7a CD3 Drawings.pdf

PDF 30 MB Posted

Attached to
Z2DA--FY26: NRM (PROJ: 673-21-116) BB - Restoration of Building 1 Envelope
Solicitation number
36C24826R0011
Issued by

About this file

The provided file is a comprehensive set of architectural and engineering drawings for the restoration of Building 1's envelope at the James A. Haley VA Hospital in Tampa, Florida. The documents include detailed plans spanning multiple floors, exterior elevations, mechanical and electrical specifications, and technical drawings covering window replacement, brick facade restoration, and structural modifications. The project involves a complete exterior renovation, including removing and replacing windows, brick veneer, precast concrete elements, and associated building systems, with careful attention to maintaining the building's functionality during construction.

The restoration project is valued between $5,000,000 and $10,000,000, with a solicitation issued on October 30, 2025, and proposals due on December 3, 2025, at 2:00 PM EST. A mandatory site visit is scheduled for November 12, 2025, at 10:00 AM EST, with interested contractors required to confirm attendance with Healthcare Engineer Nicole Dayton. The work will be performed at the James A. Haley VA Hospital, located at 13000 Bruce B. Downs Boulevard in Tampa, Florida, and involves comprehensive exterior envelope improvements while ensuring minimal disruption to the hospital's ongoing operations.

View the file

Other files

File Type Posted
36C24826R0011 0006-ko.pdf PDF
673-21-116-James Haley Restor B1_Addendum 03_02.23.26.pdf PDF
36C24826R0011 0005.pdf PDF
VA NOTICE OF LIMITATIONS ON SUBCONTRACTING.pdf PDF
36C24826R0011 0004.pdf PDF
36C24826R0011 0003.pdf PDF
36C24826R0011 0002.pdf PDF
WD-FL20260208 01-02-26.pdf PDF
673-21-116-James Haley Restor B1_Addendum 01_11.24.2025.pdf PDF
SIGNING SHEET 1.pdf PDF
36C24826R0011 0001.pdf PDF
SIGNING SHEET 2.pdf PDF
36C24826R0011_1.docx DOCX document
36C24826R0011_1.docx DOCX document
36C24826R0011_1.docx DOCX document
Experience information Sheet.pdf PDF
EMR 1 page.pdf PDF
PAST AND PRESENT PERFORMANCE QUESTIONNAIRE.docx DOCX document
7 Tampa site map.pdf PDF
WD FL20250208 05232025.pdf PDF
Base Offer Price Breakdown - 1 page.xlsx XLSX spreadsheet
7 100 CD3 Specs.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXTERIOR ELEVATION

INTERIOR ELEVATION

SECTION/DETAIL NUMBER

DRAWING NUMBER

COLUMN GRID

NOTE

WINDOW OPENING

DOOR OPENING

ROOM NAME

ROOM NUMBER

WALL TYPE

CEILING HEIGHT

10'-8"

X

X

XX.X-X

XX

X

1/A101

X

A101

X

A101

SIM

B ru c e

B D o w n s B lv d

E 131st Ave

Richard Silver Wy

E Fletcher Ave

E 132nd Ave

N n d S t

PROJECT SITE

S T A

T E

OF FLO

R

I D A

R E G

IS

TERED ARC

H

IT

E C T

J A S

ON

H. RO

S S

AR101907

VA Project No.

RDC/JPA Project No.

Department of Veterans Affairs Medical Center

PENNONI

ENGINEERING CONSULTANT

5755 RIO VISTS DRIVE

CLEARWATER, FL 33760

ARCHITECTURE PLANNING INTERIOR DESIGN

524 FERNWOOD AVENUE

ALTAMONTE SPRINGS, FLORIDA 32701

407.830.6522 P

RDC / JPA ARCHITECTURE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

BECS

STRUCTURAL ENGINEER

6339 TEN OAKS ROAD

SUITE 307

CLARKSVILLE, MD 21029-1155

ABOVE GROUP ENGINEERING

MECHANICAL ELECTRICAL CONSULTANT

305 EAST DR.,

SUITE H

MELBOURNE, FL 32904

/3

/2

:5

:2

P

M

RESTORATION OF BUILDING 1

ENVELOPE

01/31/25

COVER SHEET

G-001

RGDF

673-21-116

TAMPA, FLORIDA

B1

RESTORATION OF BUILDING 1 ENVELOPE

James A. Haley VA Hospital 13000 Bruce B Downs Blvd., Tampa, FL 33612 PROJECT #: 673-21-116

STATION CHIEF - MICHAEL ROGALA

100% BID DOCUMENTS

22004.00

G-001 COVER SHEET

G-101 PHASING/FACADE PLAN

A-101 PIPE BASEMENT PLAN

A-102 GROUND FLOOR PLAN

A-103 FIRST FLOOR PLAN

A-104 SECOND FLOOR PLAN

A-105 THIRD FLOOR PLAN

A-106 FOURTH FLOOR PLAN

A-107 FIFTH FLOOR PLAN

A-108 SIXTH FLOOR PLAN

A-109 SEVENTH FLOOR PLAN

A-200 EXTERIOR ELEVATIONS - OVERVIEW

A-201 EXTERIOR ELEVATIONS - OVERVIEW

AD-202 O.R. DEMOLITION ELEVATIONS

A-203 EXT. ELEV. - EAST GRD. - 3RD FL.

A-204 EXT. ELEV. - SOUTH GRD. - 3RD FL.

A-205 EXT. ELEV. - WEST GRD. - 3RD FL.

A-206 EXT. ELEV. - NORTH GRD. - 3RD FL.

A-207 EXT. ELEV. - SOUTH 3RD - LWR. PENT.

A-208 EXT. ELEV. - NORTH 3RD - LWR. PENT.

A-220 WEST DUCT - ENL. ELEV.

A-221 WEST DUCT - WALL SECTIONS

A-310 DETAILS

A-311 DETAILS & WALL SECTIONS

A-601 NEW WINDOW TYPES

A-602 WALL TYPES & DETAILS

A-610 WINDOW DEMOLITION DETAILS

A-611 WINDOW DEMOLITION DETAILS

A-620 WINDOW NEW DETAILS

A-621 WINDOW NEW DETAILS

A-622 FIRST FLOOR REFLECTED CEILING PLAN & LEGEND

A-630 WINDOW SCHEDULE

A-701 INTERIOR WINDOW CONDITIONS

A-702 INTERIOR WINDOW CONDITIONS

S0.1 STRUCTRUAL GENERAL NOTES

S0.2 STRUCTRUAL SPECIFICATIONS

S0.3 STRUCTRUAL SPECIFICATIONS

S0.4 WIND LOADS

S1.1 DUCT TOWER FRAMING PLANS

S1.2 DUCT TOWER FRAMING PLANS

S2.1 EXTERIOR EXISTING ELEVATIONS - OVERVIEW

S2.2 EXTERIOR EXISTING ELEVATIONS - OVERVIEW

S2.3 EXT. ELV. - EAST GRD - 3RD FLR

S2.4 EXT. ELV. - EAST GRD - 3RD FLR

S2.5 EXT. ELV. - WEST GRD - 3RD FLR

S2.6 EXT. ELV. - NORTH GRD - 3RD FLR

S2.7 EXT. ELV. - EAST 3RD FLOOR - LWR. PENT.

S2.8 EXT. ELV. - SOUTH 3RD FLOOR - LWR. PENT.

S2.12 PHOTOS

S2.13 PHOTOS

S2.14 PHOTOS

S2.15 PHOTOS

S2.16 PHOTOS

S3.1 FRAMING SECTIONS

S3.2 FRAMING SECTIONS

S3.3 REPAIR DETAILS

S3.4 REPAIR DETAILS

S3.5 REPAIR DETAILS

S3.6 REPAIR DETAILS

M-001 MECHANICAL NOTES, LEGENDS, & SYMBOLS

M-201 MECHANICAL ELEVATIONS

M-202 MECHANICAL ELEVATIONS

E-001 ELECTRICAL LEGENDS & SYMBOLS

E-002 ELECTRICAL GENERAL NOTES

ED-101 ELECTRICAL EXTERIOR PLAN - DEMO

EP-101 ELECTRICAL EXTERIOR PLAN - NEW WORK

E-201 ELECTRICAL ELEVATIONS

E-202 ELECTRICAL ELEVATIONS

E-601 ELECTRICAL DIAGRAMS

DRAWING INDEX

GRAPHIC SYMBOLS

Scale: 12" = 1'-0"

Vicinity Map

524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523

2023 Florida Building Code, Building, Eighth Edition:

202 Definitions

• WIND-BORNE DEBRIS REGION. Areas within hurricane-prone regions located in areas where the ultimate design wind speed, Vult, is 140 mph (63.6 m/s) or greater.

1. For Risk Category IV buildings and other structures, the wind-borne debris region shall be based on Figure 1609.3(3).

1603.1.4 Wind design data.

The following information related to wind loads shall be shown, regardless of whether wind loads govern the design of the lateral force-resisting system of the structure:

1. Ultimate design wind speed, Vult, (3-second gust), miles per hour (km/hr), tornado speed, VT (mph) and nominal design wind speed, Vasd, (mph) as determined in accordance with Section 1609.3.1. Vult = 153 mph. See Structural Drawings

2. Risk category IV. See Structural Drawings

3. Effective plan area, Ae, for tornado design in accordance with Chapter 32 of ASCE 7.

4. Wind exposure Category = C. See Structural Drawings.

5. Applicable internal pressure coefficients and applicable tornado internal pressure coefficients.

6. Design wind pressures and their applicable zones with dimensions to be used for exterior component and cladding materials not specifically designed by the registered design professional responsible for the design of the structure, psf (kN/m2). Where design for tornado loads is required, the design pressures shown shall be the maximum of wind or tornado pressures.See Structural Drawings.

TABLE 1604.5

RISK CATEGORY OF BUILDINGS AND OTHER STRUCTURES IV - Buildings and other structures designated as essential facilities,

• Group I-2 occupancies having surgery or emergency treatment facilities.

1609.1.2 Protection of openings.

In wind-borne debris regions, glazed openings in buildings shall be impact resistant or protected with an impact-resistant covering meeting the requirements of ANSI/DASMA 115 (for garage doors and rolling doors) or TAS 201, 202 and 203, AAMA 506, ASTM E1996 and ASTM E1886 referenced herein, or an approved impact-resistant standard as follows:

1. Glazed openings located within 30 feet (9144 mm) of grade shall meet the requirements of the large missile test of ASTM E1996 (Level E missile rating).

2. Glazed openings located more than 30 feet (9144 mm) above grade shall meet the provisions of the small missile test of ASTM E1996. (Level D missile rating).

