This document is an Addendum (No. 1) for the Restoration of Building 1 Envelope project at the James A. Haley VA Hospital in Tampa, Florida, with project number 673-21-116. The addendum, issued on November 24, 2025, provides corrections and clarifications to the original bid drawings, including revisions to multiple sheets such as the Phasing/Facade Plan, Ground Floor Plan, First Floor Plan, Fifth Floor Plan, and O.R. Demolition Elevations. Key changes include modifying notes about work scope for specific facades, adding missing room designations, updating interior condition markings, and revising details about door frames, expansion joints, and plan references. The addendum is to be forwarded to all Prime Bidders and building code authorities, and bidders must acknowledge its receipt on their Bid Form.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24826R0011 0006-ko.pdf | ||
| VA NOTICE OF LIMITATIONS ON SUBCONTRACTING.pdf | ||
| 673-21-116-James Haley Restor B1_Addendum 03_02.23.26.pdf | ||
| 36C24826R0011 0005.pdf | ||
| 36C24826R0011 0004.pdf | ||
| 36C24826R0011 0003.pdf | ||
| 36C24826R0011 0002.pdf | ||
| WD-FL20260208 01-02-26.pdf | ||
| 36C24826R0011 0001.pdf | ||
| SIGNING SHEET 1.pdf | ||
| SIGNING SHEET 2.pdf | ||
| 36C24826R0011_1.docx | DOCX document | |
| 36C24826R0011_1.docx | DOCX document | |
| 36C24826R0011_1.docx | DOCX document | |
| Base Offer Price Breakdown - 1 page.xlsx | XLSX spreadsheet | |
| EMR 1 page.pdf | ||
| 7a CD3 Drawings.pdf | ||
| 7 100 CD3 Specs.pdf | ||
| WD FL20250208 05232025.pdf | ||
| PAST AND PRESENT PERFORMANCE QUESTIONNAIRE.docx | DOCX document | |
| Experience information Sheet.pdf | ||
| 7 Tampa site map.pdf |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Restoration of Building 1 Envelope
James A. Haley VA Hospital – Project #673-21-116
Addendum No. 1
524 Fernwood Drive, Altamonte Springs, Florida 32701 | rdcjpa.com | 800.362.1523
November 24, 2025
Addendum No. 1
Restoration of Building 1 Envelope
James A Haley VA Hospital – Proj. #673-21-116
13000 Bruce B. Downs Blvd.
Tampa, FL 33612
This Addendum supplements and amends the original Drawings and Specifications for the above referenced project. This Addendum shall be forwarded to all Prime Bidders and all appropriate building code authorities. This Addendum shall be taken into account in the preparation of bids and shall become a part of the Contract Documents.
Receipt of this Addendum must be acknowledged on the Bid Form.
This addendum consists of the following items:
General
1. Corrections and clarifications to the Bid drawings.
Drawings
2. Sheet G-101 – Phasing / Façade Plan – Revise as follows:
a. Revise Note 1.06 to read “Work scope at these facades (and their related interior conditions) are included as part of BID ITEM #2 (Deduct Alternate)”.
3. Sheet A-102 – Ground Floor Plan: – Revise as follows:
a. Revise Note 1.06 to read “Work scope at these facades (and their related interior conditions) are included as part of BID ITEM #2 (Deduct Alternate)”.
4. Sheet A-103 – First Floor Plan: – Sheet Reissued. Revisions include:
a. Revise Note 1.06 to read “Work scope at these facades (and their related interior conditions) are included as part of BID ITEM #2 (Deduct Alternate)”.
b. Included missing colored Interior Conditions designations to the floor plan.
c. Added plan detail reference at façade “A”.
5. Sheet A-107 – Fifth Floor Plan: – Sheet Reissued. Revisions include:
a. Include missing room names and numbers.
6. Sheet AD-202 – O.R. Demolition Elevations: – Sheet Reissued. Revisions include:
a. West Elev. #28: Revise existing hollow metal door pair and frame to remain, previously noted to be removed.
7. Sheet A-203 – Exterior Elevs. – East Ground – 3rd Flr: – Revise as follows:
a. Revise Note 7.40 to read “1” wide exterior expansion joint system.”.
8. Sheet A602 – Wall Types & Details: – Revise as follows:
a. Revise Note 7.40 to read “1” wide exterior expansion joint system.”.
End of Addendum No. 1
B
B m m ta bl e
A
F
D
H H
RAMP
R A M P
K - 1728C H ESAP EAK EC _ LAVATOR YVITR EOU S
C HINA
A.P.
