This proposal schedule outlines the tasks and pricing structure for a design-build replacement of a catwalk and associated appurtenances at the Little White Salmon National Fish Hatchery. The contractor is to provide pricing for four base tasks including reviewing the existing site, constructing a permanent replacement catwalk structure, and as-built drawings. An optional task includes constructing temporary repairs. The contractor must edit the proposal schedule, provide a detailed cost breakdown and pricing for each task, and submit backup documentation. The soliciting agency is the Department of the Interior Fish and Wildlife Service for opportunity WA-LWSNFH - DESIGN/BUILD NEW REPLACEMENT with a solicitation number of 140F0321Q0060. The incomplete bids will not be considered for this award.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B12_LWS__Questions_and_Responses__Amend_2_0002.pdf | ||
| B12_LWS__Contractor_Sign-In__Revised_0002.pdf | ||
| Sol_140F0321Q0060_Amd_0002.pdf | ||
| A04_LWSNFH__SOW__REVISION_2_9_14_21_0002.pdf | ||
| Sol_140F0321Q0060_Amd_0001.pdf | ||
| A04_LWSNFH_Revised_SOW_8_19_21_0001.pdf | ||
| B12_REVISED_Pre-Offer_Bid_Meeting_(2)_0001.pdf | ||
| Sol_140F0321Q0060.pdf | ||
| A04__LWSNFH__SOW__Revised_08-18_2021.pdf | ||
| B03_Construction_Wage_Rates.pdf | ||
| B12_Pre-Offer_Bid_Meeting.pdf | ||
| A06_Existing_Drawings_-_For_Reference_ONLY_(1).pdf | ||
| B12_LWSNFH__Subcontract_List_(1).pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LITTLE WHITE SALMON NATIONAL FISH HATCHERY
Design/Build Replacement Catwalk and All Associated Appurtenances And Option Tasks if Awarded.
PROPOSAL SCHEDULE
INSTRUCTIONS:
The Offeror shall edit this Proposal Schedule and may provide a detailed breakdown of their Proposal (including support documentation) and all associated line item pricing. It is the responsibility of the Offeror to ensure all requirements are met and all support documentation is provided. The purpose of the Proposal Schedule Document is to organize Base Bid Tasks and Option Bid Tasks for U.S. Fish and Wildlife Service Price Evaluation. Contractor shall show pricing for items. Failure to provide pricing for all items may result in bid not being considered for award.
Design-Build Services - Base and Option Tasks:
TASK
(Base or Option)
Description Amount
(Base)
Review Existing Site. Prepare and Submit a Summary on the Temporary and Permanent Repair Approach and How it Meets OSHA Standards. Contractor shall consult with a Geotechnical Engineer if required for Connections and/or Construction.
To include but not be limited to:
Incidentals.
All Associated Electronic and Hard Copy Deliverables.
(Option)
Construct Temporary Repairs.
To include but not be limited to:
Incidentals.
All Associated Electronic and Hard Copy Deliverables.
And Option Tasks if Awarded.
PROPOSAL SCHEDULE
INSTRUCTIONS:
The Offeror shall edit this Proposal Schedule and may provide a detailed breakdown of their Proposal (including support documentation) and all associated line item pricing. It is the responsibility of the Offeror to ensure all requirements are met and all support documentation is provided. The purpose of the Proposal Schedule Document is to organize Base Bid Tasks and Option Bid Tasks for U.S. Fish and Wildlife Service Price Evaluation. Contractor shall show pricing for items. Failure to provide pricing for all items may result in bid not being considered for award.
Design-Build Services - Base and Option Tasks:
TASK
(Base or Option)
Description Amount
(Base)
TASK 3. Construct Permanent Replacement Catwalk Structure.
To include but not be limited to:
Incidentals.
All Associated Electronic and Hard Copy Deliverables.
(Base)
TASK 4. As-Built Drawings.
To include but not be limited to:
Incidentals.
All Associated Electronic and Hard Copy Deliverables.
Total (Base TASKS plus Option TASK) $0.00
And Option Tasks if Awarded.
PROPOSAL SCHEDULE
INSTRUCTIONS:
The Offeror shall edit this Proposal Schedule and may provide a detailed breakdown of their Proposal (including support documentation) and all associated line item pricing. It is the responsibility of the Offeror to ensure all requirements are met and all support documentation is provided. The purpose of the Proposal Schedule Document is to organize Base Bid Tasks and Option Bid Tasks for U.S. Fish and Wildlife Service Price Evaluation. Contractor shall show pricing for items. Failure to provide pricing for all items may result in bid not being considered for award.
Design-Build Services - Base and Option Tasks:
TASK
(Base or Option)
Description Amount
Total (Base TASKS ONLY) $0.00
The Offeror may provide a detailed breakdown of their bid and all associated line item pricing.
The above Proposal Schedule Description column is not intended to be comprehensive.
It is the responsiblilty of the Offeror to ensure all requirements are met.
As part of the Proposal Schedule, and at the Offeror's discretion, Prepare and Submit Back-Up Documents for the Proposal Schedule including Number of Labor Categories, Labor Rates, Number of Labor Hours, Material Quantities, Equipment Quantities, Equipment Rates, and Required Tools. Include All Items Required and Anticipated to successfully deliver the Project.
As the Contractor is preparing their Proposal, Material Quantities require Contractor assumptions.
The Contractor may submit their assumptions about Material Quantities as part of their Offer.
Whether the Contractor chooses to submit their assumptions about Material Quantities to USFWS for review and as part of their Offer is at the discretion of the Contractor.
And Option Tasks if Awarded.
PROPOSAL SCHEDULE
INSTRUCTIONS:
The Offeror shall edit this Proposal Schedule and may provide a detailed breakdown of their Proposal (including support documentation) and all associated line item pricing. It is the responsibility of the Offeror to ensure all requirements are met and all support documentation is provided. The purpose of the Proposal Schedule Document is to organize Base Bid Tasks and Option Bid Tasks for U.S. Fish and Wildlife Service Price Evaluation. Contractor shall show pricing for items. Failure to provide pricing for all items may result in bid not being considered for award.
Design-Build Services - Base and Option Tasks:
TASK
(Base or Option)
Description Amount
Incomplete Bids Will Not Be Considered.
Name of Bidder and Company:
Address (Include Zip Code):
File details come from the government source that posted it. Updated .