1609.1.2.1 Louvers.

Louvers protecting the exterior wall opening that are located within 30 feet (9144 mm) of grade shall meet the requirements of AMCA 540 or shall be protected by an impact-resistant cover complying with the large missile test of ASTM E1996 or an approved impact-resistance standard. Louvers required to be open for life safety purposes such as providing a breathable atmosphere shall meet the requirements of AMCA 540.

N

1609.3 Ultimate design wind speed.

• FIGURE 1609.3(3) ULTIMATE DESIGN WIND SPEEDS, VULT, FOR RISK CATEGORY IV BUILDINGS AND OTHER STRUCTURES = >150 mph.

1. Area deignated as Wind-Borne Debris Region per 202.

1609.5 Tornado loads.

The design and construction of Risk Category III and IV buildings and other structures shall be in accordance with Chapter 32 of ASCE 7, except as modified by this code.

1609.6 Roof systems.

Roof systems shall be designed and constructed in accordance with Sections 1609.6.1 through 1609.6.3, as applicable.

1609.6.1 Roof deck.

The roof deck shall be designed to withstand the wind pressures determined in accordance with ASCE 7. Where design for tornado loads is required, the roof deck shall be designed to withstand the greater of wind pressures or tornado pressures determined in accordance with ASCE 7.

1609.6.2 Roof coverings.

Roof coverings shall comply with Section 1609.6.1.

1609.1.2.1 Louvers.

Louvers protecting the exterior wall opening that are located within 30 feet (9144 mm) of grade shall meet the requirements of AMCA 540 or shall be protected by an impact-resistant cover complying with the large missile test of ASTM E1996 or an approved impact-resistance standard. Louvers required to be open for life safety purposes such as providing a breathable atmosphere shall meet the requirements of AMCA 540.

1626.5.1 Louvers protecting the exterior wall envelope and are within 30 feet (9144 mm) of grade shall meet the requirements of AMCA 540 or TAS 201 (large missile test) or shall be protected by an impact-resistant cover complying with TAS 201 (large missile test), TAS 202 and TAS 203.

1626.5.2 Louvers required to be open for life safety purposes, such as providing a breathable atmosphere, that are protecting the exterior wall envelope and are within 30 feet (9144

mm) of grade shall meet the impact requirements of AMCA 540 or TAS 201 (large missile test).

1626.5.3 Open and closed louvers protecting the exterior wall envelope, regardless of their function or location from grade, shall also comply with uniform air pressure testing per TAS 202 protocol and either the cyclical wind pressure loading per TAS 203 protocol or by complying with both the impact and cyclical pressure testing of AMCA 540.

Revisions Date

100% BID DOCUMENTS 01/31/2025

UP

DN

DN

UP

UP

UP

T.O.S.= 71'-4 1/8"

T.O.S.= 87'-1 3/8"

687'-6 3/4"

T.O.S.= 57'-6 3/4"

T.O.S.= 59'-0 3/4"

T.O.S.= 85'-5 3/8"

1.03 2.18

T.O.S.= 147'-4 1/8"

T.O.S.= 88'-5 3/8"

T.O.S.= 146'-9 3/8"

T.O.S.= 83'-7 5/8"

2.42 2.42

T.O.S.= 147'-4 1/8"

T.O.S.= 71'-4 1/8"

T.O.S.= 83'-7 5/8" T.O.S.= 83'-7 5/8"

EE

M M

DDFF

G G

HH

II

KK

LL

JJ

VR

S

U

T

Q

P

O

N

M L

K

J

I

H

G

E C

C C

BB

AA

Z

Y

X

W

F

D

B

A

T.O.S.= 57'-6 3/4"

2.1012.101

2.101

2.101

2.101

2.105

1.03

2.1062.106

2.101

1.06

1.061.06

1.06

FACADE DESIGNATION (WITH WINDOWS)

PHASING LEGEND

X

S T

AT

E

OF FLOR

I D A

R

EGISTERED ARCH

IT

EC

T

J A

SO

N H. ROS

S

AR101907

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

1/

/2

:2 1:

A

M

RESTORATION OF BUILDING 1

ENVELOPE

01/31/25

PHASING/FACADE PLAN

G-101

RGDF

673-21-116

TAMPA, FLORIDA

B1

STATION CHIEF - MICHAEL ROGALA

100% BID DOCUMENTS 22004.00

N Scale: 1" = 20'-0"1 PHASING & FACADE PLAN

524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523

NOTES:

1.03 Roof Deck - 7th floor below

1.06 Work scope at these facades are part of BID ITEM #2 (Deduct

Alternate).

2.18 Existing parapet wall.

2.42 Existing connector to Building 100, protect in place.

2.101 Hospital entrance.

2.105 Building 1 Dock / Loading Area. Maintain unobstructed access at all times. Coordinate adjacent construction staging with C.O.R.

2.106 Existing raised mechanical platform to remain.

GENERAL NOTES - ROOF

A. Exterior work can be divided into individual facades. Each façade includes masonry repair, window replacement, or both. Exterior abatement and/or repair work to a facade shall proceed any window replacement to that same facade.

B. To minimize risk levels during hurricane season in Southern Florida, exterior work shall be suspended during the calendar period between late July thru end of October. Exterior work not completed during this season shall resume in the following season.

C. Coordinate phase completion and start-up with the requirements set forth by the COR to maintain daily operations to near as normal as possible.

D. Coordinate all work involving the generation of excessive noise so as to occur during non-peak operating hours (11 am to 4 pm). Activities to occur during this time period include, but are not limited to saw cutting, jack hammering, hammer drilling, and core drilling.

E. Coordinate access to all phases of construction, deliveries, and debris removal with the COR. See General Requirements.

F. Coordinate construction phasing for Building #1 with VA Medical Services directors, FMS Projects, and COR to establish schedule of temporary closures for interior construction access. Building #1 shall maintain continuous operation throughout construction.Displacement of occupants in patient care spaces to be avoided as much as possible. Availability of vacated spaces shall be coordinated and verified thru the C.O.R..

G. Note: Facade designations shown reference facades that include window replacement. Refer to exterior elevations for full scope of exterior work.

GENERAL NOTES - PHASING

A. The contractor shall provide and submit the Staging Plan for V.A.

review and approval before commencing work.

B. Roof elevations shown are approximate and are for general reference only.

C. Maintain unobstructed access from exterior means of egress doors and discharge routes. Maintain unobstructed access at paved parking areas and drive lanes for hospital patrons at all times.

Coordinate any temporary conflicts with C.O.R.

D. Coordinate crane access with C.O.R. Site shall be restored to original condition upon completion of work.

E. Contractor to protect all roof top units (RTU), ducts, and associated equipment during the project. All equipment to remain fully operable for the duration of project.

F. Prior to the start of masonry work, Contractor shall provide "pre-filter" protection of the outside air intakes of RTU's and intake building louvers adjacent to masonry work using MERV 8 air filter media rolls.

Replacement of internal RTU filters is not required as part of the project scope.

G. Contractor shall provide measures to ensure all dust and debris generated by the work remains within the work area and does not pose hazardous or objectionable conditions for employees, patients, public and building mechanical equipment.

H. The contractor shall provide temporary weather protection to prevent water entry into the building and to maintain the building in a weather-tight condition. Ensure that protection is in place and water-tight before the end of each day ’s work. During the work, the contractor shall be prepared for unexpected weather changes so that temporary protection can be quickly installed.

J. The Contractor shall protect the roof and associated systems.

Construction loads shall not exceed 25 PSF unless approved by the C.O.R. Damage caused by construction activity shall be repaired per the Owner’s direction at the Contractor's cost; all repairs must maintain existing warranties. All items must be secured and braced.

Install plywood cover board under all construction materials to protect existing roofing, parapet, and flashing. Do not store material, equipment, or demolition debris on the roof and other decks.

K. At all exterior work areas, the Contractor is to provide access to the design team and VAMC staff for observation of construction activities. Prior to the removal of exterior access equipment (swing stages, aerial platforms, etc.), provide the design team with (3) business days’ notice to allow for a site observation trip. If notice is not provided, the Contractor will be required to provide new access equipment for the site observation trip.

L. The Contractor is to secure all VA permits prior to execution of work.

20x20

H

H

MVD

MVD MVD

MVD

MVD

MVD

MVD

M

M

10128

.1

(E X

IS

TIN

G

E

LE

V

.6

AS-1

ET-1

HX-1

HX-2

PHW

P-1

SHW

P-1

FLOOR AHU

FUTURE GROUND

ACID

TANK

PRIMARY CABLES

PULLBOX FOR

36"x36"x8"

30" wide shelves ~26" apart

30" wide shelves ~26" apart w id e sh el ve s ap ar t

L dP H

L dP H

H dP

LL

dP H

UP

UP

S

TA

IR

UP

STAIR

#2

UP

UP

U P

DN

UP

UP

STAIR NO.

OPEN

RISER

UP

UP

UP

UP

UP

UP

U P

UP

U P

T

T T

T

T

TT

T

T

T

T

RETAINING

WALL

FCU-

MVD

MVD

C A R B O N

F

ILTE

R

S K

ID

M O U N

TE

D

R .O U N

IT

C

TR

L

P U M P

F D

R E

LO

C A

TE

D

E X

IS

TIN

G

TA

N K

AS-2

ET-1

AS-1

FCU-

FCU-

FCU-

UP

H

H

T

T

T

X

CLEARANCE & MINOR OBSTRUCTIONS - SEE SHEET 3/A-701

MAJOR OBSTRUCTIONS / EQUIPMENT - SEE SHEET 4/A-701

VENTS / DUCT WORK - SEE SHEET 1/A-701

WINDOW TREATMENTS - SEE SHEET 2/A-701

WALLS MAKING CONTACT WITH WINDOW - SEE SHEET 5/A-702

PATIENT LIFTS

ABOVE CEILING CONSTRUCTION REQUIRED - SEE SHEET 6/A-702

NOT IN CONTRACT / EXISTING TO REMAIN

FACADE DESIGNATION (WITH WINDOWS)

INTERIOR CONDITIONS LEGEND

S T

AT

E

OF FLOR

I D A

R

EGISTERED ARCH

IT

EC

T

J A

SO

N H. ROS

S

AR101907

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

1/

/2

:2 1:

A

M

RESTORATION OF BUILDING 1

ENVELOPE

01/31/25

PIPE BASEMENT PLAN

A-101

ACDF

673-21-116

TAMPA, FLORIDA

B1

STATION CHIEF - MICHAEL ROGALA

100% BID DOCUMENTS 22004.00

N Scale: 1" = 20'-0"1 PIPE BASEMENT PLAN

524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523

NOTES:

A. These sheets contain colored linework and poche to illustrate existing conditions and facade designation. Drawings should be printed in color.

B. Verify existing conditions before ordering, fabrication, construction and installation of new work.

C. Coordinate access into each area of the building with the C.O.R.

before beginning demolition or installation of new work.

