S1814___Data_Call_001_-_NB_SATCOM,_REV2,_26SEP18.pdf

PDF 236 KB Posted

Attached to
C5ISR 2018 BAA (Formerly S&TCD) Rev 16
Solicitation number
BAA-18-R-STCD
Issued by

About this file

The purpose of this amendment is to revise the data call 001 and update the BAA. 1. Data call 001 revised in response to questions received.

View the file

Other files

File Type Posted
Data_Call_013_Wireless Mesh Networks for Survivable Command Posts_Amended 20220315.pdf PDF
Data_Call_014_Multiband NGTT OTA CWP 9 March 2022 v2.pdf PDF
Data_Call_014_Multiband NGTT OTA CWP 9 March 2022 v2.pdf PDF
Data_Call_014_Multiband NGTT OTA CWP 9 March 2022 v1.pdf PDF
Data_Call_012_Computing Infrastructure Software for Survivable Command Posts_Amended 20220302.pdf PDF
Data_Call_013_Wireless Mesh Networks for Survivable Command Posts_20220302.pdf PDF
Data_Call_012_Computing Infrastructure Software for Survivable Command Posts_20220217.pdf PDF
C5ISR 2018 BAA (Formerly STCD) Rev15__16 Feb2022.pdf PDF
BAA-18-R-STCD_ 20180620 BAA Final Rev14 24Nov21.pdf PDF
BAA-18-R-STCD_ 20180620 BAA Final Rev13 (24 Nov 21).pdf PDF
OTA Protected SATCOM NGTT 1 CWP AMD3 DRAFT 22NOV2021.pdf PDF
OTA Protected SATCOM NGTT 1 CWP AMD2 19NOV2021.pdf PDF
Call 11_OTA Protected SATCOM NGTT 1 CWP AMD1 02NOV2021.pdf PDF
Call 11_OTA Protected SATCOM NGTT 1 CWP 27 Oct 2021.pdf PDF
BAA-18-R-STCD_ 20180620 BAA Final Rev12 (28OCT21).pdf PDF
BAA-18-R-STCD _ 20180620 BAA Final Rev11 (13Oct20).pdf PDF
BAA-18-R-STCD _ 20180620 BAA Final Rev10 (19May2020).pdf PDF
Updated Data_Call_010_WGS Ka-Band Satellite Surrogate Payload for High Altitude Platforms.docx DOCX document
Data_Call_010_WGS Ka-Band Satellite Surrogate Payload for High Altitude Platforms.pdf PDF
BAA-18-R-STCD _ 20180620 BAA Final Rev9 (12Mar20).pdf PDF
Data_Call_009_Addendum_001_-_Q&A.docx DOCX document
DataCall009-InfoTrustUpdated22Nov19.docx DOCX document
Data Call 009 - Information Trust 19Nov19.docx DOCX document
BAA-18-R-STCD_Rev8_11Oct19.pdf PDF
Data_Call_008_(S1812)_-_SATCOM_RT-RO_(Robust_Orderwire).pdf PDF
BAA-18-R-STCD_Rev7_01July19.pdf PDF
Data_Call_007_-_Question_and_Answer.pdf PDF
Data_Call_007.pdf PDF
BAA-18-R-STCD_Rev6_18April19.pdf PDF
BAA-18-R-STCD___20180620_BAA_Final_Rev5_(03Apr19).pdf PDF
Data_Call_0006_Q&A_15Feb19.pdf PDF
Call_for_White_papers_For_Protected_Comms_for_MUM-T_30Jan2019.pdf PDF
Call_for_White_papers_For_Protected_Comms_for_MUM-T_30Jan2019.pdf PDF
BAA-18-R-STCD___20180620_BAA_Final_Rev4_(17JAN19).docx DOCX document
Data_Call_005_Additional_Q&A_19Dec18.docx DOCX document
Data_Call_005_Q&A.DOCX DOCX document
DATA_CALL_004_Q&A.docx DOCX document
Data_Call_003_-_Q&A_10Dec18.docx DOCX document
Call_for_White_Paper_005_WASP_20181129.docx DOCX document
Call_for_White_Paper_SQAN_27NOV18.pdf PDF
BAA-18-R-STCD___20180620_BAA_Final_Rev3_(26NOV18).pdf PDF
Call_for_White_Paper_mmW_(rev19Nov2018).docx DOCX document
Call_for_White_Paper_003_D2TBS_(15NOV18).docx DOCX document
CALL_002_ADDENDUM_001_QA.docx DOCX document
Call_for_White_Paper_mmW_(24_Oct_2018).docx DOCX document
BAA-18-R-STCD___20180620,_BAA_Final,_Rev2_(27SEP18).pdf PDF
S1814___Data_Call_001_-NB_SATCOM,_REV1,_25SEP18.pdf PDF
S1814___Data_Call_for_NB-SATCOM_(18SEP2018).pdf PDF
STCD_BAA_20180627_Final_Ver1_Additional_Topic.pdf PDF
STCD_BAA_20180618.docx DOCX document
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR INFORMATION (RFI) / DATA CALL

Broad Area Announcement (BAA)

Solicitation: BAA-18-R-STCD, Topic #: S1814

Narrowband SATCOM Transport Controller Research

DATA CALL 001

REV2, 26SEP18

1.0 INTRODUCTION

This call for White Papers (WP) is being issued under Broad Agency Announcement (BAA) BAA- 18-R-STCD, which was published on FedBizOpps.gov on 20 June 2018, and last updated on 3 July 2018. Offerors must refer to the solicitation document entitled “STCD_BAA 20180627 Final Ver1 Additional Topic,” which incorporates Amendment 1, and it must be read in conjunction with this call for WP’s. All instructions set forth in the BAA-18-R-STCD solicitation document apply to this call.

The Space and Terrestrial Communications Directorate (S&TCD) is soliciting this call for WP’s, in accordance with (IAW) Topic # S1814. To be eligible for consideration and possible contract award, the technology or methodology shall be in the nature of either basic research, applied research, or advanced technology development, not for a specific system/hardware, or demonstration and validation.

1.1 DATA CALL INFORMATION

S&TCD provides Science and Technology (S&T) solutions to the Department of Defense (DoD), U.S. Army Joint Programs of Record (PoR), and the Warfighter. S&TCD performs research, development, and engineering functions in all aspects of terrestrial, avionics, and space-dependent communications technology to include adaptive, reliable seamless battlefield communications with full electronic counter-countermeasures capability and cybersecurity/Information Assurance

(IA).

S&TCD is interested in developing an Open Standard Architecture (OSA) compliant Gateway Transport Management System (GTMS), for the Satellite Communications (SATCOM) Divisions networks, that is capable of leveraging machine learning technologies. S&TCD is interested in the SATCOM GTMS solutions, and commercially available technical concepts and ideas for inclusion into future system designs. The development of the GTMS will directly support the U.S.

Solicitation: BAA-18-R-STCD Data Call 001, Rev2 Topic #: S1814

Army’s modernization priorities for network transport performance and technology integration, as identified herein.

1.1.1 BACKGROUND

In Fiscal Year (FY) 2018 (FY18), the Communications Electronics Research, Development, and Engineering Command (CERDEC) initiated a multi-year formal Research and Development (R&D) program to commence in FY19. This multi-year R&D program shall provide the development of the GTMS, and Automated Network Management Systems (ANCS), to supporting future Mission Command (MC) SATCOM networks, providing real-time physical through network layer sensing capabilities, and enabling transport services orchestration.

1.1.2 KEY CAPABILITIES

The key capabilities in which an Offeror should focus for the development of a product and/or solution for BAA Topic S1814, for S&TCD, SATCOM Division include:

Monitors Global Narrowband SATCOM Transports based on OSA standards.

Provides Smart Routing Based on Transport Health and User Demands

Improves Network Connectivity with Transport Management utilizing Applied Machine

Learning

Waveforms Performance Optimization

Over The Air Waveform Provisioning and Key Management

Minimize Network Admissions and Load Balancing

Provides transport network resiliency to tactical users These capabilities where derived from the Army’s modernization priorities with focus on enhance Network, Command

Control and communication (C3I) supporting key capabilities; Long Range Precision Fires, Next Generation Combat Vehicles, Future Vertical Lift, Air and Missile Defense and

Solider Lethality.

Program is a multiyear research and development effort developing enhanced transport management systems that enables cross-hub command and control operations.

1.1.3 NARROWBAND SATCOM PROBLEM STATEMENT/OVERVIEW

The current SATCOM transport architecture consists of one controller for every transport;

however, the current capabilities do not allow for one (1) controller to manage multiple transports, and is not scalable or flexible in the event of transport link degradation, as a result of a congested or contested environment The intended objective for Narrowband SATCOM is to develop a single gateway transport controller that can interact with and has ability to manage simultaneously multiple Satellite transports.

Figure 1: Narrowband SATCOM Operation View

2.0 AWARD INFORMATION

2.1 ANTICIPATED AWARD DATE: MAY 2019 (FY19, QUARTER (Q) 3 (Q3))

2.2 FUNDING AND PERIOD OF PERFORMANCE

Under this call, the United States Government (USG) intends to award up to two (2) contracts with an approximate Period of Performance (PoP) of fifty-four (54) months, with anticipated funding of approximately $13.5M, per awarded contract.

NOTE: The total PoP for this call is not to exceed (NTE) FY23, Q4; and, may be delineated in the following Phases (PH) (periods and/or Option Years (OY)):

Base Period (PH I): twelve (12) months;

OY1 (PH II): NTE twelve (12) months;

OY2 (PH III): NTE twelve (12) months;

OY3 (PH IV): NTE eighteen (18) months;

NOTE: This funding profile is an estimate only, and is not a contractual obligation for funding.

All funding is subject to change due to USG discretion and availability. Potential Offerors should be aware that due to unanticipated budget fluctuations, funding, in any or all areas, may change with little or no notice. Awards under this call are expected to range from $13.5 M to $27M;

however, USG reserves the right to award smaller or larger contracts, or assistance instruments.

USG reserves the right to select all, part, or none of the WP’s received, subject to the availability of funds.

2.3 BAA TYPE

This call for WP’s will be governed by the “two-step” process described in the General Information section of BAA-18-R-STCD. Offerors that submit a proposal without first submitting a WP may not be eligible for award.

2.4 SUBMISSION INSTRUCTIONS

All submissions shall be IAW the instructions provided within the baseline BAA-18-R-STCD, via Section III, for instructions on WP preparation, submission, and evaluation.

2.4.1 TECHNICAL APPROACH

Interested parties are requested to respond to this call for WP’s by submitting a Technical Approach describing their technical capabilities, concepts, ideas, and, relevant experience in developing similar components.

All responses shall provide sound reasoning and a description of component level functionality to support the proposed component and/or architecture. This information will be shared with DoD personnel, and DoD SETA Contractors involved in WP evaluations and review only.

Interested parties providing proposed components or technologies shall also provide thorough technical content explaining the operation, and performance of the component or technology. This portion of the response can be marked with proprietary markings.

2.5 QUESTIONS DUE DATE AND TIME

Technical questions shall be submitted No Later Than (NLT) 3:00 PM EST, 25 SEPTEMBER 2018, via email to the Technical Point of Contact (TPOC), with a carbon copy (CC) to the Contracting Officer (KO), Contract Specialist (KS), and Acquisition Management Team (AMT) Mailbox, as listed below.

USG will publish questions and answers received by industry to FBO, via a revision to this Data Call, per ADDENDUM 001, Technical Questions and Clarifications, herein.

2.6 WHITE PAPER DUE DATE AND TIME

All WP’s shall be submitted NLT 3:00 PM EST, 18 OCTOBER 2018, via email to the TPOC, with a carbon copy (CC) to the KO, KS, and AMT Mailbox, as listed below.

AMT Mailbox: usarmy.apg.rdecom-cerdec.mbx.stcd-amt@mail.mil KO, Brian Holman: brian.j.holman2.civ@mail.mil KS, Andrew Pilone: andrew.m.pilone.civ@mail.mil TPOC, Rahul Pandya: rahul.p.pandya.civ@mail.mil Alternate TPOC, Peter Bach: peter.a.bach4.civ@mail.mil

If the submission will be classified, Offerors should contact the TPOC and KO for instruction on how to submit the WP via appropriate methods/channels. The KO shall be informed, in writing, that a classified WP has been submitted, referencing the submissions title and to whom it was submitted.

Contractual questions may be directed to the KO and/or KS at any time.

ADDENDUM 001

TECHNICAL QUESTIONS AND CLARIFICATIONS

26 September 2018

Q-1: As far as military SATCOM is concerned, is the focus on next-generation NB-

SATCOM (MUOS)?

If so, does S&TCD expect the Waveform Optimizer to be limited to WCDMA or should it also optimize legacy waveforms or other waveforms considered for NB- SATCOM (e.g., OFDM)?

Are there any specific radios or other waveforms that are in scope?

USG RE: By definition MILSATCOM now (DoDI 8420.01) refers to any DoD owned or leased capability. If the DoD is paying for it, it falls under the umbrella term “MILSATCOM”.

As for Military SATCOM, NB-SATCOM is looking at supporting "low data rate traffic" over one or more transports available in a region, today and into the future.

Considerations include, but are not limited to: MUOS, (W)CDMA, 5G, OFDM, Iridium.

Specific Radios have not been defined yet and waveform implementations are dependent on the region and RF environments.

Q-2: The RFI lists seven key capabilities in Section 1.1.2. Is S&TCD interested only in solutions that address all the capabilities or also in the ones that offer a partial concept (e.g., a Smart Routing solution or a waveform optimization approach or a combination of the two)?

USG RE: S&TCD is interested in solutions that can address the key capabilities listed.

Q-3: Are software-based solutions acceptable or does S&TCD also want performers to provide/build transport controller hardware (e.g., modem to each waveform type)?

USG RE: Software solution is preferred, that is modular in design to accept API's or interfaces to physical modems that provide SATCOM IF modulated waveforms. The solution should be scalable to accept multi-vendor modems for Provisioning, configurations and management of remote devices.

NOTE: API requirements would need to be developed in support of this effort.

Q-4: In the instructions to the BAA-18-R-STCD, it references in White Paper Preparation, Submission, and Evaluation paragraph 1.c.v. that technology can be matured sufficiently to meet a TRL of 5 after 12 months of effort; but, in the Data Call, it references an approximate PoP of 54 months – does the TRL 5 in 12 months still apply?

USG RE: OY periods are available to extend the time needed to mature capabilities to a TRL 5, if required. USG prefers the vendor provides a TRL 5 capabilities with minimal OY periods.

Q-5: The request for a ROM – is that for 12 months (~ $3M) or 54 months (~ $13.5M)? 3

USG RE: IAW Section 2.2, Funding and Period of Performance, USG intends to award up to two

(2) contracts with an approximate PoP of fifty-four (54) months, consisting of one (1) twelve (12) month Base/ Phase I period, two (12) twelve (12) month OY (OY1/Phase II, and OY2/Phase III) periods, and one (1) eighteen (18) month OY4/Phase IV period;

with anticipated funding of approximately $13.5M, per awarded contract.

Q-6: The request for a ROM— is a bottom line number with a clarification that the ROM does/does not include fee acceptable?

USG RE: IAW Section 2.2, Funding and Period of Performance, the ROM is NTE the aforementioned funding of $13.5M, per contract award.

Q-7: Can the government please clarify is a Rough Order of Magnitude (ROM) is required for the S1814 Data Call? The instructions in the separate announcement do not request it, but BAA‐18‐R‐STCD mentions including a ROM as part of the submittal.

Is a White Paper incomplete without a ROM?

USG RE: All Data Calls/Calls for WP’s are in conjunction with the BAA-18-R-STCD, and, are used to provide granularity/requirement specifications for a specific topic; therefore, yes, a ROM is required for each WP submission, and, would be considered incomplete if the WP submission did not include a ROM.

File details come from the government source that posted it.