This document is an Addendum (No. 1) for the Restoration of Building 1 Envelope project at the James A. Haley VA Hospital in Tampa, Florida, with project number 673-21-116. The addendum, issued on November 24, 2025, provides corrections and clarifications to the original bid drawings, including revisions to multiple sheets such as the Phasing/Facade Plan, Ground Floor Plan, First Floor Plan, Fifth Floor Plan, and O.R. Demolition Elevations. Key changes include modifying notes about work scope for specific facades, adding missing room designations, updating interior condition markings, and revising details about door frames, expansion joints, and plan references. The addendum is to be forwarded to all Prime Bidders and building code authorities, and bidders must acknowledge its receipt on their Bid Form.

View the file

Other files

File Type Posted
36C24826R0011 0006-ko.pdf PDF
VA NOTICE OF LIMITATIONS ON SUBCONTRACTING.pdf PDF
673-21-116-James Haley Restor B1_Addendum 03_02.23.26.pdf PDF
36C24826R0011 0005.pdf PDF
36C24826R0011 0004.pdf PDF
36C24826R0011 0003.pdf PDF
36C24826R0011 0002.pdf PDF
WD-FL20260208 01-02-26.pdf PDF
36C24826R0011 0001.pdf PDF
SIGNING SHEET 1.pdf PDF
SIGNING SHEET 2.pdf PDF
36C24826R0011_1.docx DOCX document
36C24826R0011_1.docx DOCX document
36C24826R0011_1.docx DOCX document
Base Offer Price Breakdown - 1 page.xlsx XLSX spreadsheet
EMR 1 page.pdf PDF
7a CD3 Drawings.pdf PDF
7 100 CD3 Specs.pdf PDF
WD FL20250208 05232025.pdf PDF
PAST AND PRESENT PERFORMANCE QUESTIONNAIRE.docx DOCX document
Experience information Sheet.pdf PDF
7 Tampa site map.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Restoration of Building 1 Envelope

James A. Haley VA Hospital – Project #673-21-116

Addendum No. 1

524 Fernwood Drive, Altamonte Springs, Florida 32701 | rdcjpa.com | 800.362.1523

November 24, 2025

Addendum No. 1

Restoration of Building 1 Envelope

James A Haley VA Hospital – Proj. #673-21-116

13000 Bruce B. Downs Blvd.

Tampa, FL 33612

This Addendum supplements and amends the original Drawings and Specifications for the above referenced project. This Addendum shall be forwarded to all Prime Bidders and all appropriate building code authorities. This Addendum shall be taken into account in the preparation of bids and shall become a part of the Contract Documents.

Receipt of this Addendum must be acknowledged on the Bid Form.

This addendum consists of the following items:

General

1. Corrections and clarifications to the Bid drawings.

Drawings

2. Sheet G-101 – Phasing / Façade Plan – Revise as follows:

a. Revise Note 1.06 to read “Work scope at these facades (and their related interior conditions) are included as part of BID ITEM #2 (Deduct Alternate)”.

3. Sheet A-102 – Ground Floor Plan: – Revise as follows:

a. Revise Note 1.06 to read “Work scope at these facades (and their related interior conditions) are included as part of BID ITEM #2 (Deduct Alternate)”.

4. Sheet A-103 – First Floor Plan: – Sheet Reissued. Revisions include:

a. Revise Note 1.06 to read “Work scope at these facades (and their related interior conditions) are included as part of BID ITEM #2 (Deduct Alternate)”.

b. Included missing colored Interior Conditions designations to the floor plan.

c. Added plan detail reference at façade “A”.

5. Sheet A-107 – Fifth Floor Plan: – Sheet Reissued. Revisions include:

a. Include missing room names and numbers.

6. Sheet AD-202 – O.R. Demolition Elevations: – Sheet Reissued. Revisions include:

a. West Elev. #28: Revise existing hollow metal door pair and frame to remain, previously noted to be removed.

7. Sheet A-203 – Exterior Elevs. – East Ground – 3rd Flr: – Revise as follows:

a. Revise Note 7.40 to read “1” wide exterior expansion joint system.”.

8. Sheet A602 – Wall Types & Details: – Revise as follows:

a. Revise Note 7.40 to read “1” wide exterior expansion joint system.”.

End of Addendum No. 1

B

B m m ta bl e

A

F

D

H H

RAMP

R A M P

K - 1728C H ESAP EAK EC _ LAVATOR YVITR EOU S

C HINA

A.P.

CORRIDOR

(CC-1)

STORAGE

CORRIDOR

CORRIDOR

T O

E X T E R

IO

R

E X

IT

EXISTING

EXISTING

EXISTING

EQUIP

ROOM

STORAGE

TOILET SPECIAL

PROCEDURES

STAFF

DRESS

CORRIDOR

SPECIAL

PROCEDURE

ROOM

MECHANICAL

ROOM

TOILET

STAIR

#20

NSF-33

NSF-94

NSF-49 NSF-376NSF-52

SF

NSF-545

NSF-76

NSF-55

1C-174B

1C-173

1C-177 1C-1821C-178

MRI-C-1

1C-174

1C-181

1C-183

S1-20-1

1 2 3 4

C

D

E

E.4

F

E.9 x;CART x;CART x;HORIZONTAL

LAMINAR

FLOW HOOD

x;HORIZONTAL

LAMINAR

FLOW HOOD

x;CART x;HORIZONTAL

LAMINAR

FLOW HOOD

x;BAKER

EDGEGUARD

x;BENCHTOP

BIOFLOW

CHAMBER

x;BENCHTOP

BIOFLOW

CHAMBER

FD

FD

FD

FD

FDFD

FD

FD

FD

FD

10 "

13' -7 "

E 1

E

E

E4

E6 E7

E

E 9E

E 11

E12

E13

E 14

E

E16

E

E

E

E

E

E 22

E

3E

4E

E

E26

E 27

E

E29

E 5

E a

E 17b

E a E b

E a

E a

E3 E3a E3b

E 3

E 3c

10 11

16 18

19/ 20

112 117

123 124

138139145

128 129

135 136 137

1 1

40 N ew Equi pm ent ( Anal yz er )

34 35

Pr i nt erE a s y C o d e r

Co nt ro l St o ra g e

Ce nt ra l L in k

Tr a c k

C o m p r e s s o r Tr a c k U P S

Ce nt ra l L in k Pr in t e r

IQ

IQ

IQ P

rin te rs

U nd er co un te r

S p e c i m e n St o r a g e I Q

S a m p l e s

V or te x

M ix er

M ad a V ac

F innpipette

C ole-

P arm er

S h a r e d Fr e e z e r

Lab el Pr i nt er

Pe nc i l Sh a r p e n e r

Pr i nt er

Pr i nt er

S p a P L U S

M icro-scope

S am ple T rays

Zen t r i-f u g e n

N utator

A th en a

M ul ti- Ly te

Be c k m an C o ul t e r I m m a g e 8 0 0

Ro t a t o r

U P

S

Ma g ni f y

T osoh

Fluid St o ra g e

Os m o m e t e r

Vor t e x Mix er

S ero-fuge

Lab Q uake

Im m ulite

I m mu l it e 20 0 0

Is ot em p

R ef

F reezer

Re f (U s e d b y COA G, M i s c Te st in g, a nd An al yz er )

-8

F re ez erN ew

E qu ip m en t w

C ar t (A

C L

T O

P

E a s y C o d e r

3 D Ro t a t o r

Un d e r Co u n t e r Fr e ez e r

La se r Pr i nt er

I s o t e m p 20 2 S

PFA 10 0 ' s

K C 1

Mi c r o sc o p e

D iffcount

Digi t al Mi c ro s co p e & C o m pu t e r St a t i on

Ne w E q u i p m e n t w/ C a r t ( A C L TOP 5 0 0 C TS )Min i

Vi d a s

V erify N ow 's

P rinter

(S t o r es Re a ge n t s & Con t r al s f o r An al yz er )

Re f r ig e ra t o r w/ S l id in g D o or s ( C H E M )

Va cu e t t e

Ce n t r i f u g e

105 106107108109

P rinter

(S t o r ed Be l ow ) Cen t r al L in k U P S

T rituras 2

Tr i t u ra s 1

S a m p l e Ha n d l e r

R ef

Se b i a El ec t ro p ho r es i s

S ebia H ydrasys 2 F luid S torage

P ippette

A rea

Pr i nt er

So rv al l Ce n t r i f u g e

P rinter

Fr e e z e r

F low m eter

Fl ui d S t o r ag e Ca r t ; go e s w / 16 0 & s l id e s un d er co u nt e r

Pr i nt er

I s o t e m p Re f

Ac c u s p i n 3 Ce n t r i f u g e

Fluid St o ra g e

VI ST A

VI ST A

A th en a

M ul ti- Ly te

U P

S

W AM VI ST A

Un d e r c ou n t e r

A B B OTT A R C H

D e c a p p e r F ax

La se r Pr i nt er

E a s y C o d e r

Speci m en Receiv i ng/St or age 26

27 28

60 Cy t os p i n

Sp ec i - Mi x

Am e r i c a n Opt ic al

EB A 1 2 Mi c r o sc o p e

Bl ood St orage

Si emens Tr ac k

Si emens Uti l i ty Cabinet

Fl o w m e t e r h a s ex is t i ng c ar t

Si em ens D I Water Sy st em

108L .2 108H.2

A

A

CR

CR

C R

PP

EDP EDP

EDP EDP

EDP

E D P

OVERHEAD

PARTITION

LINEN

CART

x;

