BAA-AFRL-RQKM-2016-0010-Atch6.pdf

PDF 40 KB Posted

Attached to
Technical Operations V (TOPS V) Federal contract opportunity
Solicitation number
BAA-AFRL-RQKM-2016-0010
Issued by
Department of the Air Force Materiel Command Research Laboratory

About this file

Statement of Work Template

View the file

Other files for this federal contract opportunity

Other files attached to Technical Operations V (TOPS V), newest first.
File Type Posted
BAA-AFRL-RQKM-2016-0010-Amd2.pdf PDF
BAA-AFRL-RQKM-2016-0010-Atch5-Rev.pdf PDF
BAA-AFRL-RQKM-2016-0010-Atch4.pdf PDF
BAA-AFRL-RQKM-2016-0010.pdf PDF
BAA-AFRL-RQKM-2016-0010-Atch1.pdf PDF
BAA-AFRL-RQKM-2016-0010-Atch5.pdf PDF
BAA-AFRL-RQKM-2016-0010-Atch3.pdf PDF
BAA-AFRL-RQKM-2016-0010-Atch2.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BAA‐AFRL‐RQKM‐2016‐0010

ATTACHMENT 6

SAMPLE STATEMENT OF WORK (SOW) TEMPLATE

(For Task Order)

(TASK ORDER TITLE)

Effort:

Date:

Title:

Period of Performance: XX months after mail date (XX months for technical effort plus 3 additional months for completing the final report).

Basic SOW Paragraph(s):

1.0 Background:

2.0 Scope:

3.0 Objective:

4.0 Description of Work:

4.1 The Contractor shall…

4.1.1 The contractor shall …

4.1.2 The Contractor shall …

4.2 The Contractor shall…

4.2.2 …

5.0 Deliverables:

5.1 CDRLs required

5.2 Software. The contractor shall deliver (identify software). (If applicable.)

5.3 Hardware. The contractor shall deliver (identify hardware). (If applicable.)

5.4 Test Samples, Prototypes and Residual Materials. The contractor shall return to the Government all test samples, prototypes and residual materials not consumed in testing at the conclusion of the technical effort. (If applicable.)

Start Date: Mail Date

Place of Review, Inspection, and Acceptance: Destination

BAA‐AFRL‐RQKM‐2016‐0010

ATTACHMENT 6

6 Security Requirements:

6.1 The Contractor shall participate in all activities associated with the disciplines of the organization’s OPSEC program following appropriate measures required for this particular contract. This is required in an effort to reduce program vulnerability from successful adversary collection of possible sensitive unclassified and/or proprietary information, and violations of export control requirements. The prime contractor will ensure that all subcontractors, if applicable, conform to these requirements as required by the prime contractor.

6.2 Program Protection Plan (PPP) – Any potential critical program information (CPI) generated as part of this effort will be reviewed to determine the need for a PPP

File details come from the government source that posted it. Updated .