Base Offer Price Breakdown 1 Page Excel Form.xlsx
XLSX spreadsheet 23 KB Posted
- Solicitation number
- 36C24826Q0349
About this file
This is a Base Offer Price Breakdown template in Excel format designed for the Edward L. Roy VA project. The form requires contractors to submit detailed pricing organized by the 29 construction divisions specified in the MasterFormat standard, including General Requirements, Concrete, Masonry, Metals, HVAC, Electrical, Plumbing, Fire Suppression, and Earthwork, among others. For each division, offerors must separately itemize labor costs and material costs, with the template automatically calculating total costs per division. The form also requires contractors to provide overall project overhead percentage, profit percentage, and bond percentage, which are sequentially applied to generate subtotals and the final total base offer cost.
The pricing template is structured to support the evaluation of the fire suppression and sprinkler system upgrade project at C.W. Bill Young VA Medical Center in Bay Pines, Florida (Project No. 516-25-610), estimated between $2,000,000 and $5,000,000. The template explicitly requires offerors to avoid lump sum pricing and provide detailed breakdowns by division to facilitate government price analysis. Contractors must complete fields for project number, project title, project location, offeror name and address, date of offer preparation, and submission date. This pricing breakdown will support proposals due March 31, 2026, for the Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside contract with the Department of Veterans Affairs Network Contracting Office 8.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S06 36C24826Q0349 0003 4.7.26.pdf | ||
| 36C24826Q0349 0002.pdf | ||
| S06 36C24826Q0349 0001 3.12.26.pdf | ||
| S06 Amend 1 Attach Sign In Sheet.pdf | ||
| EMR 1 Page.pdf | ||
| 516-25-610-Specifiactions 647 Pages.pdf | ||
| PPQ 4 Pages.pdf | ||
| WD FL20260222 01.02.2026 Pinellas 8 Pages.pdf | ||
| 516-25-610-Drawings 66 Pages.pdf | ||
| LOS 2 Pages.pdf | ||
| A.3 Price Cost Schedule 1 Page.pdf | ||
| 36C24826Q0349_1.pdf | ||
| 36C24826Q0349.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Offer Base Offer Cost Breakdown
Project Number:
Edward L Roy: VA assigned project #
| Date: | |
| Project Title |
| Edward L Roy: VA assigned Project Title | Project Location | ||
| Offeror Name | |||
| Offeror Street | |||
| Offeror City | State | Zip |
Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division
| Material Cost | |
| Edward L Roy: Enter all Material Costs by Division | Total Cost |
Edward L Roy: This Column is the sum of the Division's Labor and Material Costs
| Division 1 | General Requirements | $ - 0 | $ - 0 | $ - 0 |
| Division 2 | Existing Conditions | - 0 | - 0 | - 0 |
| Division 3 | Concrete | - 0 | - 0 | - 0 |
| Division 4 | Masonry | - 0 | - 0 | - 0 |
| Division 5 | Metals | - 0 | - 0 | - 0 |
| Division 6 | Wood and Plastic | - 0 | - 0 | - 0 |
| Division 7 | Thermal & Moisture Protect | - 0 | - 0 | - 0 |
| Division 8 | Doors and Windows | - 0 | - 0 | - 0 |
| Division 9 | Finishes | - 0 | - 0 | - 0 |
| Division 10 | Specialties | - 0 | - 0 | - 0 |
| Division 11 | Equipment | - 0 | - 0 | - 0 |
| Division 12 | Furnishings | - 0 | - 0 | - 0 |
| Division 13 | Special Construction | - 0 | - 0 | - 0 |
| Division 14 | Conveying Equipment | - 0 | - 0 | - 0 |
| Division 21 | Fire Suppression | - 0 | - 0 | - 0 |
| Division 22 | Plumbing | - 0 | - 0 | - 0 |
| Division 23 | HVAC | - 0 | - 0 | - 0 |
| Division 26 | Electrical | - 0 | - 0 | - 0 |
| Division 27 | Communications | - 0 | - 0 | - 0 |
| Division 28 | Electronic Safety & Security | - 0 | - 0 | - 0 |
| Division 31 | Earthwork | - 0 | - 0 | - 0 |
| Division 32 | Exterior Improvements | - 0 | - 0 | - 0 |
| Division 33 | Utilities | - 0 | - 0 | - 0 |
| Division 34 | Transportation Subtotal | - 0 | - 0 | - 0 |
| Division Subtotals : | $ - 0 | $ - 0 | $ - 0 |
Overhead % 0.00% Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).
Edward L Roy: Date Offer Prepared/Submitted
| - 0 | |||
| Profit % | 0.00% | ||
| Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38). | - 0 | ||
| Bond % | 0.00% |
Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).
Edward L Roy: Enter all Labor Costs by Division
| - 0 | ||
| Overhead/Profit Subtotals : | $ - 0 |
Edward L Roy: Sum of Overhead, Profit and Bond %.
Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0
Offerors shall provide additional price breakdown to avoiding lump sum, etc. This price offer breakdown is the overall base offer price for Government price analysis
File details come from the government source that posted it. Updated .