Attachment_0003__Price_Schedule.docx
DOCX document 22 KB Posted
- Attached to
- HVAC Upgrades, Mammoth Cave National Park
- Solicitation number
- 140P5126R0010
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment__0006___Question_and_Answers_0003.pdf | ||
| Sol_140P5126R0010_Amd_0003.pdf | ||
| Sol_140P5126R0010_Amd_0002.pdf | ||
| Sol_140P5126R0010_Amd_0001.pdf | ||
| Attachment_0003__Revised_Price_Schedule_0001.xlsx | XLSX spreadsheet | |
| Attachment_0001__Statement_of_Work.pdf | ||
| Sol_140P5126R0010.pdf | ||
| Attachment_0002__DOL_WG.pdf | ||
| Attachment_0005__Bid_Bond.pdf | ||
| Attachment_0004__Past_Performance.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT PRICE SCHEDULE
SOLICITATION NUMBER:
PARK - PMIS: DEVELOPED AREA: PROJECT TITLE:
140P5126R0010
MACA
Mammoth Cave National Park Replacement of HVAC System
Notice: Refer to FAR Clause 52.217-5, Evaluation of Options, as prescribed in FAR 17. Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars. Pricing will be evaluated based on what is determined to be the best value to the Government.
In addition to the offer that conforms to the solicitation documents, offerors are encouraged to submit alternate proposals that will result in cost savings to the Government. Such proposals shall clearly identity why the acceptance of the alternate proposal would be advantageous to the Government, see FAR Clause 52.215-1, Instructions to Offerors - Competitive Acquisition-Alternate II and DSC-36 Clause (Instructions for Submission of Offers and Other Information) in Section L of the Solicitation.
CONTRACT LINE ITEM NUMBER (CLIN)
CONTRACT LINE ITEM (CLI) TITLE
QUANTITY
UNIT OF MEASURE
UNIT PRICE
TOTAL PRICE
| Remove & dispose existing HVAC units |
| 18 |
| LOT |
| 2 |
| EPA refrigerant recovery |
| 18 |
| LOT |
| 3 |
| New HVAC equipment (14–15 SEER2 systems) |
| 18 |
| LOT |
| 4 |
| Refrigerant line sets (avg. 50 ft) |
| 18 |
| LOT |
| 5 |
| Programmable thermostats |
| 18 |
| LOT |
| 6 |
| Electrical connections & disconnects |
| 18 |
| LOT |
| 7 |
| Ductwork transitions & modifications |
| 18 |
| LOT |
| 8 |
| Condensate drain installation |
| 18 |
| LOT |
| 9 |
| Startup, testing & commissioning |
| 18 |
| LOT |
| 10 |
| Equipment rental / lifts |
| 1 |
| LOT |
| 11 |
| Mobilization / transportation |
| 1 |
| LOT |
| 12 |
| Overhead & Profit |
| 1 |
| % |
| 13 |
| Other Direct Cost |
| 1 |
| LOT |
| 14 |
| Bonding |
| 1 |
| LOT |
| 15 |
| Miscellaneous |
| 1 |
| LOT |
| TOTAL PROPOSED PRICE |
| $ |