Attachment__0006___Question_and_Answers_0003.pdf
PDF 60 KB Posted
- Attached to
- HVAC Upgrades, Mammoth Cave National Park
- Solicitation number
- 140P5126R0010
About this file
This is a Questions and Answers document for federal solicitation 140P512R0010 regarding HVAC upgrades at Mammoth Cave National Park in Mammoth Cave, Kentucky.
The document clarifies five key points from the solicitation and Statement of Work. NATE certification for HVAC technicians is not required. All permits and licenses specified in the SOW and solicitation must be obtained by the contractor. Performance and Payment bonds are required at 100% of the contract price and must be submitted within 10 calendar days of award receipt. Regarding equipment specifications, SRM #2 requires a 5-ton (propane) LP/electric packaged unit, clarifying a discrepancy in the SOW where the system was listed as 4-ton split system but the equipment model number indicated a 5-ton packaged rooftop unit. This distinction is critical as it represents significantly different scopes of work and equipment costs.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P5126R0010_Amd_0003.pdf | ||
| Sol_140P5126R0010_Amd_0002.pdf | ||
| Sol_140P5126R0010_Amd_0001.pdf | ||
| Attachment_0003__Revised_Price_Schedule_0001.xlsx | XLSX spreadsheet | |
| Attachment_0001__Statement_of_Work.pdf | ||
| Sol_140P5126R0010.pdf | ||
| Attachment_0002__DOL_WG.pdf | ||
| Attachment_0003__Price_Schedule.docx | DOCX document | |
| Attachment_0005__Bid_Bond.pdf | ||
| Attachment_0004__Past_Performance.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HVAC Upgrades, Mammoth Cave National Park, Mammoth Cave, KY
Questions and Answers Solicitation 140P512R0010
Question 1: Will NATE certified HVAC technicians be a requirement for this project?
Answer: No
Question 2: Is there a hard requirement for building permits on this project? [see pg 15 - Special Requirements H.9 within the solicitation.
Answer: Obtain all permits and licenses specified in the SOW and/or solicitation.
Question 3: We want to confirm the bid bond amount is still 20% of the total.
Answer: Performance and Payment bonds are required at 100% of the contract price and must be submitted within (10) calendar days of receipt of the award.
Question 4. (SRM Office #2 System Type Conflict) The equipment schedule on page 3 of the SOW lists SRM #2 with a system description of "LP/Electric Split" but the outdoor model/serial field reads "Package Unit" and the indoor model number YHC060E3RMA1R00D decodes as a Trane packaged rooftop unit. Please confirm whether the replacement for SRM #2 is a packaged rooftop unit or a split system, as these represent significantly different scopes of work and equipment costs.
Answer: SRM #2 is 5ton (propane) LP/electric packaged unit.
Question 5. (SRM Office #2 Tonnage Conflict) The same line item lists the capacity as 4T, however the YHC060 model number indicates a 5-ton unit. Please confirm the correct replacement tonnage required for SRM #2.
Answer: SRM #2 is 5ton (propane) LP/electric packaged unit.