BAA-AFRL-RQKM-2016-0010-Atch5-Rev.pdf

PDF 49 KB Posted

Attached to
Technical Operations V (TOPS V) Federal contract opportunity
Solicitation number
BAA-AFRL-RQKM-2016-0010
Issued by
Department of the Air Force Materiel Command Research Laboratory

About this file

Correct Attachment 5

View the file

Other files for this federal contract opportunity

Other files attached to Technical Operations V (TOPS V), newest first.
File Type Posted
BAA-AFRL-RQKM-2016-0010-Amd2.pdf PDF
BAA-AFRL-RQKM-2016-0010-Atch4.pdf PDF
BAA-AFRL-RQKM-2016-0010.pdf PDF
BAA-AFRL-RQKM-2016-0010-Atch1.pdf PDF
BAA-AFRL-RQKM-2016-0010-Atch6.pdf PDF
BAA-AFRL-RQKM-2016-0010-Atch5.pdf PDF
BAA-AFRL-RQKM-2016-0010-Atch3.pdf PDF
BAA-AFRL-RQKM-2016-0010-Atch2.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BAA-AFRL-RQKM-2016-0010

BAA Attachment 5

1 March 2016

Basic Technical Proposal

STATEMENT OF OBJECTIVES (SOO)

Technical Operations (TOPS V)

1.0 Background: The Materials and Manufacturing Directorate Technical Operations (TOPS

V) Contract is an Indefinite Delivery Indefinite Quantity (IDIQ) Task Order Contract.

2.0 Scope: This SOO defines the work to be accomplished under the TOPS V Contract. This effort will consist of an indefinite number of rapid response task orders of various magnitudes as needed to support AFRL/RX Research and Development. The primary technology areas to be supported under this effort are Functional Materials and Applications, Structural Materials and

Applications, Manufacturing and Industrial Technologies, Systems Support, and New and

Emerging Technology in Materials and Manufacturing. The goal is development of materials and processing methodologies that are vital to create advanced materials and devices for future needs.

3.0 Objective:

3.1 Introduction. The purpose of the program is to focus on the translation of promising basic research into solutions for broadly defined military needs and where indicated, make the transition into the design and development phase with a focus on improving or developing new materials and manufacturing processes based on that research and advanced development technology. The research and development efforts will be centered on the following:

macromolecular materials, materials models and uncertainty methods that will lessen reliance on experimentation, computational materials science, nano-structured materials, prognostics, thermal protection materials, life prediction/models, lightweight materials for space access, multifunctional materials, materials for conductive gap treatments, and microwave and power control.

3.2 Technical Scope. The contractor shall provide for basic and applied research, as well as advanced development efforts, for the RX in the core technology areas listed below:

a. Functional Materials and Applications

b. Structural Materials and Applications

1 March 2016

c. Manufacturing and Industrial Technologies

d. Systems Support

f. New and Emerging Technology in Materials and Manufacturing

4.0 Description of Work: The contractor shall perform research and development efforts in specified materials processes, defined within each task order, with emphasis on cost reductions, reliability improvements, and enhancements to the performance of Air Force (AF) aircraft, missile and munitions systems, and spacecraft. Air Force personnel will review existing Air

Force systems requirements and will identify materials and process needs to meet current and future aerospace applications. These identified needs will be provided to the contractor for analysis. The contractor shall conduct and/or develop plans for research and development to meet these requirements in the core technology areas identified. The contractor may also be requested to develop plans for implementation of RX developed technologies on Air Force systems.

4.1 Program Management

4.1.1 General Program Management. The contractor shall provide executive level participation for monthly meetings and periodic program reviews of contract activity. The contractor shall prepare and submit reports as required. The contractor shall perform administrative and financial management functions during the course of these efforts to ensure efficient and effective execution of all task orders under this contract. These functions include scheduling of activities and milestones; describing status of each task order; outlining contractor activity and progress toward accomplishment of objectives; planning, forecasting, and making recommendations on funding and funding changes; program planning; financial management;

describing in detail the overall conduct and results of the effort.

As part of the work to be performed on each task order, the contractor shall perform the day-to-day administrative and financial management functions as required to ensure efficient and effective completion of each task order issued under the contract. These functions include planning, scheduling, supervision and execution of task order activities and milestones.

4.2 Research and Development

1 March 2016

4.2.1 Functional Materials and Applications. The contractor shall perform research in nanoelectronics, photonic, and soft matter materials, customer applications development and transition, computational materials science, and evaluation and implementation of improvements to production processes for these materials. Systems which may be investigated include: 1) nanoelectronic materials - to improve performance, affordability, efficiency, and reliability of current and future intelligence, surveillance, reconnaissance (ISR) and electronic warfare systems. 2) photonic materials - to control, manipulate, and protect against photonic energy for legacy, developmental and future Air Force system components. 3) soft matter materials - biological- and/or flexible materials and devices for legacy, developmental, and future Air Force system components. Specific activities may include the investigation, synthesis and formulation of new materials; characterization of material structure, composition, and durability to environmental exposures; the mechanical, thermal, and electromagnetic properties and mechanisms of failure; evaluation of defense or military applications of these materials and the materials specifications for these applications; user evaluations of new materials; analysis of production processes to determine how to meet user requirements and implementation of these process improvements; and manufacturing scale-up planning and engineering associated with implementation. The contractor shall define and document recent progress and problems associated with these technical areas.

4.2.2 Structural Materials. The contractor shall perform research in materials state awareness and supportability, composites, and metals, customer applications development and transition, computational materials science, and evaluation and implementation of improvements to production processes for these materials. Systems which may be investigated include: 1) materials state awareness and supportability – to improve detection and enable characterization of initial and evolving state of materials and damage in fielded and future Air

Force systems, providing increased safety and aircraft availability, reduced maintenance cost, and accelerated certification and transition of advanced structural materials. 2) composites -organic and ceramic matrix composite technologies for legacy, developmental and future Air

Force system components. 3) metals - metallic materials technologies for legacy, developmental and future Air Force system components.

1 March 2016

4.2.3 Manufacturing and Industrial Technologies. The contractor shall perform material manufacturing and industrial research in manufacturing processes, techniques, systems, and equipment needed for timely, reliable, high quality economical acquisition, production, and repair of Air Force systems. Research includes: 1) electronics and sensors - to establish the capability for effective processes, materials, and procedures necessary for the affordable manufacture of sensors, electronic devices, assemblies and subsystems for utilization in Air Force and Department of Defense (DoD)weapon systems. 2) propulsion, structures, and manufacturing enterprise - to establish and improve production capability for effective processes, materials, and procedures necessary to affordably manufacture Air Force and DoD weapon system engines and structures in response to requirements and activities within the DoD industrial base, Air Force Product and Logistics Centers, and research and development organizations.

4.2.4 Systems Support. The contractor shall perform research and technology development in the areas of materials integrity, acquisition systems support, and logistics system support. Systems which may be investigated include: 1) materials integrity – investigates potential materials and processing related problems involved with aerospace vehicle accidents and performs laboratory failure analyses on structural and electronic components and systems.

Also solves material and materials processing problems associated with operational and experimental Air Force systems, provides analytical chemical analysis support for quick-reaction efforts. 2) acquisition system support - delivers rapid expertise, solutions and technologies to meet Air Force customer needs in materials and processing, manufacturing/fabrication, corrosion control, specialty aircraft materials and maintainability, substitution of environmentally responsible materials and processes, and advanced power and alternate energy for the Air Force.

3) logistics system support - delivers rapid expertise, solutions, and technologies to meet Air

Force customer needs in materials and processing, manufacturing/fabrication, corrosion control, coatings integration, sealant and elastomers, and specialty aircraft materials affordability and sustainment.

4.2.5 New and Emerging Technology in Materials and Manufacturing. The contractor shall perform research and technology development in: Functional Materials and

1 March 2016

Applications, Structural Materials and Applications, Manufacturing and Industrial Technologies, and Systems Support. This research and development will include: synthesis, formulation, and mechanics of new and improved materials; materials characterization and processing; interfacial chemistry, physics, and transport properties; analysis, evaluation, and implementation of improvements to production processes; characterization of material structure, composition, and durability to environmental exposures; modeling and simulation; materials behavior and life prediction; evaluation of defense or military applications of these materials; and customer application development and transition.

4.2.6 Operations and Maintenance (O&M) Activities. The contractor shall assist the Government in executing related operational and maintenance activities in the areas listed in paragraph 4.2 Research and Development.

4.3 Special Considerations

4.3.1 Environmental Considerations. The contractor shall assess the environmental consequences of the technology being developed from the standpoint of potential future scale-up to production sized quantities. If the technology turns out to have adverse environmental consequences, the contractor shall make recommendations concerning how to make the technology environmentally acceptable and indicate what impact these recommendations could have on technology from an economic standpoint.

4.3.2 Supportability. In assessing the impact of the results of the studies on AF and other DoD systems and for dual use, the contractor shall consider the following supportability issues as a minimum: test and evaluation, environmental issues, documentation, reporting requirements, shelf life/storage, packaging, transportation, repairability, reliability, and producibility. The Contractor is required to address these issues, since eventual utilization will be with high national priority aerospace or other terrestrial systems.

4.3.3 Metric Data. All data shall be reported in both U.S. Customary Units and

International System of Units (Sl). The Sl units shall be included within parentheses behind the

U.S. Customary Units.

4.3.4 Demonstration Components. Any demonstration

components/subcomponents and/or samples used in performance of this contract shall be the

1 March 2016 property of the Air Force and shall be disposed of in accordance with instructions from the

Contracting Officer.

4.3.5 Reliability, Maintainability and Supportability (RM&S). Specific consideration shall be given to RM&S during any hardware or software development. These considerations shall be based on sound, practical engineering judgment, of this effort. However, RM&S data shall be documented and shortcomings reported for consideration during future developments.

4.3.6 Government Furnished Property (GFP). Will be determined based on the requirements and objectives of the individual Task Orders.

4.3.7 Contractor Acquired Property. Will be determined based on the requirements and objectives of the individual Task Orders.

4.3.8 Base Support. Base support will be provided if required to accomplish a specific task order, to include various equipment support items as deemed necessary in RX facilities located primarily in the building 651-655 complex, Area B, Wright Patterson AFB OH

45433.

4.3.9 Contract Holidays: The prices/costs include holiday observances;

accordingly, the government will not be billed for such holidays, except when services are required by the Government and are actually performed on a holiday. The following days are contract holidays: New Year’s Day, birthday of Martin Luther King Jr., President’s Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans’ Day, Thanksgiving

Day, Christmas Day.

4.3.10 Associate Contractor Agreements (ACAs): The contractor may enter into ACAs which specify requirements for them to share information, data, technical knowledge, expertise, or resources. The Contracting Officer may require ACAs when contractors working on separate government contracts must cooperate, share resources, or otherwise jointly participate in working on contracts or projects. Prime contractor to subcontractor relationships do not constitute ACAs. For each contract/task order, the Contracting Officer will identify associate contractors with whom agreements are required. ACAs will be required 90 days after contract/task order award. The agreements shall include the basis for sharing information data, technical knowledge, expertise, and/or resources essential to the Contract programs which shall

1 March 2016 ensure the greatest degree of cooperation for the development of the programs to meet the terms of the Contract(s). Associate contractors will be identified by the Contracting Officer PCO via letter.

ACAs shall include the following general information:

a. Identify the associate contractor and their relationships.

b. Identify the program involved and the relevant Government contracts of the associate contractors.

c. Describe the associate contractor interfaces by general subject matter.

d. Specify the categories of information to be exchanged or support to be provided.

e. Include the expiration date (or event) of the ACA.

f. Identify potential conflicts between relevant government contracts and the

ACA; include agreements on protection of proprietary data and restrictions on employees.

A copy of such agreement shall be provided to the Contracting Officer for review before execution of the document by the cooperating contractors.

The prime contractor will not be relieved of any contract requirements or entitled to any adjustments to the contract terms because of a failure to resolve a disagreement with an associate contractor.

Liability for the improper disclosure of any proprietary data contained in or referenced by any agreement shall rest with the parties to the agreement and not the Government.

All costs associated with the agreements are included in the negotiated cost of this contract/task order. Agreements may be amended as required by the Government during the performance of the contract/task order.

5.0 DELIVERABLE ITEMS:

5.1 Data Items: The following Contract Data Requirement Listings (CDRLs) will be made a part of the basic contract. Required Data Items will be cited on a task order by task order basis and each task order may include any or all of the following:

• Data Item A001: DI-MISC-80711A/T, Scientific & Technical Reports (final is required for each TO)

• Data Item A002: DI-FNCL-80331A/T, Funds & Man-hour Expenditure Report (monthly)

1 March 2016

• Data Item A003: DI-MGMT-81468/T, Contract Funds Status Report (CFSR) (quarterly)

• Data Item A004: DI-MGMT-80368A/T, Technical Status Report (quarterly)

• Data Item A005: DI-MGMT-81373/T, Presentation Material (quarterly)

• Data Item A006: DI-MGMT-81453/T, Data Accession List (as req’d)

• Data Item A007: DI-MISC-80169/T, Still Photo Coverage (as req’d)

• Data Item A008: DI-ADMN-81250A/T, Conference Minutes (as req’d)

• Data Item A009: DI-ADMN-81249A/T, Conference Agenda (as req’d)

• Data Item A010: DI-MISC-80508A/T, Technical Report/Study Services (at the end of each task order)

• Data Item A011: DI-MCCR-80700/T, Computer Software Product End Items (as req’d)

• Data Item A012: DI-GDRQ-81257A/T, Mathematical Model Finite Element

Analysis (as req’d)

• Data Item A013: DI-MISC-80711A/T, Scientific and Technical Reports

(annually)

• Data Item A014: DI-IPSC-81488/T, Computer Software Product (as gen)

5.2 Software: As identified or proposed in each task order. When developed under individual task orders, the Software shall be delivered, as appropriate and in a format acceptable to the parties.

5.3 Hardware: As identified or proposed in each task order, including Samples and/or

Special Purpose Test Equipment, both tested and untested, developed or used under the individual task orders shall be delivered, as appropriate, at the completion or in conjunction with associated task order(s).

5.4 Test Samples, Prototypes and Residual Materials. As identified or proposed in each task order shall be delivered, as appropriate, at the completion or in conjunction with associated task order(s).

6.0 Security Requirements:

6.1 Program Security Classification. The contractor shall comply with program security classification requirements established by the DD Form 254 associated with this contract including any emission security (TEMPEST) requirements.

6.2 Security Requirements. All contractors shall participate in all activities associated with the disciplines of the organization’s Security Program (Information Security, Industrial

Security, Operations Security (OPSEC), Personnel Security and Antiterrorism programs) following appropriate measures in each discipline during the performance of this contract. This

1 March 2016 requirement is part of an effort to reduce program vulnerability from successful adversary collection and exploitation of critical information.

6.3 Program Protection Program (PPP). Any critical program information (CPI) with a potential requirement for a program protection plan (PPP) generated as part of this contract will be addressed as needed.

6.4 International Traffic in Arms Regulations (ITAR) and Export Control (PL 98-

94). The contractor shall comply with ITAR and PL 98-94 requirements.

6.5 Military Critical Technical Data Agreement (DD Form 2345). The contractor shall have an approved DD Form 2345.

6.6 Computer and Network Access Requirements for Users and Equipment. The contractor shall comply with all computer and network access requirements and instructions stipulated by the RX.

