A00832 MASSACHUSETTS OFFICE OF COASTAL ZONE MANAGEMENT.pdf

PDF 952 KB Posted

Attached to
613202 BARNSTABLE FAP No. HIP(BR)-0035(062)X Bridge Preservation, B-01-012 (4AP) and B-01-014 (4AN State and local contract opportunity
Solicitation number
BD-25-1030-0H100-0H002-114373
Issued by
Barnstable County, Massachusetts

About this file

This document is a Federal Consistency Certification letter from the Massachusetts Office of Coastal Zone Management (CZM) dated December 12, 2024, addressed to Lily Collins at the MassDOT Highway Division. The letter pertains to a bridge preservation project located at Oak Street over Route 6 in Barnstable. The proposed activities include removing and disposing of granite curb, excavating the existing bridge barrier and safety walk, forming and pouring a new barrier and safety fence, installing highway guardrail transition, removing the temporary barrier, performing pavement milling, and installing new pavement markings.

The CZM indicates that while the project is located within the Massachusetts Coastal Zone, the activities fall below the thresholds requiring a formal review under federal consistency provisions. Consequently, a formal decision regarding consistency with enforceable program policies is not necessary. However, any federal licenses or permits for the work may be subject to CZM's federal consistency review, and the project proponent is responsible for notifying CZM and submitting detailed information about the nature of the work. The letter suggests that CZM will use the submitted information to determine if further federal consistency review is required.

View the file

Other files for this state and local contract opportunity

Other files attached to 613202 BARNSTABLE FAP No. HIP(BR)-0035(062)X Bridge Preservation, B-01-012 (4AP) and B-01-014 (4AN, newest first.
File Type Posted
613202 Bid Items List.txt TXT text file
613202 - Bid Tabulations.pdf PDF
613202 - Plan Holders List.pdf PDF
A00801 SPECIAL PROVISIONS~69.pdf PDF
A00803 DRAWINGS AND SKETCHES~18.pdf PDF
A00817 BRIDGE INSPECTION REPORTS.pdf PDF
A00871 UNITED STATES DEPARTMENT OF THE INTERIOR NO EFFECT - CONSISTENCY LETTER.pdf PDF
A00875 POLICY DIRECTIVE P-22-001 AND POLICY DIRECTIVE P-22-002~61.pdf PDF
BIDS OPENED - Tuesday - April 29-2025~3.pdf PDF
Link to Bid Opening~50.pdf PDF
613202 - Notice to Contractors.pdf PDF
BARNSTABLE-613202-129788-CDSP-A-1.pdf PDF
BARNSTABLE-613202-129788-CDSP-A-2.pdf PDF
613202 - Updated Plan Holders List.pdf PDF
A00815 WORK ZONE SAFETY TEMPORARY TRAFFIC CONTROL~58.pdf PDF
A00820 REQUEST FOR RELEASE OF MASSDOT AUTOCAD FILES FORM~63.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Massachusetts Department Of Transportation Highway Division Proposal No. 613202-129788

A00832 - 1

DOCUMENT A00832

Massachusetts Office of Coastal Zone Management

(CZM)

Massachusetts Department Of Transportation Highway Division

A00832 - 2

THIS PAGE IS INTENTIONALLY LEFT BLANK

December 12, 2024

Lily Collins Wetlands and Water Resources Co-Op MassDOT - Highway Division 10 Park Plaza Boston, MA 02116

RE: Federal Consistency Certification: Bridge Preservation Oak Street Over Route 6;

Barnstable

Dear Ms. Collins:

The Massachusetts Office of Coastal Zone Management (CZM) has completed its review of the proposed project which consists of bridge preservation activities at Oak Street over Route 6 in Barnstable. These activities include the following:

- The project consists of removing and disposing of the granite curb, excavating the existing bridge barrier and safety walk, formation and pouring of the new barrier and safety fence, installation of Highway Guardrail Transition, removal of the temporary barrier, pavement milling, and installation of new pavement markings.

Although the activities associated with this project are located within the defined

Massachusetts Coastal Zone, they fall below the thresholds that CZM generally uses to require review under our federal consistency provisions. Consequently, a formal decision from this office regarding consistency with our enforceable program policies is not necessary. Any federal licenses or permits for the work performed may be subject to CZM’s federal consistency review. It is incumbent upon the proponent to notify CZM, submit an explanation of the nature of the work, and submit necessary data and information. CZM will use this information to determine if further federal consistency review is required.

Thank you for submitting the information to CZM. If you have any questions regarding our review process, feel free to contact me at sean.duffey@mass.gov.

Sincerely, Sean Duffey CZM Project Review and Dredging Coordinator