Base Offer Price Breakdown 1 Page Excel Form.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
Z2DA--FY26: NRM (PROJ: 516-25-610) BB - Upgrade Fire Pumps, Install Wet Pipe Systems, & Replace Various Sprinkler Heads
Solicitation number
36C24826Q0349
Issued by

About this file

This is a Base Offer Price Breakdown template in Excel format designed for the Edward L. Roy VA project. The form requires contractors to submit detailed pricing organized by the 29 construction divisions specified in the MasterFormat standard, including General Requirements, Concrete, Masonry, Metals, HVAC, Electrical, Plumbing, Fire Suppression, and Earthwork, among others. For each division, offerors must separately itemize labor costs and material costs, with the template automatically calculating total costs per division. The form also requires contractors to provide overall project overhead percentage, profit percentage, and bond percentage, which are sequentially applied to generate subtotals and the final total base offer cost.

The pricing template is structured to support the evaluation of the fire suppression and sprinkler system upgrade project at C.W. Bill Young VA Medical Center in Bay Pines, Florida (Project No. 516-25-610), estimated between $2,000,000 and $5,000,000. The template explicitly requires offerors to avoid lump sum pricing and provide detailed breakdowns by division to facilitate government price analysis. Contractors must complete fields for project number, project title, project location, offeror name and address, date of offer preparation, and submission date. This pricing breakdown will support proposals due March 31, 2026, for the Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside contract with the Department of Veterans Affairs Network Contracting Office 8.

View the file

Other files

File Type Posted
S06 36C24826Q0349 0003 4.7.26.pdf PDF
36C24826Q0349 0002.pdf PDF
S06 36C24826Q0349 0001 3.12.26.pdf PDF
S06 Amend 1 Attach Sign In Sheet.pdf PDF
EMR 1 Page.pdf PDF
516-25-610-Specifiactions 647 Pages.pdf PDF
PPQ 4 Pages.pdf PDF
WD FL20260222 01.02.2026 Pinellas 8 Pages.pdf PDF
516-25-610-Drawings 66 Pages.pdf PDF
LOS 2 Pages.pdf PDF
A.3 Price Cost Schedule 1 Page.pdf PDF
36C24826Q0349_1.pdf PDF
36C24826Q0349.docx DOCX document
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Offer Base Offer Cost Breakdown

Project Number:

Edward L Roy: VA assigned project #

Date:
Project Title
Edward L Roy: VA assigned Project TitleProject Location
Offeror Name
Offeror Street
Offeror CityStateZip

Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division

Material Cost
Edward L Roy: Enter all Material Costs by DivisionTotal Cost

Edward L Roy: This Column is the sum of the Division's Labor and Material Costs

Division 1General Requirements$ - 0$ - 0$ - 0
Division 2Existing Conditions- 0- 0- 0
Division 3Concrete- 0- 0- 0
Division 4Masonry- 0- 0- 0
Division 5Metals- 0- 0- 0
Division 6Wood and Plastic- 0- 0- 0
Division 7Thermal & Moisture Protect- 0- 0- 0
Division 8Doors and Windows- 0- 0- 0
Division 9Finishes- 0- 0- 0
Division 10Specialties- 0- 0- 0
Division 11Equipment- 0- 0- 0
Division 12Furnishings- 0- 0- 0
Division 13Special Construction- 0- 0- 0
Division 14Conveying Equipment- 0- 0- 0
Division 21Fire Suppression- 0- 0- 0
Division 22Plumbing- 0- 0- 0
Division 23HVAC- 0- 0- 0
Division 26Electrical- 0- 0- 0
Division 27Communications- 0- 0- 0
Division 28Electronic Safety & Security- 0- 0- 0
Division 31Earthwork- 0- 0- 0
Division 32Exterior Improvements- 0- 0- 0
Division 33Utilities- 0- 0- 0
Division 34Transportation Subtotal- 0- 0- 0
Division Subtotals :$ - 0$ - 0$ - 0

Overhead % 0.00% Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).

Edward L Roy: Date Offer Prepared/Submitted

- 0
Profit %0.00%
Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38).- 0
Bond %0.00%

Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).

Edward L Roy: Enter all Labor Costs by Division

- 0
Overhead/Profit Subtotals :$ - 0

Edward L Roy: Sum of Overhead, Profit and Bond %.

Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0

Offerors shall provide additional price breakdown to avoiding lump sum, etc. This price offer breakdown is the overall base offer price for Government price analysis

File details come from the government source that posted it. Updated .