BAA-AFRL-RQKM-2016-0010-Atch6.pdf
PDF 40 KB Posted
- Attached to
- Technical Operations V (TOPS V) Federal contract opportunity
- Solicitation number
- BAA-AFRL-RQKM-2016-0010
About this file
Statement of Work Template
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| BAA-AFRL-RQKM-2016-0010-Amd2.pdf | ||
| BAA-AFRL-RQKM-2016-0010-Atch5-Rev.pdf | ||
| BAA-AFRL-RQKM-2016-0010-Atch4.pdf | ||
| BAA-AFRL-RQKM-2016-0010.pdf | ||
| BAA-AFRL-RQKM-2016-0010-Atch1.pdf | ||
| BAA-AFRL-RQKM-2016-0010-Atch5.pdf | ||
| BAA-AFRL-RQKM-2016-0010-Atch3.pdf | ||
| BAA-AFRL-RQKM-2016-0010-Atch2.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BAA‐AFRL‐RQKM‐2016‐0010
ATTACHMENT 6
SAMPLE STATEMENT OF WORK (SOW) TEMPLATE
(For Task Order)
(TASK ORDER TITLE)
Effort:
Date:
Title:
Period of Performance: XX months after mail date (XX months for technical effort plus 3 additional months for completing the final report).
Basic SOW Paragraph(s):
1.0 Background:
2.0 Scope:
3.0 Objective:
4.0 Description of Work:
4.1 The Contractor shall…
4.1.1 The contractor shall …
4.1.2 The Contractor shall …
4.2 The Contractor shall…
4.2.2 …
5.0 Deliverables:
5.1 CDRLs required
5.2 Software. The contractor shall deliver (identify software). (If applicable.)
5.3 Hardware. The contractor shall deliver (identify hardware). (If applicable.)
5.4 Test Samples, Prototypes and Residual Materials. The contractor shall return to the Government all test samples, prototypes and residual materials not consumed in testing at the conclusion of the technical effort. (If applicable.)
Start Date: Mail Date
Place of Review, Inspection, and Acceptance: Destination
BAA‐AFRL‐RQKM‐2016‐0010
ATTACHMENT 6
6 Security Requirements:
6.1 The Contractor shall participate in all activities associated with the disciplines of the organization’s OPSEC program following appropriate measures required for this particular contract. This is required in an effort to reduce program vulnerability from successful adversary collection of possible sensitive unclassified and/or proprietary information, and violations of export control requirements. The prime contractor will ensure that all subcontractors, if applicable, conform to these requirements as required by the prime contractor.
6.2 Program Protection Plan (PPP) – Any potential critical program information (CPI) generated as part of this effort will be reviewed to determine the need for a PPP
File details come from the government source that posted it. Updated .