N

EW

P

AS

S

TH

R U

R

EF

x;

P

AS

S

TH

R U x;

P

AS

S

TH

R U

CCTV

CCTV

ICE

MED

CART

REFRIG

MICRO

PRINTER

PYXISPYXIS

LINEN CART

CODE CART

FAX

PNEU T

SYST

CODE CART

CODE CART

MED

CART

REFRIG

RECESSED

HANDICAP

DRINKING

FOUNTAIN

FOUNTAIN

DRINKING

PROCESSOR

F2

C A M E R A

B O X

B O X

C A M E R A

PACS

P

AC

S

DN

UP

UP

DN

D N

U P

DN

UP

U P

D N

U P

D O W N

SVC/1

#2 W

D

#1 W

D 22

1 2 3

CABINET

W A L L

C A B

IN

E T

B -0

B -0

B -0

B -0

F -0

F -0

F -0

F -0

A -1

A -1

A -1

A -1

A -1

A -1

A -0

A -0

A -0

A -0

AA1-08

P -0

P -0

P -0

P -0

P -0

P -0

O1-06

O1-05

O1-04

O1-03

O1-02

O1-01

N -0

N -0

N -0

N -0

M1-10

M1-09

M1-08

M1-07

M1-06

M1-05

M1-04

M1-02 M1-01

L -0

L -0

L -0

L -0

L -0

L -0

L -0

K1-03

K1-02

K1-01

G1-02

G1-01

AA1-01

AA1-02

AA1-03

AA1-04

AA1-05

AA1-06

AA1-07

Z -0

Z -0

Z -0

Z -0

Z -0

Y1-01

Y1-02

Y1-03

Y1-04

Y1-05

Y1-06

X -0

X

-0

X -0

X -0

X -0

X -0

W1-06

W1-05

W1-04

W1-03

W1-02

W1-01

V -0

V -0

V -0

V -0

V -0

V -0

U1-01

R -0

R -0

R -0

R -0

R -0

R -0

Q1-01

Q1-04

Q1-06

Z -0

N -0

M1-03

N -0

Q1-05

Q1-03

Q1-02

F -0

RR

J -0

J -0

H -0

H -0

H -0

H -0

H -0

I1-01

I1-02

I1-04

I1-03

D -0

D -0

C1-01

EXAM

1A-150

RESTROOM

1A-150a EXAM

1A-151

EXAM

1A-152

EXAM

1A-154

EXAM

1A-156

Cast Room

1A-160

EXAM

1A-162

EXAM

1A-158

CONFERENCE

1A-171

EXAM

1A-169

EXAM

1A-173

INTERNAL

MEDICINE

CLINIC

WAITING

1A-176

EXAM

1A-173a

1B-102

CORRIDOR

C1-15-1

1B-102i

CLINIC/EDUCATION

1B-102j

CLINIC

EDUCATION/CONFERENCE

1B-109

OFFICE

1B-111

RESTROOM

1B-111a

OFFICE

1B-112

OFFICE

1B-114 1B-114a

OFFICE

1B-116

OFFICE

1B-118a

OFFICE

1B-118

OFFICE

1B-119a

OFFICE

1B-119

SLEEP LAB

1B-122a

SLEEP LAB

1B-122

STAIR #4

S1-04-1

OFFICE

1B-123a

OFFICE

1B-123

RESPIRATORY

THERAPY

BREAK ROOM

1B-124

OFFICE

SURGERY

1B-128

OFFICE

SURGERY

1B-127

FELLOWS

1B-136

DR OFFICE

1B-130

APRN

1B-138

INFUSION

TREATMENT

CHAIR AREA

1B-140

S1-05-1

1B-141

INFUSION

TREATMENT

CHAIR AREA

1B-143

CORRIDOR

C1-23-1

BREAK ROOM

1B-155

ATTENDING

EXAM ROOM

1B-154

ATTENDING

EXAM ROOM

1B-152

ATTENDING

EXAM ROOM

1B-150

1B-149a

ATTENDING

EXAM ROOM

1B-148

WAITING

1B-156

CORRIDOR

C1-49-1

1B-156d

ELECTRICAL

1B-156c

CONFERENCE

ROOM

1B-156g

1B-156a 1B-156b 1B-157 1B-159

C1-49-9CORRIDOR

1B-1581B-156e

LITHOTRIPTER

1B-104

NURSING

1C-102a 1C-102

MEDICAL

CONFERENCE

1C-104

STORAGE

1C-104a

1C-104d

1C-104a

1C-104b 1C-104c 1C-107d

ELECTRICAL WAITING

1C-107

A/C UNIT

PATIENT

RESTROOM

1C-108

EXAM

1C-109

EXAM

1C-111

1C-113

1C-112

EXAM

1C-115

EXAM

1C-116

EXAM

1C-122

EXAM

1C-122a

EXAM

1C-120

EXAM

1C-120a

EXAM

1C-118

EXAM

1C-118a

STAIR #6

S1-06-1

EXAM

1C-123a

EXAM

1C-123

EXAM

1C-125a

EXAM

1C-125

SUPERVISOR

OUTPATIENT

UNIT

1C-127a

RECORDS

PREP.

1C-127

1C-129

1C-133

EXAM

1C-135

EXAM

1C-136

EXAM

1C-136a

EXAM

1C-138

EXAM

1C-138A

EXAM

1C-140

EXAM

1C-140a

STAIR #7

S1-07-1

EXAM/CONFERENCE

1C-141

EXAM

1C-141a

EXAM

1C-143

EXAM/CAST

ROOM

1C-143a

EXAM

1C-145

EXAM

1C-145a

EXAM

1C-147

EXAM

1C-148

EXAM

1C-150

EXAM

1C-152

SCREEN/EXAM

1C-154

RESTROOM

1C-156 1C-158a

WAITING

1C-158

SECRETARY

CLERK &

FILES

1C-170

OFFICE

ASSISTANT

1D-123

OFFICE CHIEF

1D-123

OFFICE

SECRETARY

1D-124

1D-125

1D-126

CONFERENCE

ROOM

1C-172

IV ROOM

1D-127a 1D-149a 1D-149b 1D-149c

1D-149d

1D-149f 1D-149g 1D-149h 1D-149i

1D-170

1D-171a

1D-171

1D-172a1D-172b1D-172c1D-172d

1D-172e

1D-173

1D-172

1D-174 1D-174a

1D-174b

1D-174c

1D-176

1D-176a

1D-179a

1D-177a

1D-179b

1D-179c

1D-177b

C1-xx-01

C1-xx-02

STARBUCKS

1D-1xx

VESTIBULE

V1-01-1

MECHANICAL

1D-101d

VESTIBULE

V1-02-1

MAIN LOBBY

1D-101 Room

1D-102

Room

1D-103

ENROLLMENT

1A-103OFFICE

1A-104

OFFICE/EXAM

1A-104a

VESTIBULE

V1-03-1

INTERNAL

MEDICINE

1A-106y

ALPHA CHECK

IN

1A-106w

WAITING

1A-106t

EXAM

1A-106u

64 SLICE

1A-125

CONTROL

ROOM

1A-126

READING

ROOM

1A-127ADPAC

1A-130

EMERGENCY

ISOLATION

ROOM

1A-133

EMERGENCY

ISOLATION

ROOM

1A-134

OPERATIONS

ROOM

1A-147

1A-147b

1A-147a

1A-144

COMMUNICATIONS

1A-115

TRIAGE

1A-140

EMERGENCY

ROOM #3

1A-138

1A-1xx

MON EXAM

#13

1E-140

MON EXAM

#12

1E-139

MON EXAM

#11

1E-137

MON EXAM

#10

1E-135

MON EXAM #9

1E-133

PROCEDURE/CAST

1E-132

MON EXAM

1E-131

MON EXAM #7

1E-129

MON EXAM #6

1A-128

MON EXAM #5

1A-127

MON EXAM #4

1E-126

TRIAGE #3

1E-105

TRIAGE#2

1E-128

TRIAGE#1

1E-103

PRE-TRIAGE

1E-134

MON

EXAM#14

1E-141

MON

EXAM#15

1E-142

WAITING

1E-101

V1-04-1

CONFERENCE

1D-194

PATH.

1D-194b

PATH.

1D-194a

PATH.

1D-194e

PATH.

1D-194f

PATH.

1D-194c

COMM.

1D-186

ELEC.

1D-187

PATH.

1D-194d

STAIR

S1-22-1

OFFICE

1D-195d

OFFICE

1D-195c

RR

1D-193

RR

1D-192

PATH.

1D-191

PATH.

1D-190

PATH.

1D-189

CORRIDOR

C1-22-1

CORRIDOR

C1-24-1

CORRIDOR

C1-47-1

CORRIDOR

C1-48-1

CORRIDOR

C1-20-1

CORRIDOR

C1-19a-1

CORRIDOR

C1-19-1

CORRIDOR

C1-18-1

CORRIDOR

C1-17-1 ELEVATOR

LOBBY

1C-101

CORRIDOR

C1-28-1

COORIDOR

C1-28-2

CORRIDOR

C1-30-1

CORRIDOR

C1-31-1

CORRIDOR

C1-32-1

CORRIDOR

C1-34-1

CORRIDOR

C1-38-1

CORRIDOR

C1-40-1

CORRIDOR

C1-50-1

CORRIDOR

C1-57-1

CORRIDOR

C1-55-1

CORR.

C1-59-01

CORRIDOR

C1-56-1

CORRIDOR

C1-54-1

1E-121 1E-122 1E-123MON EXAM

#1

1E-119

MON EXAM

#2

1E-120

VESTIBULE

V1-05-1

RADIOGRAPHY

1E-125

CONFERENCE

/ TRAINING

1E-108

NURSE

MANAGER

1E-109

RR

1E-110a

ON CALL

1E-110

BEREAVMENT

1E-115

HOLDING

ROOM #1

1E-116

STAFF

LOCKER /

BREAK ROOM

1E-117

J -0

J -0

J -0

AFB

MYCOLOGY

1D-196f

PROCESSING

ROOM

1D-196h

AMPLIFICATION

& DETECTION

1D-195i

SPECIMEN

PREP.

1D-195h

REAGENT

PREP

1D-195e

CC1-01

CC1-02

CC1-03

CC1-04

CC1-05

CC1-06

CC1-07

CC1-08

CC1-09

CC1-10

A -0

A -0

A -0

A -0

A -0

B B

-0

B B

-0

B B

-0

F -0

F -0

F -0

F -0

B -0

B -0

1-008

1-

1-

1-

1-004

1-003

1-011

VR

S

U

T

Q

P

O

N

M L

K

J

I

H

G

E C

C C

BB

A A

Z

Y

X

W

F D

B A

A-622

Sim

1.04

1.05

1.06 1.06

A-622

A-602

X

CLEARANCE & MINOR OBSTRUCTIONS - SEE SHEET 3/A-701

MAJOR OBSTRUCTIONS / EQUIPMENT - SEE SHEET 4/A-701

VENTS / DUCT WORK - SEE SHEET 1/A-701

WINDOW TREATMENTS - SEE SHEET 2/A-701

WALLS MAKING CONTACT WITH WINDOW - SEE SHEET 5/A-702

PATIENT LIFTS

ABOVE CEILING CONSTRUCTION REQUIRED - SEE SHEET 6/A-702

NOT IN CONTRACT / EXISTING TO REMAIN

FACADE DESIGNATION (WITH WINDOWS)

INTERIOR CONDITIONS LEGEND

S T A

TE

OF FLOR

I D A

R E

GISTERED ARCH

IT

EC

T

J A

SO

N H. ROS

S

AR101907

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

/2 /2

:0

:4

A

M

RESTORATION OF BUILDING 1

ENVELOPE

01/31/25

FIRST FLOOR PLAN

A-103

RGDF

673-21-116

TAMPA, FLORIDA

B1

STATION CHIEF - MICHAEL ROGALA

100% BID DOCUMENTS

22004.00

N Scale: 1" = 20'-0"1 1st FLOOR PLAN

524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523

NOTES:

1.04 Current VA project, this area is Not In Scope.

1.05 RTU Passage to Building 38

1.06 Work scope at these facades (and their related interior conditions) are included as part of BID ITEM #2 (Deduct Alternate).

A. These sheets contain colored linework and poche to illustrate existing conditions and facade designation. Drawings should be printed in color.

B. Verify existing conditions before ordering, fabrication, construction and installation of new work.

C. Coordinate access into each area of the building with the C.O.R.

before beginning demolition or installation of new work.

D. Remove and reinstall existing wood trim as required for the removal of existing windows and trim. Finish paint wood trim at head, jamb, and sill to match existing.

E. During the installation of windows, savage existing signage, window treatments, wall-mounted devices, etc., which are adjacent to the existing window opening. Once the window installation is complete, patch and repair the wall and reinstall items back to their original location.

F. Temporary doors location & sizes are as required by the General Contractor. Doors will interfere with daily operations as little as possible. Confirm all locations with C.O.R.

GENERAL NOTES

Revisions Date

1 ADDENDUM 01 11/24/2025

P

PICIS

P

PICIS

PICIS

PICIS PICIS

PICIS

PICIS PICIS

PI

C

IS

PI

C

IS

PI

C

IS

PI

C

IS

P P P

P P P P

PICIS

P

P

P

P

EEG

MONITOR

EEG

MONITOR

UP

DN DN

UP

U P

D N

#2 W

D

#1 W

D

1 2 3

MM5-05

E E

-0

E E

-0

E E

-0

D D

-0

D D

-0

D D

-0

D D

-0

MM5-01

MM5-02

MM5-03

MM5-06

MM5-07

L L -0

L L -0

L L -0

L L -0

L L -0

L L -0

L8

KK5-09

KK5-08

KK5-07

KK5-05

KK5-04

KK5-03

KK5-02

KK5-01

J J -0

J J -0

J J -0

J J -0

J J -0

II5-02

II5-03

II5-04

II5-07

II5-01

KK5-06

II5-08

II5-09

E E

-0

D D

-0

D D

-0

MM5-08

MM5-04

KK5-11

KK5-10

L8

L8

J J -0

J J -0

J J -0

1 BED ROOM

BARIATRIC

ROOM

(ISOLATION)

PATIENT ROOM

EE

M M

DDFF

G G

HH

II

JJ

K K

LL

BARIATRIC

ROOM

(ISOLATION)

5B-515

RR

5B-515a

RR

5B-517a

RR

5B-513a

ANTE ROOM

5B-512

BARIATRIC

ROOM

5B-519

BARIATRIC

ROOM

5B-517

CLEAN LINEN

5B-514

STORAGE

5B-516

PT. RR

5B-521a

PT. RR

5B-519a

ANTE ROOM

5B-518

PT. RR

5B-520PATIENT

ROOM

5B-523

PATIENT

ROOM

5B-525

PATIENT

ROOM

5B-527

PATIENT

ROOM

5B-529

PATIENT

ROOM

5B-531

PATIENT

ROOM

5B-535

PT. RR

5B-531a

PT. RR

5B-535a

Room

5B-537

STORAGE

5B-538

DR. OFFICE

5B-539

MECHANICAL

5A-539

1 BED ROOM

5A-545

STORAGE

5A-543

1 BED ROOM

5A-547

OFFICE

5A-549

1 BED ROOM

5A-551

BARIATRIC

(ISO)

5A-553

RR

5A-553a

RR

5A-555a

BARIATRIC

(ISOLATION)

5A-555

BARIATRIC

(ISOLATION)

5A-557

ANTE ROOM

5A-556

BARIATRIC

(ISOLATION)

