Base Offer Price Breakdown - 1 page.xlsx
XLSX spreadsheet 23 KB Posted
- Solicitation number
- 36C24826Q0005
About this file
The file is a Base Offer Price Breakdown template for a VA design-build project at James A. Haley VA Hospital in Tampa, Florida. The spreadsheet provides a comprehensive cost breakdown structure across 34 construction divisions, including categories such as General Requirements, Concrete, Masonry, Electrical, HVAC, and Utilities, with designated columns for Labor Costs, Material Costs, and Total Costs. The template allows offerors to input detailed pricing information, including overhead, profit, and bonding percentages, with the goal of providing a granular price analysis for the government.
The associated federal contract opportunity (Solicitation No. 36C24826Q0005) is a design-build project to replace and relocate chilled water piping in Building 38 at the hospital. The solicitation was issued on 09/29/2025, with Phase I quotes due on 11/03/2025 at 10:00 AM EST. The project requires professional services, design, and construction for installing new chilled water piping on the parking garage level, with the primary point of contact being David Hernandez from the Department of Veterans Affairs Network Contracting Office 8.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 251117_RFI_Responses.docx | DOCX document | |
| 36C24826Q0005 0003.docx | DOCX document | |
| 251117_RFI_Responses.docx | DOCX document | |
| 36C24826Q0005 0002.docx | DOCX document | |
| 36C24826Q0005 0001.docx | DOCX document | |
| site visit for chilled water piping.pdf | ||
| 10a_230511 HVAC.docx | DOCX document | |
| WD FL20250208 05232025.pdf | ||
| Experience information Sheet.pdf | ||
| 9_013323 Shop Drawings.docx | DOCX document | |
| 10_220711 Plumbing Insulation.docx | DOCX document | |
| 4_ TIL 001121.docx | DOCX document | |
| 5 TIL General Specification - Tampa Specific.docx | DOCX document | |
| EMR 1 page.pdf | ||
| PAST AND PRESENT PERFORMANCE QUESTIONNAIRE.docx | DOCX document | |
| 36C24826Q0005_1.docx | DOCX document | |
| 6 Safety Requirements 2024 TAMPA Safety TIL.rtf | RTF text file |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Offer Base Offer Cost Breakdown
Project Number: N/A Edward L Roy: VA assigned project #
| Date: | |
| Project Title |
| Edward L Roy: VA assigned Project Title | Project Location | ||
| Offeror Name | |||
| Offeror Street | |||
| Offeror City | State | Zip |
Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division
| Material Cost | |
| Edward L Roy: Enter all Material Costs by Division | Total Cost |
Edward L Roy: This Column is the sum of the Division's Labor and Material Costs
| Division 1 | General Requirements | |||
| Division 2 | Existing Conditions | - 0 | ||
| Division 3 | Concrete | - 0 | - 0 | |
| Division 4 | Masonry | - 0 | ||
| Division 5 | Metals | - 0 | - 0 | |
| Division 6 | Wood and Plastic | - 0 | ||
| Division 7 | Thermal & Moisture Protect | - 0 | - 0 | |
| Division 8 | Doors and Windows | - 0 | - 0 | - 0 |
| Division 9 | Finishes | - 0 | - 0 | - 0 |
| Division 10 | Specialties | - 0 | - 0 | - 0 |
| Division 11 | Equipment | - 0 | - 0 | - 0 |
| Division 12 | Furnishings | - 0 | - 0 | - 0 |
| Division 13 | Special Construction | - 0 | - 0 | |
| Division 14 | Conveying Equipment | - 0 | - 0 | - 0 |
| Division 21 | Fire Suppression | - 0 | - 0 | - 0 |
| Division 22 | Plumbing | - 0 | - 0 | - 0 |
| Division 23 | HVAC | - 0 | - 0 | - 0 |
| Division 26 | Electrical | - 0 | - 0 | - 0 |
| Division 27 | Communications | - 0 | - 0 | - 0 |
| Division 28 | Electronic Safety & Security | - 0 | - 0 | - 0 |
| Division 31 | Earthwork | - 0 | - 0 | - 0 |
| Division 32 | Exterior Improvements | - 0 | - 0 | - 0 |
| Division 33 | Utilities | - 0 | - 0 | - 0 |
| Division 34 | Transportation Subtotal | - 0 | - 0 | - 0 |
| Division Subtotals : | $ - 0 | $ - 0 | $ - 0 |
Overhead % Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).
Edward L Roy: Date Offer Prepared/Submitted
| - 0 | ||
| Profit % | ||
| Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38). | - 0 | |
| Bond % |
Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).
Edward L Roy: Enter all Labor Costs by Division
| - 0 | ||
| Overhead/Profit Subtotals : | $ - 0 |
Edward L Roy: Sum of Overhead, Profit and Bond %.
Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0
Offerors shall provide additional price breakdown to avoiding lump sum, etc. This price offer breakdown is the overall base offer price for Government price analysis
File details come from the government source that posted it. Updated .