6.7 Voluntary Protection Program (VPP): Wright-Patterson AFB is participating in and is pursuing recognition under the Occupational Safety and Health Administration's (OSHA)

Voluntary Protection Program (VPP). VPP is a systems approach to identify, evaluate, prevent, and control occupational hazards to prevent injuries/illnesses by promoting effective worksite safety and health protection. VPP is required for applicable contractors defined as "contractors working on an Air Force Installation for more than 1000 hours per quarter to include construction and services contracts." Contractors are responsible for managing their own safety and health program (Public Law 91-596).

21 March 2016

Technical Operations V (TOPS V) Task Order Description/Statement of Objectives

TOPS Effort #: 0001

Date: 1 March 2016

TO Title: Photonic and plasmonic materials development

Period of Performance: 39 months after mail date (36 months for technical effort plus 3 additional months for completing the final report).

SOO Paragraphs : 4.2.1, 4.2.4, 4.2.5

1.0 Background: The purpose of the program is to focus on the translation of promising research in photonic and opto-electronic materials into device and system technology to support Air Force technical needs in communications, intelligence/surveillance/reconnaissance (ISR) and electronic warfare (EW). The aim is to leverage ongoing developments in photonic integration, novel opto-electronic materials, heterogeneous integration and quantum information to achieve new technical performance in optical, RF and photonic systems.

2.0 Scope: This task focuses on applying research in photonic materials and combining that research with materials processing, process development, integration and growth to develop and transition new technology platforms for ISR and EW applications to address AF needs for A2AD environments.

3.0 Objectives: The objective of this task will be to develop plasmonic and optical materials for use in novel imaging, directed energy and communication systems. Specifically, the works should cover novel metal and ceramic plasmonic materials for visible, mid-IR and long wave IR as well as bulk glass and ceramic systems.

Materials which enable the manufacture of surface based optical systems such as diffractive optics, planar optics, filters, beam formers and conditioners for both narrow band and wide band applications. Additionally, materials which as bulk or surface provide functionality for multiple spectral domains (both RF and Optical, for example) of operation are sought to enable novel system concepts. Manufacturability of systems and processability of materials are a focus of investigation to enable affordable and flexible use in novel technologies.

4.0 Description of Work: The contractor shall develop application specific novel optical and electromagnetic materials. Work under this task will focus on materials and devices for photonic and plasmonic systems, novel optical systems, ISR technologies and laser and directed energy technologies. These materials and components are for a variety of applications including multiband electronic warfare, onboard integrated photonics , laser systems, compact and lightweight optical systems, and multispectum sensor and DE systems. The program will perform research where materials solutions are needed to create components that meet demanding requirements that have been determined from current user needs or perceived future needs.

Research will be performed through specialized studies to examine novel material solutions, fabrication of novel test structures and devices, and evaluation of externally acquired state of the art materials and components. Research areas include integrated photonics, plasmonic materials and devices, advanced high bandwidth photodetectors, antenna design and materials, multi spectrum signal processing, photonic integration, integrated optical amplifiers, and planar photonics. Development of nano dispersed ceramic precursor materials of typical IR materials that can be used to create polycrystalline ceramic optical components for demonstration and characterizations. Typical crystalline and amorphous matrix materials will be considered, as will solution and physical precursor characterization. Optical and plasmonic ceramics and associated deposition and fabrication procedures will be explored. Control of impurities and dopants will be of principle concern in these studies. Studies of combined optical and electronics properties will be conducted.

Novel manufacturing techniques that enable higher performance or lower cost production are a focus of effort.

Reduction or elimination of impurities and monitoring of impurity effects on final optical component qualities are part of the envisioned research activities.

5.0 Deliverables

5.1 CDRLs as listed below:

Data Item A001 Final Report

Data Item A002 Funds & Manhour Expenditure Report

Data Item A003 Contract Funds Status Report

Data Item A004 Technical Status Report

Data Item A008 Conference Minutes

Data Item A009 Conference Agendas

Data Item A010 Technical Report/Study

6.0 Operations Security Requirements: All contractors shall participate in all activities associated with the disciplines of the organization’s Industrial Security, Information Security, Personnel Security, Operations Security (OPSEC), and Antiterrorism, following appropriate measures in each program as required for this particular contract. These are required in an effort to reduce program vulnerability from successful adversary collection, exploitation of critical information, and violations of export control requirements. The prime contractor will ensure that all subcontractors, if applicable, conform to these requirements as required by the prime contractor. Guidance can be provided by AFRL/RX Security as needed.

Program Protection Plan (PPP) – Any potential critical program information (CPI) generated as part of this effort will be reviewed to determine the need for a PPP.

Start Date: Mail Date

Funding Profile:

FY16 FY17 FY18 Total

$500,000 $2,500,000 $1,500,000 $4,500,000

Place of Review, Inspection, and Acceptance: Destination

Estimated Level of Effort: 10 person years

Technical Operations V (TOPS V) Task Order Description/Statement of Objectives

TOPS Effort #: 0002

Date: 1 March 2016

TO Title: Flashblindness Protection Device Design and Integration

Period of Performance: 39 months after mail date (36 months for technical effort plus 3 additional months for completing the final report).

SOO Paragraphs: 4.2.1, 4.2.2, 4.2.4, 4.2.5

1.0 Background: Flashblindness can inhibit the performance of an airman. The purpose of this program is to assimilate and integrate a range of evolving technologies into prototype them in devices. The devices will be assessed for readiness and inform concurrent technology maturation of component technologies.

2.0 Scope: This task focuses on researching and integrating technology to yield an eye protection device for use by Air Force pilots.

3.0 Objective: This effort seeks to research, mature, test, evaluate, and demonstrate eye protection devices. The effort will generally focus on technology maturation of a “next generation” device based on liquid crystals that will serve as the basis of in-band optical shutters on flexible substrates ultimately configured into a spectacle form factor. Unique to this effort, the contractor shall design, fabricate, test, and integrate advanced circuit designs and algorithms to detect a nuclear flash and respond by triggering a liquid crystal based optical protection devices. The system level switching speed from the beginning of the flash until the shutter is fully activated shall not exceed 200 microseconds. The electronics design and integration should be shielded for EMI and assessed for EMP hardness per MIL-STD-461F as well as MIL-STD-810G. The electronics shall be packaged into the eyewear device and preferably battery operated with conventional USAF AFE power sources (preferably AAA or AA batteries, although other smaller variants may be acceptable). Methods to provide skin protection shall be identified, tested for thermal hardness, and assessed for crew acceptability.

Methods for gasketing the optical protection devices to ensure a light-tight seal of the device to the face shall be identified, tested, and assessed for crew acceptability. Accordingly, this effort may require the design of a specific frame to accommodate the subsystems specified above.

To enable and facilitate assessments of these devices, interim and final deliverables will include devices based on the full-system design including in-band optical protection as well as out of band rejection coatings as well as the require power/sensing/control electronics. The effort aims for a final TRL 5 deliverable of an optical protection device in spectacle format that is EMI shielded, assessed for EMP hardness, gasketed to comfortably provide a light-tight seal to the human face, and offers a viable method for skin protection of the exposed facial regions of the aircrew.

In addition to the work specified here, the contractor should support AFRL engagements with AFGSC and AFLCMC relating to the development, testing, assessment, and sustainment of in service flash blindness protection devices.

4.0 Description of Work: To accomplish the stated objectives, the contractor shall perform the tasks defined below. Since some of the tasks are isolated, it is anticipated that some efforts can be ran in parallel or staggered with other tasks during the period of performance.

Power, Sensing, and Control Electronics for Flashblindness Devices The contractor shall research, design, and execute the build and integration of electronic circuitry that is EMI shielded in a form factor that can be battery operated and ideally fit within the housing of the spectacle. The contractor shall design an initial sensing, power, and control subsystem that triggers the optical protection device. The subsystem should discriminate between a nuclear flash event events and conditions.

Thermal Protection The contractor shall research and assess methods to provide thermal protection to exposed regions of the face and neck of a crew member. The materials and fabrics shall be subjected to thermal tests in realistic and relevant environments using a simulator at dosages specified (3.5-5 cal/cm2). The contractor shall submit potential thermal protection solutions for input from aircrew on potential acceptance.

Sealing The contractor shall research and design a spectacle housing that provides a light tight seal to the face, similar to methods used in welder’s glasses. The material solutions shall be identified and subjected to optical and thermal tests to ascertain acceptability. Demonstration articles should be provided to facilitate aircrew acceptance testing.

Interim and Final Deliverable Items

Interim deliverable items will be received every half-year (working prototypes) to allow for constant assessment of performance, ruggedness, and reliability of the system and subsystem. At the completion of this effort, the contractor shall integrate the optical protection (visible and out of band) in a light-tight spectacle form factor integrating the power, sensing, and control electronics with identified solutions for thermal protection. This integrated system should operate through thermal loads up to 3 cal/cm2 with system level switching speed of 200 microseconds (threshold) and optical density exceeding 3 at angle of incidences spanning from normal to +- 45 degrees field of view. Out of band protection requirements are not yet defined but expected to be on the order of O.D. 2-3.

Laboratory Test and Evaluation Studies

In order to assess the interim and final deliverables, as well as support ongoing AFRL engagements with AFGSC and AFLCMC related to legacy flashblindness protection devices, the contractor shall support and provide manpower to conduct the optical and thermal measurements necessary to confirm the device meets or exceeds the performance thresholds specified above.

Program Management and Reviews: The contractor shall manage all cost, schedule, performance and risk aspects of the contract and shall provide periodic technical and management reviews. The contractor shall provide face-to-face reviews within one month of contract award to “kickoff” the effort, at approximately three months after contract award to review requirements and system/sub-system architectures and technologies, and quarterly thereafter to review status, review and approve prototype designs, and review assessment and test results.

5.0 Deliverables:

5.1 CDRLS: As listed below:

Data Item A001 Final Report

Data Item A002 Monthly Financial Report

Data Item A003 Contract Funds Status Report

Data Item A004 Technical Status Report

Data Item A005 Presentation Material

Data Item A007 Still Photo Coverage

Data Item A008 Conference Agenda

Data Item A009 Conference Agendas

Data Item A013 Scientific and Technical Reports

5.2 Hardware deliverables: Hardware deliverables will include LC devices and out of band rejection filters to enable interim test and evaluation, half-yearly prototype deliverables, and final device deliverables meeting requirements (two TRL 5 spectacle that is EMI shielded, assessed for EMP hardness, gasketed to comfortably provide a light-tight seal to the human face, and including demonstrated methods for skin protection).

6.0 Operations Security Requirements: All contractors shall participate in all activities associated with the disciplines of the organization’s Industrial Security, Information Security, Personnel Security, Operations Security (OPSEC), and Antiterrorism, following appropriate measures in each program as required for this particular contract. These are required in an effort to reduce program vulnerability from successful adversary collection, exploitation of critical information, and violations of export control requirements. The prime contractor will ensure that all subcontractors, if applicable, conform to these requirements as required by the prime contractor. Guidance can be provided by AFRL/RX Security as needed.

Program Protection Plan (PPP) – Any potential critical program information (CPI) generated as part of this effort will be reviewed to determine the need for a PPP.

Start Date: Mail Date

Funding Profile:

FY16 FY17 FY18 TOTAL

$1,650,000 $1,650,000 $1,700,000 $5,000,000

Place of Review, Inspection, and Acceptance: Destination

TOPS Attachment 5 - Basic SOO
TOPS V Attachment 5 - Task 0001 SOO
TOPS V Attachment 5 - Task 0002 SOO

File details come from the government source that posted it. Updated .