This document is a Request for Proposal (RFP) for a design-build project to replace and relocate chilled water piping at the James A. Haley VA Hospital in Tampa, Florida. The project (NRM Project # 673-26-111) involves professional services, equipment, labor, and design-build services to install new chilled water piping on the parking garage level in Building 38, with an anticipated cost range between $500,000 and $2,000,000. The project is expected to be completed within 913 days after notice to proceed.
The solicitation requires offerors to submit separate technical and cost proposals, with evaluation criteria weighted at 50% each, focusing on cost (50%), construction management (20%), past experience (15%), and schedule (15%). Key personnel requirements include roles such as Project Manager, Architect, Structural Engineer, Electrical Engineer, Construction Project Manager, and others. Proposals must demonstrate design-build experience, key personnel qualifications, detailed project schedule, and construction management techniques. The project will be awarded to the offeror presenting the most advantageous proposal to the government, with the Department of Veterans Affairs Network Contracting Office 8 managing the solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 251117_RFI_Responses.docx | DOCX document | |
| 36C24826Q0005 0003.docx | DOCX document | |
| 251117_RFI_Responses.docx | DOCX document | |
| 36C24826Q0005 0002.docx | DOCX document | |
| 36C24826Q0005 0001.docx | DOCX document | |
| site visit for chilled water piping.pdf | ||
| 10a_230511 HVAC.docx | DOCX document | |
| WD FL20250208 05232025.pdf | ||
| Experience information Sheet.pdf | ||
| 9_013323 Shop Drawings.docx | DOCX document | |
| 10_220711 Plumbing Insulation.docx | DOCX document | |
| 5 TIL General Specification - Tampa Specific.docx | DOCX document | |
| EMR 1 page.pdf | ||
| PAST AND PRESENT PERFORMANCE QUESTIONNAIRE.docx | DOCX document | |
| 36C24826Q0005_1.docx | DOCX document | |
| 6 Safety Requirements 2024 TAMPA Safety TIL.rtf | RTF text file | |
| Base Offer Price Breakdown - 1 page.xlsx | XLSX spreadsheet |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
09-01-21
SECTION 00 11 21
REQUEST FOR PROPOSAL TO DESIGN BUILD
Replace Relocate Chilled Water piping SCI) 673-26-111 (Bld 38, JAHVAH)
| A. | PART I - General |
| A1. | Scope of Contract |
| Provide all necessary professional services, equipment, labor, materials, supervision, tools, testing, specialty services, and design-build services to perform a design-build for the NRM Project # 673-26-111, " Replace Relocate Chilled Water Piping SCI" in Building 38 at the James A. Haley VA Hospital, located at 13000 Bruce B. Downs Boulevard, Tampa, Florida, 33612. The work includes, but is not limited to site investigation, design and preparation of drawings, phase planning, specifications, construction, and installation of new chilled water piping on the parking garage level in Building 38 as designed in the hospital areas identified in the project description in the SOW. |
Spec Writer Note: Insert title of project and define scope of design build and construction work.
| A2. | Definitions |
| A. | Design-Build (DB) as defined by the US Department of Veterans Affairs (VA) is the procurement by the Government, under one contract, with one firm or joint venture (JV) for both design and construction services for a specific project. |
| 1. | Contracting Officer: The services to be performed under this contract are subject to the general supervision, direction, control and approval of the Contracting Officer. |
| 2. | Project Manager: The Contracting Officer's representative responsible for administering contracts under the immediate direction of the Contracting Officer. |
| 3. | COR: The Contracting Officer's authorized representative at the construction site. When more than one Resident Engineer is assigned to a construction project one is designated as being in‑charge and is called the "Senior Resident Engineer". The Resident Engineer is responsible for protecting the Government's interest in the execution of the construction contract work. His duties include surveillance of all construction work to assure compliance with the contract documents, interpretation of the contract documents, approval of changed work, approval of all submittals, samples, shop drawings, etc. The Resident Engineer may issue change orders to the Contractor within the limitations set forth in his delegation of authority from the Contracting Officer. |
| 4. | Design Build Contract: This term, as used herein, refers to the Contract(s) to perform the design and construction of the project. |
| 5. | Contractor: This term, as used herein, refers to the contractor under this contract or the DB team. |
| 6. | AE: This term, as used herein, refers to the Architect‑Engineer firm(s)that are a part of the DB team, also referred to as DB/AE. |
| A3. | Cost Range |
| The anticipated cost range for this project is between $500,000 and $2,000,000. | |
| A4. | Schedule Objectives |
The anticipated completion of this project is 913 days after “notice to proceed”.
