613202 - Bid Tabulations.pdf

PDF 799 KB Posted

Attached to
613202 BARNSTABLE FAP No. HIP(BR)-0035(062)X Bridge Preservation, B-01-012 (4AP) and B-01-014 (4AN State and local contract opportunity
Solicitation number
BD-25-1030-0H100-0H002-114373
Issued by
Barnstable County, Massachusetts

About this file

The document is a Bid Tabulation from the Massachusetts Department of Transportation (MassDOT) Highway Division for Project #613202, a bridge preservation project located in Barnstable, Massachusetts. The project involves comprehensive preservation work for two bridges (B-01-012 and B-01-014) situated at Oak Street over Route 6 (Mid-Cape Highway), with bids scheduled to open on April 29, 2025. The bid tabulation includes detailed line items for various construction activities such as selective clearing, partial demolition of bridge superstructures, concrete excavation, pavement milling, asphalt surfacing, drainage structure remodeling, guardrail installation, and numerous traffic management and safety-related components.

The bid tabulation presents pricing submissions from three entities: the Office Estimate, Northern Construction Service LLC, and NEL Corporation/New England Infrastructure Inc. The total project estimates range from approximately $1,888,632 (Office Estimate) to $3,077,777 (Northern Construction Service LLC), with significant variations in unit pricing across different line items. Notable high-cost items include bridge structure alterations, partial demolition of bridge superstructures, and elastomeric protective coating. The substantial price differences between bidders suggest potential complexity in the project specifications, material requirements, or interpretation of the scope of work. The bid document indicates this is a federally aided project (HIP(BR)-0035(062)X) with specific technical and regulatory compliance requirements.

View the file

Other files for this state and local contract opportunity

Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Prelims Unit

Bid Tabulations

Project # : 613202 Bids Open Date : 29 Apr 2025 Location : BARNSTABLE Contract # : 129788 District : 5 Description : BARNSTABLE- BRIDGE PRESERVATION, B-01-012 (4AP) AND B-01-014 (4AN), OAK STREET OVER ROUTE 6 (MID-CAPE HIGHWAY)

Office Estimate NORTHERN CONSTRUCTION SERVICE LLC

Item # Quantity Units Description Unit Price Amount Unit Price Amount

102. 0.500 A SELECTIVE CLEARING AND THINNING $30,000.00 $15,000.00 $107,000.00 $53,500.00

114.11 1.000 LS PARTIAL DEMOLITION OF SUPERSTRUCTURE OF

BRIDGE NO. B-01-012 (4AP)

$216,000.00 $216,000.00 $400,000.00 $400,000.00

114.12 1.000 LS PARTIAL DEMOLITION OF SUPERSTRUCTURE OF

BRIDGE NO. B-01-014 (4AN)

