BARNSTABLE-613202-129788-CDSP-A-2.pdf

PDF 310 KB Posted

Attached to
613202 BARNSTABLE FAP No. HIP(BR)-0035(062)X Bridge Preservation, B-01-012 (4AP) and B-01-014 (4AN State and local contract opportunity
Solicitation number
BD-25-1030-0H100-0H002-114373
Issued by
Barnstable County, Massachusetts

About this file

This document is Addendum No. 2 for a Massachusetts Department of Transportation (MassDOT) Highway Division bridge preservation project in Barnstable County. The addendum, dated April 25, 2025, pertains to Federal Aid Project No. HIP(BR)-0035(062)X for bridge preservation work on two bridges (B-01-012 and B-01-014) located at Oak Street over Route 6 (Mid-Cape Highway). The proposal is scheduled to be opened and read on Tuesday, April 29, 2025, at 2:00 P.M. The addendum includes a question and response from NEL Corporation seeking clarification on quantities and units of measurement for granite coping and horizontal sawn granite facing to be removed and stockpiled.

The addendum specifically addresses Sub-Items 116.3 under Items 114.11 and 114.12, which involve removing and stockpiling pink granite. The quantities remain at 22 cubic yards (CY) for each bridge, despite the contractor's inquiry about the seemingly larger volume of granite to be removed. MassDOT emphasizes that the contractor should be satisfied by their own investigation and research regarding conditions and materials. The document reiterates that no additional compensation will be provided beyond the lump sum bid price if materials or work differ from the descriptions in the contract documents. The addendum provides a basis for partial payment for demolition of superstructure components, detailing specific quantities for items such as granite end posts, reinforced concrete excavation, curb removal, and temporary protective shielding.

View the file

Other files for this state and local contract opportunity

Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ten Park Plaza, Suite 4160, Boston, MA 02116 Tel: 857-368-4636, TTY: 857-368-0655 mass.gov/massdot

April 25, 2025

613202-129788

ADDENDUM NO. 2

To Prospective Bidders and Others on:

BARNSTABLE

FAP NO. HIP(BR)-0035(062)X

Bridge Preservation, B-01-012 (4AP) and B-01-014 (4AN), Oak Street over Route 6 (Mid-Cape Highway)

THIS PROPOSAL TO BE OPENED AND READ: TUESDAY, APRIL 29, 2025 at 2:00 P.M.

Transmitting revisions to the Contract Documents as follows:

QUESTION AND RESPONSE: One page.

DOCUMENT A00801: Revised page 44.

Take note of the above, substitute the revised page for the original, and acknowledge Addendum No. 2 in your Expedite Proposal file before submitting your bid.

Very truly yours, Eric M. Cardone, P.E.

Construction Contracts Engineer

HA

cc: Albin Napit, Project Manager

THIS PAGE INTENTIONALLY LEFT BLANK

613202-129788

BARNSTABLE

FAP NO. HIP(BR)-0035(062)X

Bridge Preservation, B-01-012 (4AP) and B-01-014 (4AN), Oak Street over Route 6 (Mid-Cape Highway)

Question and Response Addendum No.2, April 25, 2025

NEL Corporation, E-mail dated April 25, 2025

Question 2) Could you please provide further clarification regarding yesterday’s addendum (No. 1) to the subject project. Sub Items 116.3 (under both 114.11 and 114.12) have quantities of 22 cubic feet (CF) each. Should the quantity units be cubic yards (CY) in lieu of cubic ft (CF)? The granite coping and horizontal sawn face granite runs the full length of barrier wall (East and West sides, on and off bridge). The length of barrier wall to be demolished is approximately 350’ on each side (approximately 700’ total). The total dimensions of the coping are 7”x1’4”x700’ and the horizontal sawn granite face is 4”x1’10”x700’. If the intent is to remove and store granite coping and facing, for the full length of barrier wall (to be demolished as part of the project), there seems to be significantly more than 22 cubic feet (CF) of granite facing/coping to be removed on each side (or bridge). Could you please clarify?

Response 2) See revised page A00801 – 44 attached.

THIS PAGE IS INTENTIONALLY LEFT BLANK

Massachusetts Department Of Transportation Highway Division Proposal No. 613202-129788

A00801 - 44

Addendum No. 2, April 25, 2025 ITEMS 114.11 and 114.12 (Continued)

MassDOT does not guarantee or represent that the bridge materials will actually coincide with any descriptions contained herein or represented on the Contract drawings. The Contractor shall be satisfied by their own investigation and research regarding all conditions and materials affecting the work to be done.

The Contractor shall submit in duplicate for approval, by the Engineer, a cost schedule for the Demolition of Superstructure Components for Bridge No. B-01-012 (4AP) and Bridge No. B- 01-014 (4AN). The approval of the cost schedule by the Engineer shall not be considered as a guarantee to the Contractor of the quantities assumed in developing any part of the submitted cost schedule. The schedule is only for the purposes of estimating partial payments, and it shall not affect the contract terms in any way.

No additional compensation, other than the lump sum price bid for this item, shall be made if the materials or work prove to be different than the inferred or described herein, or shown on the Contract drawings.

BASIS FOR PARTIAL PAYMENT FOR PARTIAL DEMOLITION OF SUPER-

STRUCTURE OF BRIDGE NO. B-01-012 (4AP)

Sub-Item No.

Description QTY. UNIT UNIT

PRICE

TOTAL

116.1 Remove and Stockpile Granite End Posts 2 EA

116.3 Remove and Stockpile Pink Granite 22 CY

127.1 Reinforced Concrete Excavation 85 CY

594. Curb Removed and Discarded 372 FT

994.11 Temporary Protective Shielding 183 FT

TOTAL LUMP SUM FOR ITEM 114.11 =

BASIS FOR PARTIAL PAYMENT FOR PARTIAL DEMOLITION OF SUPER-

STRUCTURE OF BRIDGE NO. B-01-014 (4AN)

Sub-Item No.

Description QTY. UNIT UNIT

PRICE

TOTAL

116.1 Remove and Stockpile Granite End Posts 2 EA

116.3 Remove and Stockpile Pink Granite 22 CY

127.1 Reinforced Concrete Excavation 83 CY

594. Curb Removed and Discarded 372 FT

994.11 Temporary Protective Shielding 183 FT

TOTAL LUMP SUM FOR ITEM 114.12 =

613202 Addendum Letter-A2
613202 Ques and Resp-A2
A00801-A2-P(44)
2025-04-25T14:00:38-0400
Eric M. Cardone