5A-559

1 BED ROOM

5A-561

1 BED ROOM

5A-565

1 BED ROOM

5A-567

1 BED ROOM

5A-569

STAFF

LOUNGE

5A-571

EQUIPMENT

STORAGE

5A-573

BLOOD GAS

5A-573a

1 BED ROOM

5A-501

1 BED ROOM

5A-503

1 BED ROOM

5A-504

1 BED ROOM

5A-5052 BED ROOM

5A-506

SOILED

UTILITY

5A-509

NURSE

REVIEWER

5A-510

RR

5A-511

MED

SUPPLIES

5A-513

RR

5A-513a

RR

5A-517b

1 BED ROOM

5A-517

1 BED ROOM

5A-518

STORAGE

5A-519

4 BED ROOM

5A-520

4 BED ROOM

5A-522

4 BED ROOM

5A-523

1 BED ROOM

5A-524

RR

5A-524a1 BED ROOM

5A-525

ELECTRICAL

5A-525b

4 BED ROOM

5A-526

Room

5A-526a

2 BED ROOM

5A-528

2 BED ROOM

5A-529 GI

SECRETARY

5A-531

GI DOCTOR

5A-531a

PHYSICIAN

5A-534

ELEVATOR

LOBBY

5A-5xx

PT. RR

5B-503a

PATIENT

ROOM

5B-503

PATIENT

ROOM

5B-505

PATIENT

ROOM

5B-507

MECHANICAL

5B-509

ELECTRICAL

5B-512b

Room

5B-511 PT. RR

5B-525a

PT. RR

5B-527a

PT. RR

5B-529a

RR

5B-543a

RR

5B-545a

RR

5A-547aELECTRICAL

5A-548b

RR

5A-551a

CLEAN LINEN

5A-552

STORAGE

5A-554

RR

5A-557a

RR

5A-559a

RR

5A-559b

RR

5A-565a

RR

5A-563a

RR

5A-567c

RR

5A-569a

STAFF RR

5A-571a

RR

5A-501a

RR

5A-504a

RR

5A-506a

RR

5A-518a

RR

5A-519a

RR

5A-520a

RR

5A-522a

RR

5A-523a

RR

5A-527

RR

5A-528a

PT. RR

5B-505a

PT. RR

5B-507a

CORRIDOR

C5-02-1

CORRIDOR

C5-03-1

CORRIDOR

C5-01-1

1 BED ROOM

5A-563

CORRIDOR

C5-07-1

ANTE ROOM

5A-550CORRIDOR

C5-05-1

CORRIDOR

C5-14-1

CORRIDOR

C5-09-1

CORRIDOR

C5-10-1

CORRIDOR

C5-11-1

Room

5B-513

Room

5B-521

X

CLEARANCE & MINOR OBSTRUCTIONS - SEE SHEET 3/A-701

MAJOR OBSTRUCTIONS / EQUIPMENT - SEE SHEET 4/A-701

VENTS / DUCT WORK - SEE SHEET 1/A-701

WINDOW TREATMENTS - SEE SHEET 2/A-701

WALLS MAKING CONTACT WITH WINDOW - SEE SHEET 5/A-702

PATIENT LIFTS

ABOVE CEILING CONSTRUCTION REQUIRED - SEE SHEET 6/A-702

NOT IN CONTRACT / EXISTING TO REMAIN

FACADE DESIGNATION (WITH WINDOWS)

INTERIOR CONDITIONS LEGEND

S T A

TE

OF FLOR

I D A

R E

GISTERED ARCH

IT

EC

T

J A

SO

N H. ROS

S

AR101907

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

/2 /2

:0

:5

A

M

RESTORATION OF BUILDING 1

ENVELOPE

01/31/25

FIFTH FLOOR PLAN

A-107

RGDF

673-21-116

TAMPA, FLORIDA

B1

STATION CHIEF - MICHAEL ROGALA

100% BID DOCUMENTS

22004.00

N Scale: 1" = 20'-0"1 5th FLOOR PLAN

524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523

NOTES:

A. These sheets contain colored linework and poche to illustrate existing conditions and facade designation. Drawings should be printed in color.

B. Verify existing conditions before ordering, fabrication, construction and installation of new work.

C. Coordinate access into each area of the building with the C.O.R.

before beginning demolition or installation of new work.

D. Remove and reinstall existing wood trim as required for the removal of existing windows and trim. Finish paint wood trim at head, jamb, and sill to match existing.

E. During the installation of windows, savage existing signage, window treatments, wall-mounted devices, etc., which are adjacent to the existing window opening. Once the window installation is complete, patch and repair the wall and reinstall items back to their original location.

F. Temporary doors location & sizes are as required by the General Contractor. Doors will interfere with daily operations as little as possible. Confirm all locations with C.O.R.

GENERAL NOTES

Revisions Date

GND. FLOOR

43'-2 5/8"

1st FLOOR 57'-0"

2nd FLOOR 70'-9 3/8"

3rd FLOOR 83'-5 3/8"

2.90

2.89

2.82

2.05

2.052.052.05

2.812.81 2.84

(Typ.)

2.88

2.06

2.79

26.01

(Typ.)

23.01GND. FLOOR

43'-2 5/8"

1st FLOOR 57'-0"

2nd FLOOR 70'-9 3/8"

3rd FLOOR 83'-5 3/8"

2.812.81 2.84

2.902.90

2.04

2.052.052.05

2.82

2.88

2.43

(Typ.)

2.782.792.902.89

21.01

AD-202

A-602

GND. FLOOR

43'-2 5/8"

1st FLOOR 57'-0"

2nd FLOOR 70'-9 3/8"

3rd FLOOR 83'-5 3/8"

2.86

2.87 2.90

2.812.81 2.84

2.83

2.82

2.052.052.05

2.06

2.05

2.83

2.91

2.48

2.772.78

2.97

26.01

(Typ.)

26.01

2.8026.01

4.39

TOWER

ROOF

DECK

2ND FLOOR

ROOF DECK

2ND FLOOR

ROOF DECK

O.R.

ROOF

DECKE.D.

ROOF

DECK

EXTERIOR ELEVATION / GLAZING LEGEND:

SPANDREL GLAZING: Refer to New Window Types & Window Schedule.

CURRENT VA PROJECT: Designated facade/area 'Not in Project Scope'.

INSTALL RELIEF ANGLE: Assumed relief angle is absent at building corners. Refer to Keynote 4.35.

REMOVE/REINSTALL BRICK FACADE: As required for removal/installation of through-wall flashing at relief angle. Refer to Keynote 4.34.

BRICK INFILL: Color and texture to match existing brick veneer on facade.

BRICK VENEER REMOVAL: Remove mismatched brick veneer from facade.

BRICK REMOVAL: Sawcut and remove brick veneer for installation of structural frame.

REPLACE & REPAIR BRICK/CMU: Replace and repair damaged masonry voids to match existing conditions.

GND. FLOOR

43'-2 5/8"

1st FLOOR 57'-0"

OR Roof Slab 86'-9 3/8"

2.79

2.06

2.06

2.88

2.05

2.05

2.82

2.81

2.01

2.02

2.02

2.01

2.79

2.81

2.01

2.01

S T A

TE

OF FLOR

I D A

R E

GISTERED ARCH

IT

EC

T

J A

SO

N H. ROS

S

AR101907

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

/2 /2

:0

:0

A

M

RESTORATION OF BUILDING 1

ENVELOPE

01/31/25

O.R. DEMOLITION ELEVATIONS

AD-202

RGDF

673-21-116

TAMPA, FLORIDA

B1

STATION CHIEF - MICHAEL ROGALA

100% BID DOCUMENTS

22004.00

524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523

Scale: 3/32" = 1'-0"1

EAST ELEVATION - DEMOLITION

Scale: 3/32" = 1'-0"29

NORTH ELEVATION - DEMOLITION

Scale: 3/32" = 1'-0"28

WEST ELEVATION - DEMOLITION

A. Remove all existing partitions shown with dashed line. Repair wall and floor finishes to match adjacent surfaces at areas of removal or scheduled new surfaces as required.

B. Repair existing walls to match adjacent where ceilings, roller shades, etc. are shown to be removed and reinstalled.

C. All interior and exterior surfaces damaged during the replacement work shall be repaired and finished to match existing material, finish, and color, unless noted otherwise.

D. See P, M, E & FP drawings for removal work associated with those trades.

E. P, M, E & FP systems above ceiling of area to be remodeled shall be maintained during demolition/construction, unless noted otherwise.

GENERAL DEMOLITION NOTES

N N.T.S.Scale:

KEY PLAN

NOTES:

2.01 Existing construction to remain, protect in place.

2.02 Existing structure to remain.

2.04 Existing precast sill to remain, protect in place.

2.05 Existing brick ledge to remain. Assumed location within the wall, field verify.

2.06 Existing mechanical ductwork to remain. Protect in place. Refer to Mechanical Drawings.

2.43 Existing downspout and scupper to be removed.

2.48 Existing ramp to pipe basement to remain. Protect in place.

2.77 Existing coping to remain, protect in place.

2.78 Remove existing parapet coping and prepare area for new

construction.

2.79 Remove existing mechanical ductwork. Refer to Mechanical Drawings.

2.80 Remove existing expansion joint and prepare area for new construction.

2.81 Remove existing face brick, insulation, flashing & membrane to faces of CMU and concrete substrate.

2.82 Remove existing metal wall coping.

2.83 Remove pipe chase. See Mechanical Drawings.

2.84 Remove existing light fixture. See Electrical Drawings.

2.86 Remove existing support posts after existing duct is anchored to new framing.

2.87 Remove existing HM door. HM frame to remain.

2.88 Remove existing metal enclosure and framing.

2.89 Remove existing metal canopy and framing.

2.90 Existing louvers to remain. See Mechanical Drawings.

2.91 Existing HM door & frame to remain.

2.97 Salvage & reinstall the existing exterior light back to its original location once new construction is complete. See Electrical Drawings.

4.39 Tooth in and infill masonry wall cavity. Brick and mortar to match existing conditions.

21.01 Fire Department Connection fixture. See Fire Protection Drawings.

23.01 Mechanical Equipment. See Mechanical Drawings.

26.01 Light fixture. See Electrical Drawings.

Scale: 1/2" = 1'-0"2

WALL SECT. - DEMO @ DUCTWORK