$212,000.00 $212,000.00 $400,000.00 $400,000.00

127.12 10.500 CY REINFORCED CONCRETE SUBSTRUCTURE

EXCAVATION

$4,000.00 $42,000.00 $4,600.00 $48,300.00

129.6 245.000 SY BRIDGE PAVEMENT EXCAVATION $20.00 $4,900.00 $50.00 $12,250.00

140. 25.000 CY BRIDGE EXCAVATION $60.00 $1,500.00 $110.00 $2,750.00

151. 54.000 CY GRAVEL BORROW $30.00 $1,620.00 $94.00 $5,076.00

184.1 4.500 TON DISPOSAL OF TREATED WOOD PRODUCTS $500.00 $2,250.00 $600.00 $2,700.00

204. 2.000 EA GUTTER INLET $2,350.00 $4,700.00 $3,600.00 $7,200.00

220.5 2.000 EA DRAINAGE STRUCTURE REMODELED $1,000.00 $2,000.00 $660.00 $1,320.00

221. 2.000 EA FRAME AND COVER $1,250.00 $2,500.00 $1,460.00 $2,920.00

222.1 2.000 EA FRAME AND GRATE - MASSDOT CASCADE TYPE $1,500.00 $3,000.00 $1,800.00 $3,600.00

223.2 2.000 EA FRAME AND GRATE (OR COVER) REMOVED AND

DISCARDED

$225.00 $450.00 $475.00 $950.00

238.10 23.500 FT 10 INCH DUCTILE IRON PIPE $230.00 $5,405.00 $300.00 $7,050.00

415.4 2,057.000 SY BRIDGE PAVEMENT MILLING $20.00 $41,140.00 $19.00 $39,083.00

450.601 182.000 TON SUPERPAVE BRIDGE SURFACE COURSE - 9.5

POLYMER (SSC-B - 9.5 - P)

$385.00 $70,070.00 $330.00 $60,060.00

451. 58.000 TON HMA FOR PATCHING $220.00 $12,760.00 $563.00 $32,654.00

452. 176.000 GAL ASPHALT EMULSION FOR TACK COAT $8.00 $1,408.00 $21.00 $3,696.00

453. 1,652.000 FT HMA JOINT ADHESIVE $4.00 $6,608.00 $3.00 $4,956.00

472. 6.000 TON TEMPORARY ASPHALT PATCHING $238.00 $1,428.00 $1,000.00 $6,000.00

482.31 158.000 FT SAWING AND SEALING JOINTS IN ASPHALT

PAVEMENT AT BRIDGES

$35.00 $5,530.00 $37.00 $5,846.00

501. 42.000 FT GRANITE CURB TYPE VA1 - STRAIGHT $80.00 $3,360.00 $190.00 $7,980.00

501.1 42.000 FT GRANITE CURB TYPE VA1 - CURVED $120.00 $5,040.00 $190.00 $7,980.00

594. 141.000 FT CURB REMOVED AND DISCARDED $20.00 $2,820.00 $5.00 $705.00

620.12 86.000 FT GUARDRAIL, TL-2 (SINGLE FACED) $40.00 $3,440.00 $34.00 $2,924.00

CMS105 - Report Date: 4/29/2025 2:28 PM Page 1 of 6

Project # : 613202 Bids Open Date : 29 Apr 2025 Location : BARNSTABLE Contract # : 129788 District : 5 Description : BARNSTABLE- BRIDGE PRESERVATION, B-01-012 (4AP) AND B-01-014 (4AN), OAK STREET OVER ROUTE 6 (MID-CAPE HIGHWAY)

Office Estimate NORTHERN CONSTRUCTION SERVICE LLC

Item # Quantity Units Description Unit Price Amount Unit Price Amount

627.1 2.000 EA TRAILING ANCHORAGE $2,580.00 $5,160.00 $3,000.00 $6,000.00

627.82 2.000 EA GUARDRAIL TANGENT END TREATMENT, TL-2 $4,000.00 $8,000.00 $5,400.00 $10,800.00

628.24 4.000 EA TRANSITION TO BRIDGE RAIL $6,000.00 $24,000.00 $5,500.00 $22,000.00

628.315 1.000 EA TEMPORARY IMPACT ATTENUATOR, REDIRECTIVE,

TL-3

$4,800.00 $4,800.00 $14,300.00 $14,300.00

628.4 1.000 EA TEMPORARY IMPACT ATTENUATOR, REMOVED

AND RESET

$2,000.00 $2,000.00 $3,150.00 $3,150.00

630.2 256.000 FT HIGHWAY GUARD REMOVED AND DISCARDED $6.00 $1,536.00 $10.50 $2,688.00

722.3 1.000 LS SCHEDULE OF OPERATIONS (TYPE C) - FIXED

PRICE $9500

$9,500.00 $9,500.00 $9,500.00 $9,500.00

734. 2.000 EA SIGN REMOVED AND RESET $1,000.00 $2,000.00 $600.00 $1,200.00

740. 23.000 MO ENGINEER'S FIELD OFFICE AND EQUIPMENT (TYPE

A)

$2,620.00 $60,260.00 $3,400.00 $78,200.00

748. 1.000 LS MOBILIZATION $54,140.00 $54,140.00 $97,500.00 $97,500.00

751. 20.000 CY LOAM FOR ROADSIDES $75.00 $1,500.00 $120.00 $2,400.00

765. 174.000 SY SEEDING $8.00 $1,392.00 $7.00 $1,218.00

769. 357.000 FT PAVEMENT MILLING MULCH UNDER GUARD RAIL $11.50 $4,105.50 $15.00 $5,355.00

850.41 350.000 HR ROADWAY FLAGGER $60.00 $21,000.00 $80.00 $28,000.00

851.1 250.000 DAY TRAFFIC CONES FOR TRAFFIC MANAGEMENT $50.00 $12,500.00 $1.00 $250.00

852. 668.000 SF SAFETY SIGNING FOR TRAFFIC MANAGEMENT $18.00 $12,024.00 $33.00 $22,044.00

853.1 15.000 EA PORTABLE BREAKAWAY BARRICADE TYPE III $50.00 $750.00 $174.00 $2,610.00

853.21 561.000 FT TEMPORARY BARRIER REMOVED AND RESET $15.00 $8,415.00 $29.00 $16,269.00

853.33 561.000 FT TEMPORARY BARRIER - LIMITED DEFLECTION (TL-

3)

$80.00 $44,880.00 $87.00 $48,807.00

853.403 150.000 DAY TRUCK MOUNTED ATTENUATOR $100.00 $15,000.00 $190.00 $28,500.00

853.8 46.000 DAY TEMPORARY ILLUMINATION FOR WORK ZONE $100.00 $4,600.00 $185.00 $8,510.00

854.016 4,294.000 FT TEMPORARY PAVING MARKINGS - 6 INCH

(PAINTED)

$0.50 $2,147.00 $0.50 $2,147.00

854.1 1,572.000 SF PAVEMENT MARKING REMOVAL $2.00 $3,144.00 $3.00 $4,716.00

854.6 22.000 DAY TEMPORARY PORTABLE RUMBLE STRIP $28.00 $616.00 $388.00 $8,536.00

856. 134.000 DAY ARROW BOARD $10.00 $1,340.00 $7.50 $1,005.00

CMS105 - Report Date: 4/29/2025 2:28 PM Page 2 of 6

Location : BARNSTABLE Contract # : 129788 District : 5 Description : BARNSTABLE- BRIDGE PRESERVATION, B-01-012 (4AP) AND B-01-014 (4AN), OAK STREET OVER ROUTE 6 (MID-CAPE HIGHWAY)

Office Estimate NORTHERN CONSTRUCTION SERVICE LLC

Item # Quantity Units Description Unit Price Amount Unit Price Amount

856.12 212.000 DAY PORTABLE CHANGEABLE MESSAGE SIGN $20.00 $4,240.00 $19.00 $4,028.00

859. 2,050.000 DAY REFLECTORIZED DRUM $0.50 $1,025.00 $0.50 $1,025.00

859.1 300.000 DAY REFLECTORIZED DRUMS WITH SEQUENTIAL

FLASHING WARNING LIGHTS

$8.00 $2,400.00 $6.00 $1,800.00

866.106 1,380.000 FT 6 INCH REFLECTORIZED WHITE LINE

(THERMOPLASTIC)

$1.50 $2,070.00 $1.50 $2,070.00

866.112 15.000 FT 12 INCH REFLECTORIZED WHITE LINE

(THERMOPLASTIC)

$6.50 $97.50 $7.00 $105.00

867.106 1,380.000 FT 6 INCH REFLECTORIZED YELLOW LINE

(THERMOPLASTIC)