CORRIDOR
(CC-1)
STORAGE
CORRIDOR
CORRIDOR
T O
E X T E R
IO
R
E X
IT
EXISTING
EXISTING
EXISTING
EQUIP
ROOM
STORAGE
TOILET SPECIAL
PROCEDURES
STAFF
DRESS
CORRIDOR
SPECIAL
PROCEDURE
ROOM
MECHANICAL
ROOM
TOILET
STAIR
#20
NSF-33
NSF-94
NSF-49 NSF-376NSF-52
SF
NSF-545
NSF-76
NSF-55
1C-174B
1C-173
1C-177 1C-1821C-178
MRI-C-1
1C-174
1C-181
1C-183
S1-20-1
1 2 3 4
C
D
E
E.4
F
E.9 x;CART x;CART x;HORIZONTAL
LAMINAR
FLOW HOOD
x;HORIZONTAL
LAMINAR
FLOW HOOD
x;CART x;HORIZONTAL
LAMINAR
FLOW HOOD
x;BAKER
EDGEGUARD
x;BENCHTOP
BIOFLOW
CHAMBER
x;BENCHTOP
BIOFLOW
CHAMBER
FD
FD
FD
FD
FDFD
FD
FD
FD
FD
10 "
13' -7 "
E 1
E
E
E4
E6 E7
E
E 9E
E 11
E12
E13
E 14
E
E16
E
E
E
E
E
E 22
E
3E
4E
E
E26
E 27
E
E29
E 5
E a
E 17b
E a E b
E a
E a
E3 E3a E3b
E 3
E 3c
10 11
16 18
19/ 20
112 117
123 124
138139145
128 129
135 136 137
1 1
40 N ew Equi pm ent ( Anal yz er )
34 35
Pr i nt erE a s y C o d e r
Co nt ro l St o ra g e
Ce nt ra l L in k
Tr a c k
C o m p r e s s o r Tr a c k U P S
Ce nt ra l L in k Pr in t e r
IQ
IQ
IQ P
rin te rs
U nd er co un te r
S p e c i m e n St o r a g e I Q
S a m p l e s
V or te x
M ix er
M ad a V ac
F innpipette
C ole-
P arm er
S h a r e d Fr e e z e r
Lab el Pr i nt er
Pe nc i l Sh a r p e n e r
Pr i nt er
Pr i nt er
S p a P L U S
M icro-scope
S am ple T rays
Zen t r i-f u g e n
N utator
A th en a
M ul ti- Ly te
Be c k m an C o ul t e r I m m a g e 8 0 0
Ro t a t o r
U P
S
Ma g ni f y
T osoh
Fluid St o ra g e
Os m o m e t e r
Vor t e x Mix er
S ero-fuge
Lab Q uake
Im m ulite
I m mu l it e 20 0 0
Is ot em p
R ef
F reezer
Re f (U s e d b y COA G, M i s c Te st in g, a nd An al yz er )
-8
F re ez erN ew
E qu ip m en t w
C ar t (A
C L
T O
P
E a s y C o d e r
3 D Ro t a t o r
Un d e r Co u n t e r Fr e ez e r
La se r Pr i nt er
I s o t e m p 20 2 S
PFA 10 0 ' s
K C 1
Mi c r o sc o p e
D iffcount
Digi t al Mi c ro s co p e & C o m pu t e r St a t i on
Ne w E q u i p m e n t w/ C a r t ( A C L TOP 5 0 0 C TS )Min i
Vi d a s
V erify N ow 's
P rinter
(S t o r es Re a ge n t s & Con t r al s f o r An al yz er )
Re f r ig e ra t o r w/ S l id in g D o or s ( C H E M )
Va cu e t t e
Ce n t r i f u g e
105 106107108109
P rinter
(S t o r ed Be l ow ) Cen t r al L in k U P S
T rituras 2
Tr i t u ra s 1
S a m p l e Ha n d l e r
R ef
Se b i a El ec t ro p ho r es i s
S ebia H ydrasys 2 F luid S torage
P ippette
A rea
Pr i nt er
So rv al l Ce n t r i f u g e
P rinter
Fr e e z e r
F low m eter
Fl ui d S t o r ag e Ca r t ; go e s w / 16 0 & s l id e s un d er co u nt e r
Pr i nt er
I s o t e m p Re f
Ac c u s p i n 3 Ce n t r i f u g e
Fluid St o ra g e
VI ST A
VI ST A
A th en a
M ul ti- Ly te
U P
S
W AM VI ST A
Un d e r c ou n t e r
A B B OTT A R C H
D e c a p p e r F ax
La se r Pr i nt er
E a s y C o d e r
Speci m en Receiv i ng/St or age 26
27 28
60 Cy t os p i n
Sp ec i - Mi x
Am e r i c a n Opt ic al
EB A 1 2 Mi c r o sc o p e
Bl ood St orage
Si emens Tr ac k
Si emens Uti l i ty Cabinet
Fl o w m e t e r h a s ex is t i ng c ar t
Si em ens D I Water Sy st em
108L .2 108H.2
A
A
CR
CR
C R
PP
EDP EDP
EDP EDP
EDP
E D P
OVERHEAD
PARTITION
LINEN
CART
x;
N
EW
P
AS
S
TH
R U
R
EF
x;
P
AS
S
TH
R U x;
P
AS
S
TH
R U
CCTV
CCTV
ICE
MED
CART
REFRIG
MICRO
PRINTER
PYXISPYXIS
LINEN CART
CODE CART
FAX
PNEU T
SYST
CODE CART
CODE CART
MED
CART
REFRIG
RECESSED
HANDICAP
DRINKING
FOUNTAIN
FOUNTAIN
DRINKING
PROCESSOR
F2
C A M E R A
B O X
B O X
C A M E R A
PACS
P
AC
S
DN
UP
UP
DN
D N
U P
DN
UP
U P
D N
U P
D O W N
SVC/1
#2 W
D
#1 W
D 22
1 2 3
CABINET
W A L L
C A B
IN
E T
B -0
B -0
B -0
B -0
F -0
F -0
F -0
F -0
A -1
A -1
A -1
A -1
A -1
A -1
A -0
A -0
A -0
A -0
AA1-08
P -0
P -0
P -0
P -0
P -0
P -0
O1-06
O1-05
O1-04
O1-03
O1-02
O1-01
N -0
N -0
N -0
N -0
M1-10
M1-09
M1-08
M1-07
M1-06
M1-05
M1-04
M1-02 M1-01
L -0
L -0
L -0
L -0
L -0
L -0
L -0
K1-03
K1-02
K1-01
G1-02
G1-01
AA1-01
AA1-02
AA1-03
AA1-04
AA1-05
AA1-06
AA1-07
Z -0
Z -0
Z -0
Z -0
Z -0
Y1-01
Y1-02
Y1-03
Y1-04
Y1-05
Y1-06
X -0
X
-0
X -0
X -0
X -0
X -0
W1-06
W1-05
W1-04
W1-03
W1-02
W1-01
V -0
V -0
V -0
V -0
V -0
V -0
U1-01
R -0
R -0
R -0
R -0
R -0
R -0
Q1-01
Q1-04
Q1-06
Z -0
N -0
M1-03
N -0
Q1-05
Q1-03
Q1-02
F -0
RR
J -0
J -0
H -0
H -0
H -0
H -0
H -0
I1-01
I1-02
I1-04
I1-03
D -0
D -0
C1-01
EXAM
1A-150
RESTROOM
1A-150a EXAM
1A-151
EXAM
1A-152
EXAM
1A-154
EXAM
1A-156
Cast Room
1A-160
EXAM
1A-162
EXAM
1A-158
CONFERENCE
1A-171
EXAM
1A-169
EXAM
1A-173
INTERNAL
MEDICINE
CLINIC
WAITING
1A-176
EXAM
1A-173a
1B-102
CORRIDOR
C1-15-1
1B-102i
CLINIC/EDUCATION
1B-102j
CLINIC
EDUCATION/CONFERENCE
1B-109
OFFICE
1B-111
RESTROOM
1B-111a
OFFICE
1B-112
OFFICE
1B-114 1B-114a
OFFICE
1B-116
OFFICE
1B-118a
OFFICE
1B-118
OFFICE
1B-119a
OFFICE
1B-119
SLEEP LAB
1B-122a
SLEEP LAB
1B-122
STAIR #4
S1-04-1
OFFICE
1B-123a
OFFICE
1B-123
RESPIRATORY
THERAPY
BREAK ROOM
1B-124
OFFICE
SURGERY
1B-128
OFFICE
SURGERY
1B-127
FELLOWS
1B-136
DR OFFICE
1B-130
APRN
1B-138
INFUSION
TREATMENT
CHAIR AREA
1B-140
S1-05-1
1B-141
INFUSION
TREATMENT
CHAIR AREA
1B-143
CORRIDOR
C1-23-1
BREAK ROOM
1B-155
ATTENDING
EXAM ROOM
1B-154
ATTENDING
EXAM ROOM
1B-152
ATTENDING
EXAM ROOM
1B-150
1B-149a
ATTENDING
EXAM ROOM
1B-148
WAITING
1B-156
CORRIDOR
C1-49-1
1B-156d
ELECTRICAL
1B-156c
CONFERENCE
ROOM
1B-156g
1B-156a 1B-156b 1B-157 1B-159
C1-49-9CORRIDOR
1B-1581B-156e
LITHOTRIPTER
1B-104
NURSING
1C-102a 1C-102
MEDICAL
CONFERENCE
1C-104
STORAGE
1C-104a
1C-104d
1C-104a
1C-104b 1C-104c 1C-107d
ELECTRICAL WAITING
1C-107
A/C UNIT
PATIENT
RESTROOM
1C-108
EXAM
1C-109
EXAM
1C-111
1C-113
1C-112
EXAM
1C-115
EXAM
1C-116
EXAM
1C-122
EXAM
1C-122a
EXAM
1C-120
EXAM
1C-120a
EXAM
1C-118
EXAM
1C-118a
STAIR #6
S1-06-1
EXAM
1C-123a
EXAM
1C-123
EXAM
1C-125a
EXAM
1C-125
SUPERVISOR
OUTPATIENT
UNIT
1C-127a
RECORDS
PREP.
1C-127
1C-129
1C-133
EXAM
1C-135
EXAM
1C-136
EXAM
1C-136a
EXAM
1C-138
EXAM
1C-138A
EXAM
1C-140
EXAM
1C-140a
STAIR #7
S1-07-1
EXAM/CONFERENCE
1C-141
EXAM
1C-141a
EXAM
1C-143
EXAM/CAST
ROOM
1C-143a
EXAM
1C-145
EXAM
1C-145a
EXAM
1C-147
EXAM
1C-148
EXAM
1C-150
EXAM
1C-152
SCREEN/EXAM
1C-154
RESTROOM
1C-156 1C-158a
WAITING
1C-158
SECRETARY
CLERK &
FILES
1C-170
OFFICE
ASSISTANT
1D-123
OFFICE CHIEF
1D-123
OFFICE
SECRETARY
1D-124
1D-125
1D-126
CONFERENCE
ROOM
1C-172
IV ROOM
1D-127a 1D-149a 1D-149b 1D-149c
1D-149d
1D-149f 1D-149g 1D-149h 1D-149i
1D-170
1D-171a
1D-171
1D-172a1D-172b1D-172c1D-172d
1D-172e
1D-173
1D-172
1D-174 1D-174a
1D-174b
1D-174c
1D-176
1D-176a
1D-179a
1D-177a
1D-179b
1D-179c
1D-177b
C1-xx-01
C1-xx-02
STARBUCKS
1D-1xx
VESTIBULE
V1-01-1
MECHANICAL
1D-101d
VESTIBULE
V1-02-1
MAIN LOBBY
1D-101 Room
1D-102
Room
1D-103
ENROLLMENT
1A-103OFFICE
1A-104
OFFICE/EXAM
1A-104a
VESTIBULE
V1-03-1
INTERNAL
MEDICINE
1A-106y
ALPHA CHECK
IN
1A-106w
WAITING
1A-106t
EXAM
1A-106u
64 SLICE
1A-125
CONTROL
ROOM
1A-126
READING
ROOM
1A-127ADPAC
1A-130
EMERGENCY
ISOLATION
ROOM
1A-133
EMERGENCY
ISOLATION
ROOM
1A-134
OPERATIONS
ROOM
1A-147
1A-147b
1A-147a
1A-144
COMMUNICATIONS
1A-115
TRIAGE
1A-140
EMERGENCY
ROOM #3
1A-138
1A-1xx
MON EXAM
#13
1E-140
MON EXAM
#12
1E-139
MON EXAM
#11
1E-137
MON EXAM
#10
1E-135
MON EXAM #9
1E-133
PROCEDURE/CAST
1E-132
MON EXAM
1E-131
MON EXAM #7
1E-129
MON EXAM #6
1A-128
MON EXAM #5
1A-127
MON EXAM #4
1E-126
TRIAGE #3
1E-105
TRIAGE#2
1E-128
TRIAGE#1
1E-103
PRE-TRIAGE
1E-134
MON
EXAM#14
1E-141
MON
EXAM#15
1E-142
WAITING
1E-101
V1-04-1
CONFERENCE
1D-194
PATH.
1D-194b
PATH.
1D-194a
PATH.
1D-194e
PATH.
1D-194f
PATH.
1D-194c
COMM.
1D-186
ELEC.
1D-187
PATH.
1D-194d
STAIR
S1-22-1
OFFICE
1D-195d
OFFICE
1D-195c
RR
1D-193
RR
1D-192
PATH.
1D-191
PATH.
1D-190
PATH.
1D-189
CORRIDOR
C1-22-1
CORRIDOR
C1-24-1
CORRIDOR
C1-47-1
CORRIDOR
C1-48-1
CORRIDOR
C1-20-1
CORRIDOR
C1-19a-1
CORRIDOR
C1-19-1
CORRIDOR
C1-18-1
CORRIDOR
C1-17-1 ELEVATOR
LOBBY
1C-101
CORRIDOR
C1-28-1
COORIDOR
C1-28-2
CORRIDOR
C1-30-1
CORRIDOR
C1-31-1
CORRIDOR
C1-32-1
CORRIDOR
C1-34-1
CORRIDOR
C1-38-1
CORRIDOR
C1-40-1
CORRIDOR
C1-50-1
CORRIDOR
C1-57-1
CORRIDOR
C1-55-1
CORR.
C1-59-01
CORRIDOR
C1-56-1
CORRIDOR
C1-54-1
1E-121 1E-122 1E-123MON EXAM
#1
1E-119
MON EXAM
#2
1E-120
VESTIBULE
V1-05-1
RADIOGRAPHY
1E-125
CONFERENCE
/ TRAINING
1E-108
NURSE
MANAGER
1E-109
RR
1E-110a
ON CALL
1E-110
BEREAVMENT
1E-115
HOLDING
ROOM #1
1E-116
STAFF
LOCKER /
BREAK ROOM
1E-117
J -0
J -0
J -0
AFB
MYCOLOGY
1D-196f
PROCESSING
ROOM
1D-196h
AMPLIFICATION
& DETECTION
1D-195i
SPECIMEN
PREP.
1D-195h
REAGENT
PREP
1D-195e
CC1-01
CC1-02
CC1-03
CC1-04
CC1-05
CC1-06
CC1-07
CC1-08
CC1-09
CC1-10
A -0
A -0
A -0
A -0
A -0
B B
-0
B B
-0
B B
-0
F -0
F -0
F -0
F -0
B -0
B -0
1-008
1-
1-
1-
1-004
1-003
1-011
VR
S
U
T
Q
P
O
N
M L
K
J
I
H
G
E C
C C
BB
A A
Z
Y
X
W
F D
B A
A-622
Sim
1.04
1.05
1.06 1.06
A-622
A-602
X
CLEARANCE & MINOR OBSTRUCTIONS - SEE SHEET 3/A-701
MAJOR OBSTRUCTIONS / EQUIPMENT - SEE SHEET 4/A-701
VENTS / DUCT WORK - SEE SHEET 1/A-701
WINDOW TREATMENTS - SEE SHEET 2/A-701
WALLS MAKING CONTACT WITH WINDOW - SEE SHEET 5/A-702
PATIENT LIFTS
ABOVE CEILING CONSTRUCTION REQUIRED - SEE SHEET 6/A-702
NOT IN CONTRACT / EXISTING TO REMAIN
FACADE DESIGNATION (WITH WINDOWS)
INTERIOR CONDITIONS LEGEND
S T A
TE
OF FLOR
I D A
R E
GISTERED ARCH
IT
EC
T
J A
SO
N H. ROS
S
AR101907
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
/2 /2
:0
:4
A
M
RESTORATION OF BUILDING 1
ENVELOPE
01/31/25
FIRST FLOOR PLAN
A-103
RGDF
673-21-116
TAMPA, FLORIDA
B1
STATION CHIEF - MICHAEL ROGALA
100% BID DOCUMENTS
22004.00
N Scale: 1" = 20'-0"1 1st FLOOR PLAN
524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523
NOTES:
1.04 Current VA project, this area is Not In Scope.
1.05 RTU Passage to Building 38
1.06 Work scope at these facades (and their related interior conditions) are included as part of BID ITEM #2 (Deduct Alternate).
A. These sheets contain colored linework and poche to illustrate existing conditions and facade designation. Drawings should be printed in color.
B. Verify existing conditions before ordering, fabrication, construction and installation of new work.
C. Coordinate access into each area of the building with the C.O.R.
before beginning demolition or installation of new work.
D. Remove and reinstall existing wood trim as required for the removal of existing windows and trim. Finish paint wood trim at head, jamb, and sill to match existing.