D. Remove and reinstall existing wood trim as required for the removal of existing windows and trim. Finish paint wood trim at head, jamb, and sill to match existing.

E. During the installation of windows, savage existing signage, window treatments, wall-mounted devices, etc., which are adjacent to the existing window opening. Once the window installation is complete, patch and repair the wall and reinstall items back to their original location.

F. Temporary doors location & sizes are as required by the General Contractor. Doors will interfere with daily operations as little as possible. Confirm all locations with C.O.R.

GENERAL NOTES

DN

DNDN

UP

F-R

ATE-W

ALL-2FS-E (2 hour - Sm oke - existing) (C

O

LO

R 8)

F-R

ATE-W

ALL-2F-E (2 hour - existing) (C O

LO

R

8)

F-R

ATE-W

ALL-2FS (2 hour - Sm oke - new

) (C O

LO

R

53) F-R

ATE-W

ALL-2F (2 hour - new

) (C O

LO

R

13)

F-R

ATE-W

ALL-1F-E (1 hour - existing) (C O

LO

R

8)

F-R

ATE-W

ALL-SM

-E (Sm oke - existing) (C O

LO

R

8)

F-R

ATE-W

ALL-SM

(Sm oke - new ) (C

O

LO

R 73)

F-R

ATE-W

ALL-1F (1 hour - new ) (C

O

LO

R 5)

H

N

C

D

K M

A B

G

G

RTU

CORRIDOR

K E Y P

LA

N

N

G R O U N D

F

LO

O R

P H A S E

F E C

FEC

FEC

F E C

F E C

F E C

FEC

FEC

F E C

F E C

INTERC

OM

INTERC

OM

INTERCOMINTERCOM

D

C

23'-8"

'-1

3/

4"

'-4

14'-4"

'-8

/4

F

E

J

N

MED

GAS

SHELF UNIT

SHELF UNIT

SHELF UNIT

SHELF UNIT

SHELF UNIT

SHELF UNIT

SHELF UNIT

SHELF UNIT

SHELF UNIT

SHELF UNIT

SHELF UNIT

SHELF UNIT

SH

EL

F U

N

IT

SHELF UNIT

SHELF UNIT

SHELF UNIT

SHELF UNIT

SHELF UNIT

SHELF UNIT

SH

EL

F U

N

IT

SHELF UNIT

SHELF UNIT

SH

EL

F U

N

IT

RTU

CORRIDOR

MECHANICAL ----

TELEPHONE

SIGNAL

MECHANICAL

3T MRI

EQUIPMENT ROOM

CONTROL ROOM

OFFICE

CHIEF MRI

SECRETARY

STAFF PHYSICIAN

NON-PROF. NON-PHYS.

MAGNETIC TAPE

STAIR #21

MECHANICAL

LINENS

REPRODUCTION

MAIL ROOM

OFFICE PHARMACY

OFFICE PHARMACY

ELECTRICALOFFICE PHARMACY

OFFICES WAREHOUSE

WAREHOUSE STORAGE

C O R R

ID

O R

ST

A

IR

442 NSF 109 NSF

43 NSF

5 NSF

5 NSF

151 NSF

456 NSF

293 NSF

140 NSF

144 NSF

199 NSF

155 NSF

137 NSF

134 NSF

77 NSF

57 NSF

428 NSF

75 NSF

303 NSF

974 NSF

130 NSF

167 NSF

201 NSF180 NSF

280 NSF

1,398 NSF

N

SF

N

SF

GB-011 GB-010

GC-051

GC-052

GC-028b

GC-027

GC-028a

GC-028

GC-030

GC-031

GC-045

GC-046

GC-047

GC-049

S0-21-1

GC-050

GC-048

GC-008g

GC-008h

GC-008f

GC-008b GC-008dGC-008a

GC-008c

GC-004e

C 0-

S0

ELEVATOR

#18

WHEEL CHAIR RAMP

WHEEL CHAIR RAMP

D N

UP

DN

DN

@ 5%

SLOPE

S

LO

P E

SLOPE

@ 5%

AHU

A/C-13

G C

-049

G C

-008b

G B-011

G B-012

G B-013

G B-014

G C

-002

G D

-003s

G D

-003t

G D

-003e

G D

-004

G A-028

G D

-003d

G D

-001

G D

-002

G A-030

G A-020

G B-010

C 0-01-1

S0-3-1

C 0-06-1

C 0-07-1

C 0-01a-1

G B-020b

G A-017

G A-018

G A-006

G A-006a

WHEEL CHAIR RAMP

WHEEL CHAIR RAMP

EL S-4 EL S-5

ELEVATOR

EL S-10

SERVICE

EL S-11

ELEVATOR

SERVICE

ELEV

EL S-6

ELEC

. PAN

ELS

EL P-1 EL P-2

F E C

F G

H J

K L

M N

G

N .8

M .4

M .1

PH

AR

M

AC

Y

O

FFIC

E

PH

AR

M

AC

Y

M

EC

H

AN

IC

AL

R O

O M

H .A.C

TO

ILET

M

ALE

TO

ILET

FEM

ALE

ELEVATO

R

LO

BBY

FIR

E

C

LO

SET

SIG

N

AL

C

LO

SET

TELEPH

O

N E

C

LO

SET

H .A.C

LAU

N

D R

Y C

LO

SET

1,2 & 3

LO

BBY

ELEVATO

R 4 & 5

LO

BBY

ELEVATO

R

10 & 11

LO

BBY

H .A.C

C O

PIER

R

O O

M

H R

-LIN

KS

C O

R R

ID

O

R

STAIR

#3

C O

R R

ID

O

R

C O

R R

ID

O

R

C O

R R

ID

O

R

STO

R

AG

E

SELECTIVE

VERTICAL

SVC-1

PIPE/ELECT

CHASE

O

FFIC

E

PM

&R S

SEC

PM

&R S

O

FFIC

E C

H

IEF

PM

&R

S

EM

G

F-RATE-WALL-SM (Smoke - new) (COLOR 73)

F-RATE-WALL-SM-E (Smoke - existing) (COLOR 8)

F-RATE-WALL-1F-E (1 hour - existing) (COLOR 8) F-RATE-WALL-2F-E (2 hour - existing) (COLOR 8) F-RATE-WALL-2FS-E (2 hour - Smoke - existing) (COLOR 8)

F-RATE-WALL-1F (1 hour - new) (COLOR 5) F-RATE-WALL-2F (2 hour - new) (COLOR 13) F-RATE-WALL-2FS (2 hour - Smoke - new) (COLOR 53)

22 22

K-

KI

N G

ST

O

N C

_L

AV

AT

O

R Y

VI

TR

EO

U

S C

H

IN

A

K-4330

KIN

G

STO

N C

_TO

ILETS

VITR

EO

U S C

H

IN

A

K-4330 KINGSTON C_TOILETS VITREOUS CHINA

K-2006KINGSTONC_LAVATORYVITREOUS CHINA

K-2006 KINGSTON C_LAVATORY VITREOUS CHINA

K-4330 KINGSTON C_TOILETS VITREOUS CHINA

G .7

G .9

G F

E.7 E

D C

.2 C

B

A.1 A

J

G .7

G .9

H G

F E.7

E D

C .2

C B

A.1 A

20.1

G .7

G .9

G F

E.7 E

D C

.2 C

B

A.1 A

J

G .7

G .9

H G

F E.7

E D

C .2

C B

A.1 A

20.1

J.1

21.9

21.8

D O

W N

U P

D O

W N

U P

PY

XI

S

STL.

RAILING

STL.

RAILING

HANDRAIL

PASS-THRU

UNIT SUB

STA

A2A

A/C

A/C

P

LA

TF

O R M

P

LA

TF

O R M

PLATFORM

SCALE

MOTOR

GRILL

FRYER

OVEN

TOUNION

KETTLES

CONVECTION

OVEN

CONVECTION

CONVECTION

OVEN

CONVECTION

OVEN

BCS

SN

D O W N

STL.

RAILING

STL.

RAIL

UP

DOWN

DOWNTO

PIPE

BASEMENT

DOWN

DOWN UP

DOWN

UP

U P

U P

U P

D N

UP

STEPS

CONC.

DOWN

STEEL

RAIL

D N

UP

DN

DN

@ 5%

SLOPE

S

LO

P E

SLOPE

@ 5%

STAIRS

D O W N

U P

D N

UP

D N

UP

DN

@ 5%

S

LO

P E

SELECTIVE

VERTICAL

SVC-1

DUMBWAITERS

D W #1

D W #2

GVC-3

GVC-4

1 2 3

48"

1 2 3

RoomAB-6BAB-6CAB-6DBA-023ABA-023BC0-01A-1C0-05-1C0-05A-1C0-05B-1C0-05C-1C0-05D-1C0-08-1C0-09-1C0-XX-1GA-002GA-003GA-004GA-004AGA-004BGA-004BGA-004CGA-004DGA-005GA-005AGA-006GA-006AGA-007GA-008GA-009GA-009AGA-010GA-011GA-011AGA-011BGA-012GA-012AGA-013GA-013AGA-013AGA-014GA-015GA-016AGA-016BGA-016CGA-016DGA-017GA-018GA-021GA-022GA-023GA-023CGA-023DGA-024GA-024AGA-025GA-027GA-027AGA-027HGA-027IGA-027LGA-027MGA-027NGA-027OGA-027RGA-027SGA-027TGA-029GA-029AGA-029AGA-029BGA-029CGA-029DGA-029EGA-029JGA-029KGA-030GD-001GD-002GD-003CGD-003E?GD-003JGD-009S0-02-1S0-03-1

NameServiceSupportsFTEE% Occup NameServiceSupportsFTEE% Occup NameServiceSupportsFTEE% Occup

RoomAB-6BAB-6CAB-6DBA-023BBB-001BB-001ABB-001BC0-01-1C0-01B-1C0-01C-1C0-02-1C0-03-1C0-04-1C0-07-1GA-029DGB-010GB-011GB-013GB-014GB-015GB-017GB-020GB-020AGB-020BGB-020CGB-020DGB-021GB-021AGB-021EGB-022GB-022AGB-023BGB-024GB-024BGB-024CGB-024DGB-024FGB-025GB-025AGB-026GB-026AGB-026BGB-027GB-027AGB-027BGB-027CGB-027DGB-027FGB-029GB-030GB-030AGB-031GB-033GB-034GB-035GB-036GB-038GB-039GB-039AGC-002GC-003GD-003?GD-003EGD-003SGD-003TS0-03-1S0-04-1S0-05-1

NameServiceSupportsFTEE% Occup NameServiceSupportsFTEE% Occup NameServiceSupportsFTEE% Occup