$1.50 $2,070.00 $2.00 $2,760.00

874.1 5.000 EA STREET SIGN REMOVED AND RESET $200.00 $1,000.00 $368.00 $1,840.00

905. 10.500 CY 4000 PSI, 3/8 INCH, 660 CEMENT CONCRETE $4,500.00 $47,250.00 $6,600.00 $69,300.00

964.3 13,069.000 SF ELASTOMERIC PROTECTIVE COATING $3.50 $45,741.50 $9.00 $117,621.00

992.11 1.000 LS ALTERATION TO BRIDGE STRUCTURE NO. B-01-012

(4AP)

$417,000.00 $417,000.00 $666,000.00 $666,000.00

992.12 1.000 LS ALTERATION TO BRIDGE STRUCTURE NO. B-01-014

(4AN)

$394,000.00 $394,000.00 $666,023.00 $666,023.00

Total : $1,888,632.50 Total : $3,077,777.00

CMS105 - Report Date: 4/29/2025 2:28 PM Page 3 of 6

Location : BARNSTABLE Contract # : 129788 District : 5 Description : BARNSTABLE- BRIDGE PRESERVATION, B-01-012 (4AP) AND B-01-014 (4AN), OAK STREET OVER ROUTE 6 (MID-CAPE HIGHWAY)

NEL CORPORATION NEW ENGLAND INFRASTRUCTURE INC

Item # Quantity Units Description Unit Price Amount Unit Price Amount

102. 0.500 A SELECTIVE CLEARING AND THINNING $47,810.00 $23,905.00 $80,000.00 $40,000.00

114.11 1.000 LS PARTIAL DEMOLITION OF SUPERSTRUCTURE OF

BRIDGE NO. B-01-012 (4AP)

$409,205.00 $409,205.00 $500,000.00 $500,000.00

114.12 1.000 LS PARTIAL DEMOLITION OF SUPERSTRUCTURE OF

BRIDGE NO. B-01-014 (4AN)

$409,205.00 $409,205.00 $500,000.00 $500,000.00

127.12 10.500 CY REINFORCED CONCRETE SUBSTRUCTURE

EXCAVATION

$8,440.00 $88,620.00 $5,000.00 $52,500.00

129.6 245.000 SY BRIDGE PAVEMENT EXCAVATION $35.00 $8,575.00 $90.00 $22,050.00

140. 25.000 CY BRIDGE EXCAVATION $126.00 $3,150.00 $400.00 $10,000.00

151. 54.000 CY GRAVEL BORROW $64.00 $3,456.00 $200.00 $10,800.00

184.1 4.500 TON DISPOSAL OF TREATED WOOD PRODUCTS $1,000.00 $4,500.00 $400.00 $1,800.00

204. 2.000 EA GUTTER INLET $1,612.00 $3,224.00 $1,500.00 $3,000.00

220.5 2.000 EA DRAINAGE STRUCTURE REMODELED $1,304.00 $2,608.00 $2,500.00 $5,000.00

221. 2.000 EA FRAME AND COVER $1,040.00 $2,080.00 $2,000.00 $4,000.00

222.1 2.000 EA FRAME AND GRATE - MASSDOT CASCADE TYPE $1,362.00 $2,724.00 $2,000.00 $4,000.00

223.2 2.000 EA FRAME AND GRATE (OR COVER) REMOVED AND

DISCARDED

$140.00 $280.00 $400.00 $800.00

238.10 23.500 FT 10 INCH DUCTILE IRON PIPE $146.00 $3,431.00 $400.00 $9,400.00

415.4 2,057.000 SY BRIDGE PAVEMENT MILLING $23.00 $47,311.00 $25.00 $51,425.00

450.601 182.000 TON SUPERPAVE BRIDGE SURFACE COURSE - 9.5

POLYMER (SSC-B - 9.5 - P)

$440.00 $80,080.00 $350.00 $63,700.00

451. 58.000 TON HMA FOR PATCHING $350.00 $20,300.00 $200.00 $11,600.00

452. 176.000 GAL ASPHALT EMULSION FOR TACK COAT $22.80 $4,012.80 $15.00 $2,640.00

453. 1,652.000 FT HMA JOINT ADHESIVE $2.28 $3,766.56 $2.00 $3,304.00

472. 6.000 TON TEMPORARY ASPHALT PATCHING $440.00 $2,640.00 $200.00 $1,200.00

482.31 158.000 FT SAWING AND SEALING JOINTS IN ASPHALT

PAVEMENT AT BRIDGES

$44.00 $6,952.00 $100.00 $15,800.00

501. 42.000 FT GRANITE CURB TYPE VA1 - STRAIGHT $105.00 $4,410.00 $200.00 $8,400.00

501.1 42.000 FT GRANITE CURB TYPE VA1 - CURVED $107.00 $4,494.00 $200.00 $8,400.00

594. 141.000 FT CURB REMOVED AND DISCARDED $18.00 $2,538.00 $40.00 $5,640.00

620.12 86.000 FT GUARDRAIL, TL-2 (SINGLE FACED) $154.00 $13,244.00 $40.00 $3,440.00

CMS105 - Report Date: 4/29/2025 2:28 PM Page 4 of 6

Location : BARNSTABLE Contract # : 129788 District : 5 Description : BARNSTABLE- BRIDGE PRESERVATION, B-01-012 (4AP) AND B-01-014 (4AN), OAK STREET OVER ROUTE 6 (MID-CAPE HIGHWAY)

NEL CORPORATION NEW ENGLAND INFRASTRUCTURE INC

Item # Quantity Units Description Unit Price Amount Unit Price Amount

627.1 2.000 EA TRAILING ANCHORAGE $6,515.00 $13,030.00 $3,500.00 $7,000.00

627.82 2.000 EA GUARDRAIL TANGENT END TREATMENT, TL-2 $8,715.00 $17,430.00 $6,000.00 $12,000.00

628.24 4.000 EA TRANSITION TO BRIDGE RAIL $12,000.00 $48,000.00 $7,500.00 $30,000.00

628.315 1.000 EA TEMPORARY IMPACT ATTENUATOR, REDIRECTIVE,

TL-3

$9,000.00 $9,000.00 $9,500.00 $9,500.00

628.4 1.000 EA TEMPORARY IMPACT ATTENUATOR, REMOVED

AND RESET

$2,060.00 $2,060.00 $4,000.00 $4,000.00

630.2 256.000 FT HIGHWAY GUARD REMOVED AND DISCARDED $8.00 $2,048.00 $5.00 $1,280.00

722.3 1.000 LS SCHEDULE OF OPERATIONS (TYPE C) - FIXED

PRICE $9500

$9,500.00 $9,500.00 $9,500.00 $9,500.00

734. 2.000 EA SIGN REMOVED AND RESET $660.00 $1,320.00 $500.00 $1,000.00

740. 23.000 MO ENGINEER'S FIELD OFFICE AND EQUIPMENT (TYPE

A)

$3,310.00 $76,130.00 $3,000.00 $69,000.00

748. 1.000 LS MOBILIZATION $100,000.00 $100,000.00 $90,000.00 $90,000.00

751. 20.000 CY LOAM FOR ROADSIDES $220.00 $4,400.00 $150.00 $3,000.00

765. 174.000 SY SEEDING $13.00 $2,262.00 $20.00 $3,480.00

769. 357.000 FT PAVEMENT MILLING MULCH UNDER GUARD RAIL $15.00 $5,355.00 $25.00 $8,925.00

850.41 350.000 HR ROADWAY FLAGGER $79.00 $27,650.00 $1.00 $350.00

851.1 250.000 DAY TRAFFIC CONES FOR TRAFFIC MANAGEMENT $10.00 $2,500.00 $1.00 $250.00

852. 668.000 SF SAFETY SIGNING FOR TRAFFIC MANAGEMENT $31.00 $20,708.00 $45.00 $30,060.00

853.1 15.000 EA PORTABLE BREAKAWAY BARRICADE TYPE III $126.00 $1,890.00 $100.00 $1,500.00

853.21 561.000 FT TEMPORARY BARRIER REMOVED AND RESET $21.00 $11,781.00 $20.00 $11,220.00

853.33 561.000 FT TEMPORARY BARRIER - LIMITED DEFLECTION (TL-

3)

$90.00 $50,490.00 $125.00 $70,125.00

853.403 150.000 DAY TRUCK MOUNTED ATTENUATOR $209.00 $31,350.00 $200.00 $30,000.00

853.8 46.000 DAY TEMPORARY ILLUMINATION FOR WORK ZONE $280.00 $12,880.00 $200.00 $9,200.00

854.016 4,294.000 FT TEMPORARY PAVING MARKINGS - 6 INCH

(PAINTED)

$1.00 $4,294.00 $1.00 $4,294.00

854.1 1,572.000 SF PAVEMENT MARKING REMOVAL $3.70 $5,816.40 $1.00 $1,572.00

854.6 22.000 DAY TEMPORARY PORTABLE RUMBLE STRIP $135.00 $2,970.00 $400.00 $8,800.00

856. 134.000 DAY ARROW BOARD $55.00 $7,370.00 $15.00 $2,010.00

CMS105 - Report Date: 4/29/2025 2:28 PM Page 5 of 6

Location : BARNSTABLE Contract # : 129788 District : 5 Description : BARNSTABLE- BRIDGE PRESERVATION, B-01-012 (4AP) AND B-01-014 (4AN), OAK STREET OVER ROUTE 6 (MID-CAPE HIGHWAY)

NEL CORPORATION NEW ENGLAND INFRASTRUCTURE INC

Item # Quantity Units Description Unit Price Amount Unit Price Amount

856.12 212.000 DAY PORTABLE CHANGEABLE MESSAGE SIGN $32.00 $6,784.00 $30.00 $6,360.00

859. 2,050.000 DAY REFLECTORIZED DRUM $1.00 $2,050.00 $0.20 $410.00

859.1 300.000 DAY REFLECTORIZED DRUMS WITH SEQUENTIAL

FLASHING WARNING LIGHTS

$8.00 $2,400.00 $10.00 $3,000.00

866.106 1,380.000 FT 6 INCH REFLECTORIZED WHITE LINE

(THERMOPLASTIC)

$2.23 $3,077.40 $2.00 $2,760.00

866.112 15.000 FT 12 INCH REFLECTORIZED WHITE LINE

(THERMOPLASTIC)

$12.00 $180.00 $5.00 $75.00

867.106 1,380.000 FT 6 INCH REFLECTORIZED YELLOW LINE

(THERMOPLASTIC)

$2.23 $3,077.40 $2.00 $2,760.00

874.1 5.000 EA STREET SIGN REMOVED AND RESET $377.00 $1,885.00 $600.00 $3,000.00

905. 10.500 CY 4000 PSI, 3/8 INCH, 660 CEMENT CONCRETE $7,400.00 $77,700.00 $5,000.00 $52,500.00

964.3 13,069.000 SF ELASTOMERIC PROTECTIVE COATING $11.40 $148,986.60 $9.00 $117,621.00

992.11 1.000 LS ALTERATION TO BRIDGE STRUCTURE NO. B-01-012

(4AP)

$807,980.00 $807,980.00 $840,000.00 $840,000.00

992.12 1.000 LS ALTERATION TO BRIDGE STRUCTURE NO. B-01-014

(4AN)

$807,980.00 $807,980.00 $840,000.00 $840,000.00

Total : $3,487,046.16 Total : $3,625,451.00

CMS105 - Report Date: 4/29/2025 2:28 PM Page 6 of 6

File details come from the government source that posted it. Updated .