E. During the installation of windows, savage existing signage, window treatments, wall-mounted devices, etc., which are adjacent to the existing window opening. Once the window installation is complete, patch and repair the wall and reinstall items back to their original location.
F. Temporary doors location & sizes are as required by the General Contractor. Doors will interfere with daily operations as little as possible. Confirm all locations with C.O.R.
GENERAL NOTES
Revisions Date
1 ADDENDUM 01 11/24/2025
P
PICIS
P
PICIS
PICIS
PICIS PICIS
PICIS
PICIS PICIS
PI
C
IS
PI
C
IS
PI
C
IS
PI
C
IS
P P P
P P P P
PICIS
P
P
P
P
EEG
MONITOR
EEG
MONITOR
UP
DN DN
UP
U P
D N
#2 W
D
#1 W
D
1 2 3
MM5-05
E E
-0
E E
-0
E E
-0
D D
-0
D D
-0
D D
-0
D D
-0
MM5-01
MM5-02
MM5-03
MM5-06
MM5-07
L L -0
L L -0
L L -0
L L -0
L L -0
L L -0
L8
KK5-09
KK5-08
KK5-07
KK5-05
KK5-04
KK5-03
KK5-02
KK5-01
J J -0
J J -0
J J -0
J J -0
J J -0
II5-02
II5-03
II5-04
II5-07
II5-01
KK5-06
II5-08
II5-09
E E
-0
D D
-0
D D
-0
MM5-08
MM5-04
KK5-11
KK5-10
L8
L8
J J -0
J J -0
J J -0
1 BED ROOM
BARIATRIC
ROOM
(ISOLATION)
PATIENT ROOM
EE
M M
DDFF
G G
HH
II
JJ
K K
LL
BARIATRIC
ROOM
(ISOLATION)
5B-515
RR
5B-515a
RR
5B-517a
RR
5B-513a
ANTE ROOM
5B-512
BARIATRIC
ROOM
5B-519
BARIATRIC
ROOM
5B-517
CLEAN LINEN
5B-514
STORAGE
5B-516
PT. RR
5B-521a
PT. RR
5B-519a
ANTE ROOM
5B-518
PT. RR
5B-520PATIENT
ROOM
5B-523
PATIENT
ROOM
5B-525
PATIENT
ROOM
5B-527
PATIENT
ROOM
5B-529
PATIENT
ROOM
5B-531
PATIENT
ROOM
5B-535
PT. RR
5B-531a
PT. RR
5B-535a
Room
5B-537
STORAGE
5B-538
DR. OFFICE
5B-539
MECHANICAL
5A-539
1 BED ROOM
5A-545
STORAGE
5A-543
1 BED ROOM
5A-547
OFFICE
5A-549
1 BED ROOM
5A-551
BARIATRIC
(ISO)
5A-553
RR
5A-553a
RR
5A-555a
BARIATRIC
(ISOLATION)
5A-555
BARIATRIC
(ISOLATION)
5A-557
ANTE ROOM
5A-556
BARIATRIC
(ISOLATION)
5A-559
1 BED ROOM
5A-561
1 BED ROOM
5A-565
1 BED ROOM
5A-567
1 BED ROOM
5A-569
STAFF
LOUNGE
5A-571
EQUIPMENT
STORAGE
5A-573
BLOOD GAS
5A-573a
1 BED ROOM
5A-501
1 BED ROOM
5A-503
1 BED ROOM
5A-504
1 BED ROOM
5A-5052 BED ROOM
5A-506
SOILED
UTILITY
5A-509
NURSE
REVIEWER
5A-510
RR
5A-511
MED
SUPPLIES
5A-513
RR
5A-513a
RR
5A-517b
1 BED ROOM
5A-517
1 BED ROOM
5A-518
STORAGE
5A-519
4 BED ROOM
5A-520
4 BED ROOM
5A-522
4 BED ROOM
5A-523
1 BED ROOM
5A-524
RR
5A-524a1 BED ROOM
5A-525
ELECTRICAL
5A-525b
4 BED ROOM
5A-526
Room
5A-526a
2 BED ROOM
5A-528
2 BED ROOM
5A-529 GI
SECRETARY
5A-531
GI DOCTOR
5A-531a
PHYSICIAN
5A-534
ELEVATOR
LOBBY
5A-5xx
PT. RR
5B-503a
PATIENT
ROOM
5B-503
PATIENT
ROOM
5B-505
PATIENT
ROOM
5B-507
MECHANICAL
5B-509
ELECTRICAL
5B-512b
Room
5B-511 PT. RR
5B-525a
PT. RR
5B-527a
PT. RR
5B-529a
RR
5B-543a
RR
5B-545a
RR
5A-547aELECTRICAL
5A-548b
RR
5A-551a
CLEAN LINEN
5A-552
STORAGE
5A-554
RR
5A-557a
RR
5A-559a
RR
5A-559b
RR
5A-565a
RR
5A-563a
RR
5A-567c
RR
5A-569a
STAFF RR
5A-571a
RR