B. SELECTION PROCEDURE
The Government expects its selection of the Design-Build Contractor will encompass several steps. However, the Government may initiate action to award a contract at any point after review of the offers. Therefore, each offer should reflect the Offeror’s best terms, both from a cost and technical standpoint. See FAR 52. 215-1, Instructions to Offerors - Competitive Acquisition (OCT 1997).
| B1. | Offers |
| A. | Offers shall be based on this solicitation, together with General Requirements listed in Division 1, Section 01010, Contract Documents listed for Project 673-26-111. Offers will be in the format stipulated elsewhere in this section. |
| B. | Sealed Offers, will be presented, separately bound by cost and technical parts in original and three copies. Offers shall include a completed SF 1442 (Solicitation Offer and Award) which acknowledges receiving all amendments, by number. There will be no public opening of the offers; and |
| C. | A Pre-Proposal Conference will be held on TBD. Offerors, subcontractors, manufacturers, and suppliers are invited to attend. |
| B2. | Best and Final Offer |
| A. | If determined to be necessary, best and final offers will be requested from the original offers received. The Contracting Officer will identify those offerors whose proposals are within the competitive range, considering the selection criteria identified in this section. Negotiations may be conducted with those offerors falling within the competitive range, after which best and final offers will be requested. Those selected as within the competitive range will be given 14 calendar days to prepare their best and final offer. Sealed best and final offers will be submitted as per A2.1.B except as noted below and will be due at a time and place to be determined. There will be no public opening of the offers; and |
| B. | Offerors submitting best and final offers will not be requested to re-submit any documents which are unchanged from their initial proposals. Provide necessary changes as individual paragraphs or otherwise as briefly as possible, together with a table of contents, which clarifies where within the initial proposal additional or changed documents would be placed. Cost proposals shall include a completed SF 1442 (Solicitation Offer and Award) which acknowledges receiving all amendments, by number. A new Bid Bond shall be submitted only if the best and final offeror’s price proposal is greater than its initial price proposal. |
| B3. | Selection Criteria and Weightings |
A. Proposals will be evaluated based on both cost and technical considerations. In descending order of importance, evaluations will be based on cost, construction management, past experience, and schedule.
B. Award will be made to the offeror whose proposal is most advantageous to the government, price, and other factors considered. Offerors are advised that if the technical proposals are essentially equal, award will be made on the basis of the lowest price.
C. The weightings will be based on a total of 100%, with the cost evaluation at 50% and the technical evaluation at 50%. The weightings are as follows:
a. Cost Evaluation = 50% of total:
i. Formula = [A/B] X C = D
ii. A = Lowest price proposal (maximum points)
iii. B = Each remaining price proposal
iv. C = Maximum points for price
v. D = Point value for each remaining price proposal
b. Technical Evaluation = 50% of total:
| c. a. | Construction Management: (20% of total); |
| d. b. | Past Experience: (15% of total); and |
| e. c. | Schedule: (15% of total). |
D. Responsibility determination will be made in accordance with FAR 9.1, responsible Prospective Contractors.
B4. Cost Evaluation Offers shall be prepared for a 365-day schedule. Offeror’s may propose an alternate schedule, in addition to the 365-day base schedule, which will also be evaluated per article A2.3, Selection Criteria and Weightings.
| B5. | Technical Evaluation |
| A. | Construction Management - Design-Build Team engineering/technical consultants shall be the subcontractor of the Design-Build Architect Engineer (DB A/E), not the Design-Build contractor or sub-contractors, assuming that the DB A/E and DB contractor are not one and the same firm. The Offeror shall demonstrate relevant experience of key personnel to be involved in this procurement. Supply biographical data including name of individual, company position, years with the company, work and educational background, tasks to be assigned on this project, percentage of work week to be committed to this project: |
| 1. | Key personnel shall include: |
| a. | Project Manager. |
| b. | Architect. |
| c. | Structural Engineer. |
| e. | Electrical Engineer. |
| f. | Interior Designer. |
| g. | Construction Project Manager. |
| h. | Construction Superintendent. |
| i. | Certified Industrial Hygienist; and |
| j. | Qualified Fire Protection Engineer. |
| 2. | The Offeror shall demonstrate techniques for maintaining on-time schedule performance. |
| 3. | The Offeror shall demonstrate a plan for utilizing the staging area, indicated on site drawings; and |
| 4. | The Offeror shall demonstrate techniques for maintaining workmanship and material quality control. |
| B. | Past Experience - The Offeror shall demonstrate prior corporate experience listing only projects awarded within the last five years with either of the following criteria: 1) projects completed by a DB contract (DB as defined by the VA (See article A1.2), and 2) project was one similar in size and scope to this project. Scoring may be more favorable if both criteria are met. Also include the following information for each project listed (Items are of equal importance): |
| 1. | The Offeror’s design experience in the Design-Build process. |
| 2. | The Offeror’s construction experience in the Design-Build process. |
| 3. | The Offeror’s recent experience in meeting the completion schedule for similar projects. |
| 4. | The Offeror’s awards that have been won for similar projects; and |
| 5. | The Offeror the major equipment supplier and their qualifications. |
| C. | Schedule - The Offeror shall provide a detailed schedule with narrative: |
| 1. | Design Period: |
| a. | The design period and provisions for Government reviews. |
| b. | A list of drawings to be included with each design submittal for VA reviews; and |
| c. | A phasing plan for coordination of interruptions to the utility service due to relocation site utility work. |
| 2. | Construction Period: |
| a. | Mobilization. |
| b. | Demolition method and sequencing. |
| c. | Excavation. |
| d. | Enclosure. |
| e. | Interior construction. |
| f. | Procurement and installation of equipment. |
| g. | Provisions for overtime or shift work. |
| h. | Timing of relocation of existing equipment. (list any existing equipment to be relocated). |
| i. | Site utilities, temporary stairs, and roadway realignment; and |
| j. | Tests and final inspection. |
| B6. | Role for VA’s consultant A/E Team |
| A. | The Government has determined that the Department of Veterans Affairs team of architect and engineering (A/E) consultant firms who developed this project to date (and produced these RFP documents) are not available to be named as members of the Offeror’s design team. The VA will retain their team for the remainder of the project’s development for review and monitoring purposes; and |
| B. | For clarity the A/E team who produced these RFP documents are listed below: |
JAHVA FMS Project Engineering Section
| C. | OFFER REQUIREMENTS |
| C1. | Proposal Sections |
Cost and Technical sections of the Offerors proposals will be evaluated independently. Offeror shall separately bind each section. Each section must therefore be labeled with the Offeror’s organization, business address, and VA Project Number 673-26-111.
| C2. | Cost Proposal Requirements |
| A. | Carefully follow “Instructions, Conditions, and Notices to Offerors.” Standard Form 1442 (Solicitation, Offer, and Award) shall be used for submitting offers. Offerors shall affix their names and return addresses in the lower left corner of the Offeror’s envelope. Envelopes containing offers must be sealed. Submit four copies of Standard Form 1442 with an offer guarantee as stipulated in the Section “Instructions, Conditions, and Notices to Offerors”. |
| B. | Offerors shall submit separate prices for architect-engineer services, construction work and other activities (and the equipment). Under Section 304(b) of the Federal Property and Administrative Services Act, VA is not authorized to obligate funds or pay for architect-engineer services that exceed 6 percent of the estimated project cost, exclusive of fees; and |
| C. | Offeror shall include all required Representations and Certifications. |
| C3. | Technical Proposal Requirements |
| A. | The proposal shall meet the following requirements and evaluation will be based upon the criteria mentioned in article A2.5, Technical Evaluation. |
| B. | The Offeror shall provide a narrative description of the proposed building system or technology; and |
| C. | Construction Management: The Offeror shall demonstrate the relevant experience of key project personnel. Supply biographical data for key personnel for both the design and build portions of the work. Biographical data shall include the following: name of individual, company position, years with the company, work and educational background, and position that the individual will hold in regard to this contract: |
| 1. | Key personnel shall include: |
| a. | Overall Project Manager; |
| b. | Architect; |
| c. | Structural Engineer; |
| e. | Electrical Engineer; |
| f. | Certified Industrial Hygienist; |
| g. | Qualified Fire Protection Engineer; |
| h. | Construction Project Manager; and |
| i. | Construction Superintendent. |
| 2. | Indicate which individuals are used for the design phase and which are used during the construction phrase. Indicate what percentage of each individual’s time would be committed to the project during both the design and construction phases. |
| D. | Past (Corporate) Experience: The Offeror shall demonstrate prior corporate experience in the last five years with Design-Build. In describing project design and construction experience, provide the following information: |
| 1. | Project location. |
| 2. | Project owner. |
| 3. | Name and telephone number of Owner’s contact person. |
| 4. | Design Architect and Engineers. |
| 5. | Completion Date. |
| 6. | Construction Cost. |
| 7. | Names of Major Subcontractors. |
| 8. | Square Footage. |
| 9. | Foundation Type. |
| 10. | Number of Levels. |
| 11. | Length of Design Effort. |
| 12. | Length of Construction; and |
| 13. | A list of all consultants and all proposed major subcontractors. |
Also include experience in meeting the completion schedule, awards, and major equipment suppliers and their qualifications for similar Design-Build projects.
| E. | Detailed Schedule and Narrative: The Offeror shall provide a detailed schedule and narrative, indicating specific dates for each step of the process: |
| 1. | Contract progress schedule: The progress schedule will be in a time scaled bar graph format. The horizontal axis will be scaled for time beginning with the Notice to Proceed and concluding with contract completion. The vertical axis will show the milestones and major portions of the contract work. All schedule items will show a start date and a completion date. |
| 2. | The Offeror shall describe in a written narrative its plans for phasing the work so that the Medical Center remains operational while utilities and access roadways are realigned. The narrative will also detail how the contractor intends to prepare the site, disassemble, relocate, reassemble, and reactivate utility services to the Medical Center within the specified time limits. |
| 3. | The Offeror shall clarify its intended uses of portions of the site for materials staging, temporary trailer offices, employee parking, and other activities. |
| 4. | The Offeror shall specify how much allowance has been made for bad weather in the schedule. |
| 5. | The Offeror shall specify the days of the week and the hours of construction operations during each phase of the work; and |
| 6. | The Offeror shall specify the percentage of contract completion that will be achieved at the completion of design and thereafter at each month of construction. |
| F. | CADD Drawings: The Offeror shall submit all drawings in both hard copy and electronic form in AutoCAD. |
| D. | GENERAL CONTRACT REQUIREMENTS |
Provide design build services to replace and relocate chilled water piping in Building 38 (Spinal Cord Injury) from above patient areas to the pipe basement/garage area.
The Contractor shall comply with all VA applicable design and construction criteria using industry standard best practices and materials. No deviations from the criteria shall be permitted without prior written approval from the C.O.R. All questions or problems encountered by the Contractor in following criteria shall be promptly submitted with recommendations to the C.O.R. for review. The SOW documents do not present or solve any building code or life safety problems. The DB team will have full responsibility to design and direct construction and to comply with VA building and life safety codes.
D1. Design-Build (DB) Team’s Responsibilities Intent: The DB contractor shall construct the project in accordance with the VA RFP documents and approved construction documents prepared by the DB A/E within the required time period (contract length).
| D2. | Construction Documents |
| A. | General: |
| 1. | The RFP documents are intended to define the intent of the project. It is the DB team’s responsibility to complete the documents and construction in a manner consistent with the intent of the solicitation documents; |
| 2. | The Design-Build Team A/E (DB A/E) shall prepare and submit complete construction documents for review and approval by the VA in accordance with standard professional practice, the Department of Veterans Affairs Request for Proposal (VA RFP), and prevailing codes. The DB A/E shall submit the construction documents for review at (35%), (65%), (95%), and (100%) completion stage; |
| 3. | The DB team shall allow a minimum of (15) working day for each review cycle. A cycle commences with the VA’s receipt of the review documents and concludes with the DB team’s receipt of comments, either electronically by fax, or by hard copy delivery. The DB Team shall allow for (1) full day meetings with the staff of VA Medical Center James A Haley, to review each submission and resolve design issues; |
| 4. | Each submission shall include one full-size printed drawing set, two half-size printed drawing sets, and electronic versions of it in PDF and DWG. |
| 5. | Each submittal shall be made to the VA Project Manager for coordination with the VA Medical Center, RFP A/E, VA Resident Engineer; |
| 6. | Mandatory schedules and details may be indicated either on the drawings or in the specifications, at the option of the DB team; |
| 7. | The drawings included in the VA RFP will be available to the DB team in electronic format in AutoCAD for use in preparing the construction drawings, but accuracy of drawings shall not be assumed. Since data stored on electronic media can deteriorate undetected or be modified without the RFP Architect/Engineer’s knowledge, the CADD drawing files are provided without warranty or obligation on the part of the RFP Architect/Engineer as to accuracy or information contained in the files. All information in the files shall be independently verified by the user. Any user shall agree to indemnify and hold the RFP Architect Engineer harmless from any and all claims, damages, losses, and expenses including, but not limited to, attorney’s fee arising out of the use of the CADD drawing files; |
| 8. | The specifications included in the VA RFP shall be available to the DB team in electronic format in (Word) for use in preparing the construction specifications. Since data stored on electronic media can deteriorate undetected or be modified without the RFP Architect/Engineer’s knowledge, the CADD drawing files are provided without warranty or obligation on the part of the RFP Architect/Engineer as to accuracy or information contained in the files. All information in the files shall be independently verified by the user. Any user shall agree to indemnify and hold the RFP Architect Engineer harmless from any and all claims, damages, losses, and expenses including, but not limited to, attorney’s fee arising out of the use of the electronic files; |
| 9. | The DB A/E who prepares the construction documents shall be professional architect/engineers licensed in the state in which the design work is completed. The professional seal indicating such license by the state shall appear on the documents. The architect whose seal is shown will be known as the architect of record. The DB A/E shall certify compliance with the VA RFP; and |
| 10. | The construction drawings shall comply with the VA RFP and be prepared to include such details that the project can be constructed. The construction record drawings shall be completed in AutoCAD. Construction shop drawings are not required to be completed in AutoCAD. Drawings shall be plotted at scales no smaller than those used for equivalent information in the RFP (solicitation)documents. |
| B. | Construction Drawings: If called for, the construction drawings shall include a coordinated set of: |
| 1. | Civil engineering drawings including grading and drainage plans, paving plans, utility plans, schedules, and details; |
| 2. | Landscape drawings including landscape plans, plant schedule and list, special landscape elements, proposed materials to be used for each special landscape element, and details; |
| 3. | Structural drawings including foundation plans, roof framing plans, schedules, and details, including general notes and all calculations; |
| 4. | Architectural drawings including floor plans, building elevations, building sections, wall sections, reflected ceiling plans, stair details, toilet and bath details, cabinetry elevations, door schedules and details, window schedules and details, room finish schedules, loading dock details, auto transport and pneumatic tube details, and other details; |
| 5. | Fire protection drawings including floor and roof plans, riser diagrams, equipment schedules, plumbing fixture schedules, and details, including general notes and all related calculations; |
| 6. | Food service Equipment drawings including floor plans, elevators, equipment schedules, and details; |
| 7. | Plumbing drawings including floor and roof plans, riser diagrams, equipment schedules, plumbing fixture schedules, and details, including general notes and all related calculations; |
| 8. | HVAC drawings including floor and roof plans, one-line flow diagrams, equipment schedules, and details, including general notes and all related calculations. Also provide sections for mechanical equipment rooms and sequence of operation for all HVAC equipment; |
| 9. | Outside Steam Distribution drawings including system plans and profiles, manhole piping plans and sections, equipment schedules, and details; and |
| 10. | Electrical drawings including floor and roof plans (power, lighting, and other systems), one-line diagrams, panel schedules, equipment schedules, light fixture schedules and details. |
| C. | Construction Specifications: Project Specifications shall include specifications for all products, materials, equipment, methods, and systems shown on the construction drawings and to be incorporated in the project: |
| 1. | The DB Team shall prepare and submit 100 per cent complete construction specifications in accordance with standard professional practice and the VA RFP; |
| 2. | The construction specifications shall be at a comparable level of detail and demonstrate compliance with the VA RFP. The specification submitted for review shall be a “redline and strikeout” version of the VA RFP Specifications that clearly indicate the locations of deletions, revisions, and additions to the VA RFP Specifications; and |
| 3. | The construction specifications shall include the name of the manufacturer, the product name, model number, or other identification as appropriate to clearly identify the product that will be used in the construction of the project. |
| D3. | Construction Period Submittals |
| A. | The DB Contractor shall prepare and submit shop drawings, product data, and samples during construction as required by the VA RFP documents. The shop drawings, product data, and samples shall bear the stamp of the licensed architect or engineer of record certifying compliance with the RFP (See B.1.1.A); |
| B. | Other Submittals: The DB team shall submit test results, certificates, manufacturer’s instructions, manufacturers field reports, etc. as required by the VA RFP specifications; and |
| C. | Project Record Drawings: The DB team will maintain a set of construction documents (field as-built drawings) to record actual construction changes during the construction process as required by the RFP specifications. The project record drawings will be available for review by the VA Resident Engineer at all times. |
| D4. | Project Close-out |
The DB team shall comply with the requirements in the “General Conditions”, 01001, and “General Requirements”, 01010, for submission of final RFP as-built drawings, shop drawings, manuals, and other documents as noted.
- - - END - - -
00 11 21-1
File details come from the government source that posted it. Updated .