C1021 to conduct the testing indicated.
1.6 MOCKUPS
A. Install sealant in mockups of assemblies specified in other Sections that are indicated to receive joint sealants specified in this Section. Use materials and installation methods specified in this Section.
1.7 PRECONSTRUCTION TESTING
A. Preconstruction Laboratory Testing: Submit to joint-sealant manufacturers, for testing indicated below, samples of materials that will contact or affect joint sealants.
1. Adhesion Testing: Use ASTM C794 to determine whether priming and other specific joint preparation techniques are required to obtain rapid, optimum adhesion of joint sealants to joint substrates.
2. Compatibility Testing: Use ASTM C1087 to determine sealant compatibility when in contact with glazing and gasket materials.
3. Submit manufacturer's recommended number of pieces of each type of material, including joint substrates, joint-sealant backings, and miscellaneous materials.
4. Schedule sufficient time for testing and analyzing results to prevent delaying the Work.
5. For materials failing tests, obtain joint-sealant manufacturer's written instructions for corrective measures, including use of specially formulated primers.
6. Testing will not be required if joint-sealant manufacturers submit data that are based on previous testing, not older than 24 months, of sealant products for adhesion to, staining of, and compatibility with joint substrates and other materials matching those submitted.
B. Preconstruction Field-Adhesion Testing: Before installing sealants, field test their adhesion to Project joint substrates as follows:
JOINT SEALANTS 079200 - 3
1. Locate test joints where indicated on Project or, if not indicated, as directed by Architect.
2. Conduct field tests for each kind of sealant and joint substrate.
3. Notify Architect seven days in advance of dates and times when test joints will be erected.
4. Test Method: Test joint sealants in accordance with Method A, Tail Procedure, in
ASTM C1521.
a. For joints with dissimilar substrates, verify adhesion to each substrate separately;
extend cut along one side, verifying adhesion to opposite side. Repeat procedure for opposite side.
5. Report whether sealant failed to adhere to joint substrates or tore cohesively. Include data on pull distance used to test each kind of product and joint substrate. For sealants that fail adhesively, retest until satisfactory adhesion is obtained.
6. Evaluation of Preconstruction Field-Adhesion-Test Results: Sealants not evidencing adhesive failure from testing, in absence of other indications of noncompliance with requirements, will be considered satisfactory. Do not use sealants that fail to adhere to joint substrates during testing.
1.8 FIELD CONDITIONS
A. Do not proceed with installation of joint sealants under the following conditions:
1. When ambient and substrate temperature conditions are outside limits permitted by joint-sealant manufacturer or are below 40 deg F (5 deg C).
2. When joint substrates are wet.
3. Where joint widths are less than those allowed by joint-sealant manufacturer for applications indicated.
4. Where contaminants capable of interfering with adhesion have not yet been removed from joint substrates.
1.9 WARRANTY
A. Special Installer's Warranty: Installer agrees to repair or replace joint sealants that do not comply with performance and other requirements specified in this Section within specified warranty period.
1. Warranty Period: Two years from date of Substantial Completion.
B. Special Manufacturer's Warranty: Manufacturer agrees to furnish joint sealants to repair or replace those joint sealants that do not comply with performance and other requirements specified in this Section within specified warranty period.
1. Warranty Period: Five years from date of Substantial Completion.
C. Special warranties specified in this article exclude deterioration or failure of joint sealants from the following:
JOINT SEALANTS 079200 - 4
1. Movement of the structure caused by stresses on the sealant exceeding sealant manufacturer's written specifications for sealant elongation and compression.
2. Disintegration of joint substrates from causes exceeding design specifications.
3. Mechanical damage caused by individuals, tools, or other outside agents.
4. Changes in sealant appearance caused by accumulation of dirt or other atmospheric contaminants.
PART 2 - PRODUCTS
2.1 SOURCE LIMITATIONS
A. Obtain joint sealants from single manufacturer.
2.2 JOINT SEALANTS, GENERAL
A. Compatibility: Provide joint sealants, backings, and other related materials that are compatible with one another and with joint substrates under conditions of service and application, as demonstrated by joint-sealant manufacturer, based on testing and field experience.
B. Colors of Exposed Joint Sealants: As selected by Architect from manufacturer's full range.
2.3 URETHANE JOINT SEALANTS
A. Urethane, S, P, 25, T, NT: Single-component, pourable, plus 25 percent and minus 25 percent movement capability, traffic- and nontraffic-use, urethane joint sealant; ASTM C920, Type S, Grade P, Class 25, Uses T and NT.
a. BASF Building Systems; Sonolastic SL 1.
b. Pecora Corporation; Urexpan NR-201.
c. Sika Corporation. Construction Products Division; Sikaflex - 1CSL.
d. Tremco Incorporated; Vulkem 45.
e. Tremco Incorporated; Tremflex S/L.