RoomC0-01C-1C0-06-1C0-06A-1C0-07-1C0-07A-1C0-07B-1C0-18-1GB-010GB-011GC-001AGC-001BGC-002GC-003GC-004GC-004AGC-004BGC-004CGC-004DGC-004EGC-004GGC-004JGC-004KGC-005GC-006LGC-007GC-007AGC-007BGC-008GC-008AGC-008BGC-008CGC-008DGC-008FGC-008GGC-008HGC-008IGC-009GC-010GC-011GC-012GC-012AGC-020GC-021GC-022AGC-022BGC-023GC-025GC-026GC-026AGC-027GC-028GC-028AGC-028B

RoomGC-030GC-031GC-032GC-034GC-035GC-036GC-043GC-044GC-045GC-046GC-047GC-048GC-049GC-050GC-051GC-052GC-0XXGD-003?GD-003EGD-003SGD-003TGD-005GD-007GD-007GD-007DGD-007EGD-007FGD-007GGD-007NGD-007PGD-007QGD-007RS0-03-1S0-06-1S0-07-1S0-12-1S0-20-1S0-21-1S0-XX-1

NameServiceSupportsFTEE% Occup NameServiceSupportsFTEE% Occup NameServiceSupportsFTEE% Occup

RoomC0-01A-1C0-05D-1C0-06A-1C0-08-1C0-09-1C0-09A-1C0-10-1C0-11-1C0-12-1C0-13-1C0-14-1C0-15-1C0-16-1C0-17-1C0-21-1C0-XX-1GA-002GA-004GA-004BGA-004CGA-004DGA-017GA-029JGA-029KGA-030GB-037BGC-006GC-007VGC-007WGD-001GD-002GD-003E?GD-005GD-007GD-007GD-007AGD-007BGD-007CGD-007DGD-007EGD-007JGD-007MGD-007O

RoomGD-007PGD-007RGD-007SGD-007TGD-007UGD-008GD-009GD-010GD-010AGD-010BGD-010CGD-010DGD-011GD-012GD-012AGD-012BGD-012CGD-012DGD-012LGD-013GD-013AGD-013BGD-013CGD-014GD-014AGD-015GD-015AGD-015BGD-017GD-017AGD-017BGD-017CGD-017DGD-017EGD-017FGD-018GD-018AGD-020GD-020AGD-022GD-022AGD-023GD-023AGD-023B

RoomGD-023CGD-023DGD-023EGD-024GD-025GD-026GD-026AGD-027GD-029GD-030GD-031GD-031AGD-034GD-035GD-036GD-036AGD-036BGD-037GD-037AGD-037CGD-038GD-038AGD-038CGD-038DGD-038EGD-038FGD-038GGD-039GD-039AGD-039BGD-039CGD-040GD-0??GD-0XXS0-01-1S0-08-1S0-13-1S0-22-1

NameServiceSupportsFTEE% Occup NameServiceSupportsFTEE% Occup NameServiceSupportsFTEE% Occup

CC0-03

CC0-02

CC0-01

SOILED RECEIVING / DECON AREA

PATIENT

RECORD

GA-027

POOL

SERVICE

ROOM

GA-011a

CONSTRUCTION

LAYDOWN

GA-011

EMPLOYEE

GYM

GA-004b

MH TEAM

GROUP ROOM

GA-004b

MH ADMIN

(SWING)

GA-004c

GA-004c

GA-004d

CORRIDOR

CO-08-1

LOGISTICS

STORAGE

GD-010

SPS OFFICES

GD-012

GD-012d

WOMENS

LOCKERS

GD-013b

MENS

LOCKERS

GD-015a

ELECTRONICS

SHOP

GD-023a

SHOP

GD-023b

SHOP

GD-023c

BIOMED SHOP

GD-024

STERILE

STORAGE

GD-025

CART

STORAGE

GD-050

SOILED

RECEIVING/DECON

AREA

GD-051

H.A.C.

GD-047b

DECON

TOILET

GD-047a

MECH.

GD-047c

ELECTRICAL

GD-040

CORRIDOR

CO-21-1

ELECTRICAL342.19 SF

MEZZANINE

MECHANICAL

GD-036

CORRIDOR

CO-13-1

N&FS OFFICE

GD-007u

N&FS OFFICE

GD-007t

REFRIGERATOR

GD-007s

KITCHEN

ENTRY

GD-007v

DAIRY & EGG

GD-007g

PATIENT

LAUNDRY

GC-007

CORRIDOR

CO-07b-1

WAREHOUSE

GC-004

TRASH

COLLECTION

GC-012

GC-012a

WORKSTATIONS

GC-004h

STAIR #12

SO-12-1

STAIR #7

SO-07-1

WAREHOUSE

GC-004f

PHARMACY

STORAGE

GC-004k

STAIR #6

S0-06-1

EMS

SUPPLIES

GC-004e

GC-009

GC-010 GC-011

GB-024dGB-024c

OFFICE IMS

GB-024b OFFICE

GB-024f

OFFICE IMS

GB-024

STAIR #5

S0-05-1

COMPUTER

ROOM

S0-05-2

OFFICE STAFF

EMS

GB-030a

GB-029

STAIR #4

SO-04-1

UNION

OFFICE

GB-035

CORRIDOR

C0-01-1

LINEN ROOM

GB-036

N&FS

GB-031

N&FS

GB-033

CORRIDOR

CO-04-1

STORAGE

GB-038

MECHANICAL

BB-001a

TEMPORARY

STORAGE

AB-6d

AB-6c

ELECTRICAL

RELEASE OF

INFORMATION

GA-024

ELECTRICAL

GA-023d

DOCTORS

WORKROOM

GA-027s

DOCTORS

WORKROOM

GA-027r

GA-025

CORRIDOR

C0-05a-1

ELECTRICAL

GE-002

EMERGENCY

ELECTRICAL

GE-003

TELECOMMUNICATIONS

GE-004

SIGNAL

GE-005

MECHANICAL

GE-001

STORAGE

GA-027w

LOBBY

GA-027t

STAIR #9

S0-09-1

RR

GA-027h

RR

GA-027h

BARBER

SHOP

GD-036a

FOOD

PRODUCTION

OFFICE

GD007j

MAIN

KITCHEN

GD-007

GA-027a

GD-008

GD-0xx

W0-L2

Z

AA

AA0-02

1.04

1.05

C C

1.06

1.06

X

CLEARANCE & MINOR OBSTRUCTIONS - SEE SHEET 3/A-701

MAJOR OBSTRUCTIONS / EQUIPMENT - SEE SHEET 4/A-701

VENTS / DUCT WORK - SEE SHEET 1/A-701

WINDOW TREATMENTS - SEE SHEET 2/A-701

WALLS MAKING CONTACT WITH WINDOW - SEE SHEET 5/A-702

PATIENT LIFTS

ABOVE CEILING CONSTRUCTION REQUIRED - SEE SHEET 6/A-702

NOT IN CONTRACT / EXISTING TO REMAIN

FACADE DESIGNATION (WITH WINDOWS)

INTERIOR CONDITIONS LEGEND

S T

AT

E

OF FLOR

I D A

R

EGISTERED ARCH

IT

EC

T

J A

SO

N H. ROS

S

AR101907

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

1/

/2

:2 1:

A

M

RESTORATION OF BUILDING 1

ENVELOPE

01/31/25

GROUND FLOOR PLAN

A-102

RGDF

673-21-116

TAMPA, FLORIDA

B1

STATION CHIEF - MICHAEL ROGALA

100% BID DOCUMENTS 22004.00

N Scale: 1" = 20'-0"1 GROUND FLOOR PLAN

524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523

NOTES:

1.04 Current VA project, this area is Not In Scope.

1.05 RTU Passage to Building 38

1.06 Work scope at these facades are part of BID ITEM #2 (Deduct

Alternate).

A. These sheets contain colored linework and poche to illustrate existing conditions and facade designation. Drawings should be printed in color.

B. Verify existing conditions before ordering, fabrication, construction and installation of new work.

C. Coordinate access into each area of the building with the C.O.R.

before beginning demolition or installation of new work.

D. Remove and reinstall existing wood trim as required for the removal of existing windows and trim. Finish paint wood trim at head, jamb, and sill to match existing.

E. During the installation of windows, savage existing signage, window treatments, wall-mounted devices, etc., which are adjacent to the existing window opening. Once the window installation is complete, patch and repair the wall and reinstall items back to their original location.

F. Temporary doors location & sizes are as required by the General Contractor. Doors will interfere with daily operations as little as possible. Confirm all locations with C.O.R.

GENERAL NOTES

x x x x x x x x x x x x x x x x x x x x x x x x

B B m m ta bl e

10'-9"10'-8"8'-10"

11'-10" 12'-0" 12'-0" 7'-2" 7'-11" 7'-11" 11'-6"

5'-6"

A

F

D

H H

RAMP

R A M P

106 108

109 110

101 103

106 108

109 110

101 103

12'-2"22'-9"

13'-8"11'-8"

9'-0"11'-7" 9'-0"11'-7"

14'-0"8'-2" 14'-0"8'-2"

9'-4"11'-8"

5'-0"32'-1"

12'-6"9'-11" 11'-8"9'-11"

11'-8"9'-8"

4'-1"14'-2"

12'-2"22'-9"

13'-8"11'-8"

9'-0"11'-7" 9'-0"11'-7"

14'-0"8'-2" 14'-0"8'-2"

9'-4"11'-8"

5'-0"32'-1"

12'-6"9'-11" 11'-8"9'-11"

11'-8"9'-8"

4'-1"14'-2"

K-1728CHESAPEAKEC_LAVATORYVITREOUS

CHINA

A.P.

CORRIDOR

(CC-1)

STORAGE

CORRIDOR

CORRIDOR

TO

E X

TE

R

IO

R

E X

IT

EXISTING

EXISTING

EXISTING

EQUIP

ROOM

STORAGE

TOILET SPECIAL

PROCEDURES

STAFF

DRESS

CORRIDOR

SPECIAL

PROCEDURE

ROOM

MECHANICAL

ROOM

TOILET

STAIR

#20

NSF-33

NSF-94

NSF-49 NSF-376NSF-52

SF

NSF-545

NSF-76

NSF-55

1C-174B

1C-173

1C-177 1C-1821C-178

MRI-C-1

1C-174

1C-181

1C-183

S1-20-1

1 2 3 4

C

D

E

E.4

F

E.9

20.0000

73.0000 179.0000 5.0000 136.0000 8.0000

83.0000

272.0000

258.0000

304.0000

4'-8"

254.0000

306.0000

79.9702

182.0178

90.000042.0000

34.0000

118.0000

12.0001

77.9999 x;CART x;CART x;HORIZONTAL

LAMINAR

FLOW HOOD

x;HORIZONTAL

LAMINAR

FLOW HOOD

x;CART x;HORIZONTAL

LAMINAR

FLOW HOOD

x;BAKER

EDGEGUARD

x;BENCHTOP

BIOFLOW

CHAMBER

x;BENCHTOP

BIOFLOW

CHAMBER

FD

FD

FD

FD

FDFD

FD

FD

FD

FD

10"

13'-7"

E1

E2 E3

E4

E6 E7

E8

E9E1

E11

E12

E13

E14

E15

E16

E1

E18

E1

E20

E2

E22

E23

E24

E2

E25

E26

E27

E28

E29

E5

E17a

E17b

E1 a

E1 b

E2 5a

E2 8a

E3 E3a E3b

E3

E3c

8 10 11

16 18

19/20

112 117113 114115

119121

123 124

138139145

128 129

135 136 137

1 15315

40 New Equipment (Analyzer)

34 35

PrinterEasy Coder

Control StorageCentral Link

Track Compressor

Track UPS

Central Link Printer

IQ

IQ

IQ Pr in te rs

Un de rc ou nt er

Specimen Storage

IQ

Samples

Vo rte x M ixe r

M ad a Va c

Finnpipette Cole- Parm er

Shared Freezer

Label Printer

Pencil Sharpener

Printer

Printer

SpaPLUS

M icro-scope

Sam ple

Trays

Zentri-fugen

Nutator

At he na M ul ti-

Ly te

Beckman Coulter Immage 800

Rotator

UP

S

Magnify

Tosoh

Fluid Storage

Osmometer

Vortex Mixer

Sero-fuge

Lab Q uake

Im m ulite

Immulite

Is ot em p

Re f

FreezerRef (Used by COAG, Misc Testing, and Analyzer)

-8

Fr ee ze r

Ne w

Eq ui pm en t w/

C ar t (

AC

L

TO

P)

Easy Coder

3D Rotator

Under Counter Freezer

Laser Printer

Isotemp 202S

PFA 100's

KC1

Microscope

Diffcount

Digital Microscope & Computer Station

New Equipment w/ Cart (ACL

TOP 500 CTS)

Mini Vidas

Verify Now's & Printer

(Stores Reagents & Contrals for Analyzer)

Refrigerator w/ Sliding Doors

(CHEM)

Vacuette

Centrifuge

105 106107108109

Printer

(Stored Below) Central Link

UPS

Trituras 2

Trituras 1

Sample Handler

Re f

Sebia Electrophoresis

Sebia Hydrasys 2 Fluid Storage

Pippette Area

Printer

Sorvall Centrifuge

Printer

Freezer

Flowm eter

Fluid Storage Cart; goes w/ 160 & slides under counter

Printer

Isotemp Ref

Accuspin3 Centrifuge

Fluid Storage

VISTA

VISTA

At he na M ul ti-

Ly te

UP

S

WAM VISTA

Undercounter

ABBOTT ARCH

Decapper Fax

Laser Printer

Easy Coder

Specimen Receiving/Storage 2627 28

60 Cytospin

Speci- Mix

American Optical

EBA 12 Microscope

Blood Storage

Siemens Track

Siemens Utility Cabinet

Flowmeter has existing cart

Siemens DI Water System

108L.2 108H.2

A

A

CR

CR

C R

PP

EDP EDP

EDP EDP

EDP

ED

P

OVERHEAD

PARTITION

LINEN

CART

x;

NE

W

PA

SS

TH

RU

RE

F.

x;

PA

SS

TH

RU

x;

PA

SS

TH

RU

CCTV

CCTV

ICE

MED

CART

REFRIG

MICRO

PRINTER

PYXISPYXIS

LINEN CART

CODE CART

FAX

PNEU T

SYST

CODE CART

CODE CART

MED

CART

REFRIG

RECESSED

HANDICAP

DRINKING

FOUNTAIN

FOUNTAIN

DRINKING

PROCESSOR

F2

C A M E R A

B O X

B O X

C A M E R A

PACS

P

AC

S

DN

UP

UP

DN

D N U P

DN

UP

U P

D N

UP

DN

U P

D O W N

SVC/1

#2 W

D

#1 W

D 22

1 2 3

CABINET

W A

LL

C A B

IN

E T

E.9

D.8

F

E .4

E

D

C.4

C

.9 1 1.3 2 3 4

E

LE

V

C O R R

ID

O R

S

TO

R A G E

B1 -0

B1 -0

B1 -0

B1 -0

F1 -0

F1 -0

F1 -0

F1 -0

A1 -1

A1 -1

A1 -1

A1 -1

A1 -1

A1 -1

A1 -0

A1 -0

A1 -0

A1 -0

AA1-08

P1 -0

P1 -0

P1 -0

P1 -0

P1 -0

P1 -0

O1-06

O1-05

O1-04

O1-03

O1-02

O1-01

N 1-

N 1-

N 1-

N 1-

M1-10

M1-09

M1-08

M1-07

M1-06

M1-05

M1-04

M1-02 M1-01

L1 -0

L1 -0

L1 -0

L1 -0

L1 -0

L1 -0

L1 -0

K1-03

K1-02

K1-01

G1-02

G1-01

AA1-01

AA1-02

AA1-03

AA1-04

AA1-05

AA1-06

AA1-07

Z1 -0

Z1 -0

Z1 -0

Z1 -0

Z1 -0

Y1-01

Y1-02

Y1-03

Y1-04

Y1-05

Y1-06

X1 -0

X1

-0

X1 -0

X1 -0

X1 -0

X1 -0

W1-06

W1-05

W1-04

W1-03

W1-02

W1-01

V1 -0

V1 -0

V1 -0

V1 -0

V1 -0

V1 -0

U1-01

R 1-

R 1-

R 1-

R 1-

R 1-

R 1-

Q1-01

Q1-04

Q1-06

Z1 -0

N 1-

M1-03

N 1-

Q1-05

Q1-03

Q1-02

F1 -0

RR

J1 -0

J1 -0

H 1-

H 1-

H 1-

H 1-

H 1-

I1-01

I1-02

I1-04

I1-03

D 1-

D 1-

C1-01

EXAM

1A-150

RESTROOM

1A-150a EXAM

1A-151

EXAM

1A-152

EXAM

1A-154

EXAM

1A-156

Cast Room 1A-160

EXAM

1A-162

EXAM

1A-158

CONFERENCE

1A-171

EXAM

1A-169

EXAM

1A-173

INTERNAL

MEDICINE

CLINIC

WAITING

1A-176

EXAM

1A-173a

1B-102

CORRIDOR

C1-15-1

1B-102i

CLINIC/EDUCATION

1B-102j

CLINIC

EDUCATION/CONFERENCE

1B-109

OFFICE

1B-111

RESTROOM

1B-111aOFFICE

1B-112

OFFICE

1B-1141B-114a

OFFICE

1B-116

OFFICE

1B-118a

OFFICE

1B-118

OFFICE

1B-119a

OFFICE

1B-119

SLEEP LAB

1B-122a

SLEEP LAB

1B-122

STAIR #4

S1-04-1 OFFICE

1B-123a

OFFICE

1B-123

RESPIRATORY

THERAPY

BREAK ROOM

1B-124

OFFICE

SURGERY

1B-128

OFFICE

SURGERY

1B-127

FELLOWS

1B-136

DR OFFICE

1B-130

APRN

1B-138

INFUSION

TREATMENT

CHAIR AREA

1B-140

S1-05-1 1B-141

INFUSION

TREATMENT

CHAIR AREA

1B-143

CORRIDOR

C1-23-1

BREAK ROOM

1B-155

ATTENDING

EXAM ROOM

1B-154

ATTENDING

EXAM ROOM

1B-152

ATTENDING

EXAM ROOM

1B-150

1B-149a

ATTENDING

EXAM ROOM

1B-148

WAITING

1B-156

CORRIDOR

C1-49-1

1B-156dELECTRICAL 1B-156c

CONFERENCE

ROOM

1B-156g

1B-156a 1B-156b 1B-157 1B-159

C1-49-9CORRIDOR

1B-1581B-156e

LITHOTRIPTER

1B-104

NURSING

1C-102a

1C-102

MEDICAL

CONFERENCE

1C-104

STORAGE

1C-104a

1C-104d

1C-104a

1C-104b 1C-104c 1C-107d

ELECTRICAL WAITING

1C-107

A/C UNIT

PATIENT

RESTROOM

1C-108

EXAM

1C-109

EXAM

1C-111

1C-113 1C-112

EXAM

1C-115

EXAM

1C-116

EXAM

1C-122

EXAM

1C-122a

EXAM

1C-120

EXAM

1C-120a

EXAM

1C-118

EXAM

1C-118a

STAIR #6

S1-06-1

EXAM

1C-123a

EXAM

1C-123

EXAM

1C-125a

EXAM

1C-125

SUPERVISOR

OUTPATIENT

UNIT

1C-127a

RECORDS

PREP.

1C-127

1C-129

1C-133

EXAM

1C-135

EXAM

1C-136

EXAM

1C-136a

EXAM

1C-138

EXAM

1C-138A

EXAM

1C-140

EXAM

1C-140a

STAIR #7

S1-07-1

EXAM/CONFERENCE

1C-141

EXAM

1C-141a

EXAM

1C-143

EXAM/CAST

ROOM

1C-143a

EXAM

1C-145

EXAM

1C-145a

EXAM

1C-147

EXAM

1C-148

EXAM

1C-150

EXAM

1C-152SCREEN/EXAM

1C-154

RESTROOM

1C-156

1C-158a

WAITING

1C-158

SECRETARY

CLERK &

FILES

1C-170

OFFICE

ASSISTANT

1D-123

OFFICE CHIEF

1D-123

OFFICE

SECRETARY

1D-124

1D-125

1D-126

CONFERENCE

ROOM

1C-172

IV ROOM

1D-127a 1D-149a 1D-149b 1D-149c

1D-149d 1D-149f 1D-149g 1D-149h 1D-149i

1D-170

1D-171a

1D-171

1D-172a1D-172b1D-172c1D-172d

1D-172e

1D-173 1D-172

1D-174 1D-174a

1D-174b

1D-174c

1D-176

1D-176a

1D-179a

1D-177a

1D-179b

1D-179c

1D-177b

C1-xx-01

C1-xx-02

STARBUCKS

1D-1xx

VESTIBULE

V1-01-1

MECHANICAL

1D-101d

VESTIBULE

V1-02-1

MAIN LOBBY

1D-101Room

1D-102 Room

1D-103

ENROLLMENT

1A-103OFFICE

1A-104

OFFICE/EXAM

1A-104a

VESTIBULE

V1-03-1

INTERNAL

MEDICINE

1A-106y

ALPHA CHECK

IN

1A-106w

WAITING

1A-106t

EXAM

1A-106u

64 SLICE

1A-125

CONTROL

ROOM

1A-126

READING

ROOM

1A-127ADPAC

1A-130

EMERGENCY

ISOLATION

ROOM

1A-133

EMERGENCY

ISOLATION

ROOM

1A-134

OPERATIONS

ROOM

1A-147

1A-147b 1A-147a

1A-144

COMMUNICATIONS

1A-115

TRIAGE

1A-140

EMERGENCY

ROOM #3

1A-138

1A-1xx

MON EXAM

#13

1E-140

MON EXAM

#12 1E-139

MON EXAM

#11

1E-137

MON EXAM

#10 1E-135

MON EXAM #9

1E-133

PROCEDURE/CAST

1E-132

MON EXAM

1E-131

MON EXAM #7

1E-129

MON EXAM #6

1A-128

MON EXAM #5

1A-127

MON EXAM #4

1E-126

TRIAGE #3

1E-105

TRIAGE#2

1E-128

TRIAGE#1

1E-103

PRE-TRIAGE

1E-134MON

EXAM#14

1E-141

MON

EXAM#15

1E-142

WAITING

1E-101

V1-04-1

CONFERENCE

1D-194 PATH.

1D-194b

PATH.

1D-194a

PATH.

1D-194e

PATH.

1D-194f

PATH.

1D-194c

COMM.

1D-186

ELEC.

1D-187

PATH.

1D-194d

STAIR

S1-22-1

OFFICE

1D-195d

OFFICE

1D-195c

RR

1D-193

RR

1D-192

PATH.

1D-191

PATH.

1D-190

PATH.

1D-189

CORRIDOR

C1-22-1

CORRIDOR

C1-24-1

CORRIDOR

C1-47-1

CORRIDOR

C1-48-1

CORRIDOR

C1-20-1

CORRIDOR

C1-19a-1

CORRIDOR

C1-19-1

CORRIDOR

C1-18-1

CORRIDOR

C1-17-1 ELEVATOR

LOBBY

1C-101

CORRIDOR

C1-28-1

COORIDOR

C1-28-2

CORRIDOR

C1-30-1

CORRIDOR

C1-31-1

CORRIDOR

C1-32-1

CORRIDOR

C1-34-1

CORRIDOR

C1-38-1

CORRIDOR

C1-40-1

CORRIDOR

C1-50-1

CORRIDOR

C1-57-1

CORRIDOR

C1-55-1

CORR.

C1-59-01

CORRIDOR

C1-56-1

CORRIDOR

C1-54-1

1E-121 1E-122 1E-123MON EXAM

#1

1E-119

MON EXAM

#2

1E-120

VESTIBULE

V1-05-1

RADIOGRAPHY

1E-125

CONFERENCE

/ TRAINING

1E-108

NURSE

MANAGER

1E-109

RR

1E-110a

ON CALL

1E-110

BEREAVMENT

1E-115

HOLDING

ROOM #1

1E-116

STAFF

LOCKER /

BREAK ROOM

1E-117

J1 -0

J1 -0

J1 -0

AFB

MYCOLOGY

1D-196f

PROCESSING

ROOM

1D-196h

AMPLIFICATION

& DETECTION

1D-195i

SPECIMEN

PREP.

1D-195h

REAGENT

PREP

1D-195e

CC1-01

CC1-02

CC1-03

CC1-04

CC1-05

CC1-06

CC1-07

CC1-08

CC1-09

CC1-10

A1 -0

A1 -0

A1 -0

A1 -0

A1 -0

BB

1-

BB

1-

BB

1-

F1 -0

F1 -0

F1 -0

F1 -0

B1 -0

B1 -0

1-008

1-

1-

1-

1-004

1-003

1-011

VR

S

U

T

Q

P

O

N

M L

K

J

I

H

G

E C

C C

BB

AA

Z

Y

X

W

F D B

A

A-622

Sim

1.04

1.05

1.06 1.06

A-622

X

CLEARANCE & MINOR OBSTRUCTIONS - SEE SHEET 3/A-701

MAJOR OBSTRUCTIONS / EQUIPMENT - SEE SHEET 4/A-701

VENTS / DUCT WORK - SEE SHEET 1/A-701

WINDOW TREATMENTS - SEE SHEET 2/A-701

WALLS MAKING CONTACT WITH WINDOW - SEE SHEET 5/A-702

PATIENT LIFTS

ABOVE CEILING CONSTRUCTION REQUIRED - SEE SHEET 6/A-702

NOT IN CONTRACT / EXISTING TO REMAIN

FACADE DESIGNATION (WITH WINDOWS)

INTERIOR CONDITIONS LEGEND

S T

AT

E

OF FLOR

I D A

R

EGISTERED ARCH

IT

EC

T

J A

SO

N H. ROS

S

AR101907

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

1/

/2

:2 1:

A

M

RESTORATION OF BUILDING 1

ENVELOPE

01/31/25

FIRST FLOOR PLAN

A-103

RGDF

673-21-116

TAMPA, FLORIDA

B1

STATION CHIEF - MICHAEL ROGALA

100% BID DOCUMENTS 22004.00

N Scale: 1" = 20'-0"1 1st FLOOR PLAN

524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523

NOTES:

1.04 Current VA project, this area is Not In Scope.

1.05 RTU Passage to Building 38

1.06 Work scope at these facades are part of BID ITEM #2 (Deduct

Alternate).

A. These sheets contain colored linework and poche to illustrate existing conditions and facade designation. Drawings should be printed in color.

B. Verify existing conditions before ordering, fabrication, construction and installation of new work.

C. Coordinate access into each area of the building with the C.O.R.

before beginning demolition or installation of new work.

D. Remove and reinstall existing wood trim as required for the removal of existing windows and trim. Finish paint wood trim at head, jamb, and sill to match existing.

E. During the installation of windows, savage existing signage, window treatments, wall-mounted devices, etc., which are adjacent to the existing window opening. Once the window installation is complete, patch and repair the wall and reinstall items back to their original location.

F. Temporary doors location & sizes are as required by the General Contractor. Doors will interfere with daily operations as little as possible. Confirm all locations with C.O.R.

GENERAL NOTES

HEAD

HEAD

HEAD

HEAD

HEAD

HEAD

15'-0"

CG1

CG1CG1

CG1CG1

CG1 CG1

CG1

CG1

CG1

CG1

CG1

CG1

CG1CG1

CG1

CG1

CG1 CG1

CG1 CG1

CG1

CG1

CG1

CG1

CG1

CG1

CG1

CG1

BG1,2

BG1,2

BG1,2

BG1,2

BG1,2 BG1,2 BG1,2

BG1,2

BG1,2BG1,2

BG1,2

BG1,2

BG1,2

BG1,2BG1,2

BG1,2

BG1,2BG1,2

BG1,2 BG1,2

BG1,2

BG1,2BG1,2

BG1,2BG1,2BG1,2BG1,2

BG1,2

BG1,2

BG1,2

BG1,2

BG1,2 BG1,2

BG1,2

BG1,2

BG1,2

BG1,2

BG1,2

BG1,2

BG1,2 BG1,2

BG1,2

BG1,2

BG1,2

BG1,2

BG1,2

BG1,2

BG1,2

BG1,2

CG1

CG1BG1,2

BG1,2

BG1,2

BG1,2

BG1,2

15'-0"

2-HOUR RATED PARTITION

(ALL SHOWN ARE EXISTING TO REMAIN)

CRP

CRP

J C

.2 H

G F

E D

C B

A

2019.61918.81817.917.11716.21614.9 151413121110 20.1 21 22

G .9

20.1 21 22

OFFICE

2D-225d

NEG.

PRESS.

ROOM 2

2D-225c

NEG.

PRESS.

ROOM 1

2D-225b

PACU

2D-225

NURSE STATION

POS.

PRESS.

ROOM 1

2D-225a

PACU

2D-225

TOILET

2D-225j

SOILED

UTILITY

2D-225g CLEAN

SUPPLY/MED

2D-225h

EQUIPMENT

STORAGE

2D-225e

NURSE STATION

m m A

RM

m m

AR

M m m

A R M m m

AR

M

1300mm ARM m m

AR

M m m

A R M

H E A D

1300m m

ARM

m m

A R M

1000m m

ARM

m m

AR

M m m

A R M

1300mm ARM m m

AR

M

H E A D

H E A D

1000m m

ARM

0mm

AR

M mm

AR

M

900m m ARM

1000mmARM

1300mm ARM

0m m

AR

M

900m m

AR

M mm AR M

900mmARM

1000mm

ARM

1000mm ARM

1000m m

ARM

1300mm ARM

H E A D

3 4 5

1 2

14151617

PPLT PPLT

PPLT PPLT

WEST

DUCT

SHAFT

POWER

COLUMN ANESTHESIA

STORAGE

MED ALCOVE

UP

DN

D O W N

SERVICE ELEVATORS

EL-S4 EL-S5

SVC-1

PASSENGER ELEVATORS

EL-P1 EL-P2 EL-P3

#2 W

D

#1 W

D

ROOM

DIVIDER

CANOPY ROOF

SUNSCREEN BELOW

SU

N

SC

RE

EN

B

EL

O W

EXISTING CONCRETE CANOPY

GUTTER:

WITH COLUMN

DOWNSPOUT INTEGRAL

CANOPY

SL

O

PE

D O W N 4"

FT

WALK PADS

RAMP

RAMP

LOCKER LOCKER

LOCKER LOCKER

TABLES

TABLES

BED BED

BEDBED

TV TV

TVTV

CHAIR CHAIR

CHAIRCHAIR

PPLT PPLT

PPLT PPLT

B.G.

CG

CG

CG

CG

CG

CG

CG

B.G.

FEC

FIRE EXTINGUISHER CABINET

DOOR SYMBOL - SEE 1-7

CUBICLE CURTAIN TRACKCCT

BG1,2

CG

BUMPER GUARDS 1 & 2

CORNER GUARD - 4 FT HIGH

WINDOW SYMBOL - SEE 1-7

WALL

LEGEND

EXISTING TO REMAIN

1-HOUR RATED PARTITION

TYP. PARTITION - 3 5/8" METAL

STUD W/ 5/8" GB EA SIDE

TYP. PARTITION - 3 5/8" METAL

STUD W/ 5/8" GB EA SIDE W/ SAB

FURRING PARTITION - 3 5/8" METALSTUD W/ 5/8" GB ONE

SIDE

PLUMBING CHASE

SEE SHEET 1-8 - PARTITION TYPES

FOR CONSTRUCTION DETAILS

1-HOUR RATED PARTITION

SHAFTWALL

1-HOUR RATED PARTITION

W/ SAB

TYP. PARTITION - 6" METAL

STUD W/ 5/8" GB EA SIDE W/ SAB

TYP. PARTITION - 6" METAL

STUD W/ 5/8" GB EA SIDE

FLOOR PLAN

NOTES:

1.

2.

3.

A.

B.

C.

D.

E.

4.

CONTRACTOR SHALL PATCH AND/OR REPAIR EXISTING WALLS

SCHEDULED TO REMAIN WHERE ABUTTED BY WALLS REMOVED

DURING DEMOLITION.

ALL MILLWORK IS TO BE PROVIDED BY MILCARE, INC., BY HERMAN

MILLER. MILLWORK IS DESCRIBED ON SHEETS 1-10 THROUGH

1-13. CONTRACTOR SHALL COORDINATE ALL WORK CONCERNING

FABRICATION, ASSEMBLY, DELIVERY AND INSTALLATION OF

MILLWORK. CONTRACTOR SHALL COORDINATE ELECTRICAL AND

PLUMBING WORK INSTALLED IN THE NEW MILLWORK.

PHASE I -

PHASE 1 IS LIMITED TO WORK IN MEN'S LOCKERS 203 & 203A.

PHASE 1 WORK IS TO BE COMPLETED BEFORE ANY WORK IS TO

BEGIN IN THE REST OF THE PROJECT. ALL WORK FOR PHASE

I SHALL BE SCHEDULED WITH THE COTR FOR EVENING, NIGHT &

WEEKEND HOURS.

ACCESS FROM CORRIDOR C2-1 TO MEN'S LOCKER 203A IS TO BE

MAINTAINED AT ALL TIMES DURING BUSINESS HOURS.

THIS PHASE IS CONSIDERED COMPLETE WHEN ALL SAFETY MEASURES

ARE IN PLACE IN CORRIDOR C2-1 AND ACCESS TO 203A IS PROVIDED

THROUGH THE NEW MEN'S LOCKER 203 WITH THE NEW PARTITIONS

DOORS AND FINISHES COMPLETE. INSTALLATION OF NEW LOCKERS

MAY BE DELAYED UNTIL ALL LOCKERS ARE TO BE INSTALLED.

PHASE 1 WORK INCLUDES (BUT IS NOT LIMITED TO):

NEW PARTITION BETWEEN 203 AND 217

NEW DOOR BETWEEN 203 AND C2-1

NEW OPENING BETWEEN 203 AND 203A

REMOVAL OF DOOR & FRAME BETWEEN 203A AND CORRIDOR

FILLING IN DOOR OPENING WITH GYP BOARD AND SAB

FINAL FINISHING OF WALLS IN 203 AND 203A

NEW FLOOR TILE, CEILING TILE, LIGHTS, HVAC, ETC., IN 203

CONSTRUCTION TUNNEL IN CORRIDOR C2-1

OTHER WORK AS REQUIRED BY THE COTR TO PROVIDE SAFE

AND CONTINUOUS ACCESS TO 203 VIA CORRIDOR C2-1

ALL WINDOW FRAMES AND SILLS ARE TO REMAIN INTACT AFTER DEMOLITION.

CONTRACTOR SHALL REPAIR OR REPLACES WINDOWS AND SILLS DAMAGED

DURING DEMOLITION.

FOR ALL LOCATIONS INDICATED AS WET AS SHOWN AT LEFT.

WATER RESISTANT GYPSUM WALLBOARD IS TO BE USED AS FINISH BOARD5.

UP

DN

UP

DN

DN

UP

U P

D N

DN

U P

D N

UP

UP

D O W N

DN

UP

SVC-1

#2 W

D

#1 W

D 22

1 2 3

GFI

GFI

V M A O

~ V

MA

O N

O M

AV

WAITING

"A"

PROCEDURE ROOM

UROLOGY SECRETARY

NURSES STATION/

STORAGE

NEW UROLOGY

PROCEDURE ROOM

RESIDENTS

DOCTOR

CONTROL/GENERATOR

TOILET

TOILET

CONTROL/GENERATOR

DOCTOR

RESIDENTS

PROCEDURE ROOM

NEW UROLOGY

STORAGE

NURSES STATION/

SECRETARYUROLOGY

PROCEDURE ROOM

"A"

WAITING

PROCEDURE ROOM

TOILET

NURSES STATION/

STORAGE

NEW UROLOGY

ELECT.

CLO.

ISOLATION ROOM

RECOVERY ROOM

RESIDENTS

SECRETARYWAITING

CONTROL ROOM

DOCTOR

PROCEDURE ROOM

UROLOGY

'A'

DOCTOR

CONTROL ROOM

WAITING

SECRETARY

RESIDENTS

RECOVERY ROOM

ISOLATION ROOM

CLO.

ELECT.

STORAGE

NURSES STATION/

TOILET

PROCEDURE ROOM

NEW UROLOGY

'A'

PROCEDURE ROOM

UROLOGY

EXTENSION

LEG

3'-6" 6'-6"

(VIEW

WINDOW)

STORAGE

WARMER

DESK

STORAGE

RACK

STORAGE

REFLECTED

ACCESS

PANEL

PANEL

ACCESS

REFLECTED

REFLECTEDACCESS

PANEL

STAGE

DINING EQUIPMENT

SCHEDULE

TOTAL NUMBER OF

SEATS

TRASH RECEPTACLE

(DOUBLE)

FOUR SEAT BOOTH, W/ 24"x44" TABLETHREE SEAT BOOTH, W/ 24"x24"

TABLEWHEELCHAIR

ACCESSIBLETWO SEAT BOOTH, W/ 24"x24"

TABLETRASH RECEPTACLE

(TRIPLE)D

E

C

NO.

A

B

ITEM

24"x47"

24"x47" 68"x24"

NO. OF

SEATSSIZE

68"x48"

68"x48"

QUANTITY

F PLANTER

G

42" WALL PANEL-NO GLASS

TOP

H 42" DIVIDER PANEL-w/18"ETCHED GLASS TOP GLASS TOP42" END PANEL-w/18"ETCHED GLASS TOP GLASS

TOPJ

Room2A-2012A-2022A-2032A-2052A-205A2A-205B2A-205C2A-205D2A-2062A-2072A-2082A-2092A-2102A-2112A-2132A-213A2A-213B2A-213C2A-213D2A-2142A-214A2A-2152A-215A2A-215A2A-215B2A-215C2A-215D2A-215E2A-215G2A-215J2A-215K2A-215L2A-215M2A-215M2A-215N2A-2162A-2172A-2182A-2192A-219A2A-2202A-2212A-2222A-2232A-2242A-224A2A-2252A-2282A-2292A-2302A-2312A-231A2A-231B2A-2322A-232A2A-232B2A-2332A-2342A-2352A-2362A-236A2A-236B2A-236C2A-236D2A-236E2A-236F2A-2372A-237A2A-2382A-238A2A-2392A-239A2A-239B2A-2402A-2412A-2422A-2432A-2442A-244A2A-244C2A-2452A-245A2A-2462A-246A2B-201E2B-202A2D-252L2D-252M2D-252N2D-252O

Room2D-252PC2-01-1C2-02-1C2-03-1C2-04-1C2-04A-1C2-05-1C2-06-1C2-07-1C2-08-1C2-09-1C2-10-1C2-11-1C2-44-1C2-49-1S2-02-1S2-09-1 NameServiceSupportsFTEE% Occup NameServiceSupportsFTEE% Occup NameServiceSupportsFTEE% Occup

Room2A-2152A-215?2A-215?2A-215A2A-215F2A-215M2B-201E2B-202A2B-2032B-203A2B-203B2B-2042B-2052B-205A2B-2072B-207A2B-207B2B-207C2B-2092B-2102B-2112B-2122B-2132B-2142B-2152B-215A2B-2162B-2172B-2182B-2192B-2202B-2212B-2222B-222A2B-2232B-2242B-224A2B-2252B-225A2B-2262B-226A2B-2272B-227A2B-227B2B-2282B-228A2B-2292B-2302B-230A2B-2312B-2322B-2332B-2342B-2352B-2362B-2372B-2382B-238A2B-238B2B-2392B-2402B-2412B-2422B-242B2B-2432B-244A2B-244B2B-2452B-245A2B-245B2B-2462B-246A2B-2472B-2482B-2492B-2502B-2512B-251A2B-251B2B-2532B-2542B-254C2B-2552B-255A2B-2562B-2572B-257B2B-257C2B-257D2B-2582C-2012C-204B?

Room?C2-11-1C2-12-1C2-13-1C2-13-1C2-14-1C2-15-1C2-15-1C2-17-1C2-17-1C2-18-1C2-19-1C2-19-1C2-21-1C2-21A-1S2-04-1S2-05-1SPACESPACE (21) NameServiceSupportsFTEE% Occup NameServiceSupportsFTEE% Occup NameServiceSupportsFTEE% Occup

Room2B-201E2C-2012C-201A2C-201B2C-201C2C-201D2C-2022C-202A2C-2032C-204A2C-204B2C-2052C-205A2C-205B2C-2062C-2072C-2082C-2092C-2102C-2112C-2122C-2132C-213A2C-213B2C-2142C-2152C-2162C-2182C-2192C-2202C-2222C-222A2C-222B2C-222C2C-222D2C-222E2C-223C2C-2242C-2252C-2262C-2272C-2282C-2292C-2302C-2312C-231A2C-2322C-2332C-2342C-2352C-2362C-2372C-2382C-2392C-2402C-2412C-2422C-242A2C-243A2C-2442C-244A2C-244B2C-2452C-2462C-247A2C-2482C-2492C-2502C-250A2C-250B2C-2512C-2522C-2532C-2542C-2552C-255A2C-255B2C-2562C-2572C-2582C-2592C-2602C-260A2C-2612C-2632C-2642C-2652C-2672C-267A2C-268A2C-2692C-2702C-2712C-271A2C-2722C-2732C-2742C-2752C-2762C-276B2C-276C2C-276C2C-276D2C-276E2D-2072D-2082D-2102D-2112D-213B2D-215C2-10-1C2-12-1C2-20-1

RoomC2-21-1C2-22-1C2-23-1C2-24-1C2-26-1C2-27-1C2-28-1C2-29-1C2-30-1C2-31-1C2-33-1C2-36-1S2-03-1S2-06-1S2-07-1 NameServiceSupportsFTEE% Occup NameServiceSupportsFTEE% Occup NameServiceSupportsFTEE% Occup

Room2A-2012A-2022A-2032A-2052A-205A2A-205B2A-205D2A-2062A-2072A-2082A-2092A-2102A-215D2A-215L2A-215M2A-215M2A-215N2A-2402A-2412A-2422A-2432A-2442A-244A2A-244C2A-2452A-245A2A-2462A-246A2B-201E2B-202A2C-201C2C-201D2C-2092C-2102C-2112C-2122C-2152C-2162C-2182C-2192C-2202C-2762C-276B2C-276C2D-2012D-2022D-2032D-2042D-2052D-2062D-2072D-2082D-209A2D-209B2D-209C2D-2102D-2112D-2122D-2132D-213A2D-213B2D-213C2D-2152D-2172D-217A2D-217B2D-2182D-218A2D-218B2D-218C2D-218D2D-218F2D-218G2D-218H2D-218J2D-218K2D-2192D-219A2D-219B2D-2202D-2212D-221A2D-221B2D-2252D-225A2D-225B2D-225C2D-225D2D-225E2D-225G2D-225H2D-225J

Room2D-2332D-2342D-2352D-2362D-2372D-237A2D-2382D-2392D-2402D-2412D-2412D-2432D-2452D-2452D-2462D-246B2D-246E2D-2472D-2482D-2492D-2502D-2512D-2522D-2522D-252A2D-252B2D-252C2D-252D2D-252E2D-252F2D-252G2D-252H2D-252I2D-252J2D-252K2D-252L2D-252M2D-252N2D-252O2D-252P2D-252Q2D-252R2D-252S2D-252T2D-252U2D-252V2D-252W2D-2532D-253A2D-255A2D-255B2D-255C2D-2562D-256A2D-256B2D-2572D-2582D-2592D-2602D-2652D-2662D-2672D-2682D-2692D-2702D-2712D-2722D-2732D-2742D-2752D-2762D-2772D-2782D-2792D-2802D-280A2D-2812D-2822D-2832D-2842D-2852D-2862D-2872D-2882D-2892D-2XXC2-01-1C2-10-1C2-31-1C2-32-1C2-32A-1C2-33-1

RoomC2-34-1C2-35-1C2-36-1C2-37-1C2-38-1C2-40-1C2-41-1C2-42-1C2-43-1C2-44-1C2-45-1C2-46-1C2-47-1C2-48-1C2-49-1C2-50-1C2-51-1C2-52-1C2-53-1S2-01-1S2-03-1S2-22-1SPACEV2-01-1V2-03-01V2-04-01 NameServiceSupportsFTEE% Occup NameServiceSupportsFTEE% Occup NameServiceSupportsFTEE% Occup NameServiceSupportsFTEE% Occup NameServiceSupportsFTEE% Occup

B2 -0

B2 -0

B2 -0

B2 -0

B2 -0

B2 -0

B2 -0

B2 -0

F2 -0

F2 -0

F2 -0

F2 -0

A2 -1

A2 -1

A2 -0

A2 -0

A2 -0

A2 -0

A2 -1

A2 -1

A2 -1

A2 -1

AA2-08

P2 -0

P2 -0

P2 -0

P2 -0

P2 -0

P2 -0

O2-06

O2-05

O2-04

O2-03

O2-02

O2-01

N 2-

N 2-

N 2-

N 2-

M2-10

M2-09

M2-08

M2-07

M2-06

M2-05

M2-04

M2-02

M2-01L2 -0

L2 -0

L2 -0

L2 -0

L2 -0

L2 -0

L2 -0

K2-03

K2-02

K2-01

G2-02

G2-01

AA2-01

AA2-02

AA2-03

AA2-04

AA2-05

AA2-06

AA2-07

Z2 -0

Z2 -0

Z2 -0

Z2 -0

Z2 -0

Y2-01

Y2-02

Y2-03

Y2-04

Y2-05

X2 -0

X2 -0

X2 -0

X2 -0

X2 -0

X2 -0

W2-06W2-05

W2-04

W2-03

W2-02

W2-01

V2 -0

V2 -0

V2 -0

V2 -0

V2 -0

V2 -0

U2-06

R 2-

R 2-

R 2-

R 2-

R 2-

R 2-

Q2-01

Q2-02

Q2-03

Z2 -0

N 2-

M2-03

N 2-

U2-05

U2-04

U2-03

U2-02

U2-01

T2 -0

T2 -0

T2 -1

T2 -0

T2 -1

T2 -1

T2 -1

T2

-1

G2-05

G2-04

G2-03

F2 -0

CHANCEL

THERAPYELECTRICALPICC NURSES /

HOSPITALIST

C2-01

D 2-

02E2-01

BREAK RM

2B-209

OFFICE

2B-212

PI

2B-214

SPECIALIST

2B-216

AO

2B-218

RESIDENT

COOR.

2B-219

SECRETARY

TO CHIEF

2B-220

SURGICAL

SERVICE

CHIEF

2B-221

RESIDENTS

2B-222a

RESIDENTS

2B-222

ORTHO PA'S

(6)

2B-225

ORTHO

2B-226

ORTHO

2B-226a

GENERAL

DOC.

2B-228a

GENERAL

DOC.

2B-228

GENERAL

DOC.

2B-230a

GENERAL

DOC.

2B-230

OFFICE

2B-231

LOCKERS

2B-238a

BREAK ROOM

2B-238

STAIR #4

S2-04-1

RR

2B-238b

R.O. TANKS

2B-241

CLEAN

SUPPLY

2B-243

2B-245b 2B-215a

ISOLATION

2B-245

STAIRS

S2-05-1

MED'S

2B-249

PERITONEAL

2B-251

PERITONEAL

2B-251a

PATIENT RR

2B-254c

FAMILY

WAITING

2B-254

ELECTRICAL

2B-257

PATIENT

EDUCATION

2B-258

P.T. CLINIC

2C-204

PROSTHETICS

DISPENSARY

2C-204B

TRANSPORT

TEAM

2C-202

TRANSPORT

TEAM

2C-202a

OFFICE

2C-257b

OFFICE

2B-257c

OFFICE

2B-257d

2C-222a

BED

2C-275

BED

2C-273

RR

2C-271c

BED

2C-271

BED

2C-269

RR

2C-267a

BED RM.

2C-267

CONTROL

ROOM

2C-276d

PROCEDURE

ROOM

2C-276

CARDIAC

CATH. LAB #2

2C-277

UPS EQUIP

2D-215 ELECTRICAL

2D-213b

MAIN

COMPUTER

2C-276b

EQUIPMENT

2C-276c

BED RM.

2C-265 2C-264

4 BED ROOM

2C-263

2C-266

2C-260B2C-261

2C-260

STAIR #7

S2-07-14 BED ROOM

2C-258

4 BED ROOM

2C-256

4 BED ROOM

2C-254

CLASS RM.

2C-252

CLEAN

STORAGE

2C-251

OFFICE

2C-249

OFFICE

2C-247

OFFICE

2C-247a

OFFICE

2C-245

OFFICE

2C-243

OFFICE

2C-243b

OFFICE

2C-243a

OFFICE

2C-242

PAT ADMIN

2C-239

FLOW

CENTER

2C-238

CLEAN LINEN

2C-237

ADC/PAT

2C-236

ADC/PAT

SC-235

RR

2C-233

ADC/PAT

2C-232

ADC/PAT

2C-230

RR

2C-228

ADC/PAT

SC-227

ADC/PAT

SC-226

CONTROL RM.

2D-213c

CORRIDOR

C2-34-1

CORRIDOR

C2-38-1

CORRIDOR

C2-39-1

C2-39-2

OFFICE

2D-286

TOILET

2D-287

GAS

2D-284

SOIL

2D-283

H.A.C.

2D-282

C2-39-8

EQUIP.

2D-281

BREAK ROOM

2D-288

SOILED CART

2D-289

EQUIPMENT

STORAGE

2D-280

CORRIDOR

C2-51-1

CORRIDOR

C2-52-1

CORRIDOR

C2-53-1

ANESTHESIA

2D-265

COMM.

2D-266

2D-267

EQUIP.

2D-268

ELEC.

2D-269

FROZEN

SECTION

2D-270

STAIR #22

S2-22-1

SD-237a

2D-238

OPERATING

ROOM #4

2D-236

OPERATING

ROOM #5

2D-239

CORRIDOR

C2-41-1

STERILE

2D-237

STORAGE

2D-252PATIENT

ROOM #12

2D-252C

PATIENT

ROOM #11

2D-252D

PATIENT

ROOM #10

2D-252e

CORRIDOR

C2-43-1

CORRIDOR

C2-44-1

PATIENT

ROOM. #3

2D-252m

PATIENT

ROOM. #4

2D-252l

PATIENT

ROOM #5

2D-252k

PATIENT

ROOM #6

2D-252j

PATIENT

ROOM #7

2D-252i

PATIENT

ROOM #8

2D-252h

PATIENT

ROOM #9

2D-252f

HEAD NURSE

2D-252g

MULTI

PURPOSE

WORKROOM

2D-252nFREEZER

2A-205d

REF.

2A-205c

2A-205a 2A-205b

KITCHEN

2A-205

CORRIDOR

C2-04a-1

CANTEEN

DINING

2A-214

CONF. RM

2A-224a

STAIR #9

S2-09-1

SACRISTY

2A-224 CORRIDOR

C2-06-1

EUCH.

PRAYER

2A-228

AUDIOLOGY

2A-229

SECRETARY

2A-233

PATH.

2A-234

BREAK RM.

2A-235

STORAGE

2A-237a

PATIENT

LIBRARY

2A-237

WORK ROOM

& STORAGE

2A-238a

LIBRARY

OFFICE

2A-238

MEDICAL

LIBRARY

2A-239

REC. SERVICE

CHIEF

2A-215c

READING RM.

2A-239b

KITCHEN

2A-215b

CANTEEN

OFFICE

2A-243

CORR.

C2-08-1

VOLUNTARY

SERVICE

C2-08-2

VOLUNTARY

SERVICE

2A-215k

ELECTRICAL

2A-213

VOLUNTARY

SERVICE

2A-215e

CORR.

C2-09-1

CORR.

C2-02-1

FLEA MARKET

2A-211

ELEC.

2A-213a

AUDITORIUM

2A-215a

STORAGE

2A-215

STORAGE

2A-215

PROJECTION

BOOTH

2A-215f

CONFERENCE

2B-207

2B-207a

SURGERY

ADMIN

OFFICES

2B-207b

OFFICE

2B-205

2B-205a 2B-203a

2B-204

CORRIDOR

C2-12-1 ELEVATOR

LOBBY

2C-201

CORRIDOR

C2-21-1

CORRIDOR

C2-30-1

CORRIDOR

C2-28-1

CORRIDOR

C2-27-1

CORRIDOR

C2-26-1

CORRIDOR

C2-24-1

CORRIDOR

C2-23-1

CORRIDOR

C2-22-1

STAIR #6

S2-06-1

CORRIDOR

C2-20-1

CORRIDOR

C2-33-1

C2-40-1 C2-33-2

CORRIDOR

C2-05-1

CORRIDOR

C2-04-1

CORRIDOR

C2-03-1

CORRIDOR

C2-01-1

CORRIDOR

C2-13-1

CORRIDOR

C2-14-1

CORRIDOR

C2-15-1

CORRIDOR

C2-15-1

B2 -1

B2 -0

2B-247

2C-204A 2C-222 2C-222

F2 -0

F2 -0

F2 -0

F2…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .