36C24826R0011_1.docx

DOCX document 155 KB Posted

Attached to
Z2DA--FY26: NRM (PROJ: 673-21-116) BB - Restoration of Building 1 Envelope
Solicitation number
36C24826R0011
Issued by

About this file

This document is a Standard Form 1442 Solicitation, Offer, and Award for a construction contract issued by the Department of Veterans Affairs Network Contracting Office 8 in Tampa, Florida. The project involves the restoration of Building 1's envelope at the James A. Haley VA Hospital, with a project scope including renovation, general construction, alterations, abatement, and removal of existing structures. The project is valued between $5,000,000 and $10,000,000 and is set aside exclusively for Service-Disabled Veteran-Owned Small Businesses (SDVOSB).

Key details include a proposal due date of December 3, 2025, at 2:00 PM EST, with a planned site visit on November 12, 2025, at 10:00 AM EST. The contract performance period is 550 calendar days after receiving the Notice to Proceed. Contractors must be registered in the Small Business Search and System for Award Management (SAM) databases, and must comply with Davis-Bacon wage determinations. The solicitation requires detailed technical submissions covering management approach, specialized experience, project schedule, past performance, and pricing, with specific evaluation criteria for each factor.

View the file

Other files

File Type Posted
36C24826R0011 0006-ko.pdf PDF
673-21-116-James Haley Restor B1_Addendum 03_02.23.26.pdf PDF
36C24826R0011 0005.pdf PDF
VA NOTICE OF LIMITATIONS ON SUBCONTRACTING.pdf PDF
36C24826R0011 0004.pdf PDF
36C24826R0011 0003.pdf PDF
36C24826R0011 0002.pdf PDF
WD-FL20260208 01-02-26.pdf PDF
673-21-116-James Haley Restor B1_Addendum 01_11.24.2025.pdf PDF
SIGNING SHEET 2.pdf PDF
SIGNING SHEET 1.pdf PDF
36C24826R0011 0001.pdf PDF
36C24826R0011_1.docx DOCX document
36C24826R0011_1.docx DOCX document
Experience information Sheet.pdf PDF
7a CD3 Drawings.pdf PDF
7 Tampa site map.pdf PDF
EMR 1 page.pdf PDF
PAST AND PRESENT PERFORMANCE QUESTIONNAIRE.docx DOCX document
WD FL20250208 05232025.pdf PDF
Base Offer Price Breakdown - 1 page.xlsx XLSX spreadsheet
7 100 CD3 Specs.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C24826R0011

1. SOLICITATION NUMBER

2. TYPE OF SOLICITATION

3. DATE ISSUED

PAGE OF PAGES

4. CONTRACT NUMBER

5. REQUISITION/PURCHASE REQUEST NUMBER

6. PROJECT NUMBER

7. ISSUED BY

CODE

8. ADDRESS OFFER TO

a. NAME

b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

STANDARD FORM 1442 (REV. 8/2014)

STANDARD FORM 1442

Prescribed by GSA-FAR (48 CFR) 52.236-1(d)

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

SOLICITATION

SOLICITATION

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SEALED BID (IFB)

NEGOTIATED (RFP)

11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).

YES

NO

a.

Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.

b.

An offer guarantee is, is not required.

c.

All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d.

Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

36C24826R0011 X 673-21-116 36C248 Department of Veterans Affairs Network Contracting Office 8 (NCO 8) Tampa FL 33637

David Hernandez 813-893-3904

PROJECT TITLE: BB - RESTORATION OF BUILDING 1 ENVELOPE

PROJECT NUMBER: 673-21-116

LOCATION: James A. Haley VA Hospital, 13000 Bruce B. Downs Boulevard, Tampa, Florida, 33612.

MAGNITUDE OF THIS PROJECT: Between $5,000,000.00 and $10,000,000.00

NAICS:236220 COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION

SERVICE CODE: Z2DA REPAIR OR ALTERATION OF HOSPITALS AND INFIRMARIES

PROJECT DESCRIPTION: This project scope shall include but not be limited to the renovation of building 1 envelope at the James A . Haley VA hospital, located at 13000 Bruce B. Downs boulevard, Tampa, Florida as required by the drawings and specifications included in this acquisition package.

An organized site visit is planned for 11/1 /2025 at 10:00 AM EST. Meeting location is Building 42 Please contact Healthcare Engineer Nicole Dayton at Nicole.Dayton2@va.gov to confirm attendance.

RFI are due on 11/ /2025 at 2:00PM EST, email to david.hernandez1@va.gov

All VA Medical Facilities are smoke free. Smoking is not permitted anywhere on the JAHVAMC Campus

The current Davis Bacon determination is General Decision Number: FL20250222 05-23-2025

AT THE TIME OF QUOTE SUBMISSION, interested contractors MUST be actively registered in the following databases:

Small Business Search https://search.certifications.sba.gov/ System for Award Management: SAM.gov | Home

THIS REQUIREMENT IS SET-ASIDE FOR VETCERT CERTIFIED, SERVICE-DISABLED VETERAN OWNED SMALL BUSINESSES (SDVOSB)

X X X

2:00PM

EST

12-03-2025 X

14. NAME AND ADDRESS OF OFFEROR

15. TELEPHONE NUMBER

16. REMITTANCE ADDRESS

CODE

FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c)( 41 U.S.C. 3304(a) (

26. ADMINISTERED BY

27. PAYMENT WILL BE MADE BY

PHONE:

FAX:

28. NEGOTIATED AGREEMENT

29. AWARD

Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.

shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER

TO SIGN

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE

BY

OFFER

AWARD

STANDARD FORM 1442 (REV. 8/2014) BACK

(Include ZIP Code) (Include area code) (Include only if different than Item 14.)

(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)

(Contractor is not required to sign this document.)

(Must be fully completed by offeror) (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

36C248 Department of Veterans Affairs Network Contracting Office 8 (NCO 8) 8875 Hidden River Pkwy Tampa FL 33637 Department of Veterans Affairs Financial Services Center P.O. Box 149971 Austin TX 78714-9971 Stacy Figlinski

Table of Contents

PART I - THE SCHEDULE1
SECTION A - SOLICITATION/CONTRACT FORM1
A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair)1
A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR)– BACK2
A.3 PRICE/COST SCHEDULE6
ITEM INFORMATION6
A.4 DELIVERY SCHEDULE7
STATEMENT OF WORK8
INSTRUCTION TO OFFERORS15
TECHNICAL EVALUATION FACTORS18
FACTOR I - Technical/Management Approach18
FACTOR II – Specialized Experience19
FACTOR III – Schedule20
FACTOR IV: Past Performance:20
FACTOR V – PRICE – EVALUATED BY CONTRACTING OFFICER21
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS22
2.1 52.201-1 ACQUISITION 360: VOLUNTARY SURVEY (SEP 2023)22
2.2 52.215-5 FACSIMILE PROPOSALS (OCT 1997)22
2.3 52.216-1 TYPE OF CONTRACT (APR 1984)23
2.4 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014)23
2.5 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014)23
2.6 52.225-11 BUY AMERICAN—CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (NOV 2023) ALTERNATE I (NOV 2023)24
2.7 52.228-1 BID GUARANTEE (SEP 1996)30
2.8 52.228-17 INDIVIDUAL SURETY—PLEDGE OF ASSETS (BID GUARANTEE) (FEB 2021)31
2.9 52.233-2 SERVICE OF PROTEST (SEP 2006)31
2.10 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)32
2.11 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009)32
2.12 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)32
REPRESENTATIONS AND CERTIFICATIONS34
3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2025) (DEVIATION FEB 2025)34
3.2 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)38
3.3 52.204-29 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS—REPRESENTATION AND DISCLOSURES (DEC 2023)40
3.4 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)42
3.5 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—CERTIFICATION (NOV 2021)43
GENERAL CONDITIONS45
4.1 52.203-14 DISPLAY OF HOTLINE POSTER(S) (NOV 2021)45
4.2 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014)46
4.3 52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS (NOV 2021)46
4.4 52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES DEVELOPED OR PROVIDED BY KASPERSKY LAB COVERED ENTITIES (DEC 2023)48
4.5 52.204-30 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS—PROHIBITION (DEC 2023)49
4.6 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)54
4.7 52.211-12 LIQUIDATED DAMAGES—CONSTRUCTION (SEPT 2000)55
4.8 52.219-28 POSTAWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JAN 2025)55
4.9 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)58
4.10 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT (DEC 2010)59
4.11 SUPPLEMENTAL INSURANCE REQUIREMENTS60
4.12 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)61
4.13 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)62
4.14 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023) (DEVIATION)64
4.15 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION)67
4.16 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018)69
4.17 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (APR 2019)70
4.18 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)71
4.19 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019)71
4.20 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019) ALTERNATE I (APR 2019)71
4.21 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT ADMINISTRATION (OCT 2020)72
4.22 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020)73
4.23 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT (SEP 2019)74
4.24 MANDATORY WRITTEN DISCLOSURES75
4.25 IT CONTRACT SECURITY75
ATTACHMENTS85
See attached document: 7 100 CD3 Specs.85
See attached document: 7 Tampa site map.85
See attached document: 7a CD3 Drawings.85
See attached document: Base Offer Price Breakdown - 1 page.85
See attached document: Experience information Sheet.85
See attached document: PAST AND PRESENT PERFORMANCE QUESTIONNAIRE.85
See attached document: EMR 1 page.85
See attached document: WD FL20250208 05232025.85

A.3 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM NUMBER
DESCRIPTION OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1.00
JB
______________
________________

BASE BID ALL WORK: This project scope shall include but not be limited to the renovation of building 1 envelope at the James A. Haley VA hospital, located at 13000 Bruce B. Downs boulevard, Tampa, Florida as required by the drawings and specifications included in this acquisition package. The scope of work includes the completion of the restoration of building 1 envelope. A general description of work includes general construction, alterations, abatement, necessary removal of existing structures, new building components, and construction and certain other items. IAW SOW, Drawings and specifications. All work to be completed within 550 calendar days after receipt of the Notice to Proceed.

Contract Period: Base POP Begin:

POP End:

PRINCIPAL NAICS CODE: 236220 - Commercial and Institutional Building Construction PRODUCT/SERVICE CODE: Z2DA - Repair or Alteration of Hospitals and Infirmaries

1.00
JB
__________________
_______________

BID ITEM I: All work in BID ITEM 1, BASE BID, except DELETE all labor, material, equipment, and supervision to perform the scope listed below:

1. All exterior wall repair, abatement, window replacement, and related interior work located within the boundaries defined in the Construction Documents. All work to be completed within 495 calendar days after receipt of the Notice To Proceed.

Contract Period: Base POP Begin:

POP End:

PRINCIPAL NAICS CODE: 236220 - Commercial and Institutional Building Construction PRODUCT/SERVICE CODE: Z2DA - Repair or Alteration of Hospitals and Infirmaries

GRAND TOTAL
_______________

A.4 DELIVERY SCHEDULE

ITEM NUMBER
SHIPPING INFORMATION
QUANTITY
DELIVERY DATE
0001
SHIP TO:
13000 Bruce B Downs Blvd

Tampa, FL 33612 4745

USA

1.00
550 days after NTP
MARK FOR:
Nicole Dayton

(813) 972-2000 x 4134 nicole.dayton2@va.gov

FOB:
DESTINATION
0002
SHIP TO:
13000 Bruce B Downs Blvd

Tampa, FL 33612 4745

USA

1.00
495 DAYS AFTER NTP
MARK FOR:
Nicole Dayton

(813) 972-2000 x 4134 nicole.dayton2@va.gov

FOB:
DESTINATION

STATEMENT OF WORK

Construction Services: Restoration of Building 1 Envelope

PROJECT # 673-21-116

Completion by 550 days after notice to proceed

SCOPE OF WORK

This project scope shall include but not be limited to the renovation of building 1 envelope at the James a. Haley VA hospital, located at 13000 Bruce B. Downs boulevard, Tampa, Florida as required by the Statement of Work, drawings and specifications included in this acquisition package. The Statement of work includes the completion of the restoration of building 1 envelope. A general description of work includes general construction, alterations, abatement, necessary removal of existing structures, new building components, and construction and certain other items.

PLACE OF PERFORMANCE

James A. Haley Medical Center Building #1 – Main Hospital, 13000 Bruce B. Downs Blvd. Tampa, Fl. 33612

HOURS OF OPERATION AND SCHEDULING

Standard work hours for this site are 7:00AM to 3:30PM Monday through Friday except for Federal Holidays. If the Contractor desires to work on Saturday, Sunday, holidays, or outside the project site’s standard working hours the contractor must submit a written request for approval to the COR at least seven (7) working days prior to the proposed start of such work. All work that interrupts facility operations must be submitted via workplan at least twenty-one (21) calendar days prior to planned work.

CONFIRMATION OF WORK

All work will be monitored by the COR to administer the technical performance of the contract, and all work is subject to Quality Control Methods before approval.

COMPLIANCE

Contractor shall comply with statement of work, all the construction documents, all applicable Department of Veterans Affairs Master Specifications, and all project specifications herein.

CONTRACTOR EMPLOYEES

Contractor personnel shall maintain professional conduct and present a professional appearance while present on James A. Haley Medical Center property. Each contractor is subject to all Department of Veteran Affairs and Medical Center rules and procedures applicable to their conduct and appearance.

CONTRACTOR EMPLOYEE IDENTIFICATION

All contractor employees must be clearly identified as contractors (not VA employees) when performing services under this contract. This includes visual (appearance), verbal (phone), and electronic (email). The contractor must provide all employees with a contractor identification (ID) badge at the contractor’s expense prior to performing work under this contract. Contractor employees are always required to display this badge when performing services under this contract. Employees released from service by the contractor must have their ID badge collected by the contractor. All ID badges must contain an expiration date and photograph of the employee. All contractor employees must also be required to wear VA issued badges and must always display these badges while in the performance of this contract and/or as instructed by the COR. The contractor supervisor must ensure that all contractor employees display their VA issued badges. The contractor supervisor must be responsible for managing all VA issued badges provided to contractor employees and immediately collect these badges from employees no longer working on the contract.

CONTRACTOR EMPLOYEE CONDUCT

· The contractor is completely responsible for all actions and conduct of their employees. Contractor employees must be well-groomed and professional in appearance.

· Contract employees must be professional in attire and must not wear any offensive clothing.

· Contractor employees must conduct themselves in a socially acceptable manner appropriate for a medical facility work environment; Loudness, vulgarity, rudeness, smoking, or other similar offensive conduct by a contractor employee may be grounds for denying the employee further access to VA property.

· Contractor employees must not consume alcohol or illegal drugs during working hours or at any other time the employees are performing work under this contract.

CONTRACTOR RESPONSIBILITY

· The contractor shall obtain all necessary licenses and/or permits as required to perform this work, including but not limited to James A Haley VA Hospital general requirement and permits for work.

· The contractor shall take all reasonable precautions necessary to protect persons and property from injury or damage during the performance of this contract.

· The contractor shall be responsible for any injury to themselves, their employees, as well as for any damage to personal or public property that occurs during the performance of this contract that is caused by his/her employees’ fault or negligence and shall maintain personal liability and property damage insurance having coverage for a limit as required by the laws of the State of Florida.

· The contractor shall execute work in a manner that interferes as little as possible with normal functioning of the Medical Center as a whole, including operations of utility services, fire protection systems, and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel.

· The contractor shall always provide protection of interior of existing structures from damage and debris and dust generated by contractor construction activities. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.

· Further, it is agreed that any negligence of the Government, its officers, agents, servants and employees, shall not be the responsibility of the contractor hereunder with the regard to any claims, loss, damage, injury, and liability resulting there from.

CONTRACT AWARD MEETING:

· The contractor shall not commence performance on the tasks in this SOW until the CO has conducted a Kickoff Meeting and given the contractor a formal notice to proceed or advised the contractor that a kickoff meeting is waived. Latest facility work request and permit procedures shall be provided by the VA at this meeting.

CHANGES TO THE STATEMENT OF WORK (SOP):

· Any changes to this SOW shall be authorized and approved only through a Modification from the CO. A copy of each change will be kept in a project folder with all other products of the project. Costs incurred by the contractor through the actions of parties other than CO shall be borne by the contractor.

PERFORMANCE REQUIREMENTS:

· Contractor shall provide the necessary personnel and equipment to meet contractual requirements. Contractor shall have the following responsibilities:

· Provide licensed and trained personnel to execute the project in the State of Florida.

· Provide all design, supervision, labor and materials to accomplish all requirements described in this SOW, the specifications and drawings.

· Obtain all necessary licenses and permits required to perform this work required by this SOW, the specifications and drawings.

· Take all precautions necessary to protect people and property from injury and/or damage during period of performance of this contract.

· Be responsible for any injury to their employees as well as for any damages to personnel or Government property that occurs during the period of performance of this contract that is caused by Contractor fault or negligence.

· Ensure that all areas where equipment is serviced within this contract are left in an as found condition.

· Contractors shall possess and utilize all necessary tools, equipment, and Personal Protective Equipment (PPE) to perform all work in a safe manner, effectively, and timely. Tools, equipment, and PPE shall comply with OSHA Standard 29 CFR 1910, (Subpart I), and NFPA 70E. Prior to initiating work, the Contractor shall provide documentation demonstrating that all instruments, test equipment, tools, and PPE possess current calibration and safety inspections. Dated calibration and safety inspection labels shall be visible on all equipment as applicable.

· Arrange and pay for proper disposal of all generated waste, dust, and debris.

· Maintain project schedule agreed upon in the final contract documents.

· Provide all OSHA site safety for each employee during work; and

· Contractor employees shall have background checks completed.

DELIVERABLES

· The Contractor shall perform the contractual requirements necessary to complete the entire project in accordance with the SOW, the specifications, drawings and the procedures described in a timely and professional manner, at the location, place, and time that expressed herein.

With No Sensitive Data but Requires Training

VA INFORMATION AND INFORMATION SYSTEM SECURITY/PRIVACY LANGUAGE

VA INFORMATION CUSTODIAL LANGUAGE:

a. Contractors, contractor personnel, subcontractors, and subcontractor personnel shall be subject to the same Federal laws, regulations, standards, and VA Directives and Handbooks as VA and VA personnel regarding information and information system security.

b. If VA determines that the contractor has violated any of the information confidentiality, privacy, and security provisions of the contract, it shall be sufficient grounds for VA to withhold payment to the contractor or third party or terminate the contract for default or terminate for cause under Federal Acquisition Regulation (FAR) part 12.

c. A contractor/subcontractor shall request logical (technical) or physical access to VA information and VA information systems for their employees, subcontractors, and affiliates only to the extent necessary to perform the services specified in the contract, agreement, or task order.

d. All contractors, subcontractors, and third-party servicers and associates working with VA information are subject to the same investigative requirements as those of VA appointees or employees who have access to the same types of information. The level and process of background security investigations for contractors must be in accordance with VA Directive and Handbook 0710, Personnel Suitability and Security Program. The Office for Operations, Security, and Preparedness is responsible for these policies and procedures.

SECURITY INCIDENT INVESTIGATION:

a. The term “security incident” means an event that has, or could have, resulted in unauthorized access to, loss or damage to VA assets, or sensitive information, or an action that breaches VA security procedures. The contractor/subcontractor shall immediately notify the COR and simultaneously, the designated ISO and Privacy Officer for the contract of any known or suspected security/privacy incidents, or any unauthorized disclosure of sensitive information, including that contained in system(s) to which the contractor/subcontractor has access.

b. To the extent known by the contractor/subcontractor, the contractor/subcontractor’s notice to VA shall identify the information involved, the circumstances surrounding the incident (including to whom, how, when, and where the VA information or assets were placed at risk or compromised), and any other information that the contractor/subcontractor considers relevant.

c. With respect to unsecured protected health information, the business associate is deemed to have discovered a data breach when the business associate knew or should have known of a breach of such information. Upon discovery, the business associate must notify the covered entity of the breach. Notifications need to be made in accordance with the executed business associate agreement.

d. In instances of theft or break-in or other criminal activity, the contractor/subcontractor must concurrently report the incident to the appropriate law enforcement entity (or entities) of jurisdiction, including the VA OIG and Security and Law Enforcement. The contractor, its employees, and its subcontractors and their employees shall cooperate with VA and any law enforcement authority responsible for the investigation and prosecution of any possible criminal law violation(s) associated with any incident. The contractor/subcontractor shall cooperate with VA in any civil litigation to recover VA information, obtain monetary or other compensation from a third party for damages arising from any incident, or obtain injunctive relief against any third party arising from, or related to, the incident.

LIQUIDATED DAMAGES FOR DATA BREACH:

a. Consistent with the requirements of 38 U.S.C. §5725, a contract may require access to sensitive personal information. If so, the contractor is liable to VA for liquidated damages in the event of a data breach or privacy incident involving any SPI the contractor/subcontractor processes or maintains under this contract. However, it is the policy of VA to forgo collection of liquidated damages in the event the contractor provides payment of actual damages in an amount determined to be adequate by the agency.

b. The contractor/subcontractor shall provide notice to VA of a “security incident” as set forth in the Security Incident Investigation section above. Upon such notification, VA must secure from a non-Department entity or the VA Office of Inspector General an independent risk analysis of the data breach to determine the level of risk associated with the data breach for the potential misuse of any sensitive personal information involved in the data breach. The term 'data breach' means the loss, theft, or other unauthorized access, or any access other than that incidental to the scope of employment, to data containing sensitive personal information, in electronic or printed form, that results in the potential compromise of the confidentiality or integrity of the data. Contractor shall fully cooperate with the entity performing the risk analysis. Failure to cooperate may be deemed a material breach and grounds for contract termination.

SECURITY CONTROLS COMPLIANCE TESTING:

On a periodic basis, VA, including the Office of Inspector General, reserves the right to evaluate any or all of the security controls and privacy practices implemented by the contractor under the clauses contained within the contract. With 10 working days’ notice, at the request of the government, the contractor must fully cooperate and assist in a government-sponsored security controls assessment at each location wherein VA information is processed or stored, or information systems are developed, operated, maintained, or used on behalf of VA, including those initiated by the Office of Inspector General. The government may conduct a security control assessment on shorter notice (to include unannounced assessments) as determined by VA in the event of a security incident or at any other time.

TRAINING:

a. All contractor employees and subcontractor employees requiring access to VA information and VA information systems shall complete VA Privacy and Information Security Awareness and Rules of Behavior Training before being granted access to VA information and its systems.

(1) Sign and acknowledge (either manually or electronically) understanding of and responsibilities for compliance with the Rules of Behavior before being granted access to VA information and its systems.

b. The contractor shall provide to the contracting officer and/or the COR a copy of the training certificates and certification of signing the Rules of Behavior for each applicable employee within 1 week of the initiation of the contract and annually thereafter, as required.

c. Failure to complete the mandatory annual training and sign the Rules of Behavior annually, within the timeframe required, is grounds for suspension or termination of all physical or electronic access privileges and removal from work on the contract until such time as the training and documents are complete.

The Certification and Accreditation (C&A) requirements do not apply and a Security Accreditation Package is not required for this SOW.

All Contractor, Pharmaceutical Company Representative (PCR), and Healthcare Industry Representatives (HIR) will coordinate with Contracting Officer Representative for instructions, so they are in compliance with James A. Haley Veterans’ Hospital policies listed on the JAHMC Document Management Center share point site:

· HPM NO. 90-25; HEALTHCARE VENDOR ACCESS AND COMPETENCY

· HPM NO. 132-04; SECURITY MANAGEMENT PROGRAM

· HPM NO. 132‑05; HOSPITAL IDENTIFICATION PROGRAM

· HPM NO. 11-91; PHARMACEUTICAL COMPANY REPRESENTATIVES

HIR are required to report to MSDU (Room GC-003), immediately after entering the facility. HIR will be required to sign into the monitoring system and print a badge for proper identification. The Healthcare Industry Representatives for Nutrition and Food Services, Office of Information and Technology, and Social Work Services are in included in this policy; vendors (HIR) for Pharmacy Services are to follow (HPM 11-91) policy. HIR must be sponsored by a physician, a Service Chief, or their designee, for a specified date and a specified case. HIR are not permitted in patient care areas or clinics unless a prior appointment has been made.

Pharmaceutical Company Representative (PCR) refers to anyone acting on behalf of a pharmaceutical company or its business partners for the purpose of promoting the use of items managed under the VA formulary process. These items primarily include drugs, but to a lesser extent also include any medical supplies, nutritional supplements, and similar commodities managed under the VA formulary process.

a. Sign-In: PCRs may visit VA Medical care facilities no earlier than 8:00 a.m. and stay no later than 3:30 p.m., Monday through Friday, unless they receive prior approval from both the Chief of the Service that they will be visiting and the Chief of Pharmacy. Representatives visiting the JAHVH must sign in at the Pharmacy Administrative Office (Located in Trailer 78) and wear a visitor’s badge as well as their company’s personal name badge while in the hospital.

Vendors: Reference Hospital Memorandum Policy Number 90-25 Healthcare Vendor Access and Competency.

Contractors and/or project managers: Will be issued a PIV/ID badge in accordance with the facility PIV Policy. Contactors will contact their assigned VA Contracting Officer Representative (COR) for coordination.

Contract Personnel/Sub-Contractors: Contractors are responsible for the daily accountability and identification of all personnel assigned to their respective contract including sub-contractors. Contractors will identify personnel using the following procedures as appropriate.

Construction Project contract personnel will report to the contractor for issuance of a temporary self-adhesive identification badge. This badge will be issued on a daily basis and must include the following information: Company name, project number, date and name of individual. Contractor will maintain a daily log of all personnel.

Contract personnel not involved in an actual construction project will report to police dispatch for issuance of a numbered badge. A driver’s license or photo ID will be required each day upon entering the facility, in exchange for the badge, and will be given back once the badge is returned to police dispatch. The contractor will provide Police Service with a list of names for all sub-contract personnel requiring access to the facility. It is the responsibility of the contractor to update the list as necessary.

NPR OPC; CBOCs and Off-site Lease facilities with VA Police staffing: As above with check-in with VA Police.

Off-site Lease facilities w/o VA Police staffing: Coordinate with COR, Administrative Officer, or Service Point of Contact.

NARA Records Management for Contracts

1. Contractor shall comply with all applicable records management laws and regulations, as well as National Archives and Records Administration (NARA) records policies, including but not limited to the Federal Records Act (44 U.S.C. chs. 21, 29, 31, 33), NARA regulations at 36 CFR Chapter XII Subchapter B, and those policies associated with the safeguarding of records covered by the Privacy Act of 1974 (5 U.S.C. 552a). These policies include the preservation of all records, regardless of form or characteristics, mode of transmission, or state of completion.

2. In accordance with 36 CFR 1222.32, all data created for Government use and delivered to, or falling under the legal control of, the Government are Federal records subject to the provisions of 44 U.S.C. chapters 21, 29, 31, and 33, the Freedom of Information Act (FOIA) (5 U.S.C. 552), as amended, and the Privacy Act of 1974 (5 U.S.C. 552a), as amended and must be managed and scheduled for disposition only as permitted by statute or regulation.

3. In accordance with 36 CFR 1222.32, Contractor shall maintain all records created for Government use or created in the course of performing the contract and/or delivered to, or under the legal control of the Government and must be managed in accordance with Federal law. Electronic records and associated metadata must be accompanied by sufficient technical documentation to permit understanding and use of the records and data.

4. James A Haley Veterans’ Hospital and Clinics and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Records may not be removed from the legal custody of James A. Haley Veterans’ Hospital and Clinics or destroyed except for in accordance with the provisions of the agency records schedules and with the written concurrence of the Head of the Contracting Activity. Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701.

In the event of any unlawful or accidental removal, defacing, alteration, or destruction of records, Contractor must report to James A. Haley Veterans’ Hospital and Clinics. The agency must report promptly to NARA in accordance with 36 CFR 1230.

5. The Contractor shall immediately notify the appropriate Contracting Officer upon discovery of any inadvertent or unauthorized disclosures of information, data, documentary materials, records or equipment. Disclosure of non-public information is limited to authorized personnel with a need-to-know as described in the [contract vehicle]. The Contractor shall ensure that the appropriate personnel, administrative, technical, and physical safeguards are established to ensure the security and confidentiality of this information, data, documentary material, records and/or equipment is properly protected. The Contractor shall not remove material from Government facilities or systems, or facilities or systems operated or maintained on the Government’s behalf, without the express written permission of the Head of the Contracting Activity. When information, data, documentary material, records and/or equipment are no longer required, it shall be returned to James A. Haley Veterans’ Hospital and Clinics control, or the Contractor must hold it until otherwise directed. Items returned to the Government shall be hand carried, mailed, emailed, or securely electronically transmitted to the Contracting Officer or address prescribed in the [contract vehicle]. Destruction of records is EXPRESSLY PROHIBITED unless in accordance with Paragraph (4).

6. The Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under, or relating to, contracts. The Contractor (and any sub-contractor) is required to abide by Government and James A. Haley Veterans’ Hospital and Clinics guidance for protecting sensitive, proprietary information, classified, and controlled unclassified information.

7. The Contractor shall only use Government IT equipment for purposes specifically tied to or authorized by the contract and in accordance with James A. Haley Veterans’ Hospital and Clinics policy.

8. The Contractor shall not create or maintain any records containing any non-public James A. Haley Veterans’ Hospital and Clinics information that are not specifically tied to or authorized by the contract.

9. The Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected from public disclosure by an exemption to the Freedom of Information Act.

10. The James A. Haley Veterans’ Hospital and Clinics owns the rights to all data and records produced as part of this contract. All deliverables under the contract are the property of the U.S. Government for which James A Haley Veterans’ Hospital and Clinics shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest. Any Contractor rights in the data or deliverables must be identified as required by FAR 52.227-11 through FAR 52.227-20.

11. Training. All Contractor employees assigned to this contract who create, work with, or otherwise handle records are required to take VHA-provided records management training, Talent Management System (TMS) Item #4192704, Records Management for Everyone. The Contractor is responsible for confirming training has been completed according to agency policies, including initial training and any annual or refresher training.

