About this file
Written by GovTribe AI
· Sep 7, 2026
BA26-016 Stand-by Towing Operations Bidders Worksheet Summary
This is a bidders worksheet for IFB #BA26-016 Stand-by Towing Operations issued by the New York State Department of Transportation (NYSDOT). The solicitation involves stand-by towing services across multiple regions and lots, with bidders permitted to submit proposals for one or more lots and not required to bid in all regions. The worksheet covers Region 2 (six lots covering various state routes in the Amsterdam area), Region 7 (one lot covering all roads in Jefferson County within a 30-mile radius of the NYSDOT-Jefferson County Residency), and Region 8 (one lot covering Interstate 84 from Mile Marker 0.0 to 7.1). Service requirements include both Heavy and Medium vehicle towing capabilities for 8-hour shifts, 4-hour shifts at 55% of the 8-hour rate, and 2-hour extensions at 30% of the 8-hour rate. Estimated annual occurrences vary by lot, ranging from 5 to 8 occurrences for 8-hour shifts.
Bidders must submit pricing only in the designated yellow-highlighted cells for the 8-hour shift reimbursement rate, with bid prices limited to two decimal places. The 4-hour and 2-hour extension rates automatically calculate as percentages of the submitted 8-hour rate. Each bidder must complete the worksheet, calculate subtotals and grand totals for each lot, and transfer the Grand Total Bid amounts to the formal Bid Proposal Form. The completed worksheet must be printed, signed, dated, and attached to the Bid Proposal Form as a required submission component. Bidders are required to enter values for each Vehicle Type within a lot to be considered for an award for that specific lot.
Other files
File
Type
Posted
1 MWBE 100 MWBE Utilization Plan.pdf
PDF
Sep 2, 2026
11 Electronic Signatures - Supplemental Instructions.pdf
PDF
Sep 2, 2026
6 Vendor Assurance No Conflict.pdf
PDF
Sep 2, 2026
9 Affidavit of No Change.pdf
PDF
Sep 2, 2026
2 SDVOB 100 SDVOB Utilization Plan.pdf
PDF
Sep 2, 2026
BA26-016 - IFB.pdf
PDF
Sep 2, 2026
BA26-016 - Bid Proposal Form.pdf
PDF
Sep 2, 2026
8 NYS Sales and Use Tax Form - ST 220 TD.pdf
PDF
Sep 2, 2026
10 Electronic Signature Affirmation.pdf
PDF
Sep 2, 2026
3 Procurement Lobbying Act.pdf
PDF
Sep 2, 2026
BA26-016 - IFB - Amendment 1.pdf
PDF
Sep 2, 2026
5 Executive Order 16.pdf
PDF
Sep 2, 2026
4 Executive Order 177.pdf
PDF
Sep 2, 2026
7 NYS Sales and Use Tax Form - ST 220 CA.pdf
PDF
Sep 2, 2026
Stock Exhibit.pdf
PDF
Sep 2, 2026
Show all 15
On GovTribe
Work with this file
Download the original file
Contacts named in this file
Similar government files
Ask GovTribe AI about this file
Text version
The file's text, extracted by GovTribe without its formatting.
R2
IFB #BA 26-016 Stand-by Towing Operations Name/Address of Bidder
BID PROPOSAL PRICES (BID PROPOSAL WORKSHEET)
Bidders may bid on one or more lots.
Bidders must enter a value for each Vehicle Type within a lot to be considered for an award for that lot.
(Bidders are NOT required to bid in each region or to bid on all lots within a region.)
Enter values only in yellow highlighted cells (8 hr-shift reimbursement rate).
8 Hr. Rate Bid Price CANNOT EXCEED 2 DECIMAL PLACES
Subtotals and Grand Total Bid amounts automatically calculate after entering the 8-hr shift reimbursement rate.
REMINDER: Transfer the "Grand Total Bid" amount for each LOT on this Bid Worksheet to the Bid Proposal document.
Once worksheet is completed, print-out of this tab must be signed/dated and attached to the Bid Proposal Form.
REGION 2
Region 2
Lot 2-1 Route: Rte 28 From Sarafin Road to intersection of Route 168
Shift Reimbursement Rates
8 Hr. Rate Bid Price* 4 Hour Shift 2 Hour Extension
Vehicle Type Percent of 8 Hr. Shift Rate 4 hr. Rate Percent of 8 Hr. Shift Rate 2 Hr. Extension Rate Annual Estimated Occurrences ( 8 Hour) Annual Estimated Occurrences ( 4 Hour) Annual Estimated Occurrences ( 2 Hour) Subtotals
Heavy $ - 0 55% $ - 0 30% $ - 0 5 0 0 $ - 0
Medium $ - 0 55% $ - 0 30% $ - 0 5 0 0 $ - 0
Grand Total Bid Amount - Enter this Amount onto Bid Proposal Form: $ - 0
*Actual Rate to be utilized in contract: The 4 hour and Plus 2-hour extension rates are based on this rate.
Vendor Name:
Print Name:
Signature:
Date:
REGION 2
Region 2
Lot 2-2 Route: State Route 30 Thruway Exit 27 to Prospect Street, Amsterdam
Shift Reimbursement Rates
8 Hr. Rate Bid Price* 4 Hour Shift 2 Hour Extension
Vehicle Type Percent of 8 Hr. Shift Rate 4 hr. Rate Percent of 8 Hr. Shift Rate 2 Hr. Extension Rate Annual Estimated Occurrences ( 8 Hour) Annual Estimated Occurrences ( 4 Hour) Annual Estimated Occurrences ( 2 Hour) Subtotals
Heavy $ - 0 55% $ - 0 30% $ - 0 5 0 0 $ - 0
Medium $ - 0 55% $ - 0 30% $ - 0 5 0 0 $ - 0
Grand Total Bid Amount - Enter this Amount onto Bid Proposal Form: $ - 0
*Actual Rate to be utilized in contract: The 4 hour and Plus 2-hour extension rates are based on this rate.
Vendor Name:
Print Name:
Signature:
Date:
REGION 2
Region 2
Lot 2-3 Route: State Route 30 Northampton Road to Fulton County Line
Shift Reimbursement Rates
8 Hr. Rate Bid Price* 4 Hour Shift 2 Hour Extension
Vehicle Type Percent of 8 Hr. Shift Rate 4 hr. Rate Percent of 8 Hr. Shift Rate 2 Hr. Extension Rate Annual Estimated Occurrences ( 8 Hour) Annual Estimated Occurrences ( 4 Hour) Annual Estimated Occurrences ( 2 Hour) Subtotals
Heavy $ - 0 55% $ - 0 30% $ - 0 5 0 0 $ - 0
Medium $ - 0 55% $ - 0 30% $ - 0 5 0 0 $ - 0
Grand Total Bid Amount - Enter this Amount onto Bid Proposal Form: $ - 0
*Actual Rate to be utilized in contract: The 4 hour and Plus 2-hour extension rates are based on this rate.
Vendor Name:
Print Name:
Signature:
Date:
REGION 2
Region 2
Lot 2-4 Route: State Route 30A Lower Prospect Street to Fulton County Line
Shift Reimbursement Rates
8 Hr. Rate Bid Price* 4 Hour Shift 2 Hour Extension
Vehicle Type Percent of 8 Hr. Shift Rate 4 hr. Rate Percent of 8 Hr. Shift Rate 2 Hr. Extension Rate Annual Estimated Occurrences ( 8 Hour) Annual Estimated Occurrences ( 4 Hour) Annual Estimated Occurrences ( 2 Hour) Subtotals
Heavy $ - 0 55% $ - 0 30% $ - 0 5 0 0 $ - 0
Medium $ - 0 55% $ - 0 30% $ - 0 5 0 0 $ - 0
Grand Total Bid Amount - Enter this Amount onto Bid Proposal Form: $ - 0
*Actual Rate to be utilized in contract: The 4 hour and Plus 2-hour extension rates are based on this rate.
Vendor Name:
Print Name:
Signature:
Date:
REGION 2
Region 2
Lot 2-5 Route: State Route 30A Fulton County Line to Union Avenue
Shift Reimbursement Rates
8 Hr. Rate Bid Price* 4 Hour Shift 2 Hour Extension
Vehicle Type Percent of 8 Hr. Shift Rate 4 hr. Rate Percent of 8 Hr. Shift Rate 2 Hr. Extension Rate Annual Estimated Occurrences ( 8 Hour) Annual Estimated Occurrences ( 4 Hour) Annual Estimated Occurrences ( 2 Hour) Subtotals
Heavy $ - 0 55% $ - 0 30% $ - 0 5 0 0 $ - 0
Medium $ - 0 55% $ - 0 30% $ - 0 5 0 0 $ - 0
Grand Total Bid Amount - Enter this Amount onto Bid Proposal Form: $ - 0
*Actual Rate to be utilized in contract: The 4 hour and Plus 2-hour extension rates are based on this rate.
Vendor Name:
Print Name:
Signature:
Date:
REGION 2
Region 2
Lot 2-6 Route: State Route 12 Intersection of Genessee Street to Daytonville Road
Shift Reimbursement Rates
8 Hr. Rate Bid Price* 4 Hour Shift 2 Hour Extension
Vehicle Type Percent of 8 Hr. Shift Rate 4 hr. Rate Percent of 8 Hr. Shift Rate 2 Hr. Extension Rate Annual Estimated Occurrences ( 8 Hour) Annual Estimated Occurrences ( 4 Hour) Annual Estimated Occurrences ( 2 Hour) Subtotals
Heavy $ - 0 55% $ - 0 30% $ - 0 5 0 0 $ - 0
Medium $ - 0 55% $ - 0 30% $ - 0 5 0 0 $ - 0
Grand Total Bid Amount - Enter this Amount onto Bid Proposal Form: $ - 0
*Actual Rate to be utilized in contract: The 4 hour and Plus 2-hour extension rates are based on this rate.
Vendor Name:
Print Name:
Signature:
Date:
R7
IFB #BA 26-016 Stand-by Towing Operations Name/Address of Bidder
BID PROPOSAL PRICES (BID PROPOSAL WORKSHEET)
Bidders may bid on one or more lots.
Bidders must enter a value for each Vehicle Type within a lot to be considered for an award for that lot.
(Bidders are NOT required to bid in each region or to bid on all lots within a region.)
Enter values only in yellow highlighted cells (8 hr-shift reimbursement rate).
8 Hr. Rate Bid Price CANNOT EXCEED 2 DECIMAL PLACES
Subtotals and Grand Total Bid amounts automatically calculate after entering the 8-hr shift reimbursement rate.
REMINDER: Transfer the "Grand Total Bid" amount for each LOT on this Bid Worksheet to the Bid Proposal document.
Once worksheet is completed, print-out of this tab must be signed/dated and attached to the Bid Proposal Form.
REGION 7
Region 7
Lot 7-1 Route: All roads in Jefferson County within a 30 mile radius of the NYSDOT-Jefferson County Residency
located at 22430 State Route 342, Watertown, NY 13601
Shift Reimbursement Rates
8 Hr. Rate Bid Price* 4 Hour Shift 2 Hour Extension
Vehicle Type Percent of 8 Hr. Shift Rate 4 hr. Rate Percent of 8 Hr. Shift Rate 2 Hr. Extension Rate Annual Estimated Occurrences ( 8 Hour) Annual Estimated Occurrences ( 4 Hour) Annual Estimated Occurrences ( 2 Hour) Subtotals
Heavy $ - 0 55% $ - 0 30% $ - 0 5 2 0 $ - 0
Grand Total Bid Amount - Enter this Amount onto Bid Proposal Form: $ - 0
*Actual Rate to be utilized in contract: The 4 hour and Plus 2-hour extension rates are based on this rate.
Vendor Name:
Print Name:
Signature:
Date:
R8
IFB #BA 26-016 Stand-by Towing Operations Name/Address of Bidder
BID PROPOSAL PRICES (BID PROPOSAL WORKSHEET)
Bidders may bid on one or more lots.
Bidders must enter a value for each Vehicle Type within a lot to be considered for an award for that lot.
(Bidders are NOT required to bid in each region or to bid on all lots within a region.)
Enter values only in yellow highlighted cells (8 hr-shift reimbursement rate).
8 Hr. Rate Bid Price CANNOT EXCEED 2 DECIMAL PLACES
Subtotals and Grand Total Bid amounts automatically calculate after entering the 8-hr shift reimbursement rate.
REMINDER: Transfer the "Grand Total Bid" amount for each LOT on this Bid Worksheet to the Bid Proposal document.
Once worksheet is completed, print-out of this tab must be signed/dated and attached to the Bid Proposal Form.
REGION 8
Region 8
Lot 8-1 Route: Interstate 84, Mile Marker 0.0 to Mile Marker 7.1
Shift Reimbursement Rates
8 Hr. Rate Bid Price* 4 Hour Shift 2 Hour Extension
Vehicle Type Percent of 8 Hr. Shift Rate 4 hr. Rate Percent of 8 Hr. Shift Rate 2 Hr. Extension Rate Annual Estimated Occurrences ( 8 Hour) Annual Estimated Occurrences ( 4 Hour) Annual Estimated Occurrences ( 2 Hour) Subtotals
Heavy $ - 0 55% $ - 0 30% $ - 0 8 4 2 $ - 0
Medium $ - 0 55% $ - 0 30% $ - 0 8 4 2 $ - 0
Grand Total Bid Amount - Enter this Amount onto Bid Proposal Form: $ - 0
*Actual Rate to be utilized in contract: The 4 hour and Plus 2-hour extension rates are based on this rate.
Vendor Name:
Print Name:
Signature:
Date:
File details come from the government source that posted it.
Updated Sep 7, 2026 .