5A-501a
RR
5A-504a
RR
5A-506a
RR
5A-518a
RR
5A-519a
RR
5A-520a
RR
5A-522a
RR
5A-523a
RR
5A-527
RR
5A-528a
PT. RR
5B-505a
PT. RR
5B-507a
CORRIDOR
C5-02-1
CORRIDOR
C5-03-1
CORRIDOR
C5-01-1
1 BED ROOM
5A-563
CORRIDOR
C5-07-1
ANTE ROOM
5A-550CORRIDOR
C5-05-1
CORRIDOR
C5-14-1
CORRIDOR
C5-09-1
CORRIDOR
C5-10-1
CORRIDOR
C5-11-1
Room
5B-513
Room
5B-521
X
CLEARANCE & MINOR OBSTRUCTIONS - SEE SHEET 3/A-701
MAJOR OBSTRUCTIONS / EQUIPMENT - SEE SHEET 4/A-701
VENTS / DUCT WORK - SEE SHEET 1/A-701
WINDOW TREATMENTS - SEE SHEET 2/A-701
WALLS MAKING CONTACT WITH WINDOW - SEE SHEET 5/A-702
PATIENT LIFTS
ABOVE CEILING CONSTRUCTION REQUIRED - SEE SHEET 6/A-702
NOT IN CONTRACT / EXISTING TO REMAIN
FACADE DESIGNATION (WITH WINDOWS)
INTERIOR CONDITIONS LEGEND
S T A
TE
OF FLOR
I D A
R E
GISTERED ARCH
IT
EC
T
J A
SO
N H. ROS
S
AR101907
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
/2 /2
:0
:5
A
M
RESTORATION OF BUILDING 1
ENVELOPE
01/31/25
FIFTH FLOOR PLAN
A-107
RGDF
673-21-116
TAMPA, FLORIDA
B1
STATION CHIEF - MICHAEL ROGALA
100% BID DOCUMENTS
22004.00
N Scale: 1" = 20'-0"1 5th FLOOR PLAN
524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523
NOTES:
A. These sheets contain colored linework and poche to illustrate existing conditions and facade designation. Drawings should be printed in color.
B. Verify existing conditions before ordering, fabrication, construction and installation of new work.
C. Coordinate access into each area of the building with the C.O.R.
before beginning demolition or installation of new work.
D. Remove and reinstall existing wood trim as required for the removal of existing windows and trim. Finish paint wood trim at head, jamb, and sill to match existing.
E. During the installation of windows, savage existing signage, window treatments, wall-mounted devices, etc., which are adjacent to the existing window opening. Once the window installation is complete, patch and repair the wall and reinstall items back to their original location.
F. Temporary doors location & sizes are as required by the General Contractor. Doors will interfere with daily operations as little as possible. Confirm all locations with C.O.R.
GENERAL NOTES
Revisions Date
GND. FLOOR
43'-2 5/8"
1st FLOOR 57'-0"
2nd FLOOR 70'-9 3/8"
3rd FLOOR 83'-5 3/8"
2.90
2.89
2.82
2.05
2.052.052.05
2.812.81 2.84
(Typ.)
2.88
2.06
2.79
26.01
(Typ.)
23.01GND. FLOOR
43'-2 5/8"
1st FLOOR 57'-0"
2nd FLOOR 70'-9 3/8"
3rd FLOOR 83'-5 3/8"
2.812.81 2.84
2.902.90
2.04
2.052.052.05
2.82
2.88
2.43
(Typ.)
2.782.792.902.89
21.01
AD-202
A-602
GND. FLOOR
43'-2 5/8"
1st FLOOR 57'-0"
2nd FLOOR 70'-9 3/8"
3rd FLOOR 83'-5 3/8"
2.86
2.87 2.90
2.812.81 2.84
2.83
2.82
2.052.052.05
2.06
2.05
2.83
2.91
2.48
2.772.78
2.97
26.01
(Typ.)
26.01
2.8026.01
4.39
TOWER
ROOF
DECK
2ND FLOOR
ROOF DECK
2ND FLOOR
ROOF DECK
O.R.
ROOF
DECKE.D.
ROOF
DECK
EXTERIOR ELEVATION / GLAZING LEGEND:
SPANDREL GLAZING: Refer to New Window Types & Window Schedule.
CURRENT VA PROJECT: Designated facade/area 'Not in Project Scope'.
INSTALL RELIEF ANGLE: Assumed relief angle is absent at building corners. Refer to Keynote 4.35.
REMOVE/REINSTALL BRICK FACADE: As required for removal/installation of through-wall flashing at relief angle. Refer to Keynote 4.34.
BRICK INFILL: Color and texture to match existing brick veneer on facade.
BRICK VENEER REMOVAL: Remove mismatched brick veneer from facade.
BRICK REMOVAL: Sawcut and remove brick veneer for installation of structural frame.
REPLACE & REPAIR BRICK/CMU: Replace and repair damaged masonry voids to match existing conditions.
GND. FLOOR
43'-2 5/8"
1st FLOOR 57'-0"
OR Roof Slab 86'-9 3/8"
2.79
2.06
2.06
2.88
2.05
2.05
2.82
2.81
2.01
2.02
2.02
2.01
2.79
2.81
2.01
2.01
S T A
TE
OF FLOR
I D A
R E
GISTERED ARCH
IT
EC
T
J A
SO
N H. ROS
S
AR101907
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
/2 /2
:0
:0
A
M
RESTORATION OF BUILDING 1
ENVELOPE
01/31/25
O.R. DEMOLITION ELEVATIONS
AD-202
RGDF
673-21-116
TAMPA, FLORIDA
B1
STATION CHIEF - MICHAEL ROGALA
100% BID DOCUMENTS
22004.00
524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523
Scale: 3/32" = 1'-0"1
EAST ELEVATION - DEMOLITION
Scale: 3/32" = 1'-0"29
NORTH ELEVATION - DEMOLITION
Scale: 3/32" = 1'-0"28
WEST ELEVATION - DEMOLITION
A. Remove all existing partitions shown with dashed line. Repair wall and floor finishes to match adjacent surfaces at areas of removal or scheduled new surfaces as required.
B. Repair existing walls to match adjacent where ceilings, roller shades, etc. are shown to be removed and reinstalled.
C. All interior and exterior surfaces damaged during the replacement work shall be repaired and finished to match existing material, finish, and color, unless noted otherwise.
D. See P, M, E & FP drawings for removal work associated with those trades.
E. P, M, E & FP systems above ceiling of area to be remodeled shall be maintained during demolition/construction, unless noted otherwise.
GENERAL DEMOLITION NOTES
N N.T.S.Scale:
KEY PLAN
NOTES:
2.01 Existing construction to remain, protect in place.
2.02 Existing structure to remain.
2.04 Existing precast sill to remain, protect in place.
2.05 Existing brick ledge to remain. Assumed location within the wall, field verify.
2.06 Existing mechanical ductwork to remain. Protect in place. Refer to Mechanical Drawings.
2.43 Existing downspout and scupper to be removed.
2.48 Existing ramp to pipe basement to remain. Protect in place.
2.77 Existing coping to remain, protect in place.
2.78 Remove existing parapet coping and prepare area for new
construction.
2.79 Remove existing mechanical ductwork. Refer to Mechanical Drawings.
2.80 Remove existing expansion joint and prepare area for new construction.
2.81 Remove existing face brick, insulation, flashing & membrane to faces of CMU and concrete substrate.
2.82 Remove existing metal wall coping.
2.83 Remove pipe chase. See Mechanical Drawings.
2.84 Remove existing light fixture. See Electrical Drawings.
2.86 Remove existing support posts after existing duct is anchored to new framing.
2.87 Remove existing HM door. HM frame to remain.
2.88 Remove existing metal enclosure and framing.
2.89 Remove existing metal canopy and framing.
2.90 Existing louvers to remain. See Mechanical Drawings.
2.91 Existing HM door & frame to remain.
2.97 Salvage & reinstall the existing exterior light back to its original location once new construction is complete. See Electrical Drawings.
4.39 Tooth in and infill masonry wall cavity. Brick and mortar to match existing conditions.
21.01 Fire Department Connection fixture. See Fire Protection Drawings.
23.01 Mechanical Equipment. See Mechanical Drawings.
26.01 Light fixture. See Electrical Drawings.
Scale: 1/2" = 1'-0"2
WALL SECT. - DEMO @ DUCTWORK
Revisions Date