[Note: To the extent an agency requires contractors to complete records management training, the agency must provide the training to the contractor.] D. Flow down of requirements to Subcontractors

1. The Contractor shall incorporate the substance of this clause, its terms and requirements including this paragraph, in all subcontracts under this [contract vehicle], and require written subcontractor acknowledgment of same.

2. Violation by a subcontractor of any provision set forth in this clause will be attributed to the Contractor.

(END OF CLAUSE)

INSTRUCTION TO OFFERORS

ISSUE DATE: 27 October 2025 PROPOSAL DUE DATE: 12/17/2025 AT 2:00PM EST

PROJECT TITLE: BB - RESTORATION OF BUILDING 1 ENVELOPE

PROJECT NUMBER: 673-21-116

LOCATION: James A. Haley VA Hospital, 13000 Bruce B. Downs Boulevard, Tampa, Florida, 33612.

OFFICE ISSUING THIS REQUEST:

Department of Veterans Affairs Network Contracting Office (NCO) 8 Point of Contact (POC): David Hernandez Email: David.hernandez1@va.gov ; Phone: (813) 893-3904 PROJECT SUMMARY: This project scope shall include but not be limited to the renovation of building 1 envelope at the James a. Haley VA hospital, located at 13000 Bruce B. Downs boulevard, Tampa, Florida as required by the drawings and specifications included in this acquisition package. The scope of work includes the completion of the restoration of building 1 envelope. A general description of work includes general construction, alterations, abatement, necessary removal of existing structures, new building components, and construction and certain other items.

PART I – GENERAL INFORMATION

1. All references to “Bid” or “Bidder” shall be understood to mean “Offer” or “Offeror”.

2. MAGNITUDE OF THIS PROJECT: Between $5,000,000.00 and $10,000,000.00.

3. SITE VISIT: An organized site visit is planned for 11/12/2025 at 10:00 AM EST. Meeting location is Building 42 at which point the group will make its way to the site visit location. Please contact Healthcare Engineer Nicole Dayton at Nicole.Dayton2@va.gov to confirm attendance. Technical questions are not allowed during the site visit. Please record your questions and submit them to the Contracting Officer as an RFI by the date indicated in #5 below.

4. OFFER ACCEPTANCE PERIOD: Offers providing less than one hundred and twenty (120) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

5. REQUESTS FOR INFORMATION: Requests for Information (RFIs) shall be submitted by the prime contractor, through the Point of Contact (POC) email David.hernandez1@va.gov No telephone RFIs will be accepted. The cutoff for submission of RFIs is 11/21/2025 at 2:00PM EST, email to david.hernandez1@va.gov. Responses will be provided in a Question & Answer format to all Bidders.

6. SPECIFICATIONS AND DRAWINGS: All applicable specifications and drawings, if available, will be provided electronically in SAM.gov as attachments to this RFP. No hard copies will be made available to proposing contractors.

7. Any reference contained within contract specifications and/or drawings to the “VA Engineer”, “Resident Engineer”, “Senior Resident Engineer”, “Project Manager”, Contracting Officer Technical Representative, or their abbreviations are to be replaced with “Contracting Officer’s Representative (COR)”.

8. SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS VERIFICATION: Subsequent contracts are 100% set asides for verified SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS (SDVOSB). The award of this requirement shall not be delayed due to loss of SDVOSB verification. PROPOSALs submitted by non-certified by Small Business Search https://search.certifications.sba.gov/ shall be excluded from award consideration.

8.1 Small Business Verification: The Government will review Small Business Search https://search.certifications.sba.gov/ to confirm SDVOSB status verification for the submitted PROPOSAL. Evaluations will be performed on PROPOSALs submitted by verified SDVOSB only. The Contracting Officer will use the UEI to verify that the Offeror has an active Federal Government contracts registration in SAM. IAW FAR 52.204-7(b)(1)(iii).

9. LIMITATIONS ON SUBCONTRACTING (Reference Contract Clause VAR 852.219-75 for further information): By submission of an offer and execution of a contract, the Offeror agrees that in performance of the contract, the concern will perform at least fifteen (15) percent of the cost of the contract, not including the cost of materials, with its own employees.

10. FUNDS. Funds are not presently available for this contract. (Reference Contract Clause FAR 52.232-18)

11. BONDS (Reference Contract Clause FAR 52.228-15 for further information on applicability). A payment and performance bond shall be provided. The penal sum shall be one hundred percent (100%) of order price. Bonds and other payment protection shall be provided within ten (10) calendar days of award of the Contract. Notice to proceed will not be issued until the Contractor provides sufficient bonding to cover the work being performed

12. OFFER GUARANTEE: BID BOND – (SUBMIT WITH YOUR PRICE PROPOSAL) per FAR Clause 52.228-1 -Bid Guarantee, the amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000, whichever is less. Provide with PRICE PROPOSAL. NOTE: A scanned copy of the original is acceptable. Bond Seal must be visible.

13. SAFETY AND ENVIRONMENTAL RECORD (SUBMIT WITH PROPOSAL): Offerors shall submit information that specify the contractor in question has no more than three serious, or one repeat, or one willful OSHA or EPA violation(s) in the past three (3) years and has an Experience Modification Rate (EMR) that shall not exceed 1.0. If there is no EMR, state the reason way no EMR is available. EMR greater than 1.0 will not be acceptable. Offerors are required to complete and submit attached Past safety and environmental record or any other form that provided the above information. Offerors with an EMR greater than 1.0 will be considered ineligible and will not be evaluated.

14. CONTRACT PERFORMANCE PERIOD: Refer to SF1442, Block 11, for contract performance period. Performance period shall be commenced upon receipt of written Notice to Proceed (NTP) performed in concurrent or sequential phases as indicated or required.

16. WAGE DETERMINATION: Wages for all contractors and subcontractors must comply with Davis Bacon Wage Determinations. The current Davis Bacon determination is General Decision Number: FL20250222 05-23-2025. Be advised that the determination that is current at the time of the Contract award is the determination that will apply for the project. Current determinations are always available at: https://sam.gov/wage-determinations

17. CONTRACT PERFORMANCE PERIOD: 550 calendar days after receipt of written Notice to Proceed performed in concurrent or sequential phases as indicated or required. If you anticipate long lead times for project materials, state this in the technical PROPOSAL with your anticipated lead time for the specific item

II. PROPOSAL PREPARATION AND EVALUATION INFORMATION

1. PROPOSAL PREPARATION INSTRUCTION: To ensure timely and equitable evaluation of PROPOSALs, offerors must follow the instructions contained herein. In order for PROPOSALs to receive full consideration for award, offerors should ensure that the information furnished in support of the PROPOSAL is factual, accurate, and complete, and directly responds to the requirements of this RFQ.

NOTE: Your PROPOSAL shall be submitted as portable data files (pdf), and documents submitted shall be no larger than 7 Mega Bytes (MB) in size. Send document in separate files as deemed necessary. If separate files are submitted for specific submission, offeror shall include in the subject line right after required subject title, email number followed by the emails total to be submitted for specific submission.

2. PROPOSAL SUBMISSION: All PROPOSALS shall be submitted by the prime contractor no later than (NLT) closing date and time specified in SF1442, Block 13.A. (subject to amendment) through the Point of Contact email David.hernandez1@va.gov . NO OTHER FORMS OF SUBMISSION WILL BE ACCEPTED.

3. Undeliverable emails due to an offeror’s PROPOSAL size, using wrong email address, or other transmission errors, is not the responsibility of the Government.

NOTE: To be considered and accepted as timely the PROPOSAL must be received in its entirety prior to the deadline. Failure to provide a PROPOSAL in its entirety prior to the deadline will result in the proposal will not be evaluated.

4. BASIS FOR AWARD: The Government will award one (1) firm-fixed price contract resulting from this solicitation to the responsible offeror whose offer, conforming to the solicitation, will be most advantageous to the Government, all evaluation factors other than cost or price, when combined, are approximately equal to cost or price. As differences in factor ratings and relative advantages and disadvantages become less distinct, difference in price may become the discriminating factor in determining the most advantageous offer. Conversely, as differences in price become less distinct, differences in ratings and relative advantages and disadvantages between offers are determinative. The PROPOSALs must conform RFP requirements and be judged to represent the Best Value to the Government. The source selection process will utilize FAR Parts 15.103-1 (Tradeoff) and FAR Part 36 to evaluate PROPOSALs and award the contract.

The Government intends to evaluate PROPOSALs and award a contract without conducting discussions with offerors. However, the Government reserves the right to hold discussions if the Contracting Officer determines them to be necessary.

5. SELECTION AND EVALUATION PROCEDURES: This part describes the mechanism for evaluating and selecting offers for this procurement.

6. PROPOSAL PREPARATION INSTRUCTIONS: The following must be included in the offeror’s PROPOSAL:

· Cover Page with: Bid Build Project, RFQ (Solicitation) Number, Project Title and Project Number, Company Information (Primary points of contact, email, address, phone numbers (including area code), DUNs number, Cage code, EUI, etc.)

· Table of Contents

· Signed SF 1442, with Blocks 14-20C completed including acknowledgement of any Amendments issued.

· Completed Experience Modification Rate (EMR) Form

· Completed Bid Bond

· Completed and signed VAAR 852.219-75 (The formal certification must be completed, signed and returned with the offeror's bid, quotation, or proposal. The Government will not consider offers for award from offerors that do not provide the certification, and all such responses will be deemed ineligible for evaluation and award.)

· Required Submittals for Factor 1 – Technical/Management Approach

· Required Submittals for Factor 2 – Specialized Experience

· Required Submittals for Factor 3 – Schedule

· Required Submittals for Factor 4 - Past Performance

· Required Submittals for Factor 5 - Price COMPLETED PRICE SCHEDULE (Total of Proposed Price of each CLIN). The price PROPOSAL shall be submitted separate from the technical PROPOSAL. The proposed prices will be analyzed for fairness and reasonableness.

PRICE EVALUATION: The Government will initially review pricing independently from the factor evaluation. Price is not rated but will be analyzed for fairness and reasonableness. The Government may use various price analysis techniques and procedures to make a reasonable determination of price.

TECHNICAL EVALUATION FACTORS

FACTOR I - Technical/Management Approach

1. Describe in a written narrative, the plan for phasing and coordinating the work so that the facility remains…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .