Base Offer Price Breakdown - 1 page.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
Z2DA--FY26: NRM (PROJ: 673-21-116) BB - Restoration of Building 1 Envelope
Solicitation number
36C24826R0011
Issued by

About this file

The file is a Base Offer Price Breakdown template for a Department of Veterans Affairs construction project at James A. Haley VA Hospital in Tampa, Florida. The solicitation (36C24826R0011) is for the restoration of Building 1 envelope, with a project estimated between $5,000,000 and $10,000,000. Key project details include a site visit scheduled for 11/12/2025 at 10:00 AM EST, proposal due date of 12/03/2025 at 2:00 PM EST, and a 120-day offer acceptance period. The pricing breakdown template requires contractors to itemize costs across 34 different construction divisions, including labor and material costs, with sections for calculating overhead, profit, and bonding percentages. The project involves general construction, alterations, abatement, removal of existing structures, and installation of new building components at the VA hospital facility.

View the file

Other files

File Type Posted
36C24826R0011 0006-ko.pdf PDF
673-21-116-James Haley Restor B1_Addendum 03_02.23.26.pdf PDF
36C24826R0011 0005.pdf PDF
VA NOTICE OF LIMITATIONS ON SUBCONTRACTING.pdf PDF
36C24826R0011 0004.pdf PDF
36C24826R0011 0003.pdf PDF
36C24826R0011 0002.pdf PDF
WD-FL20260208 01-02-26.pdf PDF
673-21-116-James Haley Restor B1_Addendum 01_11.24.2025.pdf PDF
SIGNING SHEET 2.pdf PDF
SIGNING SHEET 1.pdf PDF
36C24826R0011 0001.pdf PDF
36C24826R0011_1.docx DOCX document
36C24826R0011_1.docx DOCX document
36C24826R0011_1.docx DOCX document
Experience information Sheet.pdf PDF
7a CD3 Drawings.pdf PDF
7 Tampa site map.pdf PDF
EMR 1 page.pdf PDF
PAST AND PRESENT PERFORMANCE QUESTIONNAIRE.docx DOCX document
WD FL20250208 05232025.pdf PDF
7 100 CD3 Specs.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Offer Base Offer Cost Breakdown

Project Number: N/A Edward L Roy: VA assigned project #

Date:
Project Title
Edward L Roy: VA assigned Project TitleProject Location
Offeror Name
Offeror Street
Offeror CityStateZip

Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division

Material Cost
Edward L Roy: Enter all Material Costs by DivisionTotal Cost

Edward L Roy: This Column is the sum of the Division's Labor and Material Costs

Division 1General Requirements
Division 2Existing Conditions- 0
Division 3Concrete- 0- 0
Division 4Masonry- 0
Division 5Metals- 0- 0
Division 6Wood and Plastic- 0
Division 7Thermal & Moisture Protect- 0- 0
Division 8Doors and Windows- 0- 0- 0
Division 9Finishes- 0- 0- 0
Division 10Specialties- 0- 0- 0
Division 11Equipment- 0- 0- 0
Division 12Furnishings- 0- 0- 0
Division 13Special Construction- 0- 0
Division 14Conveying Equipment- 0- 0- 0
Division 21Fire Suppression- 0- 0- 0
Division 22Plumbing- 0- 0- 0
Division 23HVAC- 0- 0- 0
Division 26Electrical- 0- 0- 0
Division 27Communications- 0- 0- 0
Division 28Electronic Safety & Security- 0- 0- 0
Division 31Earthwork- 0- 0- 0
Division 32Exterior Improvements- 0- 0- 0
Division 33Utilities- 0- 0- 0
Division 34Transportation Subtotal- 0- 0- 0
Division Subtotals :$ - 0$ - 0$ - 0

Overhead % Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).

Edward L Roy: Date Offer Prepared/Submitted

- 0
Profit %
Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38).- 0
Bond %

Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).

Edward L Roy: Enter all Labor Costs by Division

- 0
Overhead/Profit Subtotals :$ - 0

Edward L Roy: Sum of Overhead, Profit and Bond %.

Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0

Offerors shall provide additional price breakdown to avoiding lump sum, etc. This price offer breakdown is the overall base offer price for Government price analysis

File details come from the government source that posted it. Updated .