Base Offer Price Breakdown - 1 page.xlsx
XLSX spreadsheet 23 KB Posted
- Solicitation number
- 36C24826R0011
About this file
The file is a Base Offer Price Breakdown template for a Department of Veterans Affairs construction project at James A. Haley VA Hospital in Tampa, Florida. The solicitation (36C24826R0011) is for the restoration of Building 1 envelope, with a project estimated between $5,000,000 and $10,000,000. Key project details include a site visit scheduled for 11/12/2025 at 10:00 AM EST, proposal due date of 12/03/2025 at 2:00 PM EST, and a 120-day offer acceptance period. The pricing breakdown template requires contractors to itemize costs across 34 different construction divisions, including labor and material costs, with sections for calculating overhead, profit, and bonding percentages. The project involves general construction, alterations, abatement, removal of existing structures, and installation of new building components at the VA hospital facility.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24826R0011 0006-ko.pdf | ||
| 673-21-116-James Haley Restor B1_Addendum 03_02.23.26.pdf | ||
| 36C24826R0011 0005.pdf | ||
| VA NOTICE OF LIMITATIONS ON SUBCONTRACTING.pdf | ||
| 36C24826R0011 0004.pdf | ||
| 36C24826R0011 0003.pdf | ||
| 36C24826R0011 0002.pdf | ||
| WD-FL20260208 01-02-26.pdf | ||
| 673-21-116-James Haley Restor B1_Addendum 01_11.24.2025.pdf | ||
| SIGNING SHEET 2.pdf | ||
| SIGNING SHEET 1.pdf | ||
| 36C24826R0011 0001.pdf | ||
| 36C24826R0011_1.docx | DOCX document | |
| 36C24826R0011_1.docx | DOCX document | |
| 36C24826R0011_1.docx | DOCX document | |
| Experience information Sheet.pdf | ||
| 7a CD3 Drawings.pdf | ||
| 7 Tampa site map.pdf | ||
| EMR 1 page.pdf | ||
| PAST AND PRESENT PERFORMANCE QUESTIONNAIRE.docx | DOCX document | |
| WD FL20250208 05232025.pdf | ||
| 7 100 CD3 Specs.pdf |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Offer Base Offer Cost Breakdown
Project Number: N/A Edward L Roy: VA assigned project #
| Date: | |
| Project Title |
| Edward L Roy: VA assigned Project Title | Project Location | ||
| Offeror Name | |||
| Offeror Street | |||
| Offeror City | State | Zip |
Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division
| Material Cost | |
| Edward L Roy: Enter all Material Costs by Division | Total Cost |
Edward L Roy: This Column is the sum of the Division's Labor and Material Costs
| Division 1 | General Requirements | |||
| Division 2 | Existing Conditions | - 0 | ||
| Division 3 | Concrete | - 0 | - 0 | |
| Division 4 | Masonry | - 0 | ||
| Division 5 | Metals | - 0 | - 0 | |
| Division 6 | Wood and Plastic | - 0 | ||
| Division 7 | Thermal & Moisture Protect | - 0 | - 0 | |
| Division 8 | Doors and Windows | - 0 | - 0 | - 0 |
| Division 9 | Finishes | - 0 | - 0 | - 0 |
| Division 10 | Specialties | - 0 | - 0 | - 0 |
| Division 11 | Equipment | - 0 | - 0 | - 0 |
| Division 12 | Furnishings | - 0 | - 0 | - 0 |
| Division 13 | Special Construction | - 0 | - 0 | |
| Division 14 | Conveying Equipment | - 0 | - 0 | - 0 |
| Division 21 | Fire Suppression | - 0 | - 0 | - 0 |
| Division 22 | Plumbing | - 0 | - 0 | - 0 |
| Division 23 | HVAC | - 0 | - 0 | - 0 |
| Division 26 | Electrical | - 0 | - 0 | - 0 |
| Division 27 | Communications | - 0 | - 0 | - 0 |
| Division 28 | Electronic Safety & Security | - 0 | - 0 | - 0 |
| Division 31 | Earthwork | - 0 | - 0 | - 0 |
| Division 32 | Exterior Improvements | - 0 | - 0 | - 0 |
| Division 33 | Utilities | - 0 | - 0 | - 0 |
| Division 34 | Transportation Subtotal | - 0 | - 0 | - 0 |
| Division Subtotals : | $ - 0 | $ - 0 | $ - 0 |
Overhead % Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).
Edward L Roy: Date Offer Prepared/Submitted
| - 0 | ||
| Profit % | ||
| Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38). | - 0 | |
| Bond % |
Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).
Edward L Roy: Enter all Labor Costs by Division
| - 0 | ||
| Overhead/Profit Subtotals : | $ - 0 |
Edward L Roy: Sum of Overhead, Profit and Bond %.
Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0
Offerors shall provide additional price breakdown to avoiding lump sum, etc. This price offer breakdown is the overall base offer price for Government price analysis
File details come from the government source that posted it. Updated .