2.4 MISCELLANEOUS MATERIALS
A. Primer: Material recommended by joint-sealant manufacturer where required for adhesion of sealant to joint substrates indicated, as determined from preconstruction joint-sealant-substrate tests and field tests.
B. Cleaners for Nonporous Surfaces: Chemical cleaners acceptable to manufacturers of sealants and sealant backing materials, free of oily residues or other substances capable of staining or harming joint substrates and adjacent nonporous surfaces in any way, and formulated to promote optimum adhesion of sealants to joint substrates.
C. Masking Tape: Nonstaining, nonabsorbent material compatible with joint sealants and surfaces adjacent to joints.
JOINT SEALANTS 079200 - 5
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine joints indicated to receive joint sealants, with Installer present, for compliance with requirements for joint configuration, installation tolerances, and other conditions affecting performance of the Work.
B. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 PREPARATION
A. Surface Cleaning of Joints: Clean out joints immediately before installing joint sealants to comply with joint-sealant manufacturer's written instructions and the following requirements:
1. Remove all foreign material from joint substrates that could interfere with adhesion of joint sealant, including dust, paints (except for permanent, protective coatings tested and approved for sealant adhesion and compatibility by sealant manufacturer), old joint sealants, oil, grease, waterproofing, water repellents, water, surface dirt, and frost.
2. Clean porous joint substrate surfaces by brushing, grinding, mechanical abrading, or a combination of these methods to produce a clean, sound substrate capable of developing optimum bond with joint sealants. Remove loose particles remaining after cleaning operations above by vacuuming or blowing out joints with oil-free compressed air.
Porous joint substrates include the following:
a. Concrete.
b. Masonry.
3. Remove laitance and form-release agents from concrete.
B. Joint Priming: Prime joint substrates where recommended by joint-sealant manufacturer or as indicated by preconstruction joint-sealant-substrate tests or prior experience. Apply primer to comply with joint-sealant manufacturer's written instructions. Confine primers to areas of joint-sealant bond; do not allow spillage or migration onto adjoining surfaces.
C. Masking Tape: Use masking tape where required to prevent contact of sealant or primer with adjoining surfaces that otherwise would be permanently stained or damaged by such contact or by cleaning methods required to remove sealant smears. Remove tape immediately after tooling without disturbing joint seal.
3.3 INSTALLATION OF JOINT SEALANTS
A. General: Comply with joint-sealant manufacturer's written installation instructions for products and applications indicated, unless more stringent requirements apply.
B. Sealant Installation Standard: Comply with recommendations in ASTM C1193 for use of joint sealants as applicable to materials, applications, and conditions indicated.
JOINT SEALANTS 079200 - 6
C. Install sealant backings of type indicated to support sealants during application and at position required to produce cross-sectional shapes and depths of installed sealants relative to joint widths that allow optimum sealant movement capability.
1. Do not leave gaps between ends of sealant backings.
2. Do not stretch, twist, puncture, or tear sealant backings.
3. Remove absorbent sealant backings that have become wet before sealant application, and replace them with dry materials.
D. Install bond-breaker tape behind sealants where sealant backings are not used between sealants and backs of joints.
E. Install sealants using proven techniques that comply with the following and at the same time backings are installed:
1. Place sealants so they directly contact and fully wet joint substrates.
2. Completely fill recesses in each joint configuration.
3. Produce uniform, cross-sectional shapes and depths relative to joint widths that allow optimum sealant movement capability.
F. Tooling of Nonsag Sealants: Immediately after sealant application and before skinning or curing begins, tool sealants in accordance with requirements specified in subparagraphs below to form smooth, uniform beads of configuration indicated; to eliminate air pockets; and to ensure contact and adhesion of sealant with sides of joint.
1. Remove excess sealant from surfaces adjacent to joints.
2. Use tooling agents that are approved in writing by sealant manufacturer and that do not discolor sealants or adjacent surfaces.
3. Provide concave joint profile in accordance with Figure 8A in ASTM C1193 unless otherwise indicated.
3.4 FIELD QUALITY CONTROL
A. Tests and Inspections:
1. Field-Adhesion Testing: Field test joint-sealant adhesion to joint substrates as follows:
a. Extent of Testing: Test completed and cured sealant joints as follows:
1) Perform 10 tests for the first 1000 ft. (300 m) of joint length for each kind of sealant and joint substrate.
2) Perform one test for each 1000 ft. (300 m) of joint length thereafter or one test per each floor per elevation.
3) For joints with dissimilar substrates, verify adhesion to each substrate separately; extend cut along one side, verifying adhesion to opposite side.
Repeat procedure for opposite side.
b. Inspect tested joints and report on the following:
1) Whether sealants filled joint cavities and are free of voids.
JOINT SEALANTS 079200 - 7
2) Whether sealant dimensions and configurations comply with specified requirements.
3) Whether sealants in joints connected to pulled-out portion failed to adhere to joint substrates or tore cohesively. Include data on pull distance used to test each kind of product and joint substrate. Compare these results to determine if adhesion complies with sealant manufacturer's field-adhesion hand-pull test criteria.
c. Record test results in a field-adhesion-test log. Include dates when sealants were installed, names of persons who installed sealants, test dates, test locations, whether joints were primed, adhesion results and percent elongations, sealant material, sealant configuration, and sealant dimensions.
d. Repair sealants pulled from test area by applying new sealants following same procedures used originally to seal joints. Ensure that original sealant surfaces are clean and that new sealant contacts original sealant.
2. Evaluation of Field-Adhesion-Test Results: Sealants not evidencing adhesive failure from testing or noncompliance with other indicated requirements will be considered satisfactory. Remove sealants that fail to adhere to joint substrates during testing or to comply with other requirements. Retest failed applications until test results prove sealants comply with indicated requirements.
B. Prepare test and inspection reports.
3.5 CLEANING
A. Clean off excess sealant or sealant smears adjacent to joints as the Work progresses by methods and with cleaning materials approved in writing by manufacturers of joint sealants and of products in which joints occur.
3.6 PROTECTION
A. Protect joint sealants during and after curing period from contact with contaminating substances and from damage resulting from construction operations or other causes so sealants are without deterioration or damage at time of Substantial Completion. If, despite such protection, damage or deterioration occurs, cut out, remove, and repair damaged or deteriorated joint sealants immediately so installations with repaired areas are indistinguishable from original work.
END OF SECTION 079200
Police Department Drone Installation
Issued for Bidding
COMMON WORK RESULTS FOR ELECTRICAL 260500 - 1
SECTION 260500 - COMMON WORK RESULTS FOR ELECTRICAL
PART 1 - GENERAL
1.1 SUMMARY
A. Drawings and General Provisions of the Contract, including General and Supplementary
Conditions and Division 1 Specification Sections, apply to Division 26.
B. This Specification and associated electrical drawings are intended to provide for the electrical work required for a complete electrical system, tested, inspected and ready for operation. All such material and equipment necessary and incidental to the completion of the system, satisfying both the letter and intent of these specifications shall be furnished with the related labor and services, whether or not such items are specifically mentioned herein or shown on the
Drawings.
C. This work shall include the general layout of the complete electrical system: arrangements of feeders, circuits, outlets, switches, panelboards, and other work.
D. This Section includes the following:
1. Supporting devices for electrical components.
2. Cutting and patching for electrical construction.
3. Electrical demolition.
1.2 QUALITY ASSURANCE
A. Provide electrical materials and equipment that is listed and labeled. The terms “listed and labeled” as defined in the National Electrical Code, Article 100. Materials and equipment shall be suitable for the intended use and manufactured and tested to conform to the requirements of referenced standards and publications listed in these Specifications. In case of conflict between provisions, the most stringent shall govern as determined by the Engineer.
B. The word, “provide” shall mean furnish and install complete, tested, inspected, and ready for permanent operation by the owner.
C. All materials shall be manufactured in the USA or in countries with Free Trade Agreements
(FTA’s) or with pending FTA’s. Such FTA’s are listed at www.trade.gov. Materials from manufacturers other than the USA or non-FTA countries shall only be accepted when:
1. Material from a non-FTA country is specifically listed in the specifications.
2. Specified materials are only manufactured in a non FTA country.
3. Free Trade Agreement country end product” means an article that— http://www.trade.gov/
COMMON WORK RESULTS FOR ELECTRICAL 260500 - 2
a. Is wholly the growth, product, or manufacture of a Free Trade Agreement (FTA) country; or
b. In the case of an article that consists in whole or in part of materials from another country, has been substantially transformed in an FTA country into a new and different article of commerce with a name, character, or use distinct from that of the article or articles from which it was transformed.
1.3 COORDINATION
A. Coordinate chases, slots, inserts, sleeves, and openings for electrical supports, raceways, and cable with all other work.
B. Where electrical identification devices are applied to field-finished surfaces, coordinate installation of identification